Electrical General Demolition Notes: Electrical Specifications

Total Page:16

File Type:pdf, Size:1020Kb

Electrical General Demolition Notes: Electrical Specifications GENERAL ELECTRICAL NOTES: ELECTRICAL GENERAL DEMOLITION NOTES: ELECTRICAL SPECIFICATIONS: GENERAL: UNLESS SPECIFICALLY INDICATED OTHERWISE, ALL WORK SHOWN ON THE ELECTRICAL DRAWINGS IS GENERAL: DEMOLITION DRAWINGS ARE BASED ON EXISTING PLANS AND FIELD INVESTIGATION PRIOR TO DEMOLITION. A. GENERAL PROVISIONS 2. ALL SUBMITTED SHOP DRAWINGS (MANUFACTURERS' EQUIPMENT DESCRIPTIVE SHEETS OR VENDORS' PREPARED NEW WORK TO BE PROVIDED UNDER THIS CONTRACT. VISIT THE EXISTING BUILDING PRIOR TO BID IN ORDER TO BECOME FAMILIAR WITH THE EXISTING CONDITIONS AND IN DRAWINGS) SHALL HAVE THE GENERAL CONTRACTOR'S OR SUBCONTRACTOR'S STAMP OF APPROVAL ORDER TO AVOID CONFLICTS. INDICATING THAT THE ITEM SUBMITTED IS AS CALLED FOR ON THE PLANS AND SPECIFICATION, IS APPROVED BY 1. REQUIREMENTS SPECIFIED IN DIVISION 1, INSTRUCTIONS TO BIDDERS, SUPPLEMENTAL GENERAL CONDITIONS, COORDINATION: COORDINATE AND COOPERATE WITH ALL TRADES ON THE PROJECT. THE GENERAL CONTRACTOR OR SUBCONTRACTOR, THE DATE OF APPROVAL AND INITIALED BY THE PERSON SPECIAL CONDITIONS, ADDENDA, ALTERNATES, CONTRACT AND PROPOSAL, ALONG WITH DIVISION 16 AND ALL DASHED ITEMS: ALL ITEMS SHOWN DASHED ON DEMOLITION PLANS ARE EXISTING AND SHALL BE REMOVED APPROVING THE SUBMITTAL AND THE NAME OF THE COMPANY SUBMITTING SAID EQUIPMENT FOR APPROVAL. RECORD DRAWINGS: SECURE AN EXTRA SET OF ELECTRICAL DRAWINGS TO BE KEPT ON SITE AND MARK, DAILY, THE COMPLETE INCLUDING BOXES, CONDUIT, WIRE, FASTENERS, AND ASSOCIATED APPURTENANCES UON. IT'S SECTIONS, COMPRISE THE CONTRACT DOCUMENTS FOR THE ELECTRICAL CONTRACT. DRAWINGS AND ALL THEIR REVISIONS UP TO THE BID SUBMITTAL DATE BECOME A BINDING PART OF THE CONTRACT, ALONG WITH DRAWINGS IN RED AS THE PROJECT PROGRESSES IN ORDER TO KEEP AN ACCURATE RECORD OF ALL DEVIATIONS 3. SUBMIT BOUND BROCHURES COMPLETE WITH A TABLE OF CONTENTS. LOOSE OR STAPLED TOGETHER SHEETS EXISTING CONDUIT: ALL EXISTING CONDUITS AND WIRING THAT WILL NOT BE REUSED SHALL BE REMOVED WHERE THESE SPECIFICATIONS AS THOUGH THEY WERE ONE, AND ANYTHING IMPLIED BY THE SPECIFICATIONS AS BETWEEN THE WORK SHOWN ON THE DRAWINGS AND THE WORK WHICH IS ACTUALLY INSTALLED. THESE MARKED ARE NOT ACCEPTABLE. ANY SUBMITTALS NOT IN BROCHURE FORM OR NOT AS SPECIFIED SHALL BE RETURNED DRAWINGS SHALL REFLECT ANY AND ALL CHANGES AND REVISIONS TO THE ORIGINAL DESIGN WHICH EXISTS IN THEY WILL BE EXPOSED UPON COMPLETION OF NEW WORK. EXISTING CONDUIT TO REMAIN CONCEALED IN WALLS THOUGH SHALL BE INTERPRETED AS ALSO IMPLIED BY THE DRAWINGS AND VICE VERSA. PROVIDE NECESSARY AT THE CONTRACTORS EXPENSE FOR RESUBMITTAL. THE COMPLETED WORK. DELIVER THE MARKED DRAWINGS TO THE <ARCHITECT/ENGINEER> AT PROJECT CLOSE-OUT. SHALL BE ABANDONED. EXISTING CONDUIT TO REMAIN BELOW FLOOR SLAB SHALL BE CUT OFF ONE INCH BELOW ITEMS FOR A COMPLETE INSTALLATION OF ALL ELECTRICALLY OPERATED EQUIPMENT LISTED IN THE ROUGH FLOOR AND GROUTED FLUSH. ALL EXISTING WIRING IN CONDUITS TO BE ABANDONED SHALL BE SPECIFICATIONS OR SHOWN ON THE DRAWINGS. TESTS: TEST ALL WIRING FOR CONTINUITY AND GROUNDS BEFORE CONNECTING ANY FIXTURES OR DEVICES. DISCONNECTED FROM POWER SOURCE AND REMOVED. 4. ALL DESCRIPTIVE LITERATURE SHALL BE SUBMITTED IN A THREE (3) HOLE BROCHURE WITH A COVER IDENTIFYING PERFORM INSULATION RESISTANCE TESTS ON ALL WIRING #8 OR LARGER TO ENSURE THAT ALL PORTIONS ARE FREE 2. THE ARCHITECTURAL, STRUCTURAL, MECHANICAL, PLUMBING AND EQUIPMENT DRAWINGS AND SPECIFICATIONS THE FOLLOWING: FROM SHORT-CIRCUITS AND GROUNDS. REPAIR DAMAGE: EXERCISE CARE IN REMOVAL OF DEMOLITION ITEMS. REPAIR, AT NO ADDITIONAL COST TO OWNER, ANY DAMAGE CAUSED TO EXISTING CONSTRUCTION AND/OR EQUIPMENT TO REMAIN. ARE INCORPORATED INTO, AND BECOME A PART OF THIS DIVISION. THIS CONTRACTOR SHALL EXAMINE ALL SUCH DRAWINGS AND SPECIFICATIONS AND BECOME THOROUGHLY FAMILIAR WITH THE PROVISIONS a. NAME OF THE JOB. INSPECTIONS: ARRANGE ALL NECESSARY INSPECTIONS. DELIVER ALL REQUIRED INSPECTION CERTIFICATES TO THE b. LOCATION OF THE JOB, ADDRESS, CITY AND STATE ASSOCIATED APPURTENANCES: REMOVE ALL ELECTRICAL APPURTENANCES (DISCONNECTS, STARTERS, WIRING, CONTAINED THEREIN. THE SUBMISSION OF THE BID SHALL INDICATE SUCH KNOWLEDGE. OWNER. c. NAME AND ADDRESS OF THE COMPANY SUBMITTING THE BROCHURES. CONDUIT, ETC.) ASSOCIATED WITH EQUIPMENT TO BE REMOVED BY OTHERS. d. DATE OF THE SUBMITTAL. GROUNDING: PROVIDE GROUNDING IN ACCORDANCE WITH THE NEC FOR THE ELECTRICAL SYSTEM INCLUDING 3. ELECTRICAL DRAWINGS ARE DIAGRAMMATIC. THEY ARE INTENDED TO SHOW THE APPROXIMATE LOCATIONS OF EQUIPMENT FRAMES CONDUITS, SWITCHES, CONTROLLERS, WIRE-WAYS, NEUTRAL CONDUCTORS, AND OTHER KNOCKOUT PLUGS AND COVERS: ALL CONDUIT REMOVED SHALL BE REMOVED IN ITS ENTIRETY, INCLUDING FITTINGS, EQUIPMENT AND CONDUIT. DIMENSIONS GIVEN ON THE PLANS, IN FIGURES, SHALL TAKE PRECEDENCE OVER EQUIPMENT. PROVIDE A GROUNDING CONDUCTOR IN ALL POWER CIRCUITS. MOUNTING DEVICES, MOUNTING HARDWARE, ETC. PROVIDE CONDUIT PLUGS AND BLANKS FOR ALL OPENINGS SCALED DIMENSIONS AND SHALL BE VERIFIED IN THE FIELD. THE ELECTRICAL CONTRACTOR SHALL LAYOUT ALL 5. EVERY EFFORT SHALL BE MADE, IN CHECKING THE SHOP DRAWINGS, TO DETECT AND CORRECT ALL ERRORS, CREATED BY THE REMOVAL OF CONDUIT. PROVIDE BLANK COVER PLATES FOR ALL OPENED OUTLET BOXES CREATED EQUIPMENT ROOMS TO MAKE SURE THE EQUIPMENT, AS PURCHASED, FITS IN THE ROOM OR SPACE SHOWN AND OMISSIONS AND INACCURACIES. FAILURE TO DO THIS WILL NOT RELIEVE THE ELECTRICAL CONTRACTOR OF THE LABELS: PROVIDE LABELS FOR ALL PANELBOARDS, CABINETS, SAFETY SWITCHES, MOTOR-DISCONNECT SWITCHES, BY THE REMOVAL OF THE EQUIPMENT AND/OR DEVICES. HAS ALL CLEARANCES REQUIRED BY THE NEC. EXACT LOCATION OF ALL EQUIPMENT SHALL BE VERIFIED IN THE RESPONSIBILITY FOR THE PROPER AND COMPLETE INSTALLATION IN ACCORDANCE WITH THE CONTRACT AND MOTOR CONTROLLERS. LABELS SHALL BE MACHINE ENGRAVED, LAMINATED PLASTIC, PERMANENTLY FIELD AND ROUTING OF CONDUITS SHALL SUIT FIELD CONDITIONS. DOCUMENTS. ATTACHED WITH SELF-TAPPING SCREWS OR RIVETS. DO NOT USE SELF-ADHESIVE LABELS. DEMOLISHED MATERIALS: ALL MATERIALS REMOVED UNDER DEMOLITION, NOT TO BE RELOCATED OR DESIGNATED TO BE TURNED OVER TO THE OWNER, SHALL BECOME PROPERTY OF THE CONTRACTOR AND SHALL BE REMOVED 4. UNTIL TIME OF INSTALLATION, THE ARCHITECT RESERVES THE RIGHT TO MAKE MINOR CHANGES IN THE LOCATION E. AS-BUILT DRAWINGS J-BOX LABELING: LABEL ALL JUNCTION BOXES WITH PERMANENT MARKER IDENTIFYING CIRCUIT NUMBER AND COMPLETELY FROM THE SITE. PANELBOARD OF CIRCUITS WITHIN. OF CONDUIT AND EQUIPMENT WITHOUT ADDITIONAL COST TO THE CONTRACT. SCHEDULE OUTAGES: ALL WORK AND ALL POWER OUTAGES IN THE EXISTING BUILDING SHALL BE SCHEDULED AT 1. SUBMIT TO THE ARCHITECT ON SET OF REPRODUCIBLE ELECTRICAL DRAWINGS SHOWING THE AS BUILT PANEL DIRECTORY: PROVIDE TYPEWRITTEN PANELBOARD DIRECTORY CARD IN EACH PANELBOARD INCLUDING TIMES CONVENIENT TO THE OWNER. 5. THE ELECTRICAL DRAWINGS AND SPECIFICATIONS ARE INTENDED TO SUPPLEMENT EACH OTHER. MATERIAL CONDITIONS. EXISTING PANELBOARDS MODIFIED FOR THIS PROJECT WITH CIRCUIT LOAD INFORMATION AND ROOM NUMBER AND LABOR NECESSARY TO THE PROJECT SHALL BE FURNISHED AND INSTALLED EVEN THOUGH NOT CLEARLY IDENTIFIED. USE ACTUAL ROOM NUMBERS IN THE BUILDING, NOT THE ROOM NUMBERS SHOWN ON THE NOTIFICATION: NOTIFY THE OWNER PRIOR TO TURNING OFF ANY CIRCUITS. SPECIFICALLY MENTIONED IN BOTH. LABOR AND/OR MATERIALS NEITHER SHOWN NOR SPECIFIED, BUT F. STANDARDS AND SUBSTITUTIONS CONTRACT DRAWINGS, AS THEY ARE OFTEN DIFFERENT. OBVIOUSLY NECESSARY FOR THE COMPLETION AND PROPER FUNCTIONING OF THE SYSTEM, SHALL BE EXISTING CIRCUITS: IF DURING THE COURSE OF CONSTRUCTION, IT IS DETERMINED BY THE CONTRACTOR THAT AN FURNISHED AND INSTALLED BY THE ELECTRICAL CONTRACTOR. MOTOR COORDINATION: MOTORS, MOTOR STARTERS, CONTROLLERS, INTEGRAL DISCONNECT SWITCHES, AND EXISTING CIRCUIT BECOMES SPARE, THE CONTRACTOR SHALL UPDATE THE PANELBOARD DIRECTORY TO INDICATE 1. WHEREVER THE WORDS "APPROVED BY", "APPROVED EQUAL", "AS DIRECTED" OR SIMILAR PHRASES ARE USED IN SUCH, EVEN IF IT IS NOT EXPLICITLY MARKED ON THE ELECTRICAL PLANS. THE FOLLOWING SPECIFICATIONS, THEY SHALL BE UNDERSTOOD TO REFER TO THE OWNER AS THE APPROVING CONTACTORS SHALL BE PROVIDED WITH THEIR RESPECTIVE PIECES OF EQUIPMENT BY THE EQUIPMENT SUPPLIER. 6. ARRANGE ALL EQUIPMENT SUBSTANTIALLY AS SHOWN ON THE DRAWINGS. MAKE DEVIATIONS ONLY WHERE COMMUNICATE WITH THE TRADES PROVIDING THE EQUIPMENT, VERIFYING ALL REQUIREMENTS, PROVIDE ALL AGENCY. THE NAME OR MAKE OF ANY EQUIPMENT OR MATERIALS NAMED IN THIS SPECIFICATION (WHETHER OR NECESSARY TO AVOID INTERFERENCE. CHECK ALL EQUIPMENT SIZES AGAINST AVAILABLE SPACE PRIOR TO ELECTRICAL CONNECTIONS REQUIRED THEREIN, AND INSTALL MOTOR STARTERS. NOT THE WORDS "OR APPROVED EQUAL" ARE USED) SHALL BE KNOWN AS THE "STANDARD". POWER SYMBOLS SHIPMENT TO AVOID INTERFERENCE. MOTOR DISCONNECTS: ALL MOTORS SHALL HAVE DISCONNECTING MEANS. 2. THESE SPECIFICATIONS ESTABLISH QUALITY STANDARDS OF MATERIALS AND EQUIPMENT TO BE PROVIDED. 7. EXAMINE THE WORK OF OTHER TRADES INSOFAR AS THEIR WORK COMES IN CONTACT WITH OR IS COVERED BY S MANUAL MOTOR SWITCH OR LIGHT SWITCH (AS APPLICABLE) SPECIFIC ITEMS ARE IDENTIFIED BY MANUFACTURER, TRADE NAME OR CATALOG DESIGNATION. THIS MOTOR FUSE PROTECTION: WHERE FUSE PROTECTION IS SPECIFICALLY REQUIRED BY THE EQUIPMENT THIS WORK. IN NO CASE ATTACH TO, OR FINISH AGAINST ANY DEFECTIVE WORK OR INSTALL WORK IN A CONTRACTOR SHALL SUBMIT THE BASE BID PRICE BASED UPON STANDARD SPECIFIED EQUIPMENT DESCRIBED MANUFACTURER, PROVIDE FUSE SWITCHES IN LIEU OF NON-FUSE SWITCHES OR IN LIEU OF ENCLOSED CIRCUIT MANNER WHICH WILL PREVENT PROPER INSTALLATION
Recommended publications
  • Demolition and Cleanup
    FactSheet Demolition and Cleanup Before starting a demolition, the person or persons in charge must adequately prepare for the task with regard to the health and safety of the workers. These preparatory operations involve the overall planning of the demolition job, includ- ing the methods to be used to bring the structure down, the equipment neces- sary to do the job, and the measures to be taken to perform the work safely. Before doing demolition work, inspect available personal protective equipment (PPE), and select, wear and use the PPE appropriate for the task. Demolition work involves many of the same hazards associated with construc- tion work. However, demolition also poses additional hazards due to unknown factors such as: deviations from the structure's original design, approved or unapproved modifications that altered the original design, materials hidden with- in structural members, and unknown strengths or weaknesses of damaged mate- rials. To counter these unknowns, all personnel involved in a demolition project need to be fully aware of these types of hazards and the safety precautions avail- able to control these hazards. Preliminary Tasks al able to withstand the loads likely to be A written engineering survey must be per- imposed. Debris dropped through holes in formed on each structure being considered for the floor without the use of chutes must be demolition to determine the condition of the completely enclosed with barricades not less framing, floors and walls, and to assess the than 42 inches high and not less than 6 feet possibility of an unplanned collapse of any back from the projected edge of the opening portion of the structure.
    [Show full text]
  • Interior Architectural Design for Adaptive Reuse in Application of Environmental Sustainability Principles
    sustainability Concept Paper Interior Architectural Design for Adaptive Reuse in Application of Environmental Sustainability Principles Magdalena Celadyn Faculty of Interior Design, Academy of Fine Arts in Krakow, pl. Matejki 13, 31-157 Krakow, Poland; [email protected] Received: 3 June 2019; Accepted: 10 July 2019; Published: 12 July 2019 Abstract: The paper discusses an interior architectural design model to enable the accomplishment of sustainable design strategy of efficient resources/waste management. The proposed design concept, referred to as interior architectural design for adaptive reuse, is based on the reintroduction of reclaimed or salvaged building construction materials and products acquired from demolished or refurbished building structural portions, into the structure of interior components. The presented design approach puts circular design methods and techniques in interior design practice at the core of environmentally responsible architectural design. To achieve its objectives, the implementation of resources efficiency strategy into the interior design scheme should remain a decisive interior design quality criterion. Meanwhile, the issues related to the environmental contextualization of interior spaces and their constitutive components, in fulfilment of sustainable design requirements for the conservation of natural resources, are neither sufficiently recognized by interior designers, nor appropriately highlighted in the current design practice. The main purpose of this concept paper is to develop a theoretical scheme for systemic inclusion of interior architectural design for adaptive reuse into the environmentally sustainable interior architectural design framework. This study provides interior designers with the concept of interior components design for the fulfilment of resources efficiency and waste management effectiveness. Keywords: sustainable architectural design; sustainable interior design; interior components; adaptive reuse; environmental contextualization 1.
    [Show full text]
  • Construction and Demolition Waste Reduction and Recycling Tips
    RETHINKING DEBRIS The Industry: Construction and Demolition Waste Reduction and recycling Tips An Opportunity There is money lying virtually ignored on the ground at construction and demolition sites across Wisconsin. Second-hand wood flooring, odd cut lumber, siding scraps, used asphalt shingles, surplus drywall, spent corrugated cardboard and other materials typically labeled waste have value that only a few enterprising companies appreciate. If your business builds, renovates or remodels anything from hospitals to single-family homes, furniture or playground equipment, read on. Find out how to put that money on the ground into your pocket, while helping to conserve natural resources. Wisconsin's Wastestream Precise figures are hard to come by, but industry experts estimate that construction waste and demolition debris (C & D) may account for more than a quarter of our nation's entire wastestream. In some areas of Wisconsin, such as Dane County, analysts estimate that up to 45 percent of all landfilled waste is construction and demolition debris. As disposal costs increase, businesses that divert more of their construction waste and demolition debris from the wastestream by reducing, reusing and recycling can save money and help stimulate markets to handle their wastes. In addition to profits, there is also the law to consider. The Waste Reduction and Recycling Law Wisconsin's Waste Reduction and Recycling Law, signed by Governor Tommy Thompson in 1990, was created to help change the state's throw-away habits. Items banned entirely from state landfills and municipal solid waste incinerators include: major appliances, used motor oil, lead-acid vehicle batteries, yard wastes, corrugated cardboard, office paper, magazines, newspaper, aluminum, steel, bi-metal and glass containers, plastic containers (PETE/#I & HDPE/#2) and waste tires.
    [Show full text]
  • Demolition Ordinance
    TOWN OF MORRISTOWN ORDINANCE O-12-2019 AN ORDINANCE REPEALING CHAPTER 12 SECTION 4 “DEMOLITION OF BUILDINGS” AND AMENDING AND SUPPLEMENTING CHAPTER 30 “LAND DEVELOPMENT ORDINANCE” WHEREAS, the intent of this ordinance is to protect the historic character of Morristown by limiting the detrimental effect of demolition; and WHEREAS, significant structures within Morristown that contribute to the architectural, cultural, economic, political, or social history of the town should be preserved when possible; and WHEREAS, the purpose of this ordinance is not to permanently prevent all demolition, but to provide an opportunity to evaluate options for preservation, restoration, relocation, and rehabilitation, or when necessary, to document historic or architecturally important resources prior to demolition; and WHEREAS, as part of the adoption of this Ordinance the Town of Morristown desires to repeal Chapter 12 Section 4 of the Morristown Town Code entitled “Demolition of Buildings” as this new ordinance will now govern the process for applying and obtaining a demolition permit; NOW, THEREFORE BE IT RESOLVED, by the Town Council of the Town of Morristown, County of Morris, State of New Jersey, being the governing body thereof, that Chapter 12 Section 4 of the Morristown Town Code entitled “Demolition of Buildings” be and hereby is repealed it its entity; and BE IT FURTHER RESOLVED that Chapter 30 of the Morristown Town Code entitled “Land Development Ordinance” be and hereby is amended to read as follows: 30-8.A.3. Demolition of Buildings 1. Permit Required. No person shall remove or demolish or commence the removal or demolition of any building or structure in the Town of Morristown without first filing with the Zoning Officer an application in writing and obtaining a permit thereof.
    [Show full text]
  • Construction and Demolition Wastes and Clean Rubble Technical Guidance Document SW-1994-G2
    Kansas Department of Health and Environment Bureau of Waste Management 1000 SW Jackson, Suite 320, Topeka, Kansas 66612-1366 Construction and Demolition Wastes and Clean Rubble Technical Guidance Document SW-1994-G2 Construction and Demolition (C&D) waste is solid waste generated during construction or demolition activities. Clean rubble is also generated during construction or demolition activities, but it differs in composition from C&D waste. This document explains the definitions of C&D waste and clean rubble and acceptable methods for disposal of both. Construction and Demolition Waste Definition of C&D waste C&D waste is defined in KSA 65-3402 (u) as: • solid waste resulting from the construction, remodeling, repair and demolition of structures, roads, sidewalks and utilities; • untreated wood and untreated sawdust from any source; • treated wood from construction or demolition projects; • small amounts of municipal solid waste generated by the consumption of food and drinks at construction or demolition sites, including, but not limited to, cups, bags and bottles; • furniture and appliances from which ozone depleting chlorofluorocarbons have been removed in accordance with the provisions of the federal clean air act; • solid waste consisting of motor vehicle window glass; and • solid waste consisting of vegetation from land clearing and grubbing, utility maintenance, and seasonal or storm related cleanup. Such wastes include, but are not limited to, bricks, concrete, and other masonry materials, roofing materials, soil, rock, wood, wood products, wall or floor coverings, plaster, drywall, plumbing fixtures, electrical wiring, electrical components containing no hazardous materials, non-asbestos insulation and construction related packaging. Other statutes and regulations further refine the definition: Construction related packaging means small quantities of packaging wastes that are generated in the construction, remodeling or repair of structures and related appurtenances.
    [Show full text]
  • Design Services for the Demolition of the Gastineau Apartment Building
    Proposal: Design Services for the Demolition of the Gastineau Apartment Building In response to (C3) RFP E16-015 Submitted on 16 July, 2015 Contact: Dave Hurley, AIA Principal Architect NorthWind Architects [email protected] North Wind Architects, LLC 126 Seward St, Juneau AK 99801 P: 907-586-6150 F: 907-586-6181 Introduction Selection Committee, NorthWind Architects (NWA) is pleased to offer this proposal for design services for the demolition of the Gastineau Apartment Building including site stabilization and site preparation for potential future development. This proposal is unconventional, suggesting alternate approaches we believe will greatly increase the chances of successfully completing the work within a preferred schedule, anticipated budget, and without incident. We strongly suggest, regardless of who is awarded the work, that the project be approached in a manner as similar as possible to a Design-Build approach, with the understanding that this is not a Design-Build project. We appreciate your consideration. Having conducted a detailed condition assessment and temporary protection plan for the property Owner in 2013, we are very familiar with the structure. As you know, the plan, which was developed with Chris Gilberto, then with North Pacific Erectors, was never executed. Left unprotected for over two years, little is salvageable leaving the most efficient path forward to raze the building. This will also offer a future developer the most flexibility, increasing the chances that the site will in fact be developed. That said, NWA’s, JYL’s and R and M’s condition assessments of the building all concluded that it could be feasible to salvage the building’s primary structure, and NorthWind also began work on a proposal in 2013 to do just that.
    [Show full text]
  • Grand Challenges in Earthquake Engineering Research: a Community Workshop Report
    This PDF is available from The National Academies Press at http://www.nap.edu/catalog.php?record_id=13167 Grand Challenges in Earthquake Engineering Research: A Community Workshop Report ISBN Committee for the Workshop on Grand Challenges in Earthquake 978-0-309-21452-0 Engineering Research--A Vision for NEES Experimental Facilities and Cyberinfrastructure Tools; Committee on Seismology and Geodynamics; 102 pages National Research Council 6 x 9 PAPERBACK (2011) Visit the National Academies Press online and register for... Instant access to free PDF downloads of titles from the NATIONAL ACADEMY OF SCIENCES NATIONAL ACADEMY OF ENGINEERING INSTITUTE OF MEDICINE NATIONAL RESEARCH COUNCIL 10% off print titles Custom notification of new releases in your field of interest Special offers and discounts Distribution, posting, or copying of this PDF is strictly prohibited without written permission of the National Academies Press. Unless otherwise indicated, all materials in this PDF are copyrighted by the National Academy of Sciences. Request reprint permission for this book Copyright © National Academy of Sciences. All rights reserved. Grand Challenges in Earthquake Engineering Research: A Community Workshop Report Grand Challenges in Earthquake Engineering Research A Community Workshop Report Committee for the Workshop on Grand Challenges in Earthquake Engineering Research— A Vision for NEES Experimental Facilities and Cyberinfrastructure Tools Committee on Seismology and Geodynamics Board on Earth Sciences and Resources Division on Earth and Life Studies Copyright © National Academy of Sciences. All rights reserved. Grand Challenges in Earthquake Engineering Research: A Community Workshop Report THE NATIONAL ACADEMIES PRESS 500 Fifth Street, N.W. Washington, DC 20001 NOTICE: The project that is the subject of this report was approved by the Governing Board of the National Research Council, whose members are drawn from the councils of the National Academy of Sciences, the National Academy of Engineering, and the Institute of Medicine.
    [Show full text]
  • Protecting Historic Resources Through Demolition Review
    State of New Hampshire, Department of Cultural Resources 603-271-3483 19 Pillsbury Street, Concord, NH 03301-3570 603-271-3558 TDD Access Relay NH 1-800-735-2964 FAX 603-271-3433 www.nh.gov/nhdhr [email protected] PROTECTING HISTORIC RESOURCES THROUGH DEMOLITION REVIEW BY EMILY PAULUS, PRESERVATION PLANNER Earlier this year, a local New Hampshire paper reported a Massachusetts developer’s plans to demolish an early 19th-century house that was eligible for listing on the National Register of Historic Places. While it turned out the developer was only planning to demolish a 1950s barn on the property, the brief scare was enough to awaken residents to the fact that any historic building in the community could be torn down on a whim – even those listed on or eligible for the National Register. This scenario has played out in countless communities across the state, and has led many to take proactive steps to prevent the demolition of historically significant buildings. One approach is through the establishment of a demolition review process. What is Demolition Review and How Does it Work? Demolition review is a preservation tool that ensures potentially significant buildings and structures are not demolished without notice to the community and review by a heritage or historic district commission. A demolition delay ordinance can be adopted as an amendment to the building code, implemented as a stand-alone ordinance, or as a bylaw in an existing historic preservation or zoning ordinance. This legislation can be a very effective tool in helping to protect historically significant resources in the community.
    [Show full text]
  • Construction & Demolition Wastes to Resources
    Chapter 12 CONSTRUCTION & DEMOLITION WASTES TO RESOURCES This chapter describes the management and disposal systems for construction and demolition (C&D) waste in Clark County. C&D wastes are solid wastes that require special handling and are collected, processed, recovered, recycled and/or disposed of. C&D includes materials regulated as MSW, as well as other wastes regulated in oth- er ways. Some C & D materials are considered special wastes; see Chapter 14 Special Wastes for greater details. Definitions Construction and Demolition wastes are generally defined in the Clark County Code (CCC) Chapter 24.12 as “waste building materials and rubble, resulting from construction, remodeling, repair and demolition operations on houses, commercial buildings, pavements and other structures,” and are generated primarily during residen- tial and non-residential development, redevelopment and remodeling. The construction and demolition waste substream is made up of similar materials that come from two distinct but related activities. Remodeling and repair work generate both types of wastes, often mixed together. Both terms are more specifically defined in the Washington Administrative Code (see below). These definitions should be applied to the content and recom- mendations in this Plan. Construction WAC 480-70-041 defines construction waste as “solid waste resulting from the building Waste or renovation of buildings, roads and other man-made structures. Construction debris includes, but is not limited to, materials such as plasterboard, cement, dirt, wood and brush“. For the purposes of this Plan, construction waste is defined as: Material that is generated as a direct result of building construction activity; such waste includes, but is not limited to, concrete, rubble, fiberglass, asphalt, bricks, plaster, wood, metal, caulk- ing, paper and cardboard, roofing wastes, tar paper, plastic, plaster, paint, block foam wallboard and other similar materials.
    [Show full text]
  • Ironworker Safety
    AUGUST 2013 PRIORITY NUMBER 1: IRONWORKER SAFETY Bennett Steel Sets Safety Goal 4 In Memory of Our Fallen Brothers 8 Ironworkers on the Health Side 10 Iron Worker Members Make a Difference 15 15328_IWAug13.indd 1 8/13/13 6:17 AM 1750 New York Ave., N.W., Suite 400 Washington, D.C. 20006 p (202) 383-4800 www.ironworkers.org [email protected] INTERNATIONAL OFFICERS Volume 113 | AUGUST 2013 | Number 7 WTEAL R WISE JAY HURLEY General President Third General Vice President Suite 400 191 Old Colony Avenue, 1750 New York Avenue, NW P.O. Box 96 Washington, DC 20006 S. Boston, MA 02127 p (202) 383-4810 p (617) 268-2382 f (202) 638-4856 f (617) 268-1394 FE E ATUR S JOSEPH HUNT JOE STANDLEY General President Emeritus Fourth General Vice President 4 Bennett Steel Sets Safety Goal Suite 400 1660 San Pablo Avenue, Suite C 1750 New York Avenue, NW Pinole, CA 94564 Washington, DC 20006 p (510) 724-9277 7 In Memory of Our Fallen Brothers p (202) 383-4845 f (510) 724-1345 f (202) 638-4856 10 Ironworkers on the Health Side MARVIN RAGSDALE ERIC DEAN Fifth General Vice President General Secretary 3003 Dawn Drive 12 Iron Workers Pursue Safe and Consistent OSHA Standards Suite 400 Suite 104 1750 New York Avenue, NW Georgetown, TX 78628 Washington, DC 20006 p (512) 868-5596 15 Iron Worker Members Make a Difference p (202) 383-4820 f (512) 868-0823 f (202) 347-2319 19 Commitment to Safety DARRELL LABOUCAN EDWARD C. MCHUGH Sixth General Vice President General Treasurer #8-205 Chatelain Drive 20 TAUC Craftsperson of the Year Suite 400 St.
    [Show full text]
  • APPLICATION for DEMOLITION PERMIT Zoning Owner Location Of
    BUILDING DEPARTMENT APPROVED: _________PERMIT No:_________ VILLAGE OF GREENPORT 236 Third Street, Greenport, NY 11944 _____________________ _________________ Building Inspector Date APPLICATION FOR DEMOLITION PERMIT Application is hereby made for the issue of a Building Permit pursuant to the code of the Village of Greenport, and the New York State Fire Prevention and Building Construction Code, for the construction and removal or demolition of a building or structure, additions or alterations, as herein described. Zoning EXISTING ZONE: ………………………………………………………………………………………………………………………..… Check box if site Is in: FLOOD WETLANDS HISTORIC ZONE PROTECTION ZONE PRESEVATION DISTRICY EXISTING USE AND OCCUPANCY: ……………………………………………………………………………………………………. Applicant NAME:……………………………………………………………………………………………………………………….. IF A CORPORATION- NAME AND TITILE OF OFFICER:……………………………………………………………………………………….. ADDRESS:………………………………………………………………………………………………………………….. ……………………………………………………………….PHONE:……………………………………………………… SIGNATURE:……………………………………………….DATE:………………………………………………………. Applicant is: OWNER, LESSEE, AGENT, ARCHITECT, ENGINEER, BUILDER, GENERAL CONTRACTOR, ELECTRICIAN, PLUMBER, OTHER. EMAIL ADDRESS: ………………………………………………………………………………………………………....... Owner NAME: ………………………………………………………………………………………………………………………………………... ADDRESS: …………………………………………………………………………………………………………………………………… ……………………………………………………………….PH……………………………………………………………………………... Location of site TAX MAP 1001 SECTION: BLOCK: LOT: DISTRICT: STREET ADDRESS:………………………………………………………………………………………………………………………… Workers’ Compensation
    [Show full text]
  • Demolition Operations Safety
    Savard Labor & Marine Staffing, Inc. Demolition Operations Rev3/14 Demolition Operations Safety OSHA Technical Manual; Section V, Chapter 1. PREPARATORY OPERATIONS. Before the start of every demolition job, the demolition contractor should take a number of steps to safeguard the health and safety of workers at the job site. These preparatory operations involve the overall planning of the demolition job, including the methods to be used to bring the structure down, the equipment necessary to do the job, and the measures to be taken to perform the work safely. Planning for a demolition job is as important as actually doing the work. Therefore, all planning work should be performed by a competent person experienced in all phases of the demolition work to be performed. The American National Standards Institute (ANSI) in its ANSI A10.6-1983 - Safety Requirements For Demolition Operations states: "No employee shall be permitted in any area that can be adversely affected when demolition operations are being performed. Only those employees necessary for the performance of the operations shall be permitted in these areas." ENGINEERING SURVEY. Prior to starting all demolition operations, OSHA Standard 1926.850(a) requires that an engineering survey of the structure must be conducted by a competent person. The purpose of this survey is to determine the condition of the framing, floors, and walls so that measures can be taken, if necessary, to prevent the premature collapse of any portion of the structure. When indicated as advisable, any adjacent structure(s) or improvements should also be similarly checked. The demolition contractor must maintain a written copy of this survey.
    [Show full text]