MARC Rail Communities Sector Plan – Worksession One
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
Anderson Property Site Analysis
ANDERSON PROPERTY SITE ANALYSIS Introduction The Montgomery County Department of Transportation (MCDOT) initiated a feasibility study in the fall of 2012 to evaluate the need for transit service expansion to the existing Boyds MARC Station on Clopper Road in Boyds, Maryland. The study area is shown in Figure 1. Due to future development, MCDOT’s Ride On service may expand in the future to Clarksburg and would provide service to the Boyds MARC station, Clarksburg’s closest station. The Boyds MARC Station Project was initiated as a result of a request from the Boyds Civic Association for greater frequency of stops of the MARC Brunswick line at the Boyds station. The Boyds Transit Improvements Feasibility Study, November 2015 summarized existing conditions, identified goals for the station to meet the expanded service request, evaluated potential sites, and recommended the improvements that could accommodate the projected expansion needs. After the completion of the feasibility study, one of the adjacent sites considered for the improvements (Anderson Property) has become available for purchase, see Figure 2, sites 7 and 9. As a result, a concept layout was developed to provide bus access and additional parking for the existing Boyds MARC station on these two adjacent sites. This site analysis will briefly summarize existing conditions, identify the goals developed in the feasibility study for the station to meet the expanded service request, evaluate the feasibility of the Anderson Property. FIGURE 1: STUDY AREA N:\31681-018\Engineering\Reports\Anderson Property Site Analysis 2017.04.05.docx March 2017 Page 2 31681-018 Existing Conditions The Boyds MARC station is along the Maryland Transit Administration’s MARC Brunswick line. -
MARC Rail Communities Sector Plan Prepared by the Montgomery County Planning Department Montgomeryplanning.Org
Abstract This Sector Plan contains text and supporting maps for a limited adopted sector plan are for illustrative purposes only; they are intended amendment to the approved and adopted 1985 Boyds Master Plan, the to convey a general character rather than a specific commitment to a 1989 Germantown Master Plan and the 2009 Germantown Employment particular detailed design. Area Sector Plan. It also amends the General Plan (On Wedges and Corridors) for the Physical Development of the Maryland-Washington Sector plans do not specify all development possibilities for a particular Regional District in Montgomery and Prince George’s Counties as amended, property or area. To understand the full range of development options, the the Master Plan of Highways and Transitways within Montgomery County reader should be aware of additional land uses and development potential as amended, the 2004 Rustic Roads Functional Master Plan as amended, available through permitted conditional uses; variances; transferable the 2018 Countywide Bikeways Functional Master Plan as amended and the development rights (TDRs); moderately priced dwelling units (MPDUs); Master Plan for Historic Preservation in Montgomery County, Maryland. rezoning by local map amendments; public projects and mandatory referral processes; and municipal annexations. The Plan makes recommendations for land use, zoning, transportation, design, sustainability, community facilities and parks and open spaces. The Maryland-National Capital Park and Planning Commission The Maryland-National Capital -
Approved MARC Rail Communities Plan Scope of Work January 28, 2016 CONTENTS
Approved MARC Rail Communities Plan Scope of Work January 28, 2016 CONTENTS Introduction Purpose of the Plan Context Planning Framework Development Activity Community Outreach Plan Schedule FIGURES Figure 1: Boyds and Germantown MARC Boundaries in Relationship to I-270 and I-495 Figure 2: Boyds MARC Boundary Figure 3: Germantown MARC Boundary Figure 4: 1985 Boyds Master Plan, 1989 Germantown Master Plan and 2009 Germantown Employment Area Sector Plan in Relationship to the Proposed MARC Rail Communities Plan Boundaries Figure 5: 2009 Germantown Employment Sector Plan Districts Figure 6: Recent Major Private Development within Clarksburg Master Plan Area Figure 7: Recent Major Private Development within Germantown Master Plan Area Figure 8: Recent Major Public Development within Germantown Master Plan Area 1 Approved MARC Rail Communities Plan Scope of Work Introduction The MARC Rail Communities Plan is located in the upper portion of Montgomery County, west of I-270 and approximately 15 miles north of the Capital Beltway (I-495), along the CSX-owned railroad tracks in Boyds and Germantown. This Scope of Work describes the boundaries, context and purpose of the MARC Rail Communities Plan and highlights the process and timeline that Planning Department staff will use to work with the community to develop short- and long-term Plan recommendations. Figure 1: Boyds and Germantown MARC Boundaries in Relationship to I-270 and I-495 Plan Purpose The upper portions of Montgomery County have experienced large population growth over the past 50 years. It is anticipated that this growth will continue with development that has been recommended by Master Plans, approved by the Planning Board and is in the pipeline. -
Scope of Work for the MARC Rail Communities Plan
MONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION MCPB Item No. Date: 01-28-16 MARC Rail Communities Plan Scope of Work Roberto Duke, Planner Coordinator, Area 3 Division, [email protected], 301-495-2168 Frederick Vernon Boyd, Master Planner Supervisor, Master Plan Team, Area 3 Division, [email protected], 301-495-4654 Kipling Reynolds, Chief, Area 2 Division, [email protected], 301-495-4575 Completed: 01-21-16 Description MARC Rail Communities Plan Scope of Work Staff Recommendation Approval of the proposed Scope of Work Summary The MARC Rail Communities Plan comprises approximately 461 acres in the northwest portion of Montgomery County. This Scope of Work includes the following sections: Introduction Purpose of the Plan Context Planning Framework Development Activity Community Outreach Plan Schedule CONTENTS Introduction Purpose of the Plan Context Planning Framework Development Activity Community Outreach Plan Schedule FIGURES Figure 1: Proposed Boyds and Germantown MARC Boundaries in Relationship to I-270 and I-495 Figure 2: Proposed Boyds MARC Boundary Figure 3: Proposed Germantown MARC Boundary Figure 4: 1985 Boyds Master Plan, 1989 Germantown Master Plan and 2009 Germantown Employment Area Sector Plan in Relationship to the Proposed MARC Rail Communities Plan Boundaries Figure 5: 2009 Germantown Employment Sector Plan Districts Figure 6: Recent Major Private Development within Clarksburg Master Plan Area Figure 7: Recent Major Private Development within Germantown Master Plan Area Figure 8: Recent Major Public Development within Germantown Master Plan Area 2 Introduction The MARC Rail Communities Plan is located in the upper portion of Montgomery County, west of I-270 and approximately 15 miles north of the Capital Beltway (I-495), along the CSX-owned railroad tracks in Boyds and Germantown. -
AGENDA ITEM #3 July 9, 2019 Subject: ZTA
AGENDA ITEM #3 July 9, 2019 Subject: ZTA 19-01 Accessory Residential Uses -Accessory Apartments Purpose: To make preliminary decisions~ straw vote expected Analyst: Jeffrey L. Zyontz, Senior Legislative Analyst~ . Committee: PHED Pamela Dunn, Senior Legislative Analyst 11 Keywords: #ADU, Accessory Dwelling Unit, Accessol y Apartment, Zoning Text Amendment EXPECTED ATTENDEES Claire Iseli, Special Assistant to the County Executive Timothy Goetzinger, Acting Director, Department of Housing and Community Affairs (DHCA) Ehsan Motazedi, Department of Permitting Services (DPS) Al Roshdieh, Director, Department of Transportation (MCDOT) Christopher Conklin, Deputy Director, Department of Transportation (MCDOT) Casey Anderson, Chair, Planning Board Gwen Wright, Director, Planning Department Jason Sartori, Division Chief, Planning Department Lisa Govoni, Housing Specialist, Planning Department COUNCIL DECISION POINTS & COMMITTEE RECOMMENDATIONS Discuss approval ofZTA 19-01 with the following amendments: 1) Revise the maximum gross floor area for an Accessory Apartment (hereafter referred to as an ADU (Accessory Dwelling Unit)): a) For attached ADUs, 1,200 square feet of gross floor area; however, if the footprint of the principal structure is greater than 1,200 square feet, an ADU may occupy the basement or cellar of that structure without a square footage limit. b) For detached ADUs, the maximum gross floor area must be the least of: i) 50% of the gross floor area in the principal dwelling; ii) 10% of the lot area; or iii) 1,200 square feet of gross floor area. 2) Retain the current code on-site parking requirement for ADUs located more than I mile away from any Metrorail or Purple Line Station. Within 1 mile of such stations or within the boundaries of the City of Takoma Park, delete the additional on-site parking requirement for an ADU. -
Anderson Property Site Analysis
ANDERSON PROPERTY SITE ANALYSIS Introduction The Montgomery County Department of Transportation (MCDOT) initiated a feasibility study in the fall of 2012 to evaluate the need for transit service expansion to the existing Boyds MARC Station on Clopper Road in Boyds, Maryland. The study area is shown in Figure 1. Due to future development, MCDOT’s Ride On service may expand in the future to Clarksburg and would provide service to the Boyds MARC station, Clarksburg’s closest station. The Boyds MARC Station Project was initiated as a result of a request from the Boyds Civic Association for greater frequency of stops of the MARC Brunswick line at the Boyds station. The Boyds Transit Improvements Feasibility Study, November 2015 summarized existing conditions, identified goals for the station to meet the expanded service request, evaluated potential sites, and recommended the improvements that could accommodate the projected expansion needs. After the completion of the feasibility study, one of the adjacent sites considered for the improvements (Anderson Property) has become available for purchase, see Figure 2, sites 7 and 9. As a result, a concept layout was developed to provide bus access and additional parking for the existing Boyds MARC station on these two adjacent sites. This site analysis will briefly summarize existing conditions, identify the goals developed in the feasibility study for the station to meet the expanded service request, evaluate the feasibility of the Anderson Property. FIGURE 1: STUDY AREA N:\31681-018\Engineering\Reports\Anderson Property Site Analysis 2017.04.05.docx March 2017 Page 2 31681-018 Existing Conditions The Boyds MARC station is along the Maryland Transit Administration’s MARC Brunswick line. -
Preliminary Guide to the Baltimore and Ohio Railroad Records
Preliminary Guide to the Baltimore and Ohio Railroad Records NMAH.AC.1086 Alison Oswald January 2010 Archives Center, National Museum of American History P.O. Box 37012 Suite 1100, MRC 601 Washington, D.C. 20013-7012 [email protected] http://americanhistory.si.edu/archives Table of Contents Collection Overview ........................................................................................................ 1 Administrative Information .............................................................................................. 1 Biographical / Historical.................................................................................................... 2 Scope and Contents........................................................................................................ 3 Arrangement..................................................................................................................... 3 Names and Subjects ...................................................................................................... 6 Container Listing ............................................................................................................. 7 Series 1: Historical Background, 1827-1987............................................................ 7 Series 2: Bridge Histories, 1867-1966..................................................................... 8 Series 3: President's Office, 1826-1880................................................................... 9 Series 4: Correspondence, 1826-1859................................................................. -
Fred Stearns: Beloved Community Servant Passes Away MTA Holds Public Hearing on Train Station Closings
January 13, 2006 The Monocacy Monocle Page 1 Inside the Monocle A Biweekly Newspaper January 13, 2006 Volume 2, Number 20 Fred Stearns: Beloved Community Servant Passes Away By Rande Davis Many in the area have responded Jane have been a terrifi c resource to to Mr. Stearns’s passing. the community. With Fred’s passing, Local rail commuting isn’t going Upper Montgomery County Rev. Steve Hayward, St. Peter’s I hope that the community rallies to get any easier if the MTA starts has lost one of its dearest and most Episcopal Church, credits the work behind WUMCO and Jane in securing closing stations. important community servants with of Mr. Stearns by saying that he has his life’s work.” the passing of Fred Stearns of Dicker- been a “great gi to us everyday for Jeff Griffi ths, president of the son on January 2, 2005. Mr. Stearns, his hard work. Whatever the need Monocacy Lions Club, said, “Without eighty-seven, passed peacefully in that came our way, he was always WUMCO and Fred’s work, groups like his sleep. He and his wife, Jane, have available to assist in fi nding ways to the Lions could not be as eff ective in dedicated themselves to the cause help those who needed help. He and helping those who need eyeglasses, of helping those in need by leading eye exams, food, or many other Western Upper Montgomery County- resources. Our community is greatly HELP (WUMCO). indebted to him.” Born in Huntington Beach, “Fred’s passing is a time of California, he is survived by his wife sadness; however, how much sad- of fi y-one years, two children, six der would it have been for Western grandchildren, and eight great-grand- Montgomery County if Fred had not children. -
Commuting Trends for Primary Jobs During 2014
Commuting Trends For Primary Jobs During 2014 Published April 2018 City of Gaithersburg Planning and Code Administration 31 South Summit Avenue Gaithersburg, Maryland 20877 Telephone: (301) 258-6330 [email protected] www.gaithersburgmd.gov City Officials Mayor Jud Ashman City Council Neil Harris Laurie-Anne Sayles Micheal A. Sesma Ryan Spiegel Robert T. Wu Planning Commission Chair John Bauer Vice Chair Lloyd S. Kaufman Commissioner Matthew Hopkins Commissioner Danny Winborne Alternate Commissioner Philip Wessell Responsible Staff Raymond Robinson III, Long Range Planning Manager Gregory Mann, Planner II Alyssa Roff, Transportation Planner Commuting Trends for Primary Jobs During 2014 City of Gaithersburg, Maryland Table of Contents Part 1: Report Purpose and Executive Summary ………………………………………………………………………2 Methodology Overview ………………………………………………………………………………...4 Montgomery County Subdivisions and Census Tracts………………………………………..………...7 Mode of Commute Analysis ………………………………………………………………………...….9 Comparison to 2011-2012 report ………………………………………………………………………17 Study Area: City of Gaithersburg ……………………………………………………………………...18 Study Area: East of I-270 ……………………………………………………………………………...36 Study Area: West of I-270 ……………………………………………………………………………..53 Study Area: Census Tracts ……………………………………………………………………………..69 Comparison to 2011-2012 Census Data ………………………………………………………….…….95 Part 2:Appendix A. American Community Survey (ACS) 2014 B. Longitudinal Employer-Household Dynamics (LEHD) Data City of Gaithersburg Data East of I-270 Data West of I-270 Data -
Train Stations and Suburban Development Along the Old Baltimore and Ohio Railroad
THE MONTGOMERY COUNTY STORY Published Quarterly by The Montgomery County Historical Society Philip L. Cantelon Eleanor M. V. Cook President Editor Vol. 37, No.1 February 1994 TRAIN STATIONS AND SUBURBAN DEVELOPMENT ALONG THE OLD BALTIMORE AND OHIO RAILROAD by Jo Beck The quaint railroad stations that remain in Montgomery County today on the Maryland Rail Commuter (MARC) line serve as reminders of a real estate boom time that began in the 1870s when the coming of the rail transportation began an irrevocable change in our county. Originally, the Baltimore and Ohio Railroad (the B & 0) planned to build straight westward from Baltimore to the Ohio River, but after the Civil War Washington grew from a sleepy town to a bustli.ngcity. It became obvious that any main branch would have to include the capitol city. The railroad decided to build a 49-mile-long "Metropolitan Branch," running from the B & 0 station in the city of Washington to Point of Rocks, Haryland, at a cost of three million dollars.1 This was considered by many to be a risky undertaking. On its bisecting path through Montgomery County, the branch would encounter Maryland piedmont terrain that was rough and rocky, necessitating numerous "cuts" through solid rock and many bridges. However, the Baltimore and Ohio Railroad was a pioneer, its opening of a few miles of railroad in 1830 having marked the real beginning of the railway era in United States, and it went ahead with its plans.2 Once the Metropolitan Branch of the railroad was built, there were big changes in the towns that lay along the railroad and suburban subdivision began to appear. -
MARC Rail Communities Sector Plan Appendices A
MARC Rail Communities Sector Plan Appendices A - I December 2018 Appendix A - Boyds MARC Station Concept Study, Anderson Property Site Analysis, Montgomery County Department of Transportation ANDERSON PROPERTY SITE ANALYSIS Introduction The Montgomery County Department of Transportation (MCDOT) initiated a feasibility study in the fall of 2012 to evaluate the need for transit service expansion to the existing Boyds MARC Station on Clopper Road in Boyds, Maryland. The study area is shown in Figure 1. Due to future development, MCDOT’s Ride On service may expand in the future to Clarksburg and would provide service to the Boyds MARC station, Clarksburg’s closest station. The Boyds MARC Station Project was initiated as a result of a request from the Boyds Civic Association for greater frequency of stops of the MARC Brunswick line at the Boyds station. The Boyds Transit Improvements Feasibility Study, November 2015 summarized existing conditions, identified goals for the station to meet the expanded service request, evaluated potential sites, and recommended the improvements that could accommodate the projected expansion needs. After the completion of the feasibility study, one of the adjacent sites considered for the improvements (Anderson Property) has become available for purchase, see Figure 2, sites 7 and 9. As a result, a concept layout was developed to provide bus access and additional parking for the existing Boyds MARC station on these two adjacent sites. This site analysis will briefly summarize existing conditions, identify the goals developed in the feasibility study for the station to meet the expanded service request, evaluate the feasibility of the Anderson Property.