Department of Public Works and Highways Region Vi Aklan District Engineering Office Toting Reyes Street, Kalibo, Aklan

Total Page:16

File Type:pdf, Size:1020Kb

Department of Public Works and Highways Region Vi Aklan District Engineering Office Toting Reyes Street, Kalibo, Aklan REPUBLIC OF THE PHILIPPINES DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS REGION VI AKLAN DISTRICT ENGINEERING OFFICE TOTING REYES STREET, KALIBO, AKLAN C.Y. 2020 PROJECT DETAILED ENGINEERING PLAN FOR CONCRETING OF BRGY. VIVO FMR, BRGY VIVO, TANGALAN, AKLAN SECTION: TANGALAN, AKLAN LOCATION: BRGY VIVO STATION LIMITS: STA. 0+000.00 - STA. 0+760.00 NET LENGTH: 1.52 LANE KM. SUBMITTED: RECOMMENDED: APPROVED: RONNIE G. TABERNILLA LEO P. BIONAT ALEJANDRO M. VENTILACION OIC, PLANNING AND DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER DATE: DATE: DATE: CONCRETING OF BRGY. VIVO FMR, BRGY VIVO, TANGALAN, AKLAN BRGY VIVO, TANGALAN, AKLAN BEG. OF PROJECT END OF PROJECT STA. 0+000.00 STA. 0+760.00 STRAIGHT LINE DIAGRAM SCALE: NTS SITE VICINITY MAP PROJECT NAME AND LOCATION: SHEET CONTENTS: SURVEYED: CHECKED / REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO. REPUBLIC OF THE PHILIPPINES DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS NARDE V. RAMOS REGION VI INSTRUMENTMAN CONCRETING OF BRGY. VIVO FMR, BRGY ERNAN I. BAÑES RONNIE G. TABERNILLA LEO P. BIONAT ALEJANDRO M. VENTILACION VIVO, TANGALAN, AKLAN PREPARED: 1 1 AKLAN DISTRICT ENGINEERING OFFICE VINCINT JUDE JOSEF Z. ZUBIAGA ENGINEER II OIC, PLANNING AND DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER TOTING REYES STREET, KALIBO, AKLAN ENGINEER I DATE: DATE: DATE: DATE: 1 GENERAL NOTES PROJECT NAME AND LOCATION: SHEET CONTENTS: SURVEYED: CHECKED / REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO. REPUBLIC OF THE PHILIPPINES DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS NARDE V. RAMOS REGION VI INSTRUMENTMAN CONCRETING OF SITIO LIONG TO SITIO TACUBE, BRGY CALIMBAJAN FMR, BRGY PREPARED: ERNAN I. BAÑES RONNIE G. TABERNILLA LEO P. BIONAT ALEJANDRO M. VENTILACION 1 2 AKLAN DISTRICT ENGINEERING OFFICE CALIMBAJAN, MAKATO, AKLAN VINCINT JUDE JOSEF Z. ZUBIAGA ENGINEER II OIC, PLANNING AND DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER TOTING REYES STREET, KALIBO, AKLAN ENGINEER I DATE: DATE: DATE: DATE: 4 6 mm D/4 LONGITUDINAL JOINT/CONSTRUCTION JOINT IN MIDDLE THIRD "B" SCALE 1:10 6 mm SCALE 1:100 D/4 COINCIDENT WITH PLANNED/CONSTRUCTION JOINT "A" SCALE 1:10 DETAIL PLAN OF PCCP SCALE: AS SHOWN PROJECT NAME AND LOCATION: SHEET CONTENTS: SURVEYED: CHECKED / REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO. REPUBLIC OF THE PHILIPPINES DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS NARDE V. RAMOS REGION VI INSTRUMENTMAN CONCRETING OF SITIO LIONG TO SITIO TACUBE, BRGY CALIMBAJAN FMR, BRGY PREPARED: ERNAN I. BAÑES RONNIE G. TABERNILLA LEO P. BIONAT ALEJANDRO M. VENTILACION 1 3 AKLAN DISTRICT ENGINEERING OFFICE CALIMBAJAN, MAKATO, AKLAN VINCINT JUDE JOSEF Z. ZUBIAGA ENGINEER II OIC, PLANNING AND DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER TOTING REYES STREET, KALIBO, AKLAN ENGINEER I DATE: DATE: DATE: DATE: 4 TYPICAL ROADWAY SECTION "A" DETAIL SCALE: 1:50 M TYPICAL ROADWAY SECTION "C" DETAIL SCALE: 1:50 M PROJECT NAME AND LOCATION: SHEET CONTENTS: SURVEYED: CHECKED / REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO. REPUBLIC OF THE PHILIPPINES DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS NARDE V. RAMOS REGION VI INSTRUMENTMAN CONCRETING OF SITIO LIONG TO SITIO TACUBE, BRGY CALIMBAJAN FMR, BRGY PREPARED: ERNAN I. BAÑES RONNIE G. TABERNILLA LEO P. BIONAT ALEJANDRO M. VENTILACION 1 4 AKLAN DISTRICT ENGINEERING OFFICE CALIMBAJAN, MAKATO, AKLAN VINCINT JUDE JOSEF Z. ZUBIAGA ENGINEER II OIC, PLANNING AND DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER TOTING REYES STREET, KALIBO, AKLAN ENGINEER I DATE: DATE: DATE: DATE: 4.
Recommended publications
  • POPCEN Report No. 3.Pdf
    CITATION: Philippine Statistics Authority, 2015 Census of Population, Report No. 3 – Population, Land Area, and Population Density ISSN 0117-1453 ISSN 0117-1453 REPORT NO. 3 22001155 CCeennssuuss ooff PPooppuullaattiioonn PPooppuullaattiioonn,, LLaanndd AArreeaa,, aanndd PPooppuullaattiioonn DDeennssiittyy Republic of the Philippines Philippine Statistics Authority Quezon City REPUBLIC OF THE PHILIPPINES HIS EXCELLENCY PRESIDENT RODRIGO R. DUTERTE PHILIPPINE STATISTICS AUTHORITY BOARD Honorable Ernesto M. Pernia Chairperson PHILIPPINE STATISTICS AUTHORITY Lisa Grace S. Bersales, Ph.D. National Statistician Josie B. Perez Deputy National Statistician Censuses and Technical Coordination Office Minerva Eloisa P. Esquivias Assistant National Statistician National Censuses Service ISSN 0117-1453 FOREWORD The Philippine Statistics Authority (PSA) conducted the 2015 Census of Population (POPCEN 2015) in August 2015 primarily to update the country’s population and its demographic characteristics, such as the size, composition, and geographic distribution. Report No. 3 – Population, Land Area, and Population Density is among the series of publications that present the results of the POPCEN 2015. This publication provides information on the population size, land area, and population density by region, province, highly urbanized city, and city/municipality based on the data from population census conducted by the PSA in the years 2000, 2010, and 2015; and data on land area by city/municipality as of December 2013 that was provided by the Land Management Bureau (LMB) of the Department of Environment and Natural Resources (DENR). Also presented in this report is the percent change in the population density over the three census years. The population density shows the relationship of the population to the size of land where the population resides.
    [Show full text]
  • EVP Terminal Report: Operations Research for Disaster Preparedness and Response
    EVP Terminal Report: Operations research for disaster preparedness and response Exchange Visitor: Dr. Joline Ann V. Uichanco Ph.D., Massachusetts Institute of Technology [email protected] Partner Institution: Ateneo de Manila University January 7, 2015 Abstract This terminal report describes the project conducted by the above-named exchange visi- tor with the objective of developing operations research models for disaster preparedness and response. The report describes the objectives of the project, the activities undertaken, the find- ings based on field visits, the development of the mathematical model, and conclusions based on the model. This terminal report is submitted in partial fulfillment of the requirements for the Exchange Visitor Program alternative arrangement for technical knowledge transfer. 1 Review of activities undertaken The objective of this project are as follows: 1. Utilization of quantitative models in Operations Research to make recommendations for im- proving the efficiency and effectiveness of the Philippine disaster response. 2. Development of a mathematical model for disaster management that: (a) would be used as the basis of the decision-support tool for coordinating relief operations in the aftermath of a disaster, (b) can be used to simulate and estimate the benefit of coordinated operations, (c) can quantify the benefits of particular investments in infrastructure that would improve the Philippines resilience to disasters This project consisted broadly of four phases, namely: 1 • Data gathering • Mathematical modeling • Evaluation of the model • Development of a decision-support tool A brief description of each phase and the summary of activities undertaken in each phase follows. Phase Description Data gathering This phase consisted of compiling data on the affected population from Typhoon Yolanda, data of Visayas municipalities, and data of Visayas' transportation network (sea routes, air routes, road networks connecting municipalities and cities, and air).
    [Show full text]
  • Coral Garden & Reef Rehabilitation Project, The
    Coral garden & reef rehabilitation project, the establishment of marine reserves and fish sanctuaries of the Bureau of Fisheries and Aquatic Resources (BFAR) in the Philippines Item Type book_section Authors Dickson, Alma C.; Velasco, Pierre Easter L. Publisher Training Department, Southeast Asian Fisheries Development Center Download date 25/09/2021 19:43:09 Link to Item http://hdl.handle.net/1834/41114 CP 04 | 65 CORAL GARDEN & REEF REHABILITATION PROJECT, THE ESTABLISHMENT OF MARINE RESERVES AND FISH SANCTUARIES OF THE BUREAU OF FISHERIES AND AQUATIC RESOURCES (BFAR) IN THE PHILIPPINES Alma C. Dickson, Pierre Easter L. Velasco Bureau of Fisheries and Aquatic Resources, Philippines ABSTRACT The vastness of the Philippine waters provides significant supply of food and protein as well as opportunities for development for commercial and municipal fisheries. The utilization of such immense marine resource should be geared along sustainability not only for survival, but also to the country’s increasing population, environmental degradation, and the state’s commitment to the Global competitiveness archetype. The establishment of non-fishing areas in marine protected areas would double fish catch in 5 years (Roberts, 2002). ■ INTRODUCTION promote alternative livelihood to reduce community pressure on the reefs through The Philippines Marine Resources “green” coral aquaculture. The BFAR with the envelops a total area of 220,000 hectares LGU of Tangalan, A klan has identified and (including the Exclusive Economic Zone), delineated the 10 ha. site/area for the said coral consisting of 193,400,000 hectares of oceanic rehabilitation and marine resource or off-shore waters, and 27, 000 sq. km. of conservation and protection project.
    [Show full text]
  • Last Name) (First Name)
    DEPARTMENT OF LABOR AND EMPLOYMENT Regional Office No. VI Special Program for Employment of Students (SPES) List of SPES Beneficiaries CY 2018 As of DECEMBER 31, 2019 ACCOMPLISH IN CAPITAL LETTERS Name of Student No. Province Employer Address (Last Name) (First Name) 1 AKLAN LGU BALETE ARANAS CYREL KATE ARANAS, BALETE, AKLAN 2 AKLAN LGU BALETE DE JUAN MA. JOSELLE MAY MORALES, BALETE, AKLAN 3 AKLAN LGU BALETE DELA CRUZ ELIZA CORTES, BALETE, AKLAN 4 AKLAN LGU BALETE GUIBAY RESIA LYCA CALIZO, BALETE, AKLAN 5 AKLAN LGU BALETE MARAVILLA CHRISHA SEPH ALLANA POBLACION, BALETE, AKLAN 6 AKLAN LGU BALETE NAGUITA QUENNIE ANN ARCANGEL, BALETE, AKLAN 7 AKLAN LGU BALETE NERVAL ADE FULGENCIO, BALETE, AKLAN 8 AKLAN LGU BALETE QUIRINO PAULO BIANCO ARANAS, BALETE, AKLAN 9 AKLAN LGU BALETE REVESENCIO CJ POBLACION, BALETE, AKLAN 10 AKLAN LGU BALETE SAUZA LAIZEL ANNE GUANKO, BALETE, AKLAN 11 AKLAN AKLAN CATHOLIC COLLEGE AMBAY MA. JESSA CARMEN, PANDAN, ANTIQUE 12 AKLAN AKLAN CATHOLIC COLLEGE ARCEÑO SHAMARIE LYLE ANDAGAO, KALIBO, AKLAN 13 AKLAN AKLAN CATHOLIC COLLEGE BAUTISTA CATHERINE MAY BACHAO SUR, KALIBO, AKLAN 14 AKLAN AKLAN CATHOLIC COLLEGE BELINARIO JESSY ANNE LOUISE TAGAS, TANGALAN, AKLAN 15 AKLAN AKLAN CATHOLIC COLLEGE BRACAMONTE REMY CAMALIGAN, BATAN, AKLAN 16 AKLAN AKLAN CATHOLIC COLLEGE CONTRATA MA. CRISTINA ASLUM, IBAJAY, AKLAN 17 AKLAN AKLAN CATHOLIC COLLEGE CORDOVA MARVIN ANDAGAO, KALIBO, AKLAN 18 AKLAN AKLAN CATHOLIC COLLEGE DE JUAN CELESTE TAGAS, TANGALAN, AKLAN 19 AKLAN AKLAN CATHOLIC COLLEGE DELA CRUZ RALPH VINCENT BUBOG, NUMANCIA, AKLAN 20 AKLAN AKLAN CATHOLIC COLLEGE DELIMA BLESSIE JOY POBLACION, LIBACAO, AKLAN 21 AKLAN AKLAN CATHOLIC COLLEGE DESALES MA.
    [Show full text]
  • The Tangalan Story
    The Tangalan story Item Type article Authors Adan, R. I. Y. Download date 27/09/2021 07:53:59 Link to Item http://hdl.handle.net/1834/35074 aquafarm news • LGUs and aquaculture Now, it is not difficult to convince people The Tangalan story to participate in any LGU endeavor be­ cause they know they can benefit from it financially. “They just need a little push,” noted B y R IY Adan the M ayor. “It was accidental,” answered Tangalan barangay and even outsiders have seen the Mayor Jed Tirol when asked how the project flourish. They are now excited and Tangalan: the next eco-tourism Tangalan-SEAFDEC/AQD collaboration have began asking the mayor to start an­ destination started. Upon assumption of office on the other related project. Tangalan is being developed into an eco- first week of July 1998, the mayor received But Mayor Tirol is not your usual tourism destination. They have their cloth- a conference invitation from AQD. “please the people first” mayor. He be­ weaving industry, piña cloth, the Jawili “E ven w hen I w as still a vice m ayor, I lieves that these things should be studied waterfalls and of course, their beautiful already have an idea of what AQD is — I thoroughly. For him, a feasibility study is beaches. But the biggest attraction is the have attended some of its seminars for fish­ necessary if they want to obtain optimum three restaurants with floating fish cages pond operators. So when they presented a results. Zoning of all 15 barangays will be of grouper and red snapper.
    [Show full text]
  • Office: DOLE RO6 BENEFICIARIES 2020
    BENEFICIARIES 2020 ANNEX B Office: DOLE RO6 Program/Project Name Gender Age City/Municipality/Province ACTA, KIM PATRICK A. FEMALE 21 ROXAS CITY, CAPIZ GOVERNMENT INTERNSHIP ADRADA, KEYCEE ANN FEMALE 28 HAMTIC, ANTIQUE PROGRAM AGUILAR, AILEEN A. FEMALE 24 ROXAS CITY, CAPIZ AGUIRRE, AEDREN JAKE P. MALE 25 IBAJAY, AKLAN ALAG, LEECHELL ANGEL T. FEMALE 21 IBAJAY, AKLAN ALAGAO, CRISEL L. FEMALE 22 SAN JOSE, ANTIQUE ALAYON, GILLIE ANN A. FEMALE 22 ROXAS CITY, CAPIZ ALAYON, NONITO JR, P. MALE 26 ROXAS CITY, CAPIZ ALBARAN, KATHREEN DIANNE F. FEMALE 23 ROXAS CITY, CAPIZ ALEJANDRO, AIRA NICA JOY T. FEMALE 23 NABAS, AKLAN ALMODAL, MARY ANGELICA S. FEMALE 25 IBAJAY, AKLAN ALPAS, ROMNICK M. MALE 24 SIBALOM, ANTIQUE ANIANA, JORDAN I. FEMALE 26 BURUANGA, AKLAN ANISCOL, JOHN PAUL G. MALE 22 TALISAY CITY, NEGROS OCC ANTARAN, AIRAH MAE C. FEMALE 23 IBAJAY, AKLAN ANTARAN, MARSON T. MALE 18 TANGALAN, AKLAN ANTARAN, SHANE T. FEMALE 20 TANGALAN, AKLAN ANTONIO, ALEJANDRO L. JR MALE 23 CULASI, ANTIQUE ANTOY, JAY-R V. MALE 27 IBAJAY, AKLAN ARANETA, KAYZEL V. FEMALE 22 BACOLOD CITY, NEGROS OCC ARBADO, ANALYN G. FEMALE 22 CULASI, ANTIQUE ARSENIO, ERIC C. MALE 28 SAN JOSE, ANTIQUE ASENCI, MARYNEL M. FEMALE 21 ANINI-Y, ANTIQUE AUTENCIO, HANNAH C. FEMALE 21 LEZO, AKLAN BALBUENA, LIMUEL L. MALE 23 BELISON, ANTIQUE BALIGUAT, NIÑA MELBIE R. FEMALE 22 NABAS, AKLAN BARCENAL, JESSA MAE E. FEMALE 23 BELISON, ANTIQUE BATICAN, ROD T. MALE 27 TANGALAN, AKLAN BATILOY, LEIZEL L. FEMALE 23 TANGALAN, AKLAN BENEDICTO, JOAN GEM FEMALE 22 ROXAS CITY, CAPIZ BERMUDES, DENNIS O. MALE 30 SAN REMIGIO, ANTIQUE BERTOLANO, MICA P.
    [Show full text]
  • Aquatic Resources in the Philippines and the Extent of Poverty in the Sector
    Aquatic resources in the Philippines and the extent of poverty in the sector Item Type monograph Authors Rivera, R.; Turcotte, D.; Boyd-Hagart, A.; Pangilinan, J.; Santos, R. Publisher Support to Regional Aquatic Resources Management (STREAM) Download date 01/10/2021 17:09:47 Link to Item http://hdl.handle.net/1834/20137 Aquatic resources in the Philippines and the extent of poverty in the sector May 2002 Table of contents List of tables.......................................................................................................vi List of figures ....................................................................................................vii Abbreviations...................................................................................................viii 1 Introduction..................................................................................................1 2 Status of aquatic resources in the Philippines .........................................2 2.1 Marine resources ...............................................................................................2 2.1.1 Coral reefs .............................................................................................................. 3 2.1.2 Seagrasses and seaweeds...................................................................................... 4 2.2 Inland resources.................................................................................................5 2.2.1 Mangroves and brackish water ponds.....................................................................
    [Show full text]
  • Province, City, Municipality Total and Barangay Population AKLAN 535,725 ALTAVAS 23,919 Cabangila 1,705 Cabugao 1,708 Catmon
    2010 Census of Population and Housing Aklan Total Population by Province, City, Municipality and Barangay: as of May 1, 2010 Province, City, Municipality Total and Barangay Population AKLAN 535,725 ALTAVAS 23,919 Cabangila 1,705 Cabugao 1,708 Catmon 1,504 Dalipdip 698 Ginictan 1,527 Linayasan 1,860 Lumaynay 1,585 Lupo 2,251 Man-up 2,360 Odiong 2,961 Poblacion 2,465 Quinasay-an 459 Talon 1,587 Tibiao 1,249 BALETE 27,197 Aranas 5,083 Arcangel 3,454 Calizo 3,773 Cortes 2,872 Feliciano 2,788 Fulgencio 3,230 Guanko 1,322 Morales 2,619 Oquendo 1,226 Poblacion 830 BANGA 38,063 Agbanawan 1,458 Bacan 1,637 Badiangan 1,644 Cerrudo 1,237 Cupang 736 National Statistics Office 1 2010 Census of Population and Housing Aklan Total Population by Province, City, Municipality and Barangay: as of May 1, 2010 Province, City, Municipality Total and Barangay Population Daguitan 477 Daja Norte 1,563 Daja Sur 602 Dingle 723 Jumarap 1,744 Lapnag 594 Libas 1,662 Linabuan Sur 3,455 Mambog 1,596 Mangan 1,632 Muguing 695 Pagsanghan 1,735 Palale 599 Poblacion 2,469 Polo 1,240 Polocate 1,638 San Isidro 305 Sibalew 940 Sigcay 974 Taba-ao 1,196 Tabayon 1,454 Tinapuay 381 Torralba 1,550 Ugsod 1,426 Venturanza 701 BATAN 30,312 Ambolong 2,047 Angas 1,456 Bay-ang 2,096 Caiyang 832 Cabugao 1,948 Camaligan 2,616 Camanci 2,544 Ipil 504 Lalab 2,820 National Statistics Office 2 2010 Census of Population and Housing Aklan Total Population by Province, City, Municipality and Barangay: as of May 1, 2010 Province, City, Municipality Total and Barangay Population Lupit 1,593 Magpag-ong
    [Show full text]
  • Feasibility Study
    A. Project Title : Rehabilitation and Improvement of Banga-Libacao Road with Bridges B. Project Location : Municipality of Banga (Barangay Polo, Badiangan, Torralba & Daguitan) : Municipality of Madalag (Barangay Paningayan and Napnot) : Municipality of Libacao (Barangay Janlud) The project is located in the eastern part of the province of Aklan that traverses 7 barangays from the town of Banga to Libacao. It is parallel to the Aklan River at the right lane of the road when going to Libacao. The terrain of the location is relatively flat and gradually sloping towards Libacao. C. Project Category : Rural Access (Road Rehabilitation and Improvement) D. Project Scale/Dimension : 12,740 Meters (12.74 Kilometers) E. Project Proponent : LGU-Province of Aklan F. Implementing Unit : Provincial Government of Aklan (PEO) G. Total No. of Barangays on the Municipalities of: Libacao : 24 Madalag : 25 Banga : 30 H. Mode of Implementation : By Contract I. Road Influence Area (RIA) : 47,063.9125 hectares FEASIBILITY Libacao : 42,572.9250 STUDY hectares Madalag : 2,219.6045 hectares Banga : 2,271.383 hectares Barangay No. of has. Crops Libacao (to include the 22 barangays) 42,056.675 Abaca, Rice, Banana, Piña, Root Crops, vegetables, Fruits (lanzones, marang, rambutan, durian, oranges, mangosteen) Poblacion 162.500 Janlud 353.750 Abaca, Rice, Banana, Root Crops, Vegetables, Piña, Fruits (lanzones, marang, rambutan, durian, oranges, mangosteen) Madalag: Abaca, Coconut, Rice, Fruits, Vegetables, Corn, Root Crops, Napnot 326.940 Rattan, Bamboo, Nito, Buri 567.640 Abaca, Coconut, Rice, Fruits, Vegetables, Corn, Root Crops, Paningayan Rattan, Bamboo, Nito, Buri Banga: Cerrudo 112.5371 Rice, Corn, Banana, Coconut, Bamboo, Fruit Trees, Vegetables, Root Crops, Legumes.
    [Show full text]
  • 2012 Municipal and City Level Poverty Estimates
    2012 Municipal and City Level Poverty Estimates Republic of the Philippines Philippine Statistics Authority 2012 Municipal and City Level Poverty Estimates CAR Region I Region II Region III Region IV-A NCR Region V Region VIII Region IV-B Region VI Region VII Region X Caraga Region IX Region XI ARMM Region XII The 2012 Municipal and City Level Poverty Estimates is a major output of the Project on the Generation of 2012 Small Area Estimates of Poverty implemented by the Philippine Statistics Authority (PSA). 31 May 2016 Philippines 2012 Municipal and City Level Poverty Estimates is a publication prepared by the Poverty and Human Development Statistics Division of the Philippine Statistics Authority (PSA). For technical inquiries, please contact us at: (632) 376-1991 or email us at [email protected]. TERMS OF USE OF PSA PUBLICATIONS The PSA reserves its exclusive right to reproduce all its publications in whatever form. Any part of this publication should not be reproduced, recopied, lent or repackaged for other parties for any commercial purposes without written permission from the PSA. Any part of this publication may only be reproduced for internal use of the recipient/customer company. Should any portion of the data in this publication be included in a report/article, the title of the publication and the PSA as publisher should be cited as the source of the data. Any information derived from the processing of data contained in this publication will not be the responsibility of PSA. Published by the Philippine Statistics Authority PSA CVEA Building East Avenue, Diliman Quezon City Philippines 31 May 2016 The 2012 Municipal and City Level Poverty Estimates is available in electronic formats (Excel/Word/PDF in CDRom).
    [Show full text]
  • Complying with the National
    COMPLYING WITH THE NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM PHASE II STORM WATER REGULATIONS: NAVAL STATION NEWPORT STORM DRAIN OUTFALL MAPPING NEWPORT, RHODE ISLAND Laura M. Ernst, ESS Group, Inc. Cornelia A. Mueller, Naval Station Newport, Environmental Protection Department Karen M. Hanecak, ESS Group, Inc. Gregory A. Rowe, ESS Group, Inc. Abstract The United States Environmental Protection Agency (USEPA) has determined that municipal separate storm sewer systems (MS4s) are a major pathway for the introduction of pollutants to waterways and are a leading cause of the impairment of ambient water quality, for both fresh and coastal waters. The USEPA has developed regulations governing storm water for MS4s in 40 CFR Part 122. The Rhode Island Department of Environmental Management (RIDEM) has written equivalent regulations in its Regulations for the Rhode Island Pollutant Discharge Elimination System. MS4s are required to develop, submit for RIDEM approval, and ultimately implement a Storm Water Management Plan (SWMPP) that addresses six minimum control measures. ESS Group Inc. performed storm drain outfall mapping for the Naval Station Newport to comply with the Naval Station’s Phase II SWMPP Illicit Discharge Detection and Elimination program. ESS personnel used a handheld Global Positioning System unit with 3 ft. accuracy to obtain coordinates for outfalls to Narragansett Bay. With the coordinate locations, ESS then developed a Geographic Information System (GIS) map that includes the storm drain outfalls overlaid on geographic referenced orthophotographs. An interactive ArcView database was created as part of the GIS project which includes details on storm drain outfall, including type and size of pipe, presence/absence of flow, and date of inspection.
    [Show full text]
  • (Department of Public Works and Highways, Regional Office VI, Aklan DEO) Monitoring Reports As of June 2018
    (Department of Public Works and Highways, Regional Office VI, Aklan DEO) Monitoring Reports as of June 2018 Code Procurement PMO/ Mode of Actual Procurement Activity Source of ABC (Php) Contract Cost (Php) List of Date of Receipt of Invitation Remarks (PAP) Program/Project End-User Procurement Pre-Bid Ads/Post Eligibility Sub/Open Post Qua Notice of Contract Notice to DeliveryAcceptance/ Funds Total MO C Total MO C Invited Pre-Proc Pre-Bid Eligibility Sub/Open Bid Post (Explaining Conf of ITB Check of Bids award Signing Proceed CompletionTurnover O O O O Observers Conf Conf Check of Bids Ev. Qua Changes from E E the APP) 1. Const./Rehab.of MPB 300104202843000 (Terminal) Kalibo Transport Const. Competitive Dec. 14 - 20, FY 2018 RA10964 P9,900,000.00 P9,699,613.36 19-Dec-17 19-Dec-17 21-Dec-17 4-Jan-18 4-Jan-18 31-Jan-18 22-Feb-18 6-Mar-18 21-Mar-18 9 Terminal, Kalibo, Aklan Section Bidding 2017 Reg 2018 (18GA0051) Current 2. Construction of MPB FY 2018 RA10964 Const. Competitive -do- -do- -do- -do- 31-Jan-18 26-Feb-18 15-Mar-18 06-Apr-18 9 300104202841000 Barangay Sigcay, Banga, Aklan Section Bidding Reg 2018 P1,980,000.00 P1,915,687.99 19-Dec-17 19-Dec-17 (18GA0052) Current 3. Asphalt Overlay Along Jaime Cardinal Sin Avenue K0280+ 310102100150000 587 – K0281+649 K0282+ Const. Competitive Dec. 20 - 26, 000 – K0283+114 K0288+ 27-Dec-17 9-Jan-18 9-Jan-18 31-Jan-18 22-Feb-18 20-Mar-18 22-Mar-18 FY 2018 RA10964 P47,166,980.00 P44,800,000.00 9 28-Dec-17 28-Dec-17 Section Bidding 2017 (-618) – K0288+080 Reg 2018 K0293+000 – K0295+000 Current (18GA0053) 4.
    [Show full text]