Wayne Junction SFC 01010-1 60% Design Submittal Rehabilitation Project November 29, 2016

Total Page:16

File Type:pdf, Size:1020Kb

Wayne Junction SFC 01010-1 60% Design Submittal Rehabilitation Project November 29, 2016 SECTION 01010 SUMMARY OF WORK PART 1 - GENERAL 1.01 DESCRIPTION OF WORK A. This specification covers the rehabilitation of the Wayne Junction Static Frequency Converter (SFC) Station. The work will be executed through multiple prime contracts representing significant elements of work for each Contractor. B. The Work shall be performed concurrently and in close coordination with the respective Prime Contractors listed in these construction documents, and possibly other trades working at the site. The Contractors for this project include: 1. Contractor for General Construction Work (to be known as “General Contractor” - GC). 2. Contractor for Mechanical Construction Work (to be known as “Mechanical Contractor” - MC). 3. Contractor for Electrical Construction Work (to be known as “Electrical Contractor” - EC). 4. The EC Contractor shall be designated the Coordinating Contractor. C. A separate Contract will be awarded for the design, supply, installation supervision, testing, and commissioning of the separate SFC equipment system contract (to be known as “Static Frequency Converter Contractor” - SFCC). D. Brief Description of SEPTA’s Traction Electrification System 1. SEPTA operates a comprehensive transportation system in the Philadelphia metropolitan area and suburbs. The Regional Rail network of commuter lines is an important part of SEPTA’s service. The Regional Rail operates on tracks and systems formerly owned by the Pennsylvania Railroad (PRR) and the Reading Railroad (RRR). 2. The former Reading Railroad system is electrified at 36/24/12 kV, 25 Hz, single- phase, by an autotransformer system. Traction power is supplied from SEPTA’s three existing static frequency converters (SFCs) located in Wayne Junction, PA. This project program includes the addition of a fourth SFC at Wayne Junction SFC Station and the sequential replacement of the three existing Wayne Junction SFCs with three new SFCs. 3. The Wayne Junction converter output transformer has three bushings on its secondary side: 12 kV trolley, 24 kV feeder, and a solidly-grounded rail connection tapped at 1/3 of the secondary winding. Voltage measured from trolley-to-feeder is 36 kV, trolley-to-rail is 12 kV, and feeder-to-rail is 24 kV. E. The Work generally consists of, but is not limited to, the following: 1. The design, supply, construction, testing, and commissioning into full service of four new SFC systems, with an input of 13.2 kV, 60 Hz, 3-phase and an output of 36/24/12 kV, 25 Hz, single phase. The continuous full-load power capacity of the new SFCs shall be not less than 15 MVA. The total station capacity shall be 60 MVA with all four SFCs in operation. Wayne Junction SFC 01010-1 60% Design Submittal Rehabilitation Project November 29, 2016 Table 1 - New SFC Requirements Parameter Value Total capacity of station 60 MVA Number of converters 4 Rating (each unit) - continuous 15 MVA Rating (each unit) - overload 18 MVA for 1 hour 24 MVA for 6 minutes 30 MVA for 30 seconds 4000 A for 2 seconds at 12 kV followed by 15 MVA for 1 hour before next overload cycle 2. Each new and replaced SFC shall be fully interoperable and compatible with the existing SFCs so that it can perform its function either alone or with any combination of the existing SFCs on line. 3. The new SFC equipment will be supplied as part of a separate Contract and shall have an expected lifetime of no less than forty years. The equipment supplied with the SFC system includes the following: a) SFC power block equipment b) SFC input and output transformers c) SFC harmonic and power factor correction filters d) SFC precharging circuit breakers and auxiliary transformers e) SFC control system f) SFC cooling system, including pumps, piping, and heat exchangers g) SFC power distribution system and UPS equipment h) SFC protection system equipment i) Sequence of events recorder j) Transient disturbance recorder k) Remote terminal units (RTUs) l) SFC interconnecting cabling, conduits, and accessories 4. The construction of a new building for the fourth SFC, attached to the existing SFC #3 building. 5. Modifications to the existing SFC Control Room for SFC control and protection equipment for the new SFC system. 6. A new isolation switch and protective relays to be supplied and installed in the existing Wayne Junction 25 Hz Traction Power Substation. 7. The existing 25 Hz Traction Power Substation 12 kV and 24 kV protection schemes shall be recalibrated in order to incorporate SFC #4. Wayne Junction SFC 01010-2 60% Design Submittal Rehabilitation Project November 29, 2016 8. The replacement of the existing Pyrotronic suppression/fire alarm control panels with a new updated addressable fire alarm system and a Halon suppression activation panel in the Wayne Junction 230 kV substation and SFC building. 9. Renovations to the existing SFC building, including architectural, structural, mechanical, electrical, and plumbing work. 10. Electrical duct bank installation between the 230 kV Control Building, the SFC Building, and the existing 25 Hz Wayne Junction Traction Power Substation to support the new SFC #4. All existing power and control duct banks supporting SFC #1, #2 and #3 will remain. 11. All existing filter equipment in the 60 Hz and 25 Hz Filter Yards will be removed, but the existing foundations and associated equipment with the open-air bus system will remain. A new open-air bus system will be constructed to support the new SFC #4 on the 60 Hz and 25 Hz sides of the SFC Building. 1.02 RELATED WORK A. Agreement B. Section 01011 – Summary of Project C. Section 01025 – Measurement and Payment D. Section 01041 – Project Coordination E. Section 01060 – Regulatory Requirements and Safety F. Section 01400 – Quality Requirements 1.03 QUALITY CONTROL AND QUALITY ASSURANCE A. Each prime Contractor will assume responsibility for executing a quality control and quality assurance program. This program’s basic form will be specified in their Quality Control Plan as submitted under Section 01400 and will include the tests & inspections called for in the technical sections of the specifications. Each prime Contractor shall be responsible for requiring all subcontractors and suppliers to adhere to their Quality Assurance Program and participate in quality assurance activities. B. Where governed by “Buy America” requirements, SEPTA will require documentation to confirm the country of origin of all applicable products and materials. Each prime Contractor is responsible for communicating Buy America requirements to their subcontractors and suppliers. The lack of sufficient documentation will be grounds for rejecting a product or material. C. Quality activities will be documented by the Contractor. SEPTA may audit the Contractor’s quality assurance and quality control activities. Each prime Contractor will make their and their subcontractor’s, applicable documentation available to SEPTA. D. Each prime Contractor, and their subcontractors, is required to cooperate fully with testing and inspection activities carried out by SEPTA and its agents. The Contractor will provide the SEPTA PM with adequate (as determined by the SEPTA PM) notification for all activities which require testing and/or inspection. For all inspections and testing required by code, work will not proceed until this testing and inspection has been completed. E. Once a product or material has been accepted through the Submittal process, no substitution of this material or product will be allowed without resubmitting it following Wayne Junction SFC 01010-3 60% Design Submittal Rehabilitation Project November 29, 2016 the provisions of Section 01300. SEPTA reserves the right to require removal of any non- reviewed material and product. 1.04 CONTRACTOR RESPONSIBILITIES A. Furnish all materials, tools, equipment, supervision, administration and transportation, and perform all labor and services necessary to furnish, deliver, construct, install, connect and/or to interconnect and test as required to complete all work described in the Specifications and indicated in the Contract Drawings. B. Each Contractor shall be aware of, and be familiar with, the responsibilities and work of the other Contractors especially with regard to the sections of Division 1, which pertain to all contracts. In addition to the responsibilities shared by the/each prime Contractor, the coordinating Contractor shall have additional responsibilities as specified in the Contract documents. C. Each Contractor is responsible for securing and paying for all necessary permits and approvals required to complete the work. No work may commence on site without securing and paying for the necessary approvals including but not limited to: 1. Permits 2. Governmental Fees 3. Licenses 4. Local Applications 5. Local Taxes D. SEPTA Notification 1. Give written notices necessary for, and incidental to, the due and lawful prosecution of the Work. 2. Provide written notification at least 14 days in advance to SEPTA for all construction work which requires observation and/or testing. 3. Notify the SEPTA Project Manager (PM) at least 14 days in advance of the date the individual construction stages (and/or elements) will be fully complete and ready for inspection. 4. Notify the SEPTA PM at least 14 days in advance of the date the entire work will be substantially complete and ready for inspection. 5. Notify the SEPTA PM at least 14 days in advance of the date the entire work will be complete and ready for final acceptance inspection. E. Utility Notification 1. Known existing utilities will be indicated on the Contract Drawings but the Contractor may not interpret this information as either complete or accurate. Regardless of those shown on the drawings, the Contractor must identify and verify the location of all existing utilities prior to working by following applicable regulations and procedures, such as contacting the PA One Call system and asking SEPTA personnel to identify utilities at the site. 2. The Contractor shall determine ownership of all utilities and notify utility owners prior to intended start work date.
Recommended publications
  • [Pennsylvania County Histories]
    HEFEI 1ENCE y J^L v &fF i (10LLEI JTIONS S —A <f n v-- ? f 3 fCrll V, C3 Digitized by the Internet Archive in 2018 with funding from This project is made possible by a grant from the Institute of Museum and Library Services as administered by the Pennsylvania Department of Education through the Office of Commonwealth Libraries https://archive.org/details/pennsylvaniacoun61unse M tA R K TWAIN’S ScRdP ©GOK. DA TENTS: UNITED STATES. GREAT BRITAIN. FRANCE. June 24th, 1873. May i6th, 1877. May i 8th, 1877. TRADE MARKS: UNITED STATES. GREAT BRITAIN. Registered No. 5,896. Registered No. 15,979. DIRECTIONS. Use but little moisture, and only on ibe gummed lines. Press the scrap on without wetting it. DANIEL SLOPE A COMPANY, NEW YORK. IIsTIDEX: externaug from the Plymouth line to the Skippack road. Its lower line was From, ... about the Plymouth road, and its vpper - Hue was the rivulet running to Joseph K. Moore’s mill, in Norriton township. In 1/03 the whole was conveyed to Philip Price, a Welshman, of Upper Datef w. Merion. His ownership was brief. In the same year he sold the upper half, or 417 acres, to William Thomas, another Welshman, of Radnor. This contained LOCAL HISTORY. the later Zimmerman, Alfred Styer and jf »jfcw Augustus Styer properties. In 1706 Price conveyed to Richard Morris the The Conrad Farm, Whitpain—The Plantation •emaining 417 acres. This covered the of John Rees—Henry Conrad—Nathan Conrad—The Episcopal Corporation. present Conrad, Roberts, Detwiler, Mc¬ The present Conrad farm in Whitpain Cann, Shoemaker, Iudehaven and Hoover farms.
    [Show full text]
  • FY 2007 TIP for PA
    DVRPC FY 2007-2010 Transportation Improvement Program for Pennsylvania Modified After June 2006 Adoption Final Version Modified After June 2006 Adoption Delaware Valley Regional Planning Commission DVRPC FY 2007 Transportation Improvement Program for Pennsylvania Modified After June 2006 Adoption Pennsylvania Highway Program Delaware Valley Regional Planning Commission DVRPC FY 2007-2010 TIP for PA Final Version Pennsylvania - Highway Program Bucks MPMS# 12782 PA 263, York Road Center Turn Lane AQ Code 2010M Cty Line Rd/ Henry Ave & Roberts/Bristol Roadway and Intersection Improvement Warminster Township Funds account for Accrued Unbilled Costs Provide center left turn lane areas and/or median barriers on Old York Road between County Line Road & Henry Ave. and also between Roberts Road & Bristol Road. LET TIP Program Years ($ 000) Later FYs Phase Fund FY2007 FY2008 FY2009 FY2010 CON STU 2,063 Fiscal Year Total 2,063 0 0 0 0 Total FY 07-10 2,063 MPMS# 12923 Bristol Road Extension AQ Code 2020M US 202 to Park Avenue Major SOV Capacity Two Lane Extension Subcorr(s): 8H Chalfont Borough; New Britain Borough; New Britain Township Provide a two lane extension of Bristol Road (approximately 2000 ft.) from US 202 to Park Avenue. When completed, this improvement will provide a two-lane bypass around Chalfont Borough which will eliminate trips on US 202 and turning movements at the US 202/PA 152 intersection. SAFETEA DEMO #500 - $1.6 Million SAFETEA DEMO #4775 - $400,000 TIP Program Years ($ 000) Later FYs Phase Fund FY2007 FY2008 FY2009 FY2010
    [Show full text]
  • ANNUAL PERFORMANCE REPORT Pennsylvania Public Transportation
    Pennsylvania Public Transportation ANNUAL PERFORMANCE REPORT Fiscal Year 2014–15 April 30, 2016 On the cover: Mount Joy Amtrak Station Preliminary design, Market Street Bridge looking west Courtesy of Michael Baker International Beaver County Transit Authority Station Courtesy of Southwestern Pennsylvania Commission Washington City Transit (now Freedom Transit) Paratransit Bus Courtesy of Southwestern Pennsylvania Commission SEPTA Commuter Train at Secane Station Courtesy of PennDOT The “T” Light Rail, Pittsburgh Courtesy of Southwestern Pennsylvania Commission Capital Area Transit Fixed-Route Bus, Harrisburg Courtesy of Michael Baker International PUBLIC TRANSPORTATION ANNUAL PERFORMANCE REPORT FY 2014-15 April 30, 2016 Dear Fellow Pennsylvanians, I am pleased to submit the Pennsylvania Public Transportation Annual Performance Report for the state 2014-2015 fiscal year. Pennsylvania’s public transportation is moving toward the future, in part with additional and critically needed resources provided by Act 89 of 2013, the far-reaching funding plan that put transit on a more solid footing. The Commonwealth is very fortunate to have a world class transportation system, which adds value to the lives of millions of Pennsylvanians every day. This report shows you how transportation operates throughout our state. Innovations in public transportation help seniors travel safely to the grocery store, allow individuals to book shared ride trips online, and cost effectively get hardworking Pennsylvanians to jobs that drive our economy. This year, the Annual Performance Report reflects the advancements that have taken place, including regionalization and the implementation of cutting-edge scheduling software, solutions that streamline transportation systems and save Pennsylvanians money, while continuing to offer a superior customer product.
    [Show full text]
  • NN TOD Report FINAL PT2.Pdf
    16 Chapter Three those in the surrounding suburbs. These higher costs have led to a lower supply of new housing in Philadelphia than would Barriers to Transit-Oriented have occurred if the production costs were Development in more in line with regional averages.15 Philadelphia High construction costs also accelerate the rate of decline in neighborhoods. When construction costs are high, existing residents reconsider whether they should reinvest in tating the obvious, to achieve the their homes, or move to another home, advantages of transit-oriented S where they could perhaps get more for their development (TOD) requires that investment dollar. High construction costs development actually take place. Different therefore lower reinvestment in stakeholders can play their part in creating neighborhoods, accelerating the decline of an environment that is friendly to such older neighborhoods. development, but ultimately developers have to decide whether or not to risk their own time and capital. Those locations, unfortunately, tend to be the ones near our best transit services. In When some of Philadelphia’s oldest other words, relative to other places, it is neighborhoods were developed, these expensive to supply Philadelphia with TOD. developers found transit-proximate sites to be worth that risk. In contrast, for much of What about the demand for TOD in the past 50 years, very few sites, transit- Philadelphia? From 1960 through 2000, the proximate or not, have been developed. population of Philadelphia fell from With the city now enjoying a resurgence in approximately 2 million to 1.5 million, a new construction, it is important to consider decline of almost 25 percent.
    [Show full text]
  • PRESERVATION ALLIANCE for GREATER PHILADELPHIA 1 2 2014 PRESERVATION ACHIEVEMENT AWARDS TABLE of CONTENTS
    PRESERVATION ALLIANCE for GREATER PHILADELPHIA 1 2 2014 PRESERVATION ACHIEVEMENT AWARDS TABLE OF CONTENTS MESSAGE FROM THE EXECUTIVE DIRECTOR................................................ 4 SPECIAL RECOGNITION AWARDS .................................................................... 6 JAMES BIDDLE AWARD PUBLIC SERVICE AWARD RHODA AND PERMAR RICHARDS AWARD JOHN ANDREW GALLERY AWARD SPECIAL 200TH ANNIVERSARY AWARD PRESERVATION EDUCATION AWARD GRAND JURY AWARDS ...................................................................................... 12 AIA PHILADELPHIA AWARDS........................................................................... 23 AIA LANDMARK BUILDING AWARD HENRY J. MAGAZINER EFAIA AWARD SPONSOR RECOGNITION ................................................................................ 24 FROM THE EXECUTIVE DIRECTOR Welcome to the 22nd Annual Preservation Achievement Awards. The Preservation Achievement Awards is a celebration of the highest level preservation work occurring in the region. What an impact historic preservation has. Our 19 Grand Jury winners in the aggre- gate pumped over $300 million directly into the economy, and indirectly generated an addi- tional $435 million in spending while supporting, directly and indirectly over 5,700 jobs-years of employment. Outstanding! This year we took a bold step with the Grand Jury Awards. We convened a jury comprised of nationally recognized preservation professionals. The jury was chaired by Richard Moe, former President of the National Trust for Historic Preservation.
    [Show full text]
  • August 2009 Bulletin.Pub
    TheNEW YORK DIVISION BULLETIN - AUGUST, 2009 Bulletin New York Division, Electric Railroaders’ Association Vol. 52, No. 8 August, 2009 The Bulletin TIME SIGNAL CENTENNIAL Published by the New Station time signals, which were installed pated. Although the subway was designed for York Division, Electric on the IRT express tracks 100 years ago, a maximum daily capacity of 600,000 pas- Railroaders’ Association, Incorporated, PO Box allowed the company to run two or three sengers, the builders planned on a maximum 3001, New York, New more trains per hour. capacity of only 400,000 daily riders. In De- York 10008-3001. When one train was in the station, the origi- cember, 1904, IRT averaged 300,000 pas- nal signal system held the next train in the sengers per day with little margin for growth. block of track beyond the station. This sys- Daily traffic exceeded 800,000 in 1908 and For general inquiries, contact us at nydiv@ tem was designed to ensure safe operation. reached 1.2 million six years later. electricrailroaders.org This block of track was the distance required IRT was unable to relieve the overcrowding or by phone at (212) to stop a train plus a 50 percent safety mar- because riding was increasing rapidly. But it 986-4482 (voice mail gin. But this system seriously delayed trains, increased service by installing station time available). ERA’s website is especially during rush hours. signals and ordering 325 cars, 3700-4024. www.electricrailroaders. Meanwhile, overcrowding kept increasing. By installing center doors in all subway org. To increase service, IRT consulted an expert cars, loading was speeded up.
    [Show full text]
  • TRANSIT-ORIENTED DEVELOPMENT in PHILADELPHIA: Using a Proven Strategy to Create More Vibrant, Livable Neighborhoods
    TRANSIT-ORIENTED DEVELOPMENT IN PHILADELPHIA: Using a proven strategy to create more vibrant, livable neighborhoods. A report outlining opportunities to create more TOD in Philadelphia and its role in supporting a stronger city economy. October 2007 Report researched and written by Econsult Corporation for NeighborhoodsNow F u n d e d i n p a r t b y C i t i b a n k , S u r d n a F o u n d a t i o n a n d T h e P r u d e n t i a l F o u n d a t i o n . About NeighborhoodsNow NeighborhoodsNow, a Philadelphia-based nonprofit contributes to the economic vitality of the city and region by collaborating with public and private organizations to strengthen low- and moderate-income communities. We are a catalyst using public policy work, direct revitalization programs and strategic partnerships to re-energize and rebuild neighborhoods. Our Healthy Neighborhoods Initiative focuses on stabilizing ‘middle-market’ neighborhoods through improvements in physical appearance, resident engagement and market health. Our transit- oriented development work seeks to capitalize on existing transit assets by attracting new real estate investments that benefit current and future neighborhood residents. NeighborhoodsNow is governed by a board of directors with expertise in economic development, neighborhood revitalization and policy development. About Econsult Corporation Econsult Corporation (www.econsult.com) was founded in Philadelphia in 1979 for the purpose of providing high quality economic research and statistical & econometric analysis in support of litigation. Today Econsult’s practice has expanded beyond litigation to include economic consulting services to assist business and public policy decision-makers.
    [Show full text]
  • On Track Progress Towards Transit-Oriented Development in The
    Created in 1965, the Delaware Valley Regional Planning Commission (DVRPC) is an interstate, intercounty and intercity agency that provides continuing, comprehensive and coordinated planning to shape a vision for the future growth of the Delaware Valley region. The region includes Bucks, Chester, Delaware, and Montgomery counties, as well as the City of Philadelphia, in Pennsylvania; and Burlington, Camden, Gloucester and Mercer counties in New Jersey. DVRPC provides technical assistance and services; conducts high priority studies that respond to the requests and demands of member state and local governments; fosters cooperation among various constituents to forge a consensus on diverse regional issues; determines and meets the needs of the private sector; and practices public outreach efforts to promote two-way communication and public awareness of regional issues and the Commission. Our logo is adapted from the official DVRPC seal, and is designed as a stylized image of the Delaware Valley. The outer ring symbolizes the region as a whole, while the diagonal bar signifies the Delaware River. The two adjoining crescents represent the Commonwealth of Pennsylvania and the State of New Jersey. DVRPC is funded by a variety of funding sources including federal grants from the U.S. Department of Transportation’s Federal Highway Administration (FHWA) and Federal Transit Administration (FTA), the Pennsylvania and New Jersey departments of transportation, as well as by DVRPC’s state and local member governments. The authors, however, are solely responsible for its findings and conclusions, which may not represent the official views or policies of the funding agencies. DVRPC fully complies with Title VI of the Civil Rights Act of 1964 and related statutes and regulations in all programs and activities.
    [Show full text]
  • Corridor Rail Facilities
    7 CORRIDOR RAIL FACILITIES PENNSYLVANIA COMMISSION JANUARY 1991 1·95 Intermodal MobilitV Pioieet: Heading for the Twentv·First Century CORRIDOR RAIL 7 FACILITIES 1-95 Intermodal Mobility Project Prepared for the PENNSYLVANIA DEPARTMENT OF ® TRANSPORTATION by the DELAWARE VALLEY fJ REGIONAL PLANNING COMMISSION January 1991 . ~95 HEADING FOR THE TWENTY-FIRST CENTURY This report, prepared by the Transportation Planning Division of the Delaware Valley Regional Planning Commission, was financed by the Pennsylvania Department of Transportation and the Federal Highway Administration. The authors, however, are solely responsible for its finding and conclusions, which may not represent the official views or policies of the funding agencies. Created in 1965, the Delaware Valley Regional Planning Commission (DVRPC) is an interstate, intercounty and intercity agency which provides continuing, comprehensive and coordinated planning for the orderly growth and development of the Delaware Valley region. The region includes Bucks, Chester, Delaware, and Montgomery counties as well as the City of Philadelphia in Pennsylvania and Burlington, Camden, Gloucester, and Mercer counties in New Jersey. The Commission is an advisory agency which divides its planning and service functions among the Office of the Executive Director, the Office of Public Affairs, and four line Divisions: Transportation Planning, Regional Information Services Center, Strategic Planning, and Finance and Administration. DVRPC's mission for the 1990s is to emphasize technical assistance and services and to conduct high priority studies for member state and local governments, while determining and meeting the needs of the private sector. The DVRPC logo is adapted from the official seal of the Commission and is designed as a stylized image of the Delaware Valley.
    [Show full text]
  • Fiscal Year 2017 Annual Service Plan
    FISCAL YEAR 2017 ANNUAL SERVICE PLAN Service Planning Department 2016 DRAFT COPY TABLE OF CONTENTS INTRODUCTION 1 ANNUAL SERVICE PLAN TIMELINE 2 I. SUMMARY AND LIST OF RECOMMENDED CHANGES 3 II. ANNUAL SERVICE PLAN PROCESS 4 III. EVALUATION PROCESS 5 IV. RECOMMENDED PROJECTS 7 V. NON-RECOMMENDED PROJECTS 8 VI. POST-IMPLEMENTATION REVIEW OF PRIOR YEAR’S CHANGES 21 VII. ANNUAL ROUTE AND STATION PERFORMANCE REVIEW 26 APPENDICES 28 PROJECT MAPS 29 PROJECT COSTS/REVENUE SUMMARY CHARTS 36 COMMUNITY BENEFIT ANALYSIS COMPUTATIONS 39 ANNUAL ROUTE PERFORMANCE REVIEW 42 City Transit 44 Suburban Transit 46 Contract Operations 47 ANNUAL STATION PERFORMANCE REVIEW 48 City Transit 49 Suburban Transit 64 Regional Rail Division 68 Regional Rail Stations 73 INTRODUCTION The Southeastern Pennsylvania Transportation Authority (SEPTA) is pleased to present its Annual Service Plan (ASP) for Fiscal Year 2017. This document describes the service proposals suggested by the general public, government agencies, elected officials and Authority staff, and presents the technical and financial analyses that determine whether the proposals merit implementation. The Plan includes projects for City Transit and Suburban Transit. There are no proposals for Regional Rail. This year marks the 19th Annual Service Plan and its associated planning process. This and the previous efforts reflect SEPTA’s ongoing commitment to improve the performance and productivity of transit routes and regional rail lines through careful measurement of both ridership changes and operating cost based upon a numeric scoring methodology. This method, fully described for each proposal, includes measures for revenues, operating costs, and impacts to existing riders. Additionally, each proposal must meet minimum performance standards, adopted by the SEPTA Board, prior to review within the service plan process.
    [Show full text]
  • C:\Users\Ed\Documents\NRHS 2018\1808 AUG PAGE 1 PHL
    1935 - 2018 VOLUME49NUMBER8 DISTRICT 2 - CHAPTER WEBSITE: WWW.NRHS1.ORG AUGUST 2018 TTHE HHISISTORY OF PPHILADELPHIA''S TTRACKLESS TTROLLEYS BY JOHN CALNAN MANAGER, CITY & SERVICE PLANNING, SEPTA In the early 1920's, rubber-tired technology improved where trolley car manufacturers offered a flexible vehicle that could avoid motorists or obstacles, as well as providing transit properties a new, electric, mode that while transporting fewer passengers than a streetcar, offering frequent service without the capital outlay for trackage and equipment. Baltimore and Toronto established electric rail-less operations as experiments on two routes with the goal to spur enough development to eventually convert to streetcar operations. On October 14, 1923, the Philadelphia Rapid Transit Company (PRT) purchased 10 "Rail-Less" vehicles to test their effectiveness on newly created Route 80 which operated along Oregon Avenue from 22nd Street & Passyunk Avenue to Oregon & Delaware. The first generation of Rail-Less vehicles, also known as Trolley Coaches, or Trackless Trolleys resembled a trolley car than an electric bus. Initially, these vehicles operated from Jackson Depot, located on 16th Street, between Jackson and Wolf Streets, but the operation was relocated to Southern Depot in 1925. Southern Depot located on Johnston Street, between 19th and 20th Street , housed trolleys that served several crosstown and north-south lines and the facility had the space to store and maintain trackless vehicles. Ridership gradually grew as Route 80 connected South Philadelphia neighborhoods on either side of Broad Street and several north-south trolley routes to Center City and points north and west. These primitive vehicles were eventually retired and more modern, comfortable vehicles were acquired in November 1935.
    [Show full text]
  • March 2011 Bulletin.Pub
    TheNEW YORK DIVISION BULLETIN - MARCH, 2011 Bulletin New York Division, Electric Railroaders’ Association Vol. 54, No. 3 March, 2011 The Bulletin HUDSON-BERGEN 8TH STREET EXTENSION OPENS Published by the New by Marc Glucksman York Division, Electric Railroaders’ Association, (Photographs by the author) Incorporated, PO Box 3001, New York, New On clear, crisp Monday, January 31, NJ Mainline was reduced to the Cranford to York 10008-3001. Transit opened its most recent extension. Bayonne Scoot (usually operated with RDCs) The Hudson-Bergen Light Rail (HBLR) line from the 1967 Aldene Plan re-alignment until For general inquiries, was extended from its previous terminal at the termination of service. Member Jack May contact us at nydiv@ 22nd Street and Avenue E to 8th Street and recalled riding here on the former Central of erausa.org or by phone at (212) 986-4482 (voice Avenue C. At a cost of $58.4 million, the one- New Jersey main line. He pointed out that mail available). The mile extension brings the light rail to its far- while the architecture of the light rail station Division’s website is thest point south. Service will continue in the is very similar to the CNJ station that had www.erausa.org/ existing pattern (Tonnelle Avenue-West Side been there, it faces the opposite direction, nydiv.html. Avenue/8th Street-Hoboken Terminal). Head- away from the tracks. The extension itself ways range from a best of 3 minutes to 30 narrows to one track south of 22nd Street be- Editorial Staff: th Editor-in-Chief: minutes at night/weekend.
    [Show full text]