3--tq il{ri THIRU.A.V.VENKATACHALAM, I.F.S. STATE LEVEL ENVIRONMENT MEMBER SECRETARY IMPACT ASSESSMENT AUTHORITY. TAMILNADU, 3rd Floor, Panagal Maaligai, No.1 Jeenis Road, , -15.

Lr.No. SEIAA/TN/F.No.65 I 4/20 1 8 dated : I 5.03.20 I g To The Vice President -Liaison lws. casaGrand Builder Pvt. Ltd & M/s. Gallante promoters LLp # llll59, NPL Devi ,L.B.Road, , Chennai - 600 041.

Sir,

Sub: SEIAA-TN - Proposal Construction of Residential group development project by IWs. Casa Grande Civil Engineering Pvt Ltd & IWs. Gallante promoters LLp with a total built up area of 29,666.6 Sq.m at S.F.No.51511,51512,516 &, 517, Village, Taluk, District, - Additional details required - Regarding

Ref: 1. Application for Environment clearances received on 12.03.201g. 2. Proposal No.sIA/TNAICp/73339/20t8 dated 06.03.201s . )

On initial Scrutiny of your application seeking Environmental Clearance for the Proposal Construction of Residential group development project by tWs. Casa Grande Civil Engineering Pvt Ltd & IWs. Gallante Promoters LLP with a total built up area of 29,666.6 Sq.m at S.F.No.515fi,515/2,516 & 517, Manapakkam village, , Kanchipuram District, Tamil Nadu. It was observed that the following particulars have not been furnished.

1. Copy of land deed / long term Lease deed document with name of the owner/ leaser, S.F. No., and Area for the land of the proposed project should be furnished. for supply of water should be Copy of Commitment letter ftom competent authority fumished. Amudhasakaran' VP-Head- Liasoning' J. In the Form I it was reported that Thiru'S'R Signatory' But the application is signed by the Authorized signatory signed in the application on 4. Authorisation certificate for the Authorised Pvt Ltd & lWs' Gallante Promoters behalf of IWs. Casa Grande Civil Engineering LLP. of proposed green belt plan' DG set' STP' 5. Clear Layout map showing the location OWC, OSR area, etc' for the supply of fresh water to be 6. Permission letter from Competent Authority fumished. the the E waste shall be generated' Hence' 7. In the conceptual plan it was reported that of the E the proposed quantity of generation Project Proponent is requested to fumish and disposal in detail' waste, handling mechanism, storage to flood management' management plan due 8. Disaster management plan shall include other natural calamities' 2015 and Authenticity certificate ftom 9. Details of flood occurence in area after in case of occurrence of flood' Revenue officials; proposed measures as per rain the proponent has to revise the proposal 10. Regarding rain water harvesting by cpwD, GoI & Manual on norms and water harvesting and conservation manual GOI' of large construction project by MoEF' sandards for environment clearance made in case of fire _ and rescue services devices/ arrangements 1 I . Details of fire sai-ety - accidents, etc Village' Alandur the S'F'No'515/1'515/2' Manapakkam 12. In the patta copy it shows that to Inl/s' Gallante Promoters LLP & S'F'No' Taluk, Kanchipuram District' belongs Hence' the Grande Civii Engineering Pvt Ltd' 516,517 in the name of M/s' Casa the same' project proponent is requested to clarify for project proponent' the disposal/ treatment 13.In the water balance submitted by the the Swimming pool water is not mentioned' fresh water during competent authority for supply of 14. Copy of Commitment letter from sewage into underground sewer line' operation phase and for the disposal oftreated water bodies such as radius & 10 Km radius highlighting 15. Copy of topo map for 5km areas areas' forest areas' protected'/wild life , lake etc' catchment ecosystem' &ecological sensitive area' airports' marine 16. Copy of certificate from the competent authority stating that the proposed construction for residential building at the proposed site does not encroach water

bodies, catchment area, Drain area ofthe Lakes, Nallas, Tanks, Streams, etc. 17. Affidavit in Rs 50/- Non judicial stamp paper duly notorized by Notary public for the following needs to be fumished a. For water supply b. Excess treated water Disposal c. Solid waste disposal. d. That the Project Proponent is liable for operation and maintenance ofSTp for 10 years from the date of operation ofthe project.

e. The storm water drain would not carry any untreated (or) treated sewage. f. Details of CSR Activity g. Present status ofthe proposed site

In this regard, you are requested to fumish the above details along with the updated form I & IA and also forward the copy of your proposal seeking EC with necessary documents to all the SEAC Members both in hard and soft copy (List enclosed) and to forward the additional details and copy of Proof of Dispatch to SEIAA so as to place the subject before SEAC. a--' ^.r--?/ For Urnrvffirn SECRETARY q,l/ SEIAA-TN ,d"vlB