The State of , Ministry of Defense Coordination of Government Activities in the Territories

Projects inGaza 2010-2012 Projects in Gaza

235 Projects 1.7 million Approved

0.5 1

365 square kilometers 41 km in length, 2012 445 6-12 km width 2011 627 2010 231 2009 774 2008 3,278 ~200 International Organizations operate in Gaza

Approving Projects for Gaza etc. At the same time, Israel recognizes the needs of the civilian population and Over the past two years the Coordinator accommodates project requests. of Government Activities in the Territories (COGAT) has approved 235 The positive and trusting relationship internationally sponsored projects that Israel has with the international in conjunction with the Palestinian community has provided a solution for Authority. By and large these projects the security dilemma. COGAT permits are related to building housing, schools, international organizations to import clinics, roads, agricultural installations materials for their civilian projects. and other civilian infrastructure. Project Implementation Israel takes calculated security risks every time a building project is approved. As When a project is approved, materials innocuous as construction materials are ordered and shipped by the sponsor may seem, in the hands of terror to Kerem Shalom where they undergo organizations, they can be used to build a security check before entering Gaza. fortified bunkers, military installations, Because the international sponsors can guarantee that these materials are used for their original intent and wont be In the first half of 2012 there were 804 siphoned off by militants, the incidents involving rockets or gunfire security risk is somewhat mitigated. from Gaza.

2 Projects and the Gazan Economy 2005 Israeli disengagement from Gaza. Despite the rate of implementation, these projects have had a beneficial 2006 Hamas wins legislative elections. effect on the economic situation in Gaza. They provide employment opportunities, as well as improve the 2007 Hamas coup. Israel, close crossings. quality of living for residents.

2008 Hamas fires 3,278 rockets. Israel’s expanded civilian policy Operation Cast Lead. contributed to Gaza’s 19% and 23% GDP growth in 2010 and 2011 respectively. 14 Projects approved. The local economy improved, prices 2010 Israel expands civillian policy were lowered, orders for raw materials towards Gaza. rather than finished products increased, and there have even been reports Kerem Shalom upgraded, of exports via the tunnels. The local 2012 capacity 450 trucks/day. economy is such that Hamas has been 235 Projects approved. restricting imported goods, lest they compete with local products. This mechanism has been in place since March 2010, prior to the cabinet decision Overall the trilateral cooperation to expand the civilian policy vis-à-vis between COGAT, the international Gaza. Since then the number of projects community and the Palestinian Authority COGAT has approved increased from 14 has proven fruitful to date. We expect to 235, as of September 2012. that, with the continued support of the international community, this will COGAT has approved 88% of the 268 continue in the future. project requests, and those that have been denied may be approved in the future, subject to some alterations in their plans (i.e. location).

Unfortunately, while COGAT has increased the number of approved projects, there has been a marked decline in the number implemented this year. As of fall 2012, only 57% of projects have been, or are currently being executed. By and large this phenomenon has been attributed to a lack of funding.

Similarly, there is more capacity at Kerem Shalom Crossing than goods being sent through. Israel invested 80 million ₪ to upgrade and expand the facilities at the crossing in order to accommodate up to 450 trucks a day. However, the number of trucks sent through on a daily basis averages around 300. In the first half of 2012:37,405 truckloads carrying 993,700 tons of goods entered Gaza via Kerem Shalom

3 Measures Approved by COGAT in September 2012

Transfer of 100 million ₪ to Gaza in light of their cash shortage.

Approval of 16 new projects (12 UNRWA, 3 UNDP, 1 IMG).

Completion of the Nahal Oz water main which will have the capacity to transfer up to 5 MCM of water.

Assistance to the transportation sector – entrance of 100 buses, 6 minibuses, 65 trucks.

Export of textiles and furniture to the for the Palestinian Authority.

Increas of car quota from 80 to 100/week.

Projects Approved for Gaza Of 268 Submissions: Of the 235 Approved Projects:

235 Approved 53 Completed (22%) 10 Approval Pending 82 Underway (35%) 75 Soon to begin 20 Returned to pending import of organization, may be construction materials resubmitted subject to (32%) alterations in the plans. 16 Approved in past 2 Rejected based on week (7%) sponsor 9 Cancelled by the 1 Staff Work organization (4%)

4 2010-2012

23,252 trucks for international projects 18,151 Agrigates (construction) 3,312 Cement 1,072 Equipment 717 Iron

Project Types 53 Completed 82 Underway 235 91 Pending (import of construction material) 9 Cancelled (by the organization)

Housing Clinics

17 Projects Approved 17 Projects Approved

7 Projects 554 Units 4 Projects

5 Projects 1,364 Units 10 Projects

5 Projects 1,655 Units 3 Projects

Education

94 Projects Approved New Schools Renovations 70 24

19 Projects

23 Projects

48 Projects

New School Under Construction in 4 Projects 5 Water and Sewage Roads

37 Projects Approved 14 Projects Approved

7 Projects 1 Project

15 Projects 9 Projects 13 Projects

2 Projects 4 Projects

Infrastructure/Other Agriculture

39 Projects Approved 17 Projects Approved

11 Projects 4 Projects

14 Projects 6 Projects

13 Projects 5 Projects

1 Project 2 Projects

International Sponsors

43 Projects 104 Projects 61 Projects

9 Projects 13 Projects 6 Projects Islamic Development Bank

2 Projects 3 Projects 4 Projects World Bank

Above is a small selection of the many international organizations that operate in Gaza

*Projects listed are not mutually exclusive 6 Project Approval Process

Project submitted by sponsor

Approval of the project by the Palestinian Authority

Agreement on a package of projects by a joint team of COGAT officials and the Palestinian Authority

COGAT examines the components of the project and evaluates based on security considerations

COGAT and the relevant international organization coordinate on manner in which to implement project

Project implementation overseen and executed by relevant international organization

Israel invested 80 million ₪ to upgrade Kerem Shalom’s capacity and expanding the crossing from 120 to 600 dunams. The crossing operates on a regular weekly schedule, closing in the event of targeted attacks. Hamas knows that attacking the crossing will hinder the flow of goods into Gaza, and yet it is a regular target of militant violence.

7 Summary of All Approved Projects

Implementing Project Type Sponsor Status Organization WWTP Sheikh Aijleen Infrastructure KFW Germany Underway North Gaza Emergency Sanitation The World Bank, Infrastructure World Bank Underway Project PWA Rehabilitation of Al Quds Hospital Health AFD France Underway Private Al-Badr Flour Mill Other UNDP Completed Sponsor Establishment of 400 Family Roads USAID USAID Completed Greenhouses Establishment of 600 Agricultural Family Agriculture USAID USAID Completed Plots Renovation of ‘Women Health Center ’ Health USAID USAID Underway Culture and Free Thought Society Renovation of ‘Al Amal’ Hospital Health ANERA USAID Underway Renovation of ‘Ahli Arabi’ Hospital Health ANERA USAID Underway Renovation of YWCA Library & Multi- Education ANERA USAID Underway Purpose Hall CARE Agricultural grants Agriculture USAID Underway INTERNATIONAL Cash-for-work (850 temporary jobs) Other MERCY CORPS USAID Completed Nuseirat Health Center Health UNRWA Japan Completed Health Center Health UNRWA Japan Completed Fukhari School in Eastern Khan Younis Education UNRWA USA Completed Nuseirat School Education UNRWA USA Completed Ma’an School in Eastern Khan Younis Education UNRWA USA Completed Riyadh School in Rafah Education UNRWA Saudi Arabia Completed Nuseirat prepratory and elementary Education UNRWA Saudi Arabia Completed boys school Khan-Younis prepratory girls school Education UNRWA Saudi Arabia Underway 4 classrooms in Education UNRWA Saudi Arabia Completed 4 classrooms in Beit Lahia Education UNRWA Saudi Arabia Completed 8 SHC Shelters At Khan Younis Camp Housing UNRWA UNRWA Completed 8 SHC Shelters At Khan Younis Camp Housing UNRWA UNRWA Completed 5 housing units at Um al-Nasser Village Housing UNRWA UNRWA Completed 12 housing units in Deir al-Balah Housing UNRWA UNRWA Completed 8 Classrooms in Rafah Education UNRWA UNRWA Completed Kindergarten in Education UNRWA UNRWA Completed Community center and sport fields at Other UNRWA UNRWA Completed Khan Younis Refugee service centre in Rafah Other UNRWA UNRWA Completed Arab Orthodox Cultural Center Other ANERA USAID Underway Cancelled Cooling Building Agriculture USAID USAID by the organization

*”Pending” refers to projects that have not yet commenced implementation and are awaiting import of materials by the relevant international organization. 8 Implementing Project Type Sponsor Status Organization Cancelled Chicken coops Agriculture USAID USAID by the organization Cancelled New water well and RO unit- Al Aqsa Infastructure ANERA USAID by the University organization Cancelled Water drainage system in the Abu Anza Infastructure ANERA USAID by the Region of Abasan al-Jadida organization Cancelled Kindergarten renovation Education ANERA USAID by the organization Cancelled Renovations of 2 kindergartens and Education ANERA USAID by the community centers organization Cancelled Rehabilitation of 2 kindergartens and a Education ANERA USAID by the youth center organization Cancelled Rehabilitation of 3 kindergartens and a Education ANERA USAID by the community center organization 113 UNRWA containers Education UNRWA UNRWA Completed Tel Sultan Sewage Pumping Station Infrastructure UNRWA UNRWA Completed Red Crescent 151 Housing units in Khan Younis Housing UNRWA Completed UAE Summer Camps 2010 Education UNRWA Other Completed ‘Right to Live’ Society Other ANERA USAID Completed Rehabilitation of 9 kindergartens Education ACTED USAID Completed Children services, education and mental Education World Vision, CHF USAID Completed health programs and services Equipment for 3 Palestinian Associations Other CMM USAID Completed Operating 120 psychosocial workshop Other ARD USAID Completed for 2400 women Rafah Wastewater Treatment Plant Infrastructure ICRC USAID Completed Gaza Urban Agriculture Revitalization Agriculture CHF USAID Completed and Development Agriculture Development and Agriculture World Vision USAID Completed Integrated Livelihoods Gaza Emergency Work Opportunity and Other IOCC USAID Completed Relief Support Program Recovery in Gaza Agriculture CRS USAID Completed CARE Entry of 150 P.O.S. devices Other USAID Completed INTERNATIONAL Entry of 150 computers Education ANERA USAID Completed Pumps for the sewage station in The World Bank, Infrastructure World Bank Completed Moghragha PWA Pumps for the Water Well Project in The World Bank, Infrastructure World Bank Completed Rafah PWA Re-Construction of 259 SHC shelters at Housing UNRWA Japan Pending Khan Younis 271 Housing units in Khan Younis Housing UNRWA Japan Underway

9 Implementing Project Type Sponsor Status Organization Red Crescent 449 Housing units in Khan Yunis Housing UNRWA Pending UAE Rafah- Construction SFD 752 shelter Housing UNRWA Saudi Arabia Underway Repair of 147 shelters Housing UNRWA Canada Completed Reconstruction 41 shelters Housing UNRWA Libya Underway Construction of a standard school in Education UNRWA Saudi Arabia Underway Nasr-Khirbat al Addas Construction of school in Khan Younis Education UNRWA Saudi Arabia Underway Camp Construction of school in Qararah Education UNRWA Saudi Arabia Underway Rehabilitation of a School in Khan Education UNRWA Saudi Arabia Pending Younis Rehabilitation of a School in Khan Education UNRWA Saudi Arabia Pending Younis School in Khan Younis Camp North Education UNRWA Saudi Arabia Underway School in Khan Younis Camp North Education UNRWA Saudi Arabia Underway Construction of School in Nuseirat Education UNRWA Saudi Arabia Pending School in Al Jonena, Rafah - beside Education UNRWA Saudi Arabia Underway water collection project site School in Tel es Sultan - Abarahmeh land Education UNRWA Saudi Arabia Underway Construction of a school in Abasan Education UNRWA Saudi Arabia Pending School in Deir el Balah Education UNRWA Saudi Arabia Pending School adjacent to prep boy Education UNRWA Saudi Arabia Underway school School in Nuseirat Education UNRWA Saudi Arabia Pending School in Juhar al-Dik Education UNRWA Saudi Arabia Pending School Education UNRWA Saudi Arabia Pending School in Moghraga Education UNRWA Saudi Arabia Pending School in Beit Hanoun alShawa land Education UNRWA Saudi Arabia Pending School Laila Glabo project, Beit Lahia Education UNRWA Saudi Arabia Underway School in Beit Hanoun - al-Masreen Education UNRWA Saudi Arabia Pending Street School in Beit Hanoun - al-Masreen Education UNRWA Saudi Arabia Pending Street 2 Construction of School in Beit Hanoun al Education UNRWA Saudi Arabia Pending Banat St. 10 classroom for Down syndrome Other UNDP KFW Underway students, Right to Live Association Multipurpose Municipal Building for Other UNDP KFW Pending Abasan al-Kabira Development of al-Karamah Roads UNDP KFW Underway Neighborhood in Jabalya al- Development of al-Mudares Street Roads UNDP KFW Underway Campus for al-Quds Open University Education UNDP KFW Underway Building al- Cultural Center Other UNDP KFW Pending Rehabilitation of al-Aqsa Road Roads UNDP KFW Underway Development of al-Salateen Area/al- Roads UNDP KFW Underway Atatra Area in Beit Lahiya

10 Implementing Project Type Sponsor Status Organization Sport Activities Building for Gaza Sport Other UNDP KFW Pending Club Road repair in center of Rafah Roads UNDP KFW Underway Rehabilitation of the Jurat Allut Algharbi Roads UNDP KFW Underway Area Development of the Main Road in Deir Roads UNDP KFW Underway al-Balah Abasan al-Jadida Municipality Building Other UNDP KFW Pending Multipurpose Sports Hall in Nuseirat Other UNDP KFW Pending al-Nuseirat Central Market Other UNDP KFW Pending Cancelled Center for Human Resource Other UNDP KFW by the Development organization Development of al-Shuhada Street in Roads UNDP KFW Pending al- Paving street number 9 (al-Mustawsaf Roads UNDP KFW Pending Street) in Wadi Gaza The development of the Deir al-Balah Other UNDP KFW Underway beach. Construction of the permanent Health UNDP KFW Pending premises for the PMRS Rehabilitation of cultural and medical centre for the Palestinian Red Crescent Health UNDP IBSA Underway Society Solid waste management and Other UNDP Italy Pending composting in Beit Lahia Primary Health Services for marginalized Health NGO-Medico Germany Underway communities in the Paving of Abu Salah Road Roads ANERA USAID Underway Construction of a Municipal Vegetable Other ANERA USAID Underway Market in Al Mossadar Village Rehabilitation of agricultural roads in Agriculture ANERA USAID Underway al-Musader Rehabilitation of agricultural road Agriculture ANERA USAID Underway number 19 Rehabilitation of agricultural road Agriculture ANERA USAID Pending Awaisha and road number 8 in Fuhairi EWAS-Park construction Other ANERA USAID Underway Khan Younis Wastewater Treatment Infrastructure UNDP Japan Pending Plant Constructing main pressure lines in Infrastructure UNRWA Italy Pending Khan Younis Caravans Housing - Egypt Pending Creation of a cardio wing in the Health BTC Belgium Underway European Hospital in Khan Younis Warehouse in Rafah, Refugee Service Other UNRWA Belgium Completed Centre European Sewage projects in DB – stage B Infrastructure UNRWA Completed Union European Sewage projects in DB – stage A Infrastructure UNRWA Completed Union

11 Implementing Project Type Sponsor Status Organization Reconstruction of GFO Warehouse Other UNRWA UNRWA Underway Al-Zahra culvert Infrastructure UNRWA Brazil Underway Re-activation and upgrading of the Deir Infrastructure UNDP Italy Underway al-Balah Sea Water Desalination Plant Supply of 19 diesel engines Infrastructure UNDP Saudi Arabia Completed Housing reconstruction for non-refugee Housing UNDP Japan Underway families - 200 Units Urgent support for power station and Infrastructure UNDP Islamic Bank Underway electricity network) Urgent support for power station and Infrastructure UNDP Islamic Bank Underway electricity network) Improve the capacity of CMWU for Infrastructure UNDP Austria Completed monitoring quality water supply in Gaza Construction of 60 strawberry packing Agriculture UNDP KFW Underway rooms Construction of designed packing units Agriculture UNDP KFW Underway for 40 farms Upgrading the wastewater treatment Water Authority, Infrastructure ICRC Pending plant in Khan Younis CMWU Construction of Al-Bahrain Public Library Education UNRWA Bahrain Completed in Al-Fakhoura School at Jabalia Project to improve refugee living Housing UNRWA Netherlands Completed conditions in Khan Younis Construction of the new health center in Health UNRWA Greece Completed Saftawi (includes equipment) Reconstruction of Khan Younis Health Health UNRWA Bahrain Completed Centre. Installation of a complete wastewater Infrastructure USAID USAID Underway network at Al-Majadla Area- Khan Yunis. Installation of a complete wastewater network in Ma’an and Jouret Allot Zones Infrastructure USAID USAID Underway in Khan Yunis. Installation of a complete wastewater network in the Northern Camp of Khan Infrastructure USAID USAID Underway Yunis. Installation of a complete wastewater Infrastructure USAID USAID Underway network in Al-Amal Zone- Khan Yunis. Installation of a wastewater network in Infrastructure USAID USAID Underway different Zones in Khan Yunis. 2 Pipelines in Khan Yunis, main water Infrastructure USAID USAID Underway network for Al Rahma water tank Construction of a water reservoir and a Infrastructure USAID USAID Underway booster station in Khan Yunis, El Rahma Rehabilitation of Al-Mashroo’ Infrastructure USAID USAID Underway wastewater pump station in Bet Lahia Construction of a wastewater network in Infrastructure USAID USAID Pending Al-Shayma Zone in Beit Lahia IDB Agriculture (Land Reclamation) Agriculture UNDP Saudi Arabia Pending IDB Agriculture (Wells & Ponds) Agriculture UNDP Saudi Arabia Pending IDB Agriculture (Livestock’s & Poultry ) Agriculture UNDP Saudi Arabia Underway Rehabilitation of Rafah- Tal El-Sultan Infrastructure UNDP Japan Underway Water Tank 12 Implementing Project Type Sponsor Status Organization Rehabilitation of Wadi Gaza (Joher el- Infrastructure UNDP Brazil Underway Deke) Bridge Rehabilitation of Sekah Bridge Infrastructure UNDP Brazil Standard school in Shokah, Rafah Education UNRWA Saudi Arabia Underway Standard school in Khan Younis Education UNRWA USA Completed Donations Preparatory boys school in Beit Lahia Education UNRWA Completed from Standard school in Khirbat al Addas Education UNRWA Greece Underway Rafah Standard school in Deir el Balah, Hekr Education UNRWA Saudi Arabia Underway Jama- Deir Al Balah Standard school in Deir el Balah, Hekr Education UNRWA Saudi Arabia Pending Jama- Deir Al Balah School in Bureij - Abu Helo School. Education UNRWA Switzerland Underway Construction of the New French Cultural Other AFD France Underway Center School in Tel al-Hawwa Education UNRWA USA Underway School in Tel al-Hawwa Education UNRWA USA Underway School in Tel al-Hawwa Education UNRWA DFID Completed School in Tel al-Hawwa Education UNRWA DFID Completed Rehabilitation of Abd al-Haii Road in Roads ANERA USAID Underway al-Musader Construction of school in Khuzaa area of Education UNRWA UN Pending Khan Younis Rafah rehousing project: 875 housing Housing UNRWA Saudi Arabia Pending and related infrastructure Rafah rehousing project: 2 standard Education UNRWA Saudi Arabia Underway schools Rafah rehousing project: 2 standard Education UNRWA Saudi Arabia Underway schools NRO Road Rehabilitation Agriculture The Netherlands Pending (Netherlands) PCAP - Housing Rehabilitation Housing CHF USAID Underway PCAP - Cash For Work Agriculture Mercy corps USAID Underway Upgrade Al Quds Hospital Health ICRC ICRC Morocco Underway various SIDA Storm water and sewage Project Infrastructure Underway organizations (Sweden) 9 classrooms Darah Elementary Co-Ed Education UNRWA Switzerland Pending 8 classrooms -New Gaza Elementary Education UNRWA Switzerland Pending Boys A & B 8 classrooms - Mamouniya Prep Girls Education UNRWA Switzerland Pending 7 classrooms at Rafah Prep Girls A and Education UNRWA UN Pending Co-ed 8 classrooms Fukhari Elementary A & B Education UNRWA Bahrain Underway School in , near Jabalia Education UNRWA DFID Pending Elem. “B&D” Boy’s school School in Khan Younis Camp North in Education UNRWA DFID Pending land of Khan Younis Elem Girls School Standard F type school in Jabalia camp, Education UNRWA DFID Pending near Jabalia Prep “A&E” Boy’s school

13 Implementing Project Type Sponsor Status Organization Standard F type school in , Education UNRWA DFID Pending near Rafah Prep “D” Girls School Composting Site in Rafah Other UNDP Japan Pending Rafah Health Center Health UNRWA Islamic Bank Pending The Islamic Construction of F type school in Jabalia Education UNRWA Development Pending Elementary Co-ed Bank The Islamic Construction of a standard school in Al- Education UNRWA Development Pending Fardous, Beit Lahia Bank The Islamic Construction of a standard school in Al- Education UNRWA Development Pending Fardous, Beit Lahia Bank The Islamic Construction of a school at Beach Boys Education UNRWA Development Pending Elementary A &B Bank The Islamic Construction of an L type school in Education UNRWA Development Pending Rafah and Ibn Sina Boys Elementary Bank The Islamic Construction of a school in Salah el-Dien Education UNRWA Development Pending Bank The Islamic Construction of a school in Salah el-Dien Education UNRWA Development Pending Bank The Islamic Reconstruction of Khan Younis Boys Education UNRWA Development Pending Elementary Bank The Islamic Reconstruction of Rafah Boys Prepratory Education UNRWA Development Pending Bank The Islamic Reconstruction of Rafah Boys Elemntary Education UNRWA Development Pending Bank The Islamic Construction of standard L type school Education UNRWA Development Pending in Mustaf Hafez school Bank Repair of 72 shelters over all Gaza Strip Housing UNRWA Canada Pending Infrastructure development at Beach Persian Gulf Infrastructure UNRWA Pending Camp and the surrounding areas Countries Development of sewage, drainage and Persian Gulf water networks in Care Road, Rafah Infrastructure UNRWA Pending Countries Camp Development of infrastructure at Rafah Persian Gulf Infrastructure UNRWA Pending Camp and surrounding area Countries Development of sewage, drainage and Persian Gulf Infrastructure UNRWA Pending water networks in KhanYounis Camp Countries Sewage, drainage and water networks in Persian Gulf Infrastructure UNRWA Pending and surrounding area Countries Sewage, drainage and water networks in Persian Gulf Infrastructure UNRWA Pending Bureij Camp and surrounding area. Countries Construction of 12 schools in the Gaza Education KFW (Germany) KFW Pending Strip

14 Implementing Project Type Sponsor Status Organization Construction of 12 schools in the Gaza Education KFW (Germany) KFW Pending Strip Construction of 12 schools in the Gaza Education KFW (Germany) KFW Pending Strip Construction of 12 schools in the Gaza Education KFW (Germany) KFW Pending Strip Construction of 12 schools in the Gaza Education KFW (Germany) KFW Pending Strip Construction of 12 schools in the Gaza Education KFW (Germany) KFW Pending Strip Construction of 12 schools in the Gaza Education KFW (Germany) KFW Pending Strip Construction of 12 schools in the Gaza Education KFW (Germany) KFW Pending Strip Construction of 12 schools in the Gaza Education KFW (Germany) KFW Pending Strip Construction of 12 schools in the Gaza Education KFW (Germany) KFW Pending Strip Construction of 12 schools in the Gaza Education KFW (Germany) KFW Pending Strip Construction of 12 schools in the Gaza Education KFW (Germany) KFW Pending Strip Rehabilation of major roads, the Salah Al European Roads IMG Pending Din road and Al Kamra road Union Palestinian Community Assistance Education Mercy corps USAID Pending Program Construction of one story building for Health Mercy corps USAID Underway the blood separation unit Upgrading and replacement of Khan Infrastructure ANERA USAID Pending Yunis water network Upgrading and replacement of Beit Infrastructure ANERA USAID Underway Lahia water network Construction of storm water networks at Infrastructure ANERA USAID Pending Al-Sattar Street Wastewater networks in Jamal Abd Al- Infrastructure ANERA USAID Pending Nasser Zone in Khan Younis Construction of wastewater networks in Infrastructure ANERA USAID Pending Al Kateeba Zone in Khan Younis Renovation of the Palestine Avenir for Other ANERA USAID Pending Childhood Foundation Classroom building for the Rosary Sisters Education ANERA USAID Underway School Kindergarten expansion, Community Education ANERA USAID Underway Centre at Al-Mussadar Society Abilities Enhancement Centre for Jabalia Other ANERA USAID Pending Rehabilitation Society Diagnostic Center at Al-Ahli Arab Health ANERA USAID Pending Hospital Education and Medical Services to the Deaf and Hearing Impaired Persons Health ANERA USAID Underway (Atfaluna)

15 Implementing Project Type Sponsor Status Organization Rehabilitation of Gaza Electricity Infrastructure UNDP IDB Pending Distribution and Transport Networks Beit Hanon Emergency Water Supply Infrastructure UNDP Japan Pending and network El.Amal Rehabilitation Society Buildings- Other Mercy corps USAID Underway Rafa Multi-purpose Al-Bureij Services Sport Other Mercy corps USAID Underway Club Islamic Rehabilitation of Salah El Din regional Roads UNRWA Development Pending road Bank Islamic Green School in Khan Younis Education UNRWA Development Pending Bank Gaza Strip Solid Waste Management The World Infrastructure UNDP Pending System Bank

First Published in Israel, 2012 by the Coordinator of Government Activities in the Territories (COGAT) All RIghts Reserved © 2012 COGAT

COGAT Tel Aviv Israel www.cogat.idf.il +972-3-697-5351

Content and Information: ICLA Gaza Production: The Civil Department of COGAT Design: May Radomir

The information in this book is general and does not create any obligation on the part of any party to complete specific projects. Projects listed may still require changes to their designs, as may be required either legally or otherwise in accordance with changes in the situation.

The information contained in this book is accurate through September 2012 16