Quick viewing(Text Mode)

Arunachal Pradesh Ason30.11.08 Priority List 2004-05

Arunachal Pradesh Ason30.11.08 Priority List 2004-05

Ason30.11.08 Priority List 2004-05

Sl. No. Name of Projects Estimated Cost (Rs. in Crore) 1 Improvement & extension of Water Supply at 5.50 Township. 2 Extensive Tea Cultivation in Tirap and district 50.00 3 Di st rict Spo rts Co mpl ex at Jengging 30.00 4 Flood Protection work on the right bank of Siang river near 5.43 21 Mile to protect township, adjoining villages and agricultur e land. 5 Improvement & upg radation of road network in Lumla 3.80 township. 6 Water Supply Schem e at 15.40 7 Anti-erosion work to protect township against erosion 6.66 from river Siang and its tributaries on its right bank 8 Improvement of Porter and Mule Tracks under Lumla Sub- 3.00 Division 9 Anti-erosion work to protect ALG, and Yingkion 7.36 township from river Siang 10 Anti Erosion wo rk to pro tec t Ru pa and Tenga Valley 3.40 11 Anti-erosion work to protec t Tipp i Industrial area an d village 2.60 12 Eco-Tou rism and Adventur e Tour ism 15.00 13 C/O Motorable suspension bridg e over river Siang at the sight 16.00 of Gandhi bridg e. 14 Flood Co ntrol work at 2.87 15 Restoration/renovation of road fr om Na mang to Soha 03.00 16 Potable drinking water supply scheme for the villages of Sille, 14.92 Rani, Sikabamin, , Oyan at Sil e 17 Ropeway trolley from to Komsing over Siang river 09.00 near Sangam bridge 18 Flood protection work at Dura Nallah near Rengging Nokying 9.00 Erak Sirki confluence, Sile Korong between Pasighat and Rangg ing 19 Flood protection work at Bom ger and Anpum and Bij ari area 4.00 20 C/O landing ground at Sarkam near Yingkiong 2.07 21 Improvement of Along Township road. 04.00

22 Stee l suspension bridg e at Siyu m ov er Subansiri river 06.00 23 Flood Control work at Noha Dihing to protect Namsai 5.00 township 24 Paye Mi cro hydel 1.5 MW at Koloriang 02.00 25 C/O Changlang- Khonsa ro ad (65 KM ) 30.55 26 Infrastru cture strengthening of secondary care hospital in 09.05 Arun achal Pradesh 27 Anti erosion work to protect circle Hq Middle school 03.29 and agricultur al land 28 Anti erosion work at Borap camp to protect school complex, 01.47 IB and BRTF road under Lazu circle in

Sl. No. Name of Projects Estimated Cost (Rs. in Crore) 29 Flood protection work on the left bank of Siang river to 07.41 protect Sigar, Motum and Borguli villages and its adjoining areas 30 C/O bridge over river Kameng in between Margingla and 06.00 Khenewa 31 Flood control work at Bambung stream for protection of Riga 01.79 village and vast agricultur al alnd areas in East 32 Infrastru ctur e development in Higher Education, Institutions 8.00 at Tirap, Changlang, , , Kamki and Coll eges 33 Restoration of Yembung Hydel Switchyard and LT lines 01.00 34 Anti erosion work at Noha Dihing river to protect Miao 03.50 township and seven villages i.e., Pess i, Lowang, Chamuk, Phupkagam, Singpho and Miao Singpho of Miao Sub-Division 35 Infrastru cture strengthening of Primary care hospitals in 31.73 Arun achal Pradesh 36 Constru ction of Multipur pose outdoor stadium at Itanagar 09.47 37 Anti erosion works on left bank of Noha Dehing 06.41 38 Road from Jamiri to Buragaon (34 KM ) including widening 08.00 culverts, drainages, R&B walls soling and metaling, black toping and carpeting 39 Anti erosion works on Noha Dehing river to protect Diyum 06.22 circle 40 C/O RC C bridge in between Sepp a and Ne w 10.00 41 Flood Control work to protect township and WRC land 03.53 of West Siang Dist. 42 Konnu RLR from BRTF road to Konnu village (4 KM ) 02.50 43 C/O road from Longliam to Khogal (14 KM ) 08.00 44 Flood Protection work at confluence point of Barang river 03.00 near Kamlang nagar to protect Chowkham township (Ph-I) 45 Anti erosion work at river from Kankai village to 02.87 Nongkai village including Nampong township 46 Improvement and C/O road from Borap to Liangchang 02.93 (hamlet to Longliang in Tirap Dist.) 47 Flood control work at Mopakhat on Tiok river (1 KM) 01.05 48 C/O Mopakhat Ranglua road 03.00 49 C/O 35 KM road from Pachi to Pipu CO Headquarter 06.00 50 Infrastru ctur e development of HoDs in Hawai for newly 09.86 created . 51 C/O bridge over river Siyom (Kaying to Paksing road) 7.00 52 Creation of an Interactive Mineral Atlas of Aru nachal Pradesh. 3.41 53 Anti-erosion work at the left bank of Sisiri River to 7.43 protect Ngopok, Kiyit, Borguli & Seram villages and its agricultur al land area 54 Anti-erosion work at river Siang to protect Tabeng agricultur e 7.78 field and its surr ounding areas 55 Anti-erosion work at Cide river to protect agri l fie ld at Karko 2.53 56 Anti-erosion works to protect Lagru bridg e 1.73 57 Flood Protection work at Tiyo, Kolung agricultur al field and its 7.21 surroun ding areas 58 C/O. Road fr om Margingla to Sewa (25 KM .) 4.69 59 C/O. Road from Pakke main road to Khenewa Circle HQ. (16 3.11 KM )

Sl. No. Name of Projects Estimated Cost (Rs. in Crore) 60 C/O. Stadium at Khonsa 4.43 61 Improvement of Khonsa township road. 6.71 62 Water Supply scheme at Changlang 9.85 63 Road from Palizi to Thrizino (17 KM ) including widening 09.50 culverts, drainages, R&B walls soling and metaling, black toping and carpeting 64 C/o. Rural Link Road from Kalaktang to Samdrung ( Last 02.50 village in A.P. near boarder) via; Chingi 65 Constru ction of Motorable Road from Jengging to Ramsing in 04.00 . 66 Constru ction of Motorable Road from Jengging to Pegi Bate 05.00 via Siku in Upper Siang District. 67 Constru ction of Motorable Road from Likor to Paling in Upp er 04.50 Siang District. 68 Constru ction of Hel ipad at Chun a in District. 0.90 69 Constru ction of Helipad at Thingbu in . 0.80 70 Constru ction of Tour ist Lodge at Jang in Taw ang District 01.98 71 Constru ction of Link Road from Dongshengmang to Bongkhar 10.37 CO Hq. – 10 KM s. 72 Constru ction of Foot Suspension Bridge over Tawangchu river 01.96 between Kharun g and Woongla in Tawang District 73 Constru ction of Foot Suspension Bridge over Tawangchu river 01.99 between Bomja and Sakyur village in Tawang District 74 Constru ction of Motorable road from Poito to Lumla via 03.00 Dongshengmang in Tawang District 75 Constru ction of 12th Mil e Pullong to Chitamlo – New paniduria 03.50 road in Tirap District 76 Constru ction of road from Riloh to Suchung (20 KM ) in East 04.25 Kameng District 77 Constru ction of road from Khenew CO HQ to Jokhiyo via 08.89 Pabin, Pangia Jomoh and Nampe (40 KM ) in 78 Master Plan for construction of Foot Path conn ecting places of 03.57 tour ist interest in Tawang area. TOTAL 545.23