Restoring and Enhancing the Shropshire Union Canals
Total Page:16
File Type:pdf, Size:1020Kb
The Shropshire Union Canal system was a The Shropshire Union Canal Society was network of over 200 miles which emerged as formed to protect and enhance the canals of an entity in the 1840’s following a series of the historic Shropshire Union system in mergers. Today, its surviving parts are England and Wales, and since 1969 we have known as the Shropshire Union main line, been actively engaged in the restoration of the the Middlewich Branch, the Llangollen Canal Montgomery Canal. and the Montgomery Canal. Our volunteers have a string of projects to their credit, including: Pool Quay, Bank and Crowther Hall Locks: 1974 - 1979 Carreghofa Locks and pound: 1979 - 1986 Burgedin Locks and pound: 1987 - 1998 Brynderwen Lock: 1998 - 2002 Newhouse Lock: 2002 - 2006 Bridges 83 - 84 channel: 2008 - 2014 The Society has also installed mooring rings and other facilities at numerous locations around the SU system. We are currently working to restore the channel between Bridges 84 and 85, part of the 2.75 miles of dry canal that separates the isolated part of the Montgomery from the national network. To find out more, please visit the Society’s website: www.shropshireunion.org.uk If you would like to join the Society, please see Restoring and Enhancing the website or contact our Membership Secretary on 01630 656525. the Shropshire Union Canals Published by the Shropshire Union Canal Society, 2017. Channel excavation between Bridges 84 and 85. Newhouse Lock after restoration by the Society. Hedge-laying on a frosty morning. The current project is about 800 m but will extend The project won the Royal Institute of Chartered We have laid about one mile of hedge over nine navigation by 2 km. A grant from the HLF means that Surveyors’ Welsh Project of the Year award. winters. this project is already fully funded. Our volunteers in 2014, celebrating re-watering Maintenance at the Weston Arm picnic area. between bridges 83 and 84. Over 400 m of channel was The work included re-surfacing the towpath, A fundraising ‘lock-wind’. excavated and lined and over 40,000 concrete blocks constructing new approaches to allow wheelchair were used to cover the waterproof lining. access, painting tables and repairing brickwork. .