Engineering in Practice Wouter Ockeloen, Coastal Engineer at Van Oord

1/60 In presentation-modus:

Click on the logo to go back to menu Text small (build up) including image

Please do not change corporate slides. Company profile This information is carefully selected! ─ Leading international contractor

Dredging and Marine Contractors 2 In presentation-modus:

Click on the logo to go back to menu Text small (build up) including image

Please do not change corporate slides. Company profile This information is carefully selected! ─ Leading international contractor ─ Specialising in: − Dredging

Dredging and Marine Contractors 3 In presentation-modus:

Click on the logo to go back to menu Text small (build up) including image

Please do not change corporate slides. Company profile This information is carefully selected! ─ Leading international contractor ─ Specialising in: − Dredging

− Offshore oil and gas

Dredging and Marine Contractors 4 In presentation-modus:

Click on the logo to go back to menu Text small (build up) including image

Please do not change corporate slides. Company profile This information is carefully selected! ─ Leading international contractor ─ Specialising in: − Dredging

− Offshore oil and gas − Offshore wind projects

Dredging and Marine Contractors 5 In presentation-modus:

Click on the logo to go back to menu Text small (build up) including image

Please do not change corporate slides. Company profile This information is carefully selected! ─ Leading international contractor ─ Specialising in: − Dredging

− Offshore oil and gas − Offshore wind projects − Marine engineering

Dredging and Marine Contractors 6 In presentation-modus:

Click on the logo to go back to menu Text small (build up) including image

Please do not change corporate slides. Company profile This information is carefully selected! ─ Leading international contractor ─ Specialising in: − Dredging

− Offshore oil and gas − Offshore wind projects − Marine engineering

− Infrastructure

Dredging and Marine Contractors 7 In presentation-modus:

Click on the logo to go back to menu Text small (build up) including image

Please do not change corporate slides. Company profile This information is carefully selected! ─ Leading international contractor ─ Specialising in: − Dredging

− Offshore oil and gas − Offshore wind projects − Marine engineering − Infrastructure − Soil improvement

Dredging and Marine Contractors 8 In presentation-modus:

Click on the logo to go back to menu Text small (build up) including image

Please do not change corporate slides. Company profile This information is carefully selected! ─ Leading international contractor ─ Specialising in: − Dredging

− Offshore oil and gas − Offshore wind projects − Marine engineering

− Infrastructure − Soil improvement ─ Innovative partner for clients

Dredging and Marine Contractors 9 In presentation-modus:

Click on the logo to go back to menu Text small (build up) including image

Please do not change corporate slides. Company profile This information is carefully selected! ─ Leading international contractor ─ Specialising in: − Dredging

− Offshore oil and gas − Offshore wind projects − Marine engineering

− Infrastructure − Soil improvement ─ Innovative partner for clients

─ Dutch-based, independent family business

Dredging and Marine Contractors 10 In presentation-modus:

Click on the logo to go back to menu Text small (build up) including image

Please do not change corporate slides. Company profile This information is carefully selected! ─ Leading international contractor ─ Specialising in: − Dredging

− Offshore oil and gas − Offshore wind projects − Marine engineering

− Infrastructure − Soil improvement ─ Innovative partner for clients ─ Dutch-based, independent family business

─ Large state-of-the-art-fleet

Dredging and Marine Contractors 11 In presentation-modus:

Click on the logo to go back to menu Text (full)

Please do not change corporate slides. Offices worldwide (Annual Report 2012) This information is carefully selected!

Norway, Bergen , St Petersburg Canada, Calgary Latvia, Riga Russia, Yusno Canada, Ontario , & Russia, Moscow Gorinchem , Bremen United Kingdom, Newbury Belgium, Zele , Le Blanc-Mesnil Cédex , Manigistau , Amelia , Busan , Lisbon , Madrid , Baku Tunisia, Tunis , Houston , Shanghai , Hongkong Bangladesh, Dhaka Taiwan, Keelung City Qatar, Doha Bahrein, Manama Vietnam, Hanoi , Mexico City , Mumbai , Manila Curaçao, Willemstad Thailand, Bangkok , Panama , Ikeja-Lagos

Singapore , Kuala Lumpur , Luanda , Jakarta

Brazil, Rio de Janeiro

Australia, Brisbane , Perth

Dredging and Marine Contractors 12 In presentation-modus:

Click on the logo to go back to menu Text (full)

Selection of recent/current missions engineers to projects

Rotterdam Petten Engineering dept. Dubai - Suzanne (Bluewaters / Jumana) - Suzanne Norway, Bergen Russia, St Petersburg Canada, Calgary Latvia, Riga Russia, Yusno Canada, Ontario Netherlands, Rotterdam & Russia, Moscow - Frank Gorinchem Germany, Bremen Bahamas United Kingdom, Newbury Belgium, Zele France, Le Blanc-Mesnil Cédex Kazakhstan, Manigistau - Greg Italy, Amelia Korea, Busan ConstantaPortugal, Lisbon Spain, Madrid TaiwanAzerbaijan, Baku Gibraltar Tunisia, Tunis United States, Houston China, Shanghai - Johan - KarenUnited Arab Emirates, Dubai Hongkong Bangladesh, DhakaPluit Taiwan, Jakarta Keelung City Qatar, Doha - Cuno Bahrein,- ManamaJasper Vietnam, Hanoi Mexico, Mexico City India, Mumbai - Jan Willem Philippines, Manila Curaçao,- Dennis Willemstad Thailand, Bangkok Costa Rica Panama, Panama Nigeria, Ikeja-Lagos - Dennis - Tijmen Surabaya Malaysia, Kuala Lumpur (planned) Angola, Luanda - Frank Kuwait Singapore Indonesia, Jakarta - Kevin - LauraBrazil, Rio de Janeiro Brasil - Charlotte -CoralGuiseppe Bay Australia, Brisbane - Victor - Wouter (K) - Mark / Mark Australia, Perth Ichthys LNG - Abdi - Indira - Heidi - Erik - Johannes - Tijmen - Indira - Lieve - Erik - Johannes - Joost - Anneke

Dredging and Marine Contractors 13 Engineering role in organisation Van Oord

Organisation chart (January 2013)

Executive Board

Management Committee

Areas Business Units Staff departments

America & Offshore Communication & Markets Engineering & Estimating

Asia & Australia Offshore Wind Projects Facility Services Finance & Administration

Europe Wicks Information Technology Legal & Contracts

Operations Personnel & Organisation , Mediterranean & South West Ship Management Department Quality, Health, Safety & Environment Netherlands Survey

Treasury Van Oord Procurement

14/60 Engineering role in organisation E&E

Engineering & Estimating Department

Secretariat & Archive Tender Managers

Production Estimating Cost Estimating Engineering

Coastal eng. Geotechnical eng.

Production Equipment & Estimating Process Cost Estimators & Technology Environmental eng. Offshore eng. Project support

Graphic design dept.

15/60 Trend: projects from construct only to design and construct (D&C) projects

Increasing involvement Engineering & Estimating

CONSTRUCT ONLY

CLIENT DEVELOPMENT TENDER PHASE AWARD EXECUTION PHASE Final Design + BoQ Cost/prod. estimate Project support

DESIGN & CONSTRUCT

CLIENT TENDER PHASE AWARD EXECUTION PHASE DEVELOPMENT Reference design Tender design + cost/prod. est Final design & project support

16/60 Construct only project Engineering & Estimating involvement

DEVELOPMENT TENDER PHASE AWARD EXECUTION PHASE Final Design Cost estimate Project support

CLIENT TENDER EXECUTION - PROJECT SUPPORT

Production (Engineering Consultant Estimate design Engineering/ prod.est. - Feasibility study - Concept design Assessment) - Client requirements Env./ QHSE/ • Workability plans • Execution Methods Consultant • Specifications - FINAL DESIGN / BoQ Cost Estimate • Procedures • Design Auxiliary Structures • Field Monitoring Tender (design & BoQ) Offer / Execution plan

17/60 Design & construct project Engineering & Estimating involvement

DEVELOPMENT TENDER PHASE AWARD EXECUTION PHASE Reference design Tender design Final design & project support

CLIENT TENDER DESIGN / FINAL DESIGN EXECUTION - PROJECT SUPPORT

Production Engineering Design Engineering/ prod.est. Consultant Estimate - Feasibility Tender/ final consultant study design • Re-Design - Concept Env./ QHSE/ Numerical design • Workability plans Modelling - Client • Execution Methods requirements consultant • Specifications Cost Estimate • Procedures • Design Auxiliary Structures ITT Offer / Execution plan • Field Monitoring

18/60 Engineering activities

Design Operational Support Research Feasibility Studies Re-Design Execution Methods Preliminary Design Workability Materials Detailed Design Execution Methods Design Methods Physical Model Testing Specifications Data Management Environmental Monitoring Procedures MSc & PhD student- Plans support Design Auxiliary Structures Building with Nature Field Monitoring

Combining theory and practice 19/60 Coastal Engineering

Design: • Lay-out / concept / detailed design

20/60 Coastal Engineering

Design: • Lay-out / concept / detailed design • Revetments / breakwaters

21/60 Coastal Engineering

Design: • Lay-out / concept / detailed design • Revetments / breakwaters • Reefs / Beaches • Quay walls / bottom protection

22/60 Coastal Engineering

Design: • Lay-out / concept / detailed design • Revetments / breakwaters • Reefs / Beaches • Quay walls / bottom protection

Studies:

• Hydraulic conditions • Morphology

23/60 Coastal Engineering

Design: • Lay-out / concept / detailed design • Revetments / breakwaters • Reefs / Beaches • Quay walls / bottom protection

Studies: • Hydraulic conditions • Morphology • Physical model tests

24/60 Coastal Engineering

Design: • Lay-out / concept / detailed design • Revetments / breakwaters • Reefs / Beaches • Quay walls / bottom protection

Studies: • Hydraulic conditions • Morphology • Physical model tests • Workability

25/60 Coastal Engineering

Design: • Lay-out / concept / detailed design • Revetments / breakwaters • Reefs / Beaches • Quay walls / bottom protection

Studies: • Hydraulic conditions • Morphology • Physical model tests • Workability

Execution support: • Logistics • Risks • Execution stages • Sand transport

26/60 Geotechnics Design

Reclamations Vertical drains Embankments Excavations Geotechnical stability Civil works

27/60 P1 40.00 Layers Sand Fill Sand Quarry Quarry Run Quarry Run Shelly Sand Shelly Sand Shelly Laminated Sandstone Weathered Sandstone m 25 3 20 15 6 10 2 5 Radius : 20.37 [m] : 1.505 Safety Critical circle Bishop 0 2 1 1 P1 -5 5 -10 7 -15 -20 4

Xm : Xm -1.58 [m] : Ym 14.47 [m] 5 0 m -5 20 15 10 -10 -15

date drw. Van Oord ACZ Jan Blankenweg 2 Phone 0183-642200 4207 HN GORINCHEM Fax 0183-642704 29/01/2003 -GdV

ctr. Logo Palm Island -020785-DR Stability Quay Wall form.

MStab 9.1 : Stability High Wall Cunet.sti Annex -40.00 - A4

Anchor walls Anchor Retaining wallsRetaining Foundations Liquefaction analysisLiquefaction Soil compaction Soil improvement Settlement prediction Settlement stability Overall Tender and and support Operations Tender Geotechnics /60 28 Environmental Tender and Operations support

Environmental issues (tender/construction): • Environmental requirements in tender documents • Environmental Impact Assessments • Sense and nonsense of monitoring and mitigation • Appropriate conditions of contract • Sustainable designs CEMPs EMPs TNs

Environmental Environmental Technical notes 29/60 management plans monitoring plans Environmental Monitoring during project execution

Monitoring of environmental aspects of dredging: • Preparation of environmental monitoring plans • Initial setup of monitoring and reporting on site • Water quality training of VO staff

30/60 Environmental Eco design

The Building with Nature philosophy: • Making use of natural processes • Providing opportunities for nature to develop • Artificial reefs and reef rehabilitation

Shell fish reefs

Nourishment in Sand engine Healthy Degraded sensitive areas reef reef

31/60 Offshore & Pipelines Disciplines

• Offshore Pipeline Installation - OPI • Subsea Rock Installation - SRI • Offshore Wind Projects - OWP

32/60 What I did.. Highlights working experience

• 2007 M.Sc. Thesis TU Delft @ Van Oord • 2007 - 2013 Maritime engineer @ Royal Haskoning • 2013 - now Coastal engineer @ Van Oord

• Projects (selection) - 2007 - 2009 Palm Deira Dubai – Final Design - 2009 - 2010 Baku Azerbaijan – Conc. & Det. Design - 2009 Dikkowita Fishery Port Sri Lanka - 2010 New Doha Port Qatar – Reference Design - 2010 - 2011 DAS Island Abu Dhabi – Final Design - 2012 - 2013 Sal Rei Breakwater Redesign Cape Verde - 2013 - 2014 Cherbourg France – Tender Design

33/60

In presentation-modus:

Click on the logo to go back to menu Text (full)

My experience abroad

DHI – Denmark & Palm Deira - Dubai Sogreah – France Final design on site Physical model tests various (Haskoning, construction projects by Van Oord) Norway, Bergen Russia, St Petersburg Canada, Calgary Latvia, Riga Russia, Yusno Canada, Ontario Netherlands, Rotterdam & Russia, Moscow Gorinchem Germany, Bremen United Kingdom, Newbury Belgium, Zele France, Le Blanc-Mesnil Cédex Kazakhstan, Manigistau Italy, Amelia Korea, Busan Portugal, Lisbon Spain, Madrid Azerbaijan, Baku Gibraltar Tunisia, Tunis United States, Houston China, Shanghai United Arab Emirates, Dubai Hongkong Bangladesh, Dhaka Taiwan, Keelung City Qatar, Doha Dikkowita - Sri Lanka DAS Island - Abu Dhabi Bahrein, Manama Vietnam, Hanoi Mexico, Mexico City India, Mumbai Witness Philippines,phys. Manila model tests Client meetingsCuraçao, Willemstad(Haskoning , Thailand, Bangkok Panama, Panama hired by Van Oord) Nigeria, Ikeja-Lagos

Singapore Malaysia, Kuala Lumpur Angola, Luanda Indonesia, Jakarta

ChennaiBrazil, Rio de Janeiro - India Presented paper at PIANC- Australia, Brisbane COPEDEC 2012 conference JakartaAustralia, -Perth Indonesia Revetments design workshop at Haskoning Indonesia

Dredging and Marine Contractors 34 Coastal Engineering example Final Design – DAS Island (Abu Dhabi)

35/60 Final Design – DAS Island (Abu Dhabi)

DAS Island: • Island for oil export • Tankfarm, jetties, work harbour, SBM.. • Extension required for longer runway and accommodation 36/60 Final Design – DAS Island

D&C project; Van Oord hired Royal Haskoning for Final Design

Masterplan DAS extension: • Airport island • Accomodation island • 7.5 km revetments around the island • 2 Search&Rescue boat ramps • Submarine cable crossing protections • 14 drainage system outfalls (rainwater)

• Design conditions: up to Hs = 5m waves

37/60 Design Wave Conditions

38/60 Revetment design overview

39/60 Physical model tests 2D Test section

3D Test area

Area tested at DHI

• 2D tests in Delft - Deltares • 3D tests in Denmark and Delft (DHI / Deltares) CS-4 at -6m (Ch. 1850) • Modifications to cross sections in 2D • Verification of design in 3D, unfortunately some CS-3 at -8m (Ch. 5500) CS-1 at -9.5m (Ch. 3900) modifications required as well Area tested at Deltares

40/60 2D testing at Deltares

Wave flumes built in basin

41/60 2D test series section 1 (highest waves)

Hs = 5m

Tp = 10.1s h = +2.41m

42/60 Test results

Some damage / Overtopping issues:

. Overtopping limit: . 0.4 l/s/m . Measured: . 11 l/s/m . Drainage rock washed away

43/60 Modifications and re-testing

• Entire crest higher – no success (reclamation level could not change)

• Forget about the crown wall…

• Or put it at the end, i.e. leave the drainage principle

44/60 Final cross sections

• Permeability under crest increased for back-flow water

• Crown wall at end

• Varying crest width along island perimeter (tested simultaneously in 2 sides of flume)

45/60 3D testing SW corner at Deltares

• Results confirm stability / overtopping results from 2D tests

• Overtopping lower from oblique wave reduction, optimisation possible

46/60 3D testing NW corner at DHI (Denmark)

Crest width and level increased for overtopping (3D / foreshore effects)

47/60 Construction

48/60 Construction

Existing revetment leaves room for improvement…

49/60 Personal experiences – Sri Lanka

Dikkowita Fishery Harbour

For local small-scale fishery

Design / construction: BAM Supervision: Royal Haskoning

50/60 Personal experiences – Sri Lanka

3D model tests breakwater in wave basin

51/60 Personal experiences – Sri Lanka

Not the worst place to stay for a week or so…

52/60 Personal experiences – Dubai

Palm Deira Final Design (at Royal Haskoning) Construction by Van Oord “Largest man-made island” Palm Deira Dubai (not finished) Waterfront (not finished) The Palm Jebel Ali (‘The Palm’)

Bluewaters Jumana

53/60 Personal experiences – Palm Deira

Construction aerial March 2008

Site offices Nakheel, Van Oord and Royal Haskoning

54/60 Site offices Nakheel and Van Oord

55/60 Site office Royal Haskoning

56/60 After work..

57/60 Personal experiences – PIANC COPEDEC – Chennai India

58/60 Personal experiences – PIANC COPEDEC – Chennai India

59/60 Thank you, any questions?