J12

M62 M60 J11 stadium retail Barton Bridge hotel City Airport city of community stadium

MONTON ROAD

M602 W A57 E A S 2 T E

L

12 G A WINTON R N

E E E M602 CITY N

CENTRE

L

A N M602 E A57 E NEW RCH STR T 3 CHU ROAD M60 M602 LINK AD RO L BARTON UPON OO RAIL LINK P REDCLYFFE ROAD ER IRWELL TO WEST COAST LIV MAINLINE M 11 A SALFORD Delivered in Partnership NC BARTON HE QUAYS ST BRIDGE ER The Community Stadium and Stadium Leisure 14 ASH T S 2 B D RAFFORD H 5 U AFFORD ROAD 7 B R EST A IP T R A5 O W O C and Retail are being developed by a joint venture between N D R A A N

RO AL X

A the City of Salford and . The two partners N T E R A5063 T T AF have worked in partnership to secure the future of Salford ROAD FORD WHARF ROAD M60 NEW City Reds and kick start the development of the Salford LINK 14 ROAD 2 V 5 ILL Gateway. B AGE WAY BARTON DOCK ROAD WHARFSIDE WAY A5181 THE W Peel is progressing the delivery of Port Salford in conjunction MANCHESTER EST IN Y G HOUSE ROAD SHIP CANAL A with its ports division, Peel Ports. CENTRE W K M60 R

A M P BARTON DOCK ROAD 10 OSL EY R 2 M60 A62 16 A576 21 M60 67 ROAD 15/1 A50 The Peel Group OA D 22

The Peel Group is a leading infrastructure, transport and SWINTON A627 PARK ROAD 14 9 TRAFFORD A56 ROAD real estate enterprise in the UK. PARK OLD investments in a number of growing businesses including 13 A580 M60 TRAFFORD 11 A62 D Ports, Airports, Media, Energy, Land, Developments, LOSTOCK ROA SALFORD B5158 Investment Property, Environmental assets, Hotels, Utilities M602 M60 12/1 MANCHESTER and Advertising as well as a portfolio of investments in ECCLES AIRPORT23 The Salford Gateway is located in the Barton area of Salford quoted companies. M62 11 A635 A6010 10 A5081 MANCHESTER M67 A57 1 2 9 A56 24 3 For more information contact: A5103 investment, growth and development. Paul Walker , , Civic Centre, Salford A57 M60 DENTON HYDE A6010 8 M60 Ed Burrows, The Peel Group, [email protected] 7 A6 Salford Gateway will transform a vacant degraded site, creating thousands of new jobs over its development A6144 (M) A5103 lifespan and raising the profile of the City of Salford. SALE 6 25 26 ROMILEY 5 27 The plans for the site incorporate Port Salford, City of Salford Community Stadium and Stadium Retail Centre and the A56 1 Western Gateway Infrastructure Scheme. M60 A560 3 2 3 2 4/1 MARPLE The sole responsibility of this publication lies with the author. Western Gateway Infrastructure Scheme The European Union is not responsible for any use that may GATLEY CHEADLE A6 be made of the information contained therein. The highway works in connection to Salford Gateway are known as the Western Gateway Infrastructure Scheme 4 HAZEL GROVE

(WGIS). The works are highlighted on the aerial on the back page and include improvements to the M60 motorway 5 The Peel Group gives notice that: in good faith and believed to be correct but are made without 5. Unless otherwise stated all prices, rents and other charges are quoted between Junctions 10 and 11 and a new road link between the A57 and the . The new road will be responsibility and should not be relied upon as a representation of fact. exclusive of VAT and any intending purchaser or tenant must satisfy 1. These particulars do not constitute any part of any offer or contract. Intending purchasers or tenants must satisfy themselves as to their themselves independently6 as to the liability for VAT in respect of any achieved with a new lift bridge over the and provisions will be made to allow for the future 8 accuracy before entering into any legal contract. 7 M56transactions. 2. The information contained within these particulars has been checked MANCHESTER expansion of the public transport system. and is believed to be materially correct at the date of publication. 4. No warranty is given as to the condition of the Property or the condition 6. The seller/landlord does AnotIRP makeORT or give and no person in its or operation of any plant, machinery, equipment, services, fixtures and employment has any authority to make or give any representation or 3. All descriptions, statements, dimensions, references, condition and fittings referred to in these particulars. warranty whatsoever in relation to this property. necessary permissions for use and occupation or other details are given Not to scale relieve peak time congestions on the M60 Barton Bridge. Port Salford City of Salford Stadium Leisure Community Stadium and Retail

Port Salford will be a National Import Centre where The development will be the future home of Salford The delivery of the highway scheme will facilitate the goods arrive by water and rail and are distributed to Reds who have outgrown their current ground at development of the Stadium Retail Centre through its local centres by rail and road. The Willows. excellent connections to the wider Trafford Centre retail

Work has started on the construction of the new Stadium and it will be open for the start of the 2012 offer and links to the City of Salford Community Stadium. Rugby Season. The objective is to create a rugby ‘centre of excellence’ for Salford Reds, their academy and the wider community. Terms for Northern companies and consumers. By utilising the Port of , Manchester Ship Canal and Warehousing and retail units will be available on a ‘to let’ basis upon completion of the enabling highway Planning works (WGIS). Terms on application. Planning permission has been granted for a multimodal freight interchange comprising 154,500 sq.m. (1,663,024 sq.ft.) of rail served distribution warehousing, rail link and sidings, intermodal and ancillary Sustainability Location facilities including a canal quay. Also consented is a new canal crossing and highway It is the aim to achieve BREEAM Excellent with all buildings within Salford Gateway. All viable Salford Gateway is situated in a superb location close to the M62 and M60 with rail access to the improvements as part of the Western Gateway Infrastructure Scheme, 21,367 sq.m. (229,992 sq.ft.) of West Coast Main Line and direct access to the Manchester Ship Canal. The site is located on a priority non-food bulk retail development and a 20,000 seat sports stadium. considered as part of the design process. axis within the Trans European Transport Network. Phasing Atlantic Gateway Funding The site’s planning permission requires the supporting highway works (WGIS) to be completed prior The Salford Gateway is a key component of the Atlantic Gateway regional strategy. Atlantic Gateway North West to the occupation of the warehousing. The highway works will start on completion of the Stadium, will be a low carbon, sustainable, economic growth zone of international importance, driven by two of economy. Due to the scale of the development, Government support is required to help deliver the allowing for construction of the first phase of Port Salford. Europe’s leading city regions; Manchester and Liverpool, and second only to within a UK context. Peel and Salford City Council have applied to the Government’s Regional Growth Fund for funding. The project is part of a range of projects promoted across The retail scheme will also be constructed to coincide with the completion of the highway works. Investment in Atlantic Gateway infrastructure provides the opportunity to by the Local Enterprise Partnership (LEP). Port Salford is part funded by the The City of Salford Community Stadium will be completed by the end of 2011. opportunities for rebalancing the economy and stimulating business growth in the North of . EU TEN-T Programme and supported by the UK Department for Transport. The EU funding will support the project until December 2012. By 2030 Atlantic Gateway will create 250,000 additional jobs with a GVA value of £75bn. Through an environmental work stream, known as Adapting the Landscape, Atlantic Gateway projects can contribute to a 1% Community Environment Fund to support local projects that improve communities and green connections throughout the Atlantic Gateway Area.