Thiru.A.V.Venkatachalam, I.F.S. Member Secretary State

Total Page:16

File Type:pdf, Size:1020Kb

Thiru.A.V.Venkatachalam, I.F.S. Member Secretary State 3--tq il{ri THIRU.A.V.VENKATACHALAM, I.F.S. STATE LEVEL ENVIRONMENT MEMBER SECRETARY IMPACT ASSESSMENT AUTHORITY. TAMILNADU, 3rd Floor, Panagal Maaligai, No.1 Jeenis Road, Saidapet, Chennai-15. Lr.No. SEIAA/TN/F.No.65 I 4/20 1 8 dated : I 5.03.20 I g To The Vice President -Liaison lws. casaGrand Builder Pvt. Ltd & M/s. Gallante promoters LLp # llll59, NPL Devi ,L.B.Road, Thiruvanmiyur, Chennai - 600 041. Sir, Sub: SEIAA-TN - Proposal Construction of Residential group development project by IWs. Casa Grande Civil Engineering Pvt Ltd & IWs. Gallante promoters LLp with a total built up area of 29,666.6 Sq.m at S.F.No.51511,51512,516 &, 517, Manapakkam Village, Alandur Taluk, Kanchipuram District, Tamil Nadu - Additional details required - Regarding Ref: 1. Application for Environment clearances received on 12.03.201g. 2. Proposal No.sIA/TNAICp/73339/20t8 dated 06.03.201s . ) On initial Scrutiny of your application seeking Environmental Clearance for the Proposal Construction of Residential group development project by tWs. Casa Grande Civil Engineering Pvt Ltd & IWs. Gallante Promoters LLP with a total built up area of 29,666.6 Sq.m at S.F.No.515fi,515/2,516 & 517, Manapakkam village, Alandur Taluk, Kanchipuram District, Tamil Nadu. It was observed that the following particulars have not been furnished. 1. Copy of land deed / long term Lease deed document with name of the owner/ leaser, S.F. No., and Area for the land of the proposed project should be furnished. for supply of water should be Copy of Commitment letter ftom competent authority fumished. Amudhasakaran' VP-Head- Liasoning' J. In the Form I it was reported that Thiru'S'R Signatory' But the application is signed by the Authorized signatory signed in the application on 4. Authorisation certificate for the Authorised Pvt Ltd & lWs' Gallante Promoters behalf of IWs. Casa Grande Civil Engineering LLP. of proposed green belt plan' DG set' STP' 5. Clear Layout map showing the location OWC, OSR area, etc' for the supply of fresh water to be 6. Permission letter from Competent Authority fumished. the the E waste shall be generated' Hence' 7. In the conceptual plan it was reported that of the E the proposed quantity of generation Project Proponent is requested to fumish and disposal in detail' waste, handling mechanism, storage to flood management' management plan due 8. Disaster management plan shall include other natural calamities' 2015 and Authenticity certificate ftom 9. Details of flood occurence in area after in case of occurrence of flood' Revenue officials; proposed measures as per rain the proponent has to revise the proposal 10. Regarding rain water harvesting by cpwD, GoI & Manual on norms and water harvesting and conservation manual GOI' of large construction project by MoEF' sandards for environment clearance made in case of fire _ and rescue services devices/ arrangements 1 I . Details of fire sai-ety - accidents, etc Village' Alandur the S'F'No'515/1'515/2' Manapakkam 12. In the patta copy it shows that to Inl/s' Gallante Promoters LLP & S'F'No' Taluk, Kanchipuram District' belongs Hence' the Grande Civii Engineering Pvt Ltd' 516,517 in the name of M/s' Casa the same' project proponent is requested to clarify for project proponent' the disposal/ treatment 13.In the water balance submitted by the the Swimming pool water is not mentioned' fresh water during competent authority for supply of 14. Copy of Commitment letter from sewage into underground sewer line' operation phase and for the disposal oftreated water bodies such as radius & 10 Km radius highlighting 15. Copy of topo map for 5km areas areas' forest areas' protected'/wild life Adyar River, Porur lake etc' catchment ecosystem' &ecological sensitive area' airports' marine 16. Copy of certificate from the competent authority stating that the proposed construction for residential building at the proposed site does not encroach water bodies, catchment area, Drain area ofthe Lakes, Nallas, Tanks, Streams, etc. 17. Affidavit in Rs 50/- Non judicial stamp paper duly notorized by Notary public for the following needs to be fumished a. For water supply b. Excess treated water Disposal c. Solid waste disposal. d. That the Project Proponent is liable for operation and maintenance ofSTp for 10 years from the date of operation ofthe project. e. The storm water drain would not carry any untreated (or) treated sewage. f. Details of CSR Activity g. Present status ofthe proposed site In this regard, you are requested to fumish the above details along with the updated form I & IA and also forward the copy of your proposal seeking EC with necessary documents to all the SEAC Members both in hard and soft copy (List enclosed) and to forward the additional details and copy of Proof of Dispatch to SEIAA so as to place the subject before SEAC. a--' ^.r--?/ For Urnrvffirn SECRETARY q,l/ SEIAA-TN ,d"vlB.
Recommended publications
  • Urban and Landscape Design Strategies for Flood Resilience In
    QATAR UNIVERSITY COLLEGE OF ENGINEERING URBAN AND LANDSCAPE DESIGN STRATEGIES FOR FLOOD RESILIENCE IN CHENNAI CITY BY ALIFA MUNEERUDEEN A Thesis Submitted to the Faculty of the College of Engineering in Partial Fulfillment of the Requirements for the Degree of Masters of Science in Urban Planning and Design June 2017 © 2017 Alifa Muneerudeen. All Rights Reserved. COMMITTEE PAGE The members of the Committee approve the Thesis of Alifa Muneerudeen defended on 24/05/2017. Dr. Anna Grichting Solder Thesis Supervisor Qatar University Kwi-Gon Kim Examining Committee Member Seoul National University Dr. M. Salim Ferwati Examining Committee Member Qatar University Mohamed Arselene Ayari Examining Committee Member Qatar University Approved: Khalifa Al-Khalifa, Dean, College of Engineering ii ABSTRACT Muneerudeen, Alifa, Masters: June, 2017, Masters of Science in Urban Planning & Design Title: Urban and Landscape Design Strategies for Flood Resilience in Chennai City Supervisor of Thesis: Dr. Anna Grichting Solder. Chennai, the capital city of Tamil Nadu is located in the South East of India and lies at a mere 6.7m above mean sea level. Chennai is in a vulnerable location due to storm surges as well as tropical cyclones that bring about heavy rains and yearly floods. The 2004 Tsunami greatly affected the coast, and rapid urbanization, accompanied by the reduction in the natural drain capacity of the ground caused by encroachments on marshes, wetlands and other ecologically sensitive and permeable areas has contributed to repeat flood events in the city. Channelized rivers and canals contaminated through the presence of informal settlements and garbage has exasperated the situation. Natural and man-made water infrastructures that include, monsoon water harvesting and storage systems such as the Temple tanks and reservoirs have been polluted, and have fallen into disuse.
    [Show full text]
  • Tamil Nadu Sustainable Urban Development Project Final EA for SWD to Selected Areas of Coc
    Tamil Nadu Sustainable Urban Development Project Final EA for SWD to selected areas of CoC Public Disclosure Authorized Tamil Nadu Sustainable Urban Development Project (TNSUDP) Storm Water Drainage Project for the Selected Areas of Chennai Corporation Public Disclosure Authorized Tamil Nadu Sustainable Urban Development Project Public Disclosure Authorized Final Environmental Assessment Report Public Disclosure Authorized January 2015 Storm Water Drains Department, Corporation of Chennai 1 Tamil Nadu Sustainable Urban Development Project Final EA for SWD to selected areas of CoC Executive Summary 1. INTRODUCTION 1. Government of Tamil Nadu has proposed to implement the World Bank supported Tamil Nadu Sustainable Urban Development program (TNSUDP) to improve the delivery of urban services. The provision of Storm Water Drains to selected areas of Corporation of Chennai is one of the sub-projects proposed to be implemented by the Corporation of Chennai (CoC). This component is coordinated by Government of Tamil Nadu with Tamil Nadu Urban Infrastructure Financial Services Ltd. (TNUIFSL), Chennai as the fund Manager. This sub project is proposed to be implemented along the roadsides and canals and doesn’t involve any Land Acquisition and required land is owned by the Corporation of Chennai. 2. PROJECT DESCRIPTION 2. The Storm Water Drainage project for the selected areas of Corporation of Chennai proposed to be taken up under the TNSUDP involves construction of storm water drains and canals in the project area. This sub project proposed to be implemented in the 4 Zones of the CoC. The total length of the drains to be constructed is about 270.33 kilometres including the 11.05 km length in the canals.
    [Show full text]
  • 000.3Rd IMM Cover Page
    SOUTH ASIA CO-OPERATIVE ENVIRONMENT PROGRAMME SOUTH ASIAN SEAS PROGRAMME SOUTH ASIAN SEAS PROGRAMME 3rd Intergovernmental Meeting of Ministers Thimphu, Bhutan 26th August 2005 REPORT OF THE THIRD MINISTERIAL MEETING OF THE SOUTH ASIAN SEAS PROGRAMME SOUTH ASIAN SEAS PROGRAMME REPORT OF THE THIRD INTERGOVERNMENTAL MINISTERIAL MEETING Para No. CONTENTS Page No. 1 Introduction 1 2 Attendance 1 3 Inauguration 1 4 Election of Office Bearers 2 5 Agenda 2 6 Statement by Heads of the Delegations 2 7 Other Statements 2 Presentation of the Report of the Meeting of the National Focal 8 2 Poinsts by the Rapporteur Endorsement of Recommendations agreed upon at Meeting of 9 2 National Focal Points A Institutional 3 B Project & Programme Matters 3 C Financial 4 10 Adoption of the Report 5 11 Concluding Session 6 SOUTH ASIAN SEAS PROGRAMME Third Intergovernmental Meeting of Ministers (IMM) 26th August 2005 Thimphu, Bhutan LIST OF ANNEXES ANNEX PAGE TITLE NO NO I List of Participants 7 II Inaugural Address - Hon A. H. M Fowzie, MP, Minister of Environment & Natural Resources, Government of Sri 11 Lanka Welcome Address - Dr. A. A. Boaz , Director General, III 13 SACEP IV Agenda 15 V Country Statement by Mr. Jafar Ahmed Chowdhury, Secretary, Ministry of Environment & Forests, Government 16 of the People’s Republic of Bangladesh VI Country Statement – Government of India 18 VII Country Statement by Hon. Ahmed Abdullah Minister for Environment, Energy and Water 20 Republic of Maldives VIII Country Statement by Hon. A.H.M. Fowzie, MP Minister of Environment & Natural Resources, 22 Government of Sri Lanka Statement by Mr.
    [Show full text]
  • Research Paper Geo Spatial Application
    Academia Journal of Scientific Research 6(10): 382-393, October 2018 DOI: 10.15413/ajsr.2018.0152 ISSN 2315-7712 ©2018 Academia Publishing Research Paper Geo spatial application in impact assessment of oil spill on sensitive coastal resources: A case study of oil spill accident in Chennai (India) Accepted 30th October, 2018 ABSTRACT An accidental discharge of oil in the near shore regions requires a comprehensive post- spill assessment of environmental impact and biological effects for planning the response and post mitigation efforts. This study discusses Remote Sensing and GIS based impact assessment on the coastal resources coupled with model simulation. The oil spill impact was estimated through spill simulation and incorporated environmental sensitivity index as level of concern to assess the impact. The best guess of the trajectory simulation was used to assess the spatial distribution and concentration of oil on the coastal region to notify the area and resources to analyze the impact of the spilled oil. Under the simulation of weathering process, it is estimated that 94% oil is stranded on the shoreline. S. Arockiaraj1*, Mary Angelin1, M. C. There has been attempt to document the oil on the water surface using remote John Milton1, G. Bhaskaran2 sensing data collected by Sentinel 1A, 2A and Landsat/OLI and trajectory of the released oil. Near real time detection of oil trajectory and quantification using 1PG & Research Department of remote sensing data help with possible oil landing information. The potential Advanced Zoology and Biotechnology, Loyola College, effect of oil on species was assessed through Total Petroleum Hydrocarbon Chennai 600034.
    [Show full text]
  • Conservation Plan for Adyar River
    CONSERVATION PLAN FOR ADYAR RIVER A DISSERTATION Submitted in partial fulfillment of the requirement for the award of the degree of MASTER OF TECHNOLOGY in “ENVIRONMENTAL MANAGEMENT OF RIVERS AND LAKES” by KARTHIK KUMAR.C ALTERNATE HYDRO ENERGY CENTRE INDIAN INSTITUTE OF TECHNOLOGY ROORKEE-247667 MAY 2015 ABSTRACT The origin of Adyar River can be traced to a point near Guduvancheri village, in Adanur Tank, though it assumes the appearance as a river only after receiving the surplus water from Chembarampakkam Lake as well as the drainage from the areas in the South West of Chennai. It flows through several villages of Kancheepuram and Chennai district for a distance of 42 km, collecting surplus water from surface drainages and many tanks and lakes, with a total catchment area of 1142 sq.km, to finally drain in the Bay of Bengal. The Adyar river has low velocity and discharge and does not carry enough water to sustain organic life in the river except during the North-West monsoon season. In the upstream of the river, there is less settlement along the banks and is not affected much by domestic sewage. It receives untreated agricultural runoffs. The use of fertilizers and pesticides for agriculture leads to contamination of soil, eventually they reach river through runoff generated by the rainfall as well as agricultural runoff. This leads to the increase in both nitrates as well as phosphates pollution and also contaminates groundwater of the river basin. Adyar River also has an estuary at its mouth, covering 149 Ha of area. About 23.5 ha of its part known as Adyar creek, an estuarine wetland, which is part of the ‘green lungs' of the city, provides a habitat for migratory birds and aquatic animals.
    [Show full text]
  • Missing Links Storm Water Drainage Project for the Core City Areas of Greater Chennai Corporation
    1 Missing Links Storm Water Drainage Project for the Core City Areas of Greater Chennai Corporation Environmental Impact Assessment Report January 2021 Prepared by Greater Chennai Corporation EA Report for Missing Links Storm Water Drains in Core City Areas of GCC 2 Contents 1 Executive Summary 5 1.1 Introduction 5 1.2 Project Description 5 1.3 Applicability of ESMF 6 1.4 Environmental Screening and Assessment (ESA) 6 1.4.1 Environmental Regulatory Requirements 6 1.4.2 Baseline 1.4.3 Assessment of Impacts 6 1.4.4 Environmental Management Plan (EMP) 7 1.5 Social Impact Assessment 31 1.6 Implementation Monitoring / GRC 31 2 Introduction 33 2.1 Environmental and Social Management Framework (ESMF) 33 2.2 Environmental Assessment for Missing Link SWD to selected streets of 34 GCC 2.3 Methodology 34 2.4 Structure of EA Report 35 3 Background and Study Area 36 3.1 Existing Situation 43 3.1.1 Macro Drains 44 3.1.2 Micro Drains 44 3.1.3 De-silting of Storm Water Drains and Canals 45 3.2 Need for the Missing Links SWD 46 3.3 Objectives 49 4 Project Description 49 4.1 Study Area 49 4.2 Missing Links SWD Proposals as per the DPR and Costing 60 5 View of Environmental Regulatory Requirements, Policies & Guidelines 65 6 Baseline Environmental Status and Environmental Management Plan 71 6.1 Baseline Environmental Status 71 7 Assessment of Impacts 82 EA Report for Missing Links Storm Water Drains in Core City Areas of GCC 3 8 Analysis of Alternatives 86 9 Environmental Management Plan (EMP) 88 9.1.1 Groundwater Recharge through Rainwater Harvesting 88
    [Show full text]
  • Floods in Chennai in 2015 a Documentation of Urban Flood Management and Disaster Preparedness for Lessons for Urban Governance
    Floods in Chennai in 2015 A documentation of urban flood management and disaster preparedness for lessons for urban governance Citizen consumer and civic Action Group (CAG) This report provides a summary of the research and documentation efforts undertaken by CAG as part of the Way Forward Chennai initiative and was supported by a grant from Action Aid. It was authored by Pavithra Sriram and Satyarupa Shekhar, with support from Om Prakash Singh, Pramyudh Muralidhar, Madonna Thomas and Rajesh Ramamoorthy, CAG, with overall guidance and support from Kirtee Shah, INHAF and Tara Murali. CAG. Table of Contents 1 Way Forward Chennai - a pan India initiative ........................................................................... 3 1.1 Who we are ..................................................................................................................................... 3 1.2 What we do ..................................................................................................................................... 4 1.3 Who we work with ....................................................................................................................... 4 2 Introduction ............................................................................................................................................ 5 3 Literature review................................................................................................................................... 6 3.1 Urban flood management .........................................................................................................
    [Show full text]
  • Session – 3 River and Drainage System In
    SESSION – 3 RIVER AND DRAINAGE SYSTEM IN CMA Session – III Waterways in Chennai Thiru T.Kanthimathinathan, Eexecutive Engineer, PWD & Nodal Officer, Cooum Sub Basin Restoration & Management CHENNAI METROPOLITAN AREA • Chennai Metropolitan Area (CMA) covers 1189 Sq. Km. present population about 75 Lakhs projected to 98 Lakhs in 2011 • Chennai City covers 176 Sq. Km. having Terrain slope varying from 1 : 5000 to 1 : 10,000 • The City is drained by 2 rivers besides a number of major & minor drains through Buckingham Canal into Sea via Ennore Creek, Cooum mouth, Adyar mouth and Kovalam Creek. • Major Flood Events in Chennai City experienced during 1943, 1976, 1985,1996 & 2005 177 RIVERS AND DRAINAGE SYSTEM OF CHENNAI METROPOLITAN AREA Km. Orgin in Km. in Km. System in Sq.Km. 2005 in C/s. 2005 in C/s. Capacity in Capacity C/s Bed width in M. in Bed width River / Drainage Anticipated flood flood Anticipated discharge/ Presnet discharge/ Presnet Length in CMA in in CMA Length Flood discharge in Flood discharge with Bay of Bengal Total Length in Km. in Length Total Length in City Limits Limits in City Length Total Catchment Area Area Catchment Total Location of confluence confluence Location of RIVERS Krishnapuram (AP) for nagri am / 150 Kaveripakkam 125000/ Kosasthalaiyar Ennore Creek 136 16 3757 to 90000 (Vellore District) 110000 250 for Kosasthalaiyar arm Cooum Tank (Thiruvallur Cooum District) 40 to 22000/ Cooum Mouth near 72 18 40 400 21500 Kesavaram for 120 19500 Napier Bridge diversion from Kosasthalaiyar 10.50 Adanur Tank near 60000/
    [Show full text]
  • Assessment of Water Quality of Adyar River
    ISSN (Online) : 2319 - 8753 ISSN (Print) : 2347 - 6710 International Journal of Innovative Research in Science, Engineering and Technology An ISO 3297: 2007 Certified Organization Volume 7, Special Issue 5, April 2018 1st International Conference on Recent Innovation in Civil Engineering and Management (ICRICEM '18) 22nd March 2018 Organized by Department of Civil Engineering & MBA, Loyola Institute of Technology, Chennai, Tamilnadu, India Assessment of Water Quality of Adyar River Sasikumar.R1, Ronald Frank duff.V2, Nishanth Michael Samraj.A3, M.Kirubakaran4, G Iyappan5 UG Student, Department of Civil Engineering, Loyola Institute of Technology, Chennai India123 4 Professor, Department of Civil Engineering, Loyola Institute of Technology, Chennai India Assistant Professor, Department of Civil Engineering, Loyola Institute of Technology, Chennai India 5 ABSTRACT: This study was conducted to determine the water quality of Adyar River based on the physical and chemical parameters. Water samples were collected from 8 sampling stations along the river during the month of January, 2018. The samples were analyzed for various Physio- chemical parameters such as pH, Turbidity, chloride, sulphate .Total dissolved solids (TDS), Total alkalinity, Total hardness, Magnesium, Calcium and Iron. The results obtained by standard methods were compared with the drinking water quality requirements prescribed by Bureau of Indian Standards (BIS).The physio-chemical parameters reveals that some of the samples exceed the acceptable limit for drinking.The study also reveals that the water quality of Adyar river is highly deteriorated due to anthropogenic activities such as urbanization, construction activities, agricultural activities, discharge of untreated sewage and disposal of solid wastes directly into river. KEYWORDS: Adyar River, Anthropogenic, Deterioration of river, Physio-chemical parameters, Water quality analysis.
    [Show full text]
  • A Short Term Study of Dissolved Oxygen Behavior in Adyar River, Chennai
    International Journal of Latest Research in Engineering and Technology (IJLRET) ISSN: 2454-5031 www.ijlret.com || Volume 02 - Issue 09 || September 2016 || PP. 43-49 A Short term study of Dissolved Oxygen behavior in Adyar River, Chennai Dr. Lavanya Vaithyanathan1, Salome Solomon2, Sunkara Krishna priya3 Department of Civil Engineering, Assistant professor1, Department of Civil Engineering B.E student, 2 Department of Civil Engineering B.E student3 Abstract: This paper addresses the behavior of dissolved oxygen content (DO) in Adyar river during early hours of day in the summer season (March, 2016) – May 2016). The study showed that the Dissolved Oxygen in the stream is below 4mg/l in a stretch of 42km and therefore water is not potable. In addition to this the study assessed the physico-chemical parameter of full stretch of Adyar river and identified the high contamination zone of river and also applied the Streeter - phelp equation to find out the critical deficit and critical time of deficit across the river stretch Key words: Dissolved Oxygen Adyar River, Deoxygenation, Oxygen Deficit Introduction Water pollution is a major environmental issue in India. The largest source of water pollution in India is untreated sewage. There is no sign of river pollution being stopped. It is increasing day by day. In most of the towns and cities, the municipal drains carry our wastes to rivers. In our everyday life we can easily see symptoms of river pollution. The floating dead fishes in our river, any colored water in the river, or a bad smell from the river point towards river pollution.
    [Show full text]
  • Chennai District Tamil Nadu
    For official use Technical Report Series DISTRICT GROUNDWATER BROCHURE CHENNAI DISTRICT TAMIL NADU By T. Balakrishnan, Scientist-D Government of India Ministry of Water Resources Central Ground Water Board South Eastern Coastal Region Chennai November 2008 DISTRICT AT A GLANCE (CHENNAI DISTRICT) S. No. ITEMS STATISTICS 1. GENERAL INFORMATION i. Geographical area (Sq. km) 174 ii. Administrative Divisions (As on 31-3-2007) Number of Taluks 5 Corporation 1 iii. Population (As on 2001 Census) Total Population 4343645 Male 2219539 Female 2124106 iv. Average Annual Rainfall (mm) 1200 2. GEOMORPHOLOGY i. Major physiographic Units 1. Fluvial land forms 2. Marine land forms 3. Erosional land forms ii. Major Drainages . 3. LAND USE (Sq. km) (2005-06) Adyar & Cooum i. Forest area 3 ii. Net area sown - iii. Cultivable area - 4. MAJOR SOIL TYPES Beach sands, Clay & alluvial soils 5. NUMBER OF GROUND WATER MONITORING WELLS OF CGWB (As on 01.05.2008) i. Dug wells 11 ii. Piezometers 3 6. PREDOMINANT GEOLOGICAL Alluvium, sandstones FORMATIONS (argillaceous), clay, shale, silt stone, granites, gneisses and charnockite 7. HYDROGEOLOGY i. Major water bearing formations Sand, sandstone, weathered and fractured granites, gneisses and Charnockite ii. Pre monsoon depth to water level (May 2006) 2.21–7.64 m bgl iii. Post monsoon depth to water level (Jan. 2007) 0.45-5.32 m bgl iv. Long term water level trend in 10 years (1998- Annual 2007) (m/yr) Rise Fall Min: 0.003 Min:0. 04 Max: 0.93 Max:0. 78 i 8. GROUND WATER EXPLORATION BY CGWB (As on 31-03-2007) i.
    [Show full text]
  • Annexure- Form
    Form – I for Commercial IT Building Project U.Karunasesh FORM – I (I) Basic Information S.No. Item Details Commercial IT Building Project by U. 1. Name of the project Karunasesh 2. S.No. in the schedule 8 (a) Construction Area Details: Proposed capacity/area/length/tonnage to Total Plot Area – 11,147 Sqm 3. be handled command area/lease Total Built up area – 36,440 Sqm area/number of wells to be drilled Also refer to the Master Plan Layout (Site Plan) attached herewith as Annexure-I. 4. New/Expansion/Modernization New 5. Existing Capacity/Area etc. Not Applicable 6. Category of Project i.e., „A‟ or „B‟ B Does it attract the general condition? If 7. No yes, please specify Does it attract the specific condition? If 8. No yes, please specify Location Ambattur Industrial Estate 412/2B, 413/2, 418/1A2, 418/2B, 420/1B, Plot/Survey/Khasra No. 421/3A, 412/2C, 418/1A3, 420/1C, 421/3B 9. Village Ambattur Village Tehsil AmbatturTaluk District Tiruvallur State Tamilnadu Pattaravakkam Suburban Railway Station – 1.6 km areal distance in N direction. Nearest railway station/airport along with Nungambakkam Railway Station – 8 km 10. distance in kms. areal distance in SE direction. Chennai Airport - 12 km areal distance in S direction. Project site is located in the Western part of Nearest Town, city, District Headquarters 11. Chennai City along with distance in kms. District Head Quarters - Chennai Corporation of Chennai (CoC) Village Panchayats, ZillaParishad, Zone VII (Ambattur), Municipal Corporation, Local body 12. Thiruvallur High Road, Opp Dunlop, (complete postal addresses with Chennai – 600053.
    [Show full text]