Rebooting the City Deal How can we make transport in the region work better for everyone? The Greater Cambridge City Deal is a huge opportunity, with more than £500m at stake. Let’s be sure it leaves a legacy that future generations will thank us for. Come along to hear fresh ideas and discuss how to Rebootingimplem theent th eCitym. Deal Presentations by: How can we Cmakeolin H transportarris, Camb rinid gthee Co Cambridgennect region Edwardwork Leigh better, Smart eforr C aeveryone?mbridge Transport Rachel Aldred, Reader in Transport, University of Westminster

Followed by panel discussion with: Daniel Zeichner, MP for Cambridge and a shadow transport minister , former MP for Cambridge and one of the architects of the City Deal Others to be confirmed

Friday 14 October 2016 7:30-9pm Lee Hall, Wolfson College Barton Road, Cambridge CB3 9BB 2 Rebooting The City Deal – Autumn 2016 Rebooting The City Deal – Autumn 2016 3

About Our Panel Dr Rachel Aldred is Reader in Transport at the University of A Vision For The Region Westminster, teaching on Westminster’s MSc in Transport Planning and Management. She also sits on the editorial The Smarter Cambridge Transport team is developing and promoting a modern vision for board of Transport Reviews. In 2016, she was awarded the integrated and sustainable transport for Cambridge, South and beyond. ESRC Outstanding Impact in Public Policy Prize, and has been named as one of the ‘Progress 1000’ Most Influential We want people to have: Londoners. Smarter Cambridge • More travel options Transport is a broad • More predictable and quicker bus journey times Dr Colin Harris is Director of the environmental planning and group of impartial, unpaid • Easier interchanging between transport modes spatial data business Environmental Research & Assessment, • Simple payment for transport and parking located in Coton. He founded Cambridge Connect to help volunteers and advisers • Safer and more enjoyable cycling and walking create an enduring system of rapid and sustainable transit from Railfuture East Anglia, • Transport infrastructure designed for people not vehicles that would help address the transport challenges facing the Cambridge Cycling Cambridge, while ensuring that the social, educational, Campaign, Cambridge • Protection and enhancement of the natural and built environment • economic, environmental, historic and cultural qualities that residents associations, Promotion of social cohesion and inclusion define the City are maintained and enhanced. parish councils, plus experts We have created a 10-point plan for realising these aims, evolving all the time. We have focused for Dr Julian Huppert was MP for Cambridge from 2005 to 2010. in transport planning now on what is deliverable within 5+ years, but we are actively discussing the role of a light rail He has been named one of the most influential people in and technology, land network (see page 7), road pricing, driverless taxis and minibuses, drone delivery, and much else! UK cycling, and as an MP was Co-Chair of the All Party development, urban and Parliamentary Group on Cycling. As a County Councillor, landscape design, built and he was chair of the Cambridge Traffic Management natural heritage, and more. Committee. Smarter Cambridge Transport’s 10-Point Plan The team, led by Edward Edward Leigh is the leader of Smarter Cambridge Transport. Leigh, has been developing Implement Smart Traffic Management Reduce congestion in and around in the city, making all traffic lights Cambridge by limiting through He readily admits to not being a transport expert (his work and promoting the adoption 1 7 responsive to traffic flows, and prioritising access around the inner ring road, is in IT, marketing and business development), but enjoys of community-led ideas for the challenge of drawing together best practice and ideas in emergency service vehicles and buses restricting right-turns where a less- transport from around the world, and combining them with the City Deal over the past without widening or building new roads. disruptive alternative route exists, local knowledge. He is also an independent member of the year. and creating more home zones. Build travel hubs throughout the Cambridgeshire Police and Crime Panel and chair of his Reduce congestion in local villages Using 24/7 online region, making trains and buses more local residents association. 2 by adding missing connectivity at accessible. internal debate, Smarter the Girton interchange, A14–A11 and February Phillips has wide-ranging experience working as Cambridge Transport aims Reorganise city, rural, park-and-ride, M11–A11. a lead consultant, project architect, project manager and to be a model of mobilising works and school bus services into contract administrator on multi-award-winning projects 3 Build new train stations, such community expertise. express and local services. including listed buildings, new buildings, landscaping and 8 as Addenbrooke’s Biomedical public-realm design. Projects she has led at 5th Studio The organisation has no Campus, Fulbourn, Soham and political or commercial Implement smart ticketing for public include New Court, Trinity College, Wolfson Flats, Churchill 4 transport, car parking and cycle hire to Waterbeach North. College and Creative Exchange, St Neots. allegiance and its agenda is facilitate multi-modal journeys. transparently about seeking Promote city-wide goods delivery Daniel Zeichner MP is the Member of Parliament for out and promoting the best Create a website and app to plan 9 services to and from businesses via Cambridge. Before entering Parliament in 2015, he served as collection points at travel hubs. transport-related ideas for 5 journeys, see real-time travel updates, a councillor for eight years. He was appointed as a Shadow purchase tickets and reserve car parking. Transport Minister (with responsibility for buses, bikes and making Cambridge and the Rationalise car parking in the city, walking) in September 2015. He is a keen environmentalist surrounding region a great Create a connected network of 10 by phasing out free parking for and is an executive member of Labour’s national place to live, work and study. 6 segregated cycle ways throughout the commuters on residential roads and environmental campaigning group, making a case for a shift city and between villages. charging a workplace parking levy. to a greener tax policy. www.smartertransport.uk 4 Rebooting The City Deal – Autumn 2016 Rebooting The City Deal – Autumn 2016 5 Let’s make these schemes our priority – now

Smarter Cambridge Transport believes Acquire high quality travel data sets ‘Green ways’ cycle route network New bus stations that we should re-prioritise the schemes to This is part of the Smart Cambridge programme, These would connect Cambridge, South Cambourne, Fenstanton, Cottenham, Burwell, be delivered by the City Deal’s Tranche 1 though we believe a large budget is required to Cambridgeshire villages and travel hubs. Linton, Babraham and Comberton are the (£100m to 2019). We should choose schemes obtain historical data from third parties. highest priority locations we have identified for which have the strongest evidence base for Access and parking permit management travel hubs, readily accessible by foot, cycle or car, encouraging people to change their travel and served by regular express bus services into TROs and signage for parking controls Develop a centralised billing and enforcement habits, have popular buy-in, and will enhance Cambridge. Residents’ parking policy for the city is currently system for paid-permit-based access and parking rather than damage the environment and under review by the Cambridge City Joint Area in the city. This would enable vehicle owners to character of the region. Committee. We have proposed a city-wide pre-register for automatic charging when passing Upgraded facilities at existing stations This list comprises schemes that are relatively approach that recognises free parking attracts through access control points in the city during Better facilities would attract more people to use uncontroversial, and which would lay the traffic and creates congestion; and that better peak hours, or parking at park-and-rides, multi- public transport at St Ives bus station (waiting foundations for a step change in the attractiveness enforcement of parking controls would reduce storey car parks or on-street. Pricing of permits room and toilets), Swavesey Guided Bus station and convenience of public and active transport in congestion and delays to buses. can be tailored to different road users, taking into (car park), Oakington Guided Bus station (car the region. Many of these already feature in the [TRO = Traffic Regulation Order] account need to drive, social and environmental park), Shelford train station (more secure cycle County Council’s Long-Term Transport Strategy impacts, etc. parking), Foxton train station (100-space car park and the Transport Strategy for Cambridge and ANPR-monitored access control points plus cycle parking, co-ordinated with Network South Cambridgeshire, and just need to be Unified, multi-operator ticketing Rail project to replace level crossing), and brought forward, ahead of City Deal schemes for We have proposed alternative locations on and Addenbrooke’s bus station (waiting room, kiosk, bus lanes or busways. close to the inner ring road in our paper on buses, Develop or purchase a platform to support which we believe would be more effective and Oyster Card-style ticketing, with automatic etc.). Chisholm Trail less disruptive than the Peak-Time Congestion price capping, no matter what permutation of Control Points proposed by the City Deal. transport is used (including cycle hire). Ideally this New and upgraded bus shelters This mostly off-road, cycle/footway between the [ANPR = Automatic Number Plate Recognition camera] would be integrated into the access and parking These could be introduced alongside appropriate central and new train station at Chesterton is now management system. amenities throughout the region. The locations at the planning application stage. Smart Traffic Management New city centre cycle park should be chosen and prioritised in consultation Improved city cycle lanes/junctions Upgrade and integrate traffic signals on all with parish councils. arterial roads to optimise traffic flows, reduce There is an urgent need for more cycle parking in A few improvements are already being progressed congestion and delays, and permit quicker and Cambridge city centre. A possible location for a in the City Deal Cross City Cycling projects more effective responses in the event of incidents, 600+ space secure cycle park is in the section of We should choose and other schemes, but there are many gaps especially on the A14 and M11, which can the Grand Arcade car park immediately below schemes which have in the existing network that need joining up. cause huge volumes of traffic to be diverted into the Hilton hotel. The priority should be to create Dutch-style, Cambridge. the strongest evidence segregated cycle lanes and junctions wherever Train station at Fulbourn Hospital base for encouraging possible. Segregation is more important than lane Co-locate teams people to change width for encouraging new people to cycle. This location on the Newmarket train line their travel habits, have Currently the traffic signals and road monitoring is within easy walking or cycling distance of “ Smart City data collection platform teams, whose work is intimately connected, work 15,000 people in Cherry Hinton, Fulbourn and popular buy-in, and which out of two locations (respectively, Girton and Teversham. It would significantly reduce car will enhance rather than ...and multi-modal real-time journey planner. Shire Hall) and have to talk over the phone when traffic to the city centre, central train station and damage the environment and This is part of the City Deal Smart Cambridge dealing with an incident. The signals team could Biomedical Campus. It would serve the various programme, but needs to be more ambitious and make quicker and better decisions if they had a new developments planned in the area, including character of the region” better resourced. more complete picture of traffic conditions. the redevelopment of the hospital site. 6 Rebooting The City Deal – Autumn 2016 Rebooting The City Deal – Autumn 2016 7 Steps to getting the City Deal back on track Fast Forward to 2031

There is still time to reboot the City Deal. Good work has been done, but some of it Smarter Cambridge Transport welcomes “At present, the Greater Cambridge City has been misdirected. The purpose of the City Deal is to support the next few decades of the far-sighted approach of Cambridge Deal is not considering light rail proposals growth in population and jobs in the region, but it will fail in the short term if there is not Connect in proposing light rail for Cambridge. because they are not viewed as deliverable popular belief and support for the measures implemented. It will fail in the medium term if Moving commuters and tourists in and out of within funding and time constraints for this the city requires reliable mass transit, which at programme. Whether within the City Deal schemes do not deliver a marked improvement in mobility for all. And it will fail in the long the moment only rail can provide efficiently. framework, or outside, a longer-term approach term if infrastructure built now does not serve the needs of people in 2030 and beyond. If the aim is to bring people to points in the to an integrated and sustainable transport We offer this roadmap as a way to ensure the success of the City Deal. city from where they can easily walk or cycle strategy for the Cambridge region is needed. to their destination, we need to expand the “Cambridge Connect has therefore Vision Develop and articulate (visually as well as in words) a vision of transport of the existing rail network. developed conceptual plans for five illustrative future that takes into account social trends and technological developments. That Cambridge Connect says: “Light Rail is alternatives for a Cambridge Light Rail a practical potential solution to Cambridge system. The first priority amongst those we call vision must be worthy of Cambridge: bold, exciting and benefitting everyone. transport challenges, adopted in hundreds the ‘Isaac Newton Line’, in reference to the of cities world-wide. It offers the speed, innovative and creative approaches that are a Methodology Plan a fully-integrated transport policy and infrastructure. Replace capacity, frequency, reliability, convenience hallmark of Cambridge. Extensions could be simplistic cause-and-effect models in favour of a systems approach. Adopt a and accessibility to bring about the major developed in a phased manner. Much detailed scientific, experimental method of testing hypotheses before committing large improvements needed in the connectivity and technical work needs to be done before any amounts of money, and apply the theory of marginal gains (used by British Cycling). efficiency of the transport network. Light Rail alternative could be selected. These models are is the technology most likely to enable the substantial designed to help promote reconsideration of change in people’s journey decisions that is needed to the types of solution that will be fit for purpose Research Allocate funding and time to enable council officers and decision-makers create a more sustainable region. for the Cambridge region in the 21st century.” to attend Smart Cities and Future Transport conferences, and visit exemplary

Ely Scale: 1:100 000 @ A3 Basemap: OS VectorMap District v09/2015 © Crown copyright cities. Set up a working group to review everything about buses: routes, timetabling, Cottenham Imagery: Sentinel 2 (ESA) 04 May 2016 Prepared by: Cambridge Connect © 2016 Willingham / Burwell www.cambridge-connect.uk Northstowe ticketing, Traffic Regulation Order enforcement, stop locations, interchanging, 'Fast Forward' 12 Aug 2016 Version 5.0 Cambridge Light Rail Waterbeach Regional Integration economic viability, ownership models and sources of subsidy. Waterbeach Conceptual Plan 2016-31 A14 Oakington A10

Newmarket Bar Hill Histon / Impington Papworth Move Milton P&R to A14 Milton Everard Newmarket

Girton Provide more funding to obtain high-quality travel and traffic A14 Data & modelling Science Park Business Park GIRTON INTERCHANGEDarwin Green data, and primary and secondary research into why people don’t choose sustainable Madingley A428 CAMBRIDGE NORTH Bottisham Northwest Cambridge Cambridge Move Madingley P&R to Girton Interchange A428 J13 A14 and active modes of transport. Cambourne A1303 A1303 NEWMARKET Hardwick West Campus Coton Dullingham Caldecote Teversham M11 A603 Newnham Cambridge m a J12 FULBOURN Bourn C A1134 Invest more resources into r Comberton FULBOURN Communication & consultation e Fulbourn v Barton i

Grantchester R Addenbrookes Hospital & ADDENBROOKES Biomedical consultations to make them effective, interesting and useful for all parties. Promote Isaac Newton Line - Indicative Campus Trumpington BABRAHAM A603 Move Trumpington A11 Overground P&R to M11 open dialogue and debate, rather than one-way ‘consultation’ and ‘engagement’ Underground J11 A1307 HAUXTON Extension A- indicative Wandlebury

exercises (e.g. using Commonplace). Haslingfield Overground Hauxton Shelford

Shelfords Stapleford Underground A10 Extension B - indicative Harston

Overground Babraham M11 Underground Governance Modify the management structure and processes to strike a better Sawston Granta Park Extension C - indicative Foxton Foxton GRANTA PARK Overground FOXTON balance between public input, accountability and speed. Create working groups that Shepreth A505 Regional extensions - Indicative Whittlesford Parkway meet in public to develop proposals for specific schemes, with greater transparency Haverhill / Linton Linton Cambourne A11 Haverhill !" around who is involved in each scheme. ! ExistingEXISTING PARK & RIDE Meldreth !C " !! ProposedPROPOSED PARK & RIDE Melbourn Å Existing railway station A505 !C Proposed railway station Existing Guided Busway Design Engage the best urban realm designers to design (not just review) new Great Chesterford 0 1 2 Miles Royston infrastructure. Include a landscape architect on each project board. 0 1 2 Royston Kilometres What can you do to make a difference? Join Smarter Cambridge Transport (it’s free and gives us influence): bit.ly/sct-join …or join our mailing list: bit.ly/sct-mailings Participate in your parish council, local residents association, business group or other community group you support, and encourage them to endorse Smarter Cambridge Transport’s proposals. Volunteer for Smarter Cambridge Transport: bit.ly/sct-help Sign petitions with which you agree. We have one on parking controls: bit.ly/act-on-parking Write to your councillors and MP to ask for Smarter Cambridge Transport ideas to be tested and adopted: writetothem.com Respond to City Deal and Council consultations. Attend election hustings and challenge candidates on their manifesto on transport (the next County Council elections are in May 2017). If you’re a councillor... Invest as much time as you can afford in developing and scrutinising project briefs because these are where strong foundations are laid. Look out for project objectives that predetermine a particular solution: solving problems in the best possible way requires creative freedom. Consult your constituents at every stage of a project to draw on their collective expertise and local knowledge. Challenge officers to justify their recommendations, especially when it comes to ruling out options that you or your constituents favour. Request officers obtain independent expert evaluation of recommendations that you feel uncomfortable with.

www.smartertransport.uk