Shri Narendra Modi Hon'ble Prime Minister

NEW RAILWAYS NEW A progressive journey since 2014 Mayurbhanj Parliamentary Constituency

MAYURBHANJ RAILWAYS’ DEVELOPMENT IN ODISHA (2014-PRESENT) MAYURBHANJ PARLIAMENTARY CONSTITUENCY

A. ASSEMBLY SEGMENTS : , Saraskana, , , , , Morada RAILWAY STATIONS COVERED : Basta, , Baripada, N Mayurbhanj Road, Jugpura, Krishnachandrapur, Thakurtota, Jogal, Badampahar, Kuldiha, Road, Aunlajori Junction, Rairangpur, Gorumahisani, Bangriposi B. WORKS COMPLETED IN LAST FIVE YEARS : B.1.New Trains / New Lines & Electrication :  Introduction of 2nd Train from Tatanagar to Badampahar  90 Kms gauge conversion from Rupsa to Bangriposi at a cost of `183.980 Crore B.2. Improvement of Passenger Amenities Like :  Provision of Hand Pump, Benches, Urinals, Latrines, Tube Light with Fittings, LED Fittings, Ceiling Fan, Time Table Display Board at Aunlajori, Chhanua, Birmitrapur, Krishnachandrapur, Jamsole, Baripada, Kuchai, Buramara, Rajaluka, Bangriposi, Bhanjapur Stations at a cost of ` 0.204 Crore.  Provision of V.I.P. room and other allied works at Baripada Station at a cost of ` 0.290 Crore.  Provision of precast CC grill boundary wall at Betnoti at a cost of ` 0.085 Crore. B.3. Trafc Facilities :  Limited Height Subway at LC No. TB66 at a cost of ` 0.950 Crore. B.4. Additional Facilities :  Chhanua-Badampahar- Manning of unmanned LC no. TB - 68 73 at Km 33014 - 3311 33509 - 10 at a cost of ` 0.860 Crore.  All Unmanned Level Crossings have been eliminated.  Rairangpur - Development of station as Adarsh Station at a cost of ` 1.060 Crore.  Provision of 04 nos hand pump at a cost of ` 0.030 Crore. C. ON-GOING WORKS : C.1. Improvement of Passenger Amenities :  Provision of interlocking precast CC blocks at Baripada at a cost of ` 0.080 Crore.  Provision of Canopies at Bangriposi at a cost of ` 0.084 Crore.  LED tube light provided at Bangriposi Station at a cost of ` 0.005 Crore.  Baripada - Extension of Platform to accommodate full rake at a cost of ` 0.392 Crore. C.2. Trafc Facilities related works like :  Full rake loading, Limited Height Subway, Road Under Bridge, Subways at Badampahar, Bahalda Road, Bahalda Road - Badampahar at a cost of `15.8 Crore. C.3. Additional Facilities :  Diversion of Road, Diversion of Road for Level Crossing, Provision of Emergency sliding boom at Interlocked Level Crossing Gates, Interlocking of Level Crossing Gate, Provision of Dual Detection of last vehicle checking device, LED Street Lights at Aunlajori, Gorumahisani, Rairangpur, Kuldiha, Chhanua, Tatanagar-Badampahar, -Badampahar, Betnoti and Bhanjapur, Baripada and Bangriposi Stations at a cost of ` 8.106 Crore.

Flagging off of 2nd Train from Tatanagar to Badampahar by Hon’ble Prime Minister Shri Narendra Modi in presence of Hon’ble Governor of Odisha Shri (Prof.) Ganeshi Lal, Hon’ble Union Minister Shri Dharmendra Pradhan, Hon’ble Union Minister Shri Jual Oram and other dignitaries