Mohit Petrochemicals (P) Ltd, (Nagina Road, Bijnor)
Total Page:16
File Type:pdf, Size:1020Kb
UPDATED FORM – 1 SUBMISSION TO MINISTRY OF ENVIRONMENT, FORESTS & CLIMATE CHANGE, NEW DELHI MOHIT PETROCHEMICALS (P) LTD, (NAGINA ROAD, BIJNOR) [AMENDMENT IN ENVIRONMENTAL CLEARANCE] VILLAGE : FIROZPUR HAFIZ TEHSIL : MOHAMMEDPUR DEOMAL DISTRICT : BIJNOR STATE : UTTAR PRADESH FORM – 1 Sl. Information/ Checklist Details thereof (with approximate No. Confirmation quantities/rates, wherever possible) with source of information data 1 Name of the Project Mohit Petrochemicals (P) Ltd 2 Project Sector Industrial Project (Industry - II) 3 Sr. No in the Schedule Schedule 5(g) under category – A of EIA Notification dated 14th September 2006. 4 Proposed The present proposal is Amendment in EC of 40.0 capacity/Area/length/tonnage to be KLPD Distillery Plant (Molasses Based) : handled/command area/lease Increase in no. of operational days of Distillery from area/number of wells to be drilled. 270 to 330 days 5 New/Expansion/Modernization The present proposal is request for increase in no. of operational days of Distillery from 270 to 330 days 6 Existing capacity / Area Etc EC has been accorded by MOEF to the 40.0 KLD Distillery plant vide order no. J–11011/247/2003 – IA II (I) dated March 10, 2004. 7 Category of project i.e. ‘A’ or ‘B’. A 8 Does it attract the General condition? If NO yes, please specify. 9 Does it attract the specific condition? If NO yes, please specify 10 Location Village Firozpur Hafiz Block Mohammedpur Deomal Tehsil Bijnore District Bijnore State Uttar Pradesh 11 Nearest railway station/airport along Railway Station: Jhalara Hault Railway Station : 4.57 with distance in Kms. km in North Airport : Jolly grant Airport Dehradun : 154.0 km. 12 Nearest town, City, District Bijnor : 7.51 km in west. Headquarters along with distance in Kms. 13 Village Panchayats, Zilla Parishad, Village Panchayat – Firozpur Hafiz Municipal Corporation, Local body (Complete postal addresses with telephone nos to be given) 14 Name of the applicant Mohit Petrochemicals (P) Ltd, Vill.: Firozpur Hafiz, Tahsil - Bijnor, Distt. : Bijnor (UP) 15 Registered address 15A/13 Upper Ground Floor, East Patel Nagar, New Delhi-110008 FAX : 011-25886797 Phone No : 011 – 25886798 Address for correspondence Mohit Petrochemicals (P) Ltd, 16 Vill.: Firozpur Hafiz, Tahsil - Bijnor, Distt. : Bijnor (UP) Name Mr Suresh Panwar Designation General Manager Address Mohit Petrochemicals (P) Ltd, Vill.:Firozpur Hafiz , Tahsil - Bijnor, Distt. : Bijnor (UP) Pin Code 246701 E-mail [email protected] Telephone No. +919756601966 17 Details of Alternatives sites No alternate sites are considered as the present examined, if any. Location of these proposal is only request for amendment to EC sites should be shown on a topo sheet. accorded vides reference cited above. 18 Interlinked Project No 19 Whether separate application of No interlinked project has been submitted? 20 If yes, date of submission Not applicable 21 If no, reason Present proposal only for amendment to EC. 22 Whether the proposal involves No any approval/clearance under: If yes, details of the same and their status to be given. The forest (Conservation) Act, 1980. The wildlife (Protection) Act, 1972 The C.R.Z. Notification, 1992 23 Whether there is any Government No any Order/Policy relevant/relation to the site 24 Forest land involved (Hectares) No any 25 Whether there is any litigation No any pending against the project and/or land in which the project is propose to be set up? Name of the Court Case No Orders/directions of the court, if any and its relevance with the proposed project. 26 Project Cost Rs 52.0 Lakhs (This cost for construction of shed in active bio compost area) (II) ACTIVITY 1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) Sl. Information/Checklist confirmation Yes/ Details thereof (with approximate No. No quantities /rates, wherever possible) with source of information data 1.1 Permanent or temporary change in No The total land acquired for the Distillery unit land use, land cover or topography is 22.0 Acre. including increase in intensity of land use (with respect to local land use For the above unit, Environmental Clearance plan) was accorded by Honorable Ministry vide order no. J-11011/247/2003-IA II (I) dated March 10, 2004. 1.2 Clearance of existing land, vegetation No The proposed increase in no. of operational and buildings? days of existing distillery not involves any clearance of existing land, vegetation and buildings. Covered shed has been constructed for active bio compost area. 1.3 Creation of new land uses? No N.A. 1.4 Pre-construction investigations e.g. No As plant has already been constructed and in bore houses, soil testing? operation, no such investigations or tests are envisaged. 1.5 Construction works? No Covered Shed for active bio compost area has been constructed. 1.6 Demolition works? No No demolition works are envisaged as the present proposal is only request for amendments to increase of no. of operational days of existing distillery. 1.7 Temporary sites used for construction No NA works or Housing of construction workers? 1.8 Above ground buildings, structures or Yes Covered shed has been constructed for active earthworks including linear structures, bio compost area. cut and fill or excavations 1.9 Underground works including mining No No underground works will be involved in or tunneling? present proposal. 1.10 Reclamation works? No No such work will be involved in present proposal. 1.11 Dredging? No No such work will be involved in present proposal. 1.12 Offshore structures? No No such work will be involved in present proposal. 1.13 Production and manufacturing No The process of Fermentation & Distillation processes? already exists and there is no change in production capacity. 1.14 Facilities for storage of goods or No No additional storage of goods or materials is materials? envisaged. 1.15 Facilities for treatment or disposal of Yes The present treatment is Bio-methanation solid waste or liquid effluents? then RO plant followed by MEE, MEE concentrate is being utilized in Bio- composting. MEE Condensate is being recycled into the process. Now we have been constructed covered shed for active bio compost area to avoid contamination in run off during rainy season. In view of the above, we request Honorable Ministry to permit us to operate Distillery for 330 days. 1.16 Facilities for long term housing of No NA operational workers? 1.17 New road, rail or sea traffic during No Already existing roads to the factory are construction or operation? being utilized. 1.18 New road, rail, air waterborne or other No Already existing roads to the factory are transport infrastructure including new being utilized. No new roads envisaged as a or altered routes and stations, ports, part of this proposed amendments. airports etc? 1.19 Closure or diversion of existing No Already existing roads to the factory are transport routes or infrastructure being utilized. No closure of roads or leading to changes in traffic diversion is envisaged as a part of this movements? proposed amendment. 1.20 New or diverted transmission lines or No Nil. pipelines? 1.21 Impoundment, damming, culverting, No No impoundment, damming, culverting, realignment or other changes to the realignment or other changes to the hydrology of watercourses or hydrology of watercourses or aquifers is aquifers? envisaged. 1.22 Stream crossings? No Not Applicable as no stream crossings exists in the Plant site. 1.23 Abstraction or transfers of water form Yes The total water requirement for the Distillery ground or surface waters? unit is 400.0 m3/day. Industrial Purposes : 380.0 m3/day ( @ 9.5 KL/KL of alcohol ) Domestic : 20.0 m3/day There will not be any increase in water requirement. In fact the water requirement is being reduced due to recycling of MEE condensate. 1.24 Changes in water bodies or the land No There will not be any change in water bodies surface affecting drainage or run-off? or the land surface affecting drainage or run- off due to the proposed amendments. 1.25 Transport of personnel or materials for Yes There will not be increase in traffic during construction, operation or operation as no capacity enhancement is decommissioning? proposed. 1.26 Long-term dismantling or No No dismantling or decommissioning or decommissioning or restoration restoration works are envisaged. works? 1.27 Ongoing activity during No No decommissioning activities are involved decommissioning which could have an as a part of this proposed amendments impact on the environment? 1.28 Influx of people to an area in either No No Influx of people to an area in either temporarily or permanently? temporarily or permanently is anticipated 1.29 Introduction of alien species? No There will not be any introduction of alien species 1.30 Loss of native species or genetic No There will not be loss of native species or diversity? Genetic diversity. 1.31 Any other actions? No Nil 2. Use of natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply) Sl. Information/Checklist confirmation Yes/ Details thereof (with approximate quantities No. No /rates, wherever possible) with source of information data 2.1 Land especially undeveloped or No No additional land is envisaged for the agricultural land (ha) proposed amendment of increase in no. of operational days and change of treatment system. 2.2 Water (expected source & competing Yes The total water requirement for the existing users) unit: KLD Distillery unit is 400.0 m3/day. Industrial Purposes : 380.0 m3/day (@ 9.5 KL/KL of alcohol) Domestic : 20 m3/day The water required which is being met from ground water for the plant.