III & IV Categories Domiciled Within the Territorial Jurisdiction of 34

Total Page:16

File Type:pdf, Size:1020Kb

III & IV Categories Domiciled Within the Territorial Jurisdiction of 34 'l __ I GOVERNMENT OF ARUNACHAL PRADESH PUBLIC WORKS DEPARTMENT NOTICE INVITING TENDER Tender No: - YAlNIT/SIDF/2OL6-17 /A1 Dated 2-9,1 2*\f The Executive Engineer Yingkiong Division, pwD, Ap, yingkiong invites Tender on behalf of Governor of Arunachal Pradesh for the construction of works on item rate as detailed below, from registered contractors of Class- III & IV categories domiciled within the territorial jurisdiction of 34 Tuting-Yingkiong Assembly constituency in accordance with Govt. Notification No. SPwD/w-66 I 2Ol2 I 814 Dtd. 1 3 I OB I 2OlS. Approximate Earnest P... ukaqe Cost of Period of No." , Ni.nre ut \\ork value of lvork , Nloney ciocumeni compietio (') n 1 2 ., 4 5 6 YA/NrT/ Construction ol t 61,13,000/- T 61,130/- < s00/- SIDF/ C.C. Interlocking (Rupees Sixty (Rupees (Rupees Five 6 (Six) 2016- Bricks roarl one lakhs Sixty one hundred) Months 17 lOt within Yingkiong thirteen thousand only market under thousand) only one hundred SIDF thirty) only 1. Tender documents (and additional copies) may be purchased from the office of Executive Engineer, yingkiong Division, ewo, ae, yi.rgkiong from 30/07/2016 to 08lOBl2016 upto to 16O0 hours for a nonlrefundable fee as indicated, in the form of cash or Demar-rcl Draft on any Scheduled bank payable at state Bank of Inctia, yingkiong Branch in favour of Executive Engineer, Yingkiong Division, pwD, Ap, yingkiong. Interested tenderers may obtain further information at the same address. Tender documents requested by mail will be dispatched by registerecl/speed post on payment of an extra amount of Rs s00.00 (Rupees Five hundred) yingkiong on1y. The Executive Engineer, Division, pwd, Ap, yingkiong will not be held responsible for the postal cielay if any, in the Jetirre[. of the documents or non-receipt of the same. 2. Tender lrlust be accomparriecl by securiry oi the amount specified for work the in the table, payable at state Bank of India, yingkiong Branch and drawn iq favour of Executive Engineer, yingkiong oirri"iorr, pwD, Ap, Yingkiong. Tender security will have to be in anyone of the forms as specified in the tender document and shall have to be valid for 45 (Forty Five) diiys beyond the validity of the tender. J. Terider in single envelop covers must be delivered to Executive pwD, Engineer, Yingkiong Division, Ap, yingkiong on working days and latest by 1500 hours on or before LLlog/2016. The,,Tend"r" *ilt be opened on the same day at L53O hours, in the presence of the tenderers who wish to attend. lf the office happens to be closecl on the date of receipt of the tender as specified, the tender will be received and opened on the next 2 working day at the same time and venue. Tender shall be evaluated by a standing Screening Committee whose decision sha1l be final. 4. The tenderer who fulfills the following initial requirements sha1l only be eligible to participate a) Should have executed three similar work each of value not less than 4Ook of estimated cost or two similar works each of value not less than 60% of the estimated cost or one similar work of value not less than BO% of estimated cost (rounded to nearest of 10.00 lakh) in last 5 year ending last date of the previous month in which tender are initiated for the purpose of clause similar work meaning the work of Interlocking brick works. b) Should have had an annual financial turn over in civil engineering construction works in any one year during the last S(five) years ending March'2O16 of value not less than Rs.100.00 Lakh (Rupees Hundred lal<h) onlr,. 5. Any contractor r,vho has 2 (two) or more unco.mpieted ongoing commitment (projects to execute/contracts at hand) is not permitted to participate in this tendering. A tenderer wiil invariably submit an afhdavit sworn before a competent Magistrate to the effect that he does not lnave 2 (two) or more uncompleted ongoing commi.tments at the time of tendering. The affidavit should mention the names of the uncompleted ongoing commitments. He shal1 also, for participation in any tender be required to submit completion certificate issued by the Engineer-in-charge duly counter signed by the concerned Superintending Engineer. Any tender which does not fulfill this condition will be summarily rejected. In the event of submission of false information, which may be detected by the department after award of work, the tender shall be cancelled immediately and the contractor sha1l be barred from further participation in any tender works of the department. 6. The tenderer will have to submit No Due Certificate (NDC) / No Objection Certificate (NOC) from Arunachal Pradesh State cooperative Apex bank Limited, not oider than 3(three) months, duiy issued by the Managing Director cum Chief Executive Officer , Itanagar along with the tender. A11 lhe required irrformation anci clucrurrenis shouid be submitted strictly in the formats given in the tender document. Other standard formats may be adopted only in cases where no formats have been prescribed in the Tendei'document. B. All affidavits, undertakings, agreements etc. should invariably be sworn before a magistrate and they should be specific. 9. No attested copies of documents that ought to be submitted in original shall be accepted. I 3 10. The tenderer, at the tenderer's own responsibility and risk is encouraged to visit the work site and obtain necessary information related to it to facilitate preparation of the tender. 11. In the event of more than one qualified tenderer quoting the same amount, the award of work shall be determined by the Tender capacity of the tenderers. 12. Al1 the requisite information/documents mentioned in (6), (7), (g) and (9) above should be submitted in an orderiy manner as and where required by indexing them as detailed in the relevant section(s) of the tendering document. The guarantees, certificates, etc from bank(s) and other authorities and other information sha1l be furnished as per the standard forms given in the relevant section(s) of the Tencler Document. They must not be older than three (3) months ancl must be signed by competent authority himself/herself with proper official seal. 13. The Employer reserves the right to accept or reject any tender, and to cancel the tendering process and reject all tenders, at. any time prior to the award of contract, without thereby incurring any liability to the affected tenderer or tenderers or any obligation to inform affected tenderer or tenderers of the grounds for the employer,s action. 74. other details can be seen in the Tender documents. Executive Engineer, Yingkiong Division, pWD, Yingkiong Bid No: YA/NrT/ SrDF/20 t6_17 lOt 1247 _s7 Dated 29107 l2Ot6 1) The PS to Flon'ble Minister (pwD) for information of HM (pwD) please. )\ The PS parliamentary to Hon'ble secretary (pwD) for information of HPS (PWD) ptease. 3) The secretary' (PWD), Go,t. of Ap. Ita-naga-r for kind infoi:marion. 4) The Chief Engineer, EZ, WZ, CZ_,, SID&', Highway EZ &,W2, pWD, AP, Itanagar for information. s) The Director, IPR, Govt of Ap, Naharlagun for kind information and necepsary action. A shorter version of the advertisement is enclosed for publication in two local dailies on or before oz/ogt2oL6 6) The superintending Engineer, Boleng circre, pwD, Ap, Boreng for information and necessary action. 7) The Deputy Commissioner, Upper Siang District, yingkiong for information and wide publicity. B) The Additional Deputy commissioner, Tuting for information publicity. and wide 9) The A11 Executive Engineer, under Boleng circle for information. 10)The Ali Assistant Engineer, under yingkiong pw. Division for information and wide circulation. 1) Web Site www.arynachalpwd.org. JE, Computer in_charge of IT section pwD; of central zone-B, Itanagar is requested to upload it in the oflicial website of pWD immediatel5r 1a Execu Yingkio.
Recommended publications
  • WEST KAMENG District
    SSI-List(2001-2006) (ANNUAL SURVEY SL.NO PERMANENT MONTH OF YEAR OF UNIT NAME UNIT_NAME2 ADDRESS-1 ADDRESS-2 STATE CODE DISTRICT TTM_CODE VT_ CODE SECTOR_COD REGISTRATION REGISTRATION REGISRTRATIO CODE E NUMBER N TAWANG LOCATION CODE -1 0000001 521001022 05 2002 M/S YIDGA INCENSE INDUSTRIAL ESTATE, TAWANG 12 01 2 0000002 521001041 03 2003 M/S RAPTAA PHOTO STUDIO : TAWANG 12 01 2 0000003 120101023 07 2003 M/S EVERGREEN ENTERPRISE JANG, (TAWANG) 12 01 1 0000004 120101024 03 2003 M/S THONGMAN GARAGE NAMET VILL. TAWANG 12 01 1 0000005 120101025 03 2003 M/S WOODLAND ENTERPRISE, TAWANG NEW BAZAR LINE, TAWANG 12 01 2 0000006 120101027 03 2006 M/S LD FURNITURE, TAWANG GYANGKHAR - VILL : TAWANG 12 01 2 0000007 120101026 03 2006 M/S TASHI DELEK NOODLES SHYO VILLAGE, TAWANG 12 01 2 0000008 120101029 03 2006 M/S R.L. LOCAL BAG UNIT : TAWANG 12 01 2 0000009 120101029 03 2006 M/S HIMALAYAN INDUSTRIES, TAWANG PARIVAS, GTG ROAD : TAWANG 12 01 2 02- Location Code- WEST KAMENG District 0000010 5209001068 09 2002 M/S FRONTIER DISTILLERY Pvt. Ltd. INDUSTRIAL ESTATE, TIPPI 12 02 190 1 0000011 5209001065 05 2002 M/S KALAKTANG FURNITURE HOUSE VILL-KALAKTANG 12 02 0000012 5209003067 11 2002 M/S GURU MOTORS BIRPUR, RUPA 12 02 190 1 0000013 120201069 06 2003 M/S KARUNA COMPUTER BOMDILA 12 02 190 2 0000014 120201074 12 2003 M/S NAPRA SAW MILL INDUSTRIAL ESTATE, TIPPI 12 02 190 1 0000015 120201070 09 2003 M/S ARUNACHAL DISTILLERY & BOTTLING Pvt. Ltd. INDUSTRIAL ESTATE, TIPPI 12 02 0000016 120201072 10 2003 M/S NAFRA CHEMICAL Pvt.
    [Show full text]
  • ROADS I N D E X of AOP 2007-2008 (5054 ROADS & 3054 ROADS) PART-I ======Sl
    GOVERNMENT OF ARUNACHAL PRADESH PUBLIC WORKS DEPARTMENT SPECIAL ASSISTANCE PACKAGE (SAP) ANNUAL OPERATING PLAN 2007-2008 VOLUME – A COMMUNICATION SECTOR ROADS I N D E X OF AOP 2007-2008 (5054 ROADS & 3054 ROADS) PART-I ======================= Sl. No. Name of Circles Sub- Name of Division Page No Serial From To A. FORMATS R-1 - R-20 1. RUPA CIRCLE i) Tawang 1 - 2 ii) Jang 3 iii) Bomdila 4 - 6 iv) Kalaktang 7 - 9 v) Bameng 10 - 12 vi) Seppa 13 - 15 2. CAPITAL CIRCLE i) Capital-A 16 - 22 ii) Capital-B 23 - 28 iii) Naharlagun 29 - 33 3. NAHARLAGUN CIRCLE i) Doimukh 34 - 36 ii) Sagalee 37 - 40 iii) Ziro 41 - 44 iv) Sangram 45 - 47 4. BASAR CIRCLE i) Daporijo 48 - 56 ii) Dumporijo 57 - 59 iii) Basar 60 - 65 5. ALONG CIRCLE i) Along 66 - 67 ii) Yomcha 68 - 70 iii) Rumgong 71 - 72 iv) Mechuka 73 - 74 6. BOLENG CIRCLE i) Mariyang 75 - 77 ii) Yingkiong 78 - 80 iii) Boleng 81 - 84 iv) Pasighat 85 - 87 7. TEZU CIRCLE i) Anini 88 - 89 ii) Roing 90 - 91 iii) Hayuliang 92 - 94 iv) Namsai 95 - 96 v) Tezu 97 - 99 8. JAIRAMPUR CIRCLE i) Jairampur 100 - 102 ii) Changlang 103 - 105 iii) Khonsa 106 - 108 iv) Longding 109 - 111 Roads Formats FAOP 07-08-last,INDEX(Pt-I) Page : R-8 DETAIL STATEMENT ON DISTRIBUTION OF ALLOCATION UNDER SPECIAL ASSISTANCE PACKAGE (SAP Roads Bridges P/Tracks S/Bridges RIDF CRF (E&I) NLCPR NEC Total Sl. Name of Division No. Estimated Estimated Estimated Estimated Estimated Estimated Estimated Estimated Estimated Allocation Allocation Allocation Allocation Allocation Allocation Allocation Allocation Allocation Cost Cost Cost Cost
    [Show full text]
  • Map of Arunachal Pradesh Μ N !( " 0 ' 0
    92°0'0"E 93°0'0"E 94°0'0"E 95°0'0"E 96°0'0"E 97°0'0"E MAP OF ARUNACHAL PRADESH µ N !( " 0 ' 0 Gelling ° N 9 " 2 0 ' Tuting 0 ° *#!( !( 9 !( 2 Mipi Dambuen Migging !( !( !( ANINI !( Monigong Palling Singa !( !(") UPPER SIANG SHI YOMI YINGKIONG DIBANG VALLEY !(!( !( Mechuka !( Etalin !( Jengging *# Pidi !( !(") TATO Payum !( Jengging Mariyang !( !( !( Anelih !( UPPER SUBANSIRI SIANG *# Arzoo Riga Geku Kaying !(") !(") !(") !( Nacho Taksing ")!( !( Siyum Hunli !( BOLENG ")!( !( Limeking *# !( WEST !(*#Boleng !( Dambuk !( Chaglagam !( Kamba !( !( *# Katan *#!( Desali Kibithoo KodakPayeng SIANG *#!( Jomlu Mobuk *#!( !( !( !( AALO !(") Mebo Matengliang Darak !( Pangin !( *#!( ROING !( !( !( Yomcha !( !( !(!( Goiliang Walong Pipsorang Giba *#!( Namsing Hayuliang Nikte-Kodum !( N !(") !( Liromoba PASIGHAT *#")Hayuliang " !( !( L. DIBANG VALLEY 0 Gusar !(") !( !( ' !( 0 Damin !( Tirbin Bagra ° N !( Koronu 8 " Nyapin Tali !(") !( ANJAW EAST SIANG 2 0 !( ' Nilling !( *#!( ChetamDAPORIJO BASAR 0 KURUNG KUMEY *# Koyu Parbuk !( ° !( !( !( LEPAR!(ADA!( !(") Yagrung TEZU 8 !( *# Baririjo !( Manchal 2 !( !( Maro !( !( !( HAWAI KRA-DAADI !( ")!( !( !( !( Sarli Parsiparlo Kora Paglam !( !( Gepen Bilat !( LOHIT !( !( Sunpura !( !( Gensi *#!( Oyan !(") Chongkham KOLORIANG !(") Daring !(") Sangram Chambang Gangte Puchi Geko Nari Ruksin Sunpura !( ")!( !( !( RAGA *#!( Yangte !( !(!( LOWER SIANG Zemithang Nyapin !( !( !( !( !( *#!( !( Kamporijo *# !( Tarak Langdi Sibe New Seren Lathao Zemithang EAST KAMENG *# NAMSAI TAWANG !( Phassang JAMIN !( LIKABALI !( *#!(
    [Show full text]
  • Annual Operating Plan 2010-11 (Plan and Proposals)
    GOVERNMENT OF ARUNACHAL PRADESH ANNUAL OPERATING PLAN 2010-11 (PLAN AND PROPOSALS) INTRODUCTION : - Consequent upon the Pre-SPB discussion held on 3rd June 2010, the State Planning Department vide its memo No.PD (P)-10/2010 Dated 12th July 2010 has communicated a revised sectoral allocation under unearmarked portion for 2010-11 for Power (T&D) sector as Rs. 12212.00 lakhs. The allocation under un earmarked portion during 2009-10 was Rs. 13903.79 lakhs against which the Department had incurred an actual expenditure of Rs.13863.47 lakhs. Allocation under SPA, ACA has also been indicated against various formats which are only indicative and has not been discussed in the SPB. Actual fund allocation shall be based on actual communication from the Planning Department during the year. The non plan allocation of the department received during 2009-10 which included one time specific allocation was Rs.14624.70 lakhs against which the Department had incurred an actual expenditure of Rs.14584.78 lakhs. The fund requirement of the Department for 2010-11 under Direction and Administration subhead of 2801 non plan is Rs. 13623.59 lakhs against which the State Planning Department vide their letter No. BT-339/2009/Pt. dated 6th April 2010 has made an allocation of Rs. 11662.66 lakhs. i The total fund allocation received during 2009-10 against Central Sector Schemes such as NLCPR, NEC, MNRE etc. was Rs.29998.28 lakhs against which the Department had incurred an actual expenditure of Rs.19123.60 lakhs. The requirement of fund by the Department towards the schemes being executed under above sub-heads during 2010-11 in order to complete the schemes within the stipulated time frame is Rs.
    [Show full text]
  • Administrative Atlas
    CENSUS OF INDIA 2001 ARUNACHAL PRADESH ADMINISTRATIVE ATLAS ~~ ~~~~.~[1., #, ~.. 1/8 0\ \ ~ PEOPLE ORIENTED DEVENDER KUMAR SIKRI REGISTRAR GENERAL & CENSUS COMMISSIONER, INDIA The maps included in this publication are based upon Survey of India map with the permission of the Surveyor General of India. The territorial waters of India extend into the sea to a distance of twelve nautical miles measured from the appropriate base line (applicable to India map only). The interstate boundaries between Arunachal Pradesh, Assam and Meghalaya shown in this publication are as interpreted from the North-Eastern Areas (Reorganisation) Act, 1971 but have yet to be verified. The state boundaries between Uttaranchal & Uttar Pradesh, Bihar & Jharkhand and Chhattisgarh & Madhya Pradesh have not been verified by government concerned. © Government of India, Copyright 2006. Data Product Number 12-010-2001 - Cen-Atlas (ii) FOREWORD "Few people realize, much less appreciate, .that apart from Survey 'ot' India and Geological Survey, the Census of India has been perhaps the )arg~st single producer of maps of the Indian sub-continent" - this is an observation made by Dr. Ash-ok Mitra, an illustrious Census Commissioner of India in 1961. The statement sums up the contribution of Census Organisation wh ich has been working in the field of mapping in the country. The Census Commissionarate of India has been working in the field of cartography and mapping since 1872. A major shift was witnessed during Census 1961 when the office had got a permanent footing. For the first time, the census maps were published in the form of 'Census Atlases' in the decade of 1961-71.
    [Show full text]
  • Palynodebris Analysis and Depositional Environment of Yingkiong Group of East and Upper Siang Districts, Arunachal Pradesh, India
    Int. J. of Geology & Earth Sci., 2015 Diganta Bhuyan and Kaustuv Moni Saikia, 2015 ISSN 2395-647X www.ijges.com Vol. 1, No. 3, December 2015 © 2015 IJGES. All Rights Reserved Research Paper PALYNODEBRIS ANALYSIS AND DEPOSITIONAL ENVIRONMENT OF YINGKIONG GROUP OF EAST AND UPPER SIANG DISTRICTS, ARUNACHAL PRADESH, INDIA Diganta Bhuyan1* and Kaustuv Moni Saikia1 *Corresponding Author: Diganta Bhuyan [email protected] The present study was carried out along the Yamne river section of the East and Upper Siang Districts of Arunachal Pradesh. The area presents the Eocene Yingkiong Group of sediments exposed on the road and river sections from the north of Ranaghat up to Yingkiong. The dominating rock types encountered are sandstone, limestone, shale, carbonaceous shale and streaks of coal. The palynological study reveals the scanty occurrence of palynofossils and foraminiferal linings. The palynodebris assemblage is dominated by charcoal and degraded black debris along with considerable amount of amorphous organic matter and well preserved woody structures. Presence of charcoal and degraded black debris indicate oxidizing environment at the time of deposition of the sediments while amorphous organic matters with well preserved woody structures point that the study area experienced recurrence of reducing environment. From the occurrence of foraminiferal linings, the depositional environment can be envisaged to be shallow marine. The palynodebris assemblage together with coal occurrence indicates a tropical to sub-tropical climate with high humidity and heavy rainfall prevailed in the area of deposition. Keywords: Palynodebris, Depositional environment, Yingkiong group, Arunachal Pradesh INTRODUCTION The early Tertiary Yingkiong Group of rocks with The present area of investigation occupies the associated volcanic sequences is well exposed sub-Himalayan zone of the East and Upper Siang along the Yamne River valley in the East and districts of Arunachal Pradesh.
    [Show full text]
  • Sustainable Tourism for Regional Development in North-East States of India: Trends, Problems and Prospects by Dr
    Global Journal of HUMAN-SOCIAL SCIENCE: B Geography, Geo-Sciences, Environmental Science & Disaster Management Volume 20 Issue 2 Version 1.0 Year 2020 Type: Double Blind Peer Reviewed International Research Journal Publisher: Global Journals Online ISSN: 2249-460x & Print ISSN: 0975-587X Sustainable Tourism for Regional Development in North-East States of India: Trends, Problems and Prospects By Dr. Sherap Bhutia Abstract- Northeastern part of India comprising the states of Assam, Arunachal Pradesh, Manipur, Meghalaya, Mizoram, Nagaland, Tripura and Sikkim possesses great physical and human diversities to project it as one of the most potential areas of the country in respect of tourism. The North-Eastern states of India are lesser explored as compared to the rest of the country, despite their scenic beauty. In the context of a globally growing sector like tourism, North-East India with both physical and human diversities is one of the most promising regions of the country in respect of tourism. Considering the significance of the tourism sector as a catalyst for regional development, an attempt has been made in this article to visualize the trend and development of tourism sector in Northeastern region and focus on the need for adoption of a sustainable tourism development strategy. Furthermore, the present study is also an attempt to address the key determinants of sustainability of tourism industry in the North- Eastern India and to establish the importance of the local entrepreneurship or local community participation in ensuring sustainable tourism development. Keywords: north-east region, tourist, states, tourism, development. GJHSS-B Classification: FOR Code: 059999p S ustainableTourismforRegionalDevelopmentinNorthEastStatesofIndiaTrends,ProblemsandProspects Strictly as per the compliance and regulations of: © 2020.
    [Show full text]
  • Dated of Hearing: 19Th May'2020. Could Not Be Contacted in His Mobile
    o T{.q-;rI tnr sTfuort TO r{-/rER .Td RIGHT H INFORMATION ARUNACHAL PRADESH I NFORMATION COMMISSION ITANAGAR BEFORE THE COURT OF DR.JORAM BEGI, STATE CHIEF INFORMATION COMMISSIONER No.APlC-67 /2020 Dated,ltanagar the 19th MtY, 2O2O Under Section 19(3) RTI Act, 2005 Appellant Respondent SHRI SHONEY PERTIN, SHRI R.N. SINGH, President, Siang Rights PIO-cum-Executive Engineer, Forum(SRF) Camp Pasighat, PWD Division, Yingkiong, PO/PS-Pasighat, WARD No.-4, Vs Upper Siang District, East Siang District (A.P), Arunachal Pradesh. Dated of hearing: 19th May'2020. ORDER Whereas, anappeal under Section 19(3) of RTI Act, 2005 has been received from Shri Shoney Pertin, President, Siang Rights Forum(SRF) Camp Pasighat, PO/PS- pasighat, WARD No.-4, East Siang District (A.P), for non-furnishing of information, by Shri R.N. Singh, P|O-cum-Executive Engineer, PWD Division, Yingkiong, Upper Siang District, Arunachal Pradesh, as sought, by the Appellant under section 6(1) of RTI Act, 2005 on 10/OU2OI9. Whereas, the 1't hearing was held through Video / Audio Conferencing on 2L" April'2020. Shri R.N. Singh, PIO-cum-Executive Engineer, PWD Division, Yingkiong, could not be contacted in his Mobile NO. due to bad network connection. The Appellant Shri Shoney Pertin attended the hearing through audio conference as net work connectivity at Pasighat was not good for video conference. The PIO vide letter No. YD/E-|V/RT|/35 /2019-20/178-81, Dated Yingkiong the 06/02 /2020 had replied to the Appellant informing that the information sought by the Appellant for the mentioned work has not been sanctioned or executed.
    [Show full text]
  • Telephone Directory of Power Department
    Telephone Directory of Power Department Name of Office/ Designation Name of Officer Mobile Code Office No Fax No Resi No E-Mail ID TRANSMISSION, PLANNING & MONITORING ZONE, ITANAGAR Chief Engineer Shri Takar Mara 9436229825 360 2217301 2292547 [email protected] [email protected] Executive Engineer (Plg.) Shri Likha Taje 9436050473 Executive Engineer (Plg.) Shri Taku Budung 9436054683 Assistant Engineer (Plg.) Smti Minpi Tasar 9402602165 Addl Chief Estimator Shri Rajender Singh 2292628 Senior Estimator Miss Tadu Yamung 9774092526 Senior Estimator Shri Dari Kanu 9436288421 Senior Personal Assistant Shri Raj Narayan Jha 9436253764 Senior Fin. & Accnt. Officer Shri Tage Talin 9436044478 TRANSMISSION CIRCLE, ITANAGAR Superintending Engineer Shri T. K. Tara 9436045003 [email protected] Junior Engineer Smti Pura Annu 7005374845 TRANSMISSION DIVISION - I, DIRANG Executive Engineer Shri T. T. Dirkhipa 9436691629 [email protected] [email protected] Asstt Engr, GSSD, Khuppi Shri Hage Habung 9402935261 Asstt Engr, GSSD, Itanagar Shri Moli Kamki 9774003738 TRANSMISSION & SLDC DIVISION - II, ITANAGAR Executive Engineer Shri Sange Phuntso 9436041217 [email protected] Asstt Engr, GSSD, Daporijo Shri Duyu Richo 9402935582 TRANSMISSION DIVISION - III, PASIGHAT Executive Engineer Shri Okam Siram 9436043069 [email protected] Asstt Engr, GSSD, Pasighat Shri Hibu Bama 9436068976 Asstt Engr, GSSD, Aalo Shri Marto Kamgo 9436056120 Asstt Engr, GSSD, Deomali Shri Purik Buchi 9402936916 SYSTEM OPERATION & POWER SYSTEM COMMUNICATION Superintending Engineer Shri Nongkong Perme 9436838005 [email protected] [email protected] Executive Engineer Shri Sange Phuntso 9436041217 Asstt Engr, SLDC, Itanagar Shri Domo Kamduk 9436671717 WESTERN ELECTRICAL ZONE Chief Engineer Shri Gumdo Doji 9436248264 0360 2290608 2217440 2245318 [email protected] Superintending Engineer Shri H R Bado 9436838036 Executive Engineer Shri Zomba Nasho 9402967323 Executive Engineer Shri Ajay Murtem 9436229078 Private Secretary Shri Rajendran A E 9436256191 Senior Fin.
    [Show full text]
  • Administrative Divisions 2011 ^
    A ARUNACHAL PRADESH N ADMINISTRATIVE DIVISIONS 2011 T E I Mipi B ! Gelling KILOMETRES Tuting ! I U P P E R ! S I A N G 20 0 20 40 60 80 H T Palling Anini Singa P Monigong Migging ! (Anini) ! ! D I B A N G V A L L E Y Yingkiong Etalin P ! Pidi Payum Jengging (Yingkiong) ! ! ! Anelih Mechuka ! Mariyang ! C ! ! ! Siyum Riga Limeking Tato Boleng Taksing Nacho ! Geku ! ! Kaying ! ! Chaglagam ! Mopom Kronli Hunli ! U P P E R S U B A N S I R I W E S T S I A N G (Adipasi) ! ! ! Rumgong ! Desali ! ! ! Dambuk Payeng ! ! ! Kibithoo ! Rebo Katan ! I N Darak Jomlo PergingD L O W EIR D I B A N G MetengliaAng Kamba !Mobuk Mebo ! Goiliang ! ! ! ! ! Walong ! Taliha Liromoba ! ! V A L L E Y ! (Aalo)P Pangin (Roing)P Damin Giba ! Namsing ! ! Longding Koling ! Gite Aalo Kebang A N J A W ! ! Yomcha Koronu Hayuliang (Pipsorang) Gussar Ripa ! E A S T S I A N G ! Roing ! Tezu Manchal P(Pasighat) R ! Chetam Dumporijo Bagra Sunpura ! ! Tali ! Tirbin Koyu Paglam (Tinali) (Hawai) (Peer Yapu) P Maro ! ! Pasighat ! K U R U N G K U M E Y ! ! Basar Bilat P P ! ! Daporijo Kora Sille-Oyan Hawai P Parsi-Parlo ! Sarli Baririjo ! ! Ruksin Koloriang ! ! ! ! L O H I T ! ! Nari ! ! Sangram Chambang Puchi Daring New ! ! ! ! ! Raga Geko Sibe ! Wakro B Sawa Yangte ! Gensi Seren Chowkham ! Lathao ! Yachuli Likabali Namsai Chayangtajo Nyapin Palin ! M ! Zemithang ! Kamporijo ! Mahadevpur A Kitpi T A W A N G ! Old Ziro Kangku ! ! ! ! Khenewa Piyong ! ! Diyun ! Tawang Thingbu LOWER SUBANSIRI ! H P ! Lada Pipu- ! Miao Lhou ! ! Pistana P (Ziro Sadar) Dudunghar ! Dipu ! Yachuli Dollungmukh
    [Show full text]
  • Sl. No. Name of Districts Name of Schemes/Projects Estimated Cost
    DISTRICT-WISE SCHEMES/PROJECTS SANCTIONED UNDER NLCPR SINCE INCEPTION. Sl. Name of Name of Schemes/Projects Estimated Fund Year of Remarks No. Districts cost ( ` in Released sanction crore) 1 2 3 4 5 1 Tawang 1. C/o 33 KV Express Line from Tawang to Lumla with 33/11 KV, 6.220 5.596 2002-03 Completed 2x1.6 MVA Sub-station at Lumla. 2. Improvement of Porter Track from Jang to Sullungthi. 2.550 2.550 2002-03 Completed 3. C/o Porter Track from Nuranang to Mago. 2.590 2.550 2003-04 Completed 4. C/o road from Lhou Nallah to Mukto CO Hq. via Gomkeling 18.030 15.754 2005-06 Ongoing and Serjong. 5. V.K.V. at Kitpi in Tawang district 5.210 4.552 2005-06 Completed 6. Improvement & Extension of Water Supply at Lumla. 4.883 4.266 2006-07 Completed 7. Ropeway from Tawang Monastery to Ani Gompa 3.310 2.892 2006-07 Completed 8. Improvement of Tawang Township road network 4.896 4.320 2009-10 Ongoing 9. Providing water supply-cum-irrigation to Jangloom area. 4.915 3.497 2010-11 Ongoing 10. C/o High altitude Sports Complex at Tawang. 13.066 4.612 2010-11 Ongoing 11. Providing drinking water supply to Jang Township and its 5.651 4.018 2010-11 Ongoing peripheral rural villages. 12. Construction of road from Murga bridge point to Rho village 17.603 6.337 2011-12 Ongoing (Phase-I) 13. C/o In-Patient Department for District Hospital at Tawang.
    [Show full text]
  • Government of Arunachal Pradesh Public Works Department
    PORTER TRACKS GOVERNMENT OF ARUNACHAL PRADESH PUBLIC WORKS DEPARTMENT SPECIAL ASSISTANCE PACKAGE (SAP) ANNUAL OPERATING PLAN 2007-2008 VOLUME – D COMMUNICATION SECTOR SPECIAL ASSISTANCE PACKAGE (SAP) I N D E X OF AOP 2007-2008 (5054 SUSPENSION BRIDGES) PART-I ************************* Suspension Bridges Sub- Sl. No. Name of Circles Name of Division Page No Serial From To A. FORMATS R-1 - R-6 1. RUPA i) Tawang 1 ii) Jang 2 iii) Bomdila 3 iv) Kalaktang 4 v) Bameng 5 - 6 vi) Seppa 7 - 8 2. CAPITAL i) Capital-A ii) Capital-B iii) Naharlagun 9 3. NAHARLAGUN i) Doimukh 10 ii) Sagalee 11 - 12 iii) Ziro 13 iv) Sangram 14 - 15 4. BASAR i) Daporijo 16 - 18 ii) Dumporijo 19 iii) Basar 20 5. ALONG i) Along 21 ii) Yomcha 22 iii) Rumgong 23 iv) Mechuka 24 6. BOLENG i) Mariyang 25 ii) Yingkiong 26 iii) Boleng 27 iv) Pasighat 7. TEZU i) Anini 28 - 29 ii) Roing 30 iii) Hayuliang 31 - 32 iv) Namsai v) Tezu 33 8. JAIRAMPUR i) Jairampur ii) Changlang iii) Khonsa iv) Longding 34 Format-SBRIDGE,INDEX-PART-I R-1 FORMAT - I (PART-I) SPECIAL ASSISTANCE PACKAGE (SAP) ANNUAL OPERATING PLAN 2007-2008 OUTLAY AND EXPENDITURE 5054 SUSPENSION BRIDGES (ONGOING SCHEMES) (Rs. in lakhs) Major & Minor Heads of Targetted Outlay 2006-2007 Outlay 2007-2008 Sl. No. Development (Scheme Expenditure 2006- Total Remarks wise) 2007 Original Revised Revenue Capital 1 2 34 5 678 9 1 SUSPENSION BRIDGES 203.02 -- 203.02 -- 1274.30 1274.30 TOTAL = 203.02 203.02 1274.30 1274.30 Format-SBRIDGE,R-1(Pt-I),2/27/2008 R-2 FORMAT-1(PART-I) SPECIAL ASSISTANCE PACKAGE (SAP) ANNUAL OPERATING PLAN : 2007-2008 DISTRICT-WISE BREAKUP OF OUTLAY COMMUNICATION SECTOR : SUSPENSION BRIDGES (Rs.
    [Show full text]