Satisfactory Completions Carried out Since 01/01/2013 Until 31/12/2017 DESCRIPTION COMPLETION DATE ADDRESS REF NO Grouville 29/0

Total Page:16

File Type:pdf, Size:1020Kb

Satisfactory Completions Carried out Since 01/01/2013 Until 31/12/2017 DESCRIPTION COMPLETION DATE ADDRESS REF NO Grouville 29/0 Satisfactory Completions Carried out since 01/01/2013 until 31/12/2017 COMPLETION DATE REF NO ADDRESS DESCRIPTION Grouville 29/09/2014 B/2013/0610/ Villa d'Or, 1 Jardin des Sablons, Grouville Construct single storey extension to form sun roomm 18/04/2016 B/2013/0495/ Maison du Coin, 13 La Rue de la Forge, Grouville Construct extensions to enlarge kitchen and bedrooms over and provide ensuite bathrooms. Various internal and external alterations. 31/03/2017 B/2016/0196/ La Dorand, 2 Le Clos de la Tour, Grouville Convert loft to habitable accommodation. Replace rooflights. 07/04/2017 B/2016/0724/ La Dorand, 2 Le Clos de la Tour, Grouville Remove central column from garage entrance. 18/04/2016 B/2014/0534/ Northwood, 21 La Rue de la Forge, Grouville Construct two storey extension and change of use from garage to gym with utility room and shower room 13/11/2013 B/2012/0424/ Tadoussac, 3 Le Clos de la Rocque, Grouville Construct two storey extension to extend garage and bedroom one 21/03/2014 B/2011/0696/ Senlac, 3 Teighmore Park, Grouville Construct extension to form 1 No. one bedroom flat 31/03/2016 B/2015/0117/ , 4 La Rue de la Forge, Grouville Construct two storey extension to North elevation and balcony to South-West elevation. Alterations to ground and first floor layout. 18/07/2013 B/2011/0934/ Le Clos Lorraine, 4 Teighmore Park, Grouville Material alterations to raise existing roof to create additional livining accommodation. Convert 2 No. units into 1 No. unit and construct balcony to west elevation. 16/04/2013 B/2012/1009/ Ma Normandie, 5 La Rue de la Forge, Grouville Alterations at first floor to create en-suite shower room 16/08/2016 B/2014/0092/ La Quinta, 5 Le Clos de la Tour, Grouville Construct extension between garage and house to form additional living accommodation. 24/02/2017 B/2016/0596/ La Quinta, 5 Le Clos de la Tour, Grouville Remove central column to garage entrance, remove internal wall between dining room and kitchen and block doorway between hall and dining room. 28/06/2013 B/2008/0253/ Ker Samber, 6 Teighmore Park, Grouville Construct extension and convert loft to form dormer window. 28/07/2015 B/2015/0466/ Kyrenia, 8 Teighmore Park, Grouville Material alterations to convert shower room into ensuite bathroom. Relocate existing WC and bath. Change existing door into window. 29/09/2014 B/2013/0247/ 3, Arnworth Avenue, Grouville Material alterations to first floor roof to provide additional bedroom. Construct 3 No dormer windows. Alterations to ground floor layout and install multi-fuel stove. 27/04/2015 B/2013/0999/ Arnworth Lodge 1, Arnworth Avenue, Grouville Raise roof and construct extension to east elevation 14/08/2017 B/2015/0261/ Roselands, Belle Hougue Avenue, Grouville Internal alterations to ground floor layout and drainage alterations 09/11/2016 B/2008/0053/ Maison L'Escale, Belle Hougue Avenue, Grouville Construct box dormer to east elevation. Extend box dormer to west elevation and construct ground floor kitchen extension. 10/06/2015 B/2014/1200/ Maluti 7, Fernlea Avenue, Grouville Form cloakroom at ground floor. 09/09/2015 B/2011/0062/ Fernlea House, Fernlea Drive, Grouville Remove wall between kitchen and dining room. Move position of existing kitchen door. 04/03/2015 B/2011/0257/ 3 & 4 Village Apartments, Gorey Village, Grouville Combine 2 No. aprtments into 1 No. two bedroom flat C:\Program Files (x86)\SAP BusinessObjects\SAP BusinessObjec COMPLETION DATE REF_NO ADDRESS DESCRIPTION 25/03/2015 B/2013/0746/ 39 Jersey Pottery, Gorey Village Main Road, Grouville Construct 16 No. dwellings and associated ancillary buildings. 26/11/2015 B/2013/1140/ 2 The Sheilings, Gorey Village Main Road, Grouville Construct bedroom extension at first floor and internal alterations to existing floor layout. Construct double garage. 05/11/2015 B/2014/0748/ 38 Jersey Pottery Site, Gorey Village Main Road, Grouville Construct 28 dwellings with associated garages 21/05/2015 B/2013/0746/ 40 Jersey Pottery, Gorey Village Main Road, Grouville Construct 16 No. dwellings and associated ancillary buildings. 12/06/2015 B/2013/0746/ 27 Jersey Pottery, Gorey Village Main Road, Grouville Construct 16 No. dwellings and associated ancillary buildings. 12/06/2015 B/2013/0746/ 21 Jersey Pottery, Gorey Village Main Road, Grouville Construct 16 No. dwellings and associated ancillary buildings. 30/01/2017 B/2014/0748/MASTJersey Pottery Site, Gorey Village Main Road, Grouville Construct 28 dwellings with associated garages 28/01/2016 B/2014/0748/ 37 Jersey Pottery Site, Gorey Village Main Road, Grouville Construct 28 dwellings with associated garages 30/01/2017 B/2015/1152/ Lindau, Gorey Village Main Road, Grouville Alterations at first floor to form shower room. Form door openings from existing ground floor window openings. 30/11/2016 B/2014/0748/ 32 Jersey Pottery Site, Gorey Village Main Road, Grouville Construct 28 dwellings with associated garages 06/08/2015 B/2013/0746/ 23 Jersey Pottery, Gorey Village Main Road, Grouville Construct 16 No. dwellings and associated ancillary buildings. 17/02/2015 B/2012/1151/ 1 Jersey Pottery Site, Gorey Village Main Road, Grouville Construct 18 No. apartments and basement parking 17/02/2015 B/2012/1151/ 2 Jersey Pottery Site, Gorey Village Main Road, Grouville Construct 18 No. apartments and basement parking 17/02/2015 B/2012/1151/ 9 Jersey Pottery Site, Gorey Village Main Road, Grouville Construct 18 No. apartments and basement parking 17/02/2015 B/2012/1151/ 8 Jersey Pottery Site, Gorey Village Main Road, Grouville Construct 18 No. apartments and basement parking 31/10/2016 B/2016/0489/ Village Kitchen Studio, Gorey Village Main Road, Grouville Convert existing shop into cafe. Form new shopfront. 24/02/2016 B/2014/0748/ 16 Jersey Pottery Site, Gorey Village Main Road, Grouville Construct 28 dwellings with associated garages 24/02/2016 B/2014/0748/ 34 Jersey Pottery Site, Gorey Village Main Road, Grouville Construct 28 dwellings with associated garages 24/02/2016 B/2014/0748/ 45 Jersey Pottery Site, Gorey Village Main Road, Grouville Construct 28 dwellings with associated garages 24/02/2016 B/2014/0748/ 12 Jersey Pottery Site, Gorey Village Main Road, Grouville Construct 28 dwellings with associated garages 25/04/2017 B/2014/1143/ 3 The Sheilings, Gorey Village Main Road, Grouville Form partition in existing bedroom to form two bedrooms 30/10/2015 B/2014/0748/ 44 Jersey Pottery Site, Gorey Village Main Road, Grouville Construct 28 dwellings with associated garages 21/01/2015 B/2013/0746/ 28 Jersey Pottery, Gorey Village Main Road, Grouville Construct 16 No. dwellings and associated ancillary buildings. 21/01/2015 B/2012/1151/ 5 Jersey Pottery Site, Gorey Village Main Road, Grouville Construct 18 No. apartments and basement parking C:\Program Files (x86)\SAP BusinessObjects\SAP BusinessObjec COMPLETION DATE REF_NO ADDRESS DESCRIPTION 08/05/2015 B/2013/0746/ 41 Jersey Pottery, Gorey Village Main Road, Grouville Construct 16 No. dwellings and associated ancillary buildings. 08/05/2015 B/2013/0746/ 41 Jersey Pottery, Gorey Village Main Road, Grouville Construct 16 No. dwellings and associated ancillary buildings. 20/10/2016 B/2012/0476/ Glenmore, Gorey Village Main Road, Grouville Material alterations to existing floor layouts and extend kitchen 09/04/2015 B/2013/0746/ 25 Jersey Pottery, Gorey Village Main Road, Grouville Construct 16 No. dwellings and associated ancillary buildings. 18/12/2014 B/2012/1151/ 4 Jersey Pottery Site, Gorey Village Main Road, Grouville Construct 18 No. apartments and basement parking 18/12/2014 B/2012/1151/ 6 Jersey Pottery Site, Gorey Village Main Road, Grouville Construct 18 No. apartments and basement parking 18/12/2014 B/2012/1151/ 7 Jersey Pottery Site, Gorey Village Main Road, Grouville Construct 18 No. apartments and basement parking 18/12/2014 B/2012/1151/ 11 Jersey Pottery Site, Gorey Village Main Road, Grouville Construct 18 No. apartments and basement parking 18/12/2014 B/2012/1151/ 12 Jersey Pottery Site, Gorey Village Main Road, Grouville Construct 18 No. apartments and basement parking 18/12/2014 B/2012/1151/ 13 Jersey Pottery Site, Gorey Village Main Road, Grouville Construct 18 No. apartments and basement parking 18/12/2014 B/2012/1151/ 14 Jersey Pottery Site, Gorey Village Main Road, Grouville Construct 18 No. apartments and basement parking 18/12/2014 B/2012/1151/ 15 Jersey Pottery Site, Gorey Village Main Road, Grouville Construct 18 No. apartments and basement parking 18/12/2014 B/2012/1151/ 18 Jersey Pottery Site, Gorey Village Main Road, Grouville Construct 18 No. apartments and basement parking 18/12/2014 B/2012/1151/ 17 Jersey Pottery Site, Gorey Village Main Road, Grouville Construct 18 No. apartments and basement parking 16/12/2014 B/2013/0746/ 29 Jersey Pottery, Gorey Village Main Road, Grouville Construct 16 No. dwellings and associated ancillary buildings. 16/12/2014 B/2013/0746/ 30 Jersey Pottery, Gorey Village Main Road, Grouville Construct 16 No. dwellings and associated ancillary buildings. 18/08/2015 B/2014/0748/ 43 Jersey Pottery Site, Gorey Village Main Road, Grouville Construct 28 dwellings with associated garages 22/06/2015 B/2013/0746/ 19 Jersey Pottery, Gorey Village Main Road, Grouville Construct 16 No. dwellings and associated ancillary buildings. 28/01/2015 B/2014/1061/ Les Houmets Care Home, Gorey Village Main Road, Grouville Internal altertions to provide 2 No. bedrooms and shower rooms to second floor. 05/02/2015 B/2013/0746/ 22 Jersey Pottery, Gorey Village Main Road, Grouville Construct 16 No. dwellings and associated ancillary buildings. 15/12/2015 B/2014/0748/ 4 Jersey Pottery Site, Gorey Village Main Road, Grouville Construct 28 dwellings with associated garages 15/12/2015 B/2014/0748/ 3 Jersey Pottery Site, Gorey Village Main Road, Grouville Construct 28 dwellings with associated garages 15/12/2015 B/2014/0748/ 31 Jersey Pottery Site, Gorey Village Main Road, Grouville Construct 28 dwellings with associated garages 15/12/2015 B/2013/0746/ 26 Jersey Pottery, Gorey Village Main Road, Grouville Construct 16 No.
Recommended publications
  • Edition 52 Autumn20.Pdf
    Autumn Edition https://parish.gov.je/StBrelade/Pages/La-Baguette.aspx THE OFFICIAL PARISH OF ST. BRELADE NEWSLETTER Edition 52 • Autumn 2020 • Published by the Parish of St. Brelade, Jersey Fond farewells teachers and students alike left the End of a chapter, premises for the last time. School opens! start of a new As staff left the old Les Quennevais School building they lined up in LES Quennevais School was built in order of the length of service in the 1964 for a maximum of 450 pupils. school. The Deputy Headteacher, It was officially opened on 6 June Mrs Moisan. marked 30 years this 1966, the school's first intake of year, and the photograph shows her students having already taken place surrounded here by the 14 current on 5 January 1965, four months staff that she has taught. behind the originally planned date Throughout its history the school of September 1964. The students has had six headteachers: John were drawn from the primary and all age parish schools west of a line Watts 1964­1969, Ted Tranter drawn from north to south which 1970­1988, Tom McKeon 1988 – roughly divided the island into two 1992, Jenny Hydes 1992 – 1999, equal areas. John Thorp 1999 – 2013, Sarah Hague from 2013 Like many 1960s buildings, Les Quennevais School followed an When the original school opened architectural style that was Ted Vibert, writing in the Jersey functional, with typically small Topic, commented that “the area in entrances, narrow corridors, flat which the new school at Les roofs and basic rooms. There was Quennevais nestles is typical of the little consideration for disabled new mood of Jersey.
    [Show full text]
  • Quarterly Hearing with the Minister for Education, Sport and Culture
    Education and Home Affairs Scrutiny Panel Quarterly Hearing with the Minister for Education, Sport and Culture MONDAY, 9th NOVEMBER 2015 Panel: Deputy L.M.C. Doublet of St. Saviour: (Chairman) Deputy J.M. Maçon of St. Saviour: (Vice-Chairman) Witnesses: The Minister for Education, Sport and Culture Director, Education, Sport and Culture Executive Officer, Communications, Education, Sport and Culture Head of Planning and Projects, Education, Sport and Culture [10:02] Deputy L.M.C. Doublet of St. Saviour (Chairman): Good morning, everybody, it is really nice to see you all and I am very pleased to see a nearly full public gallery. Welcome to members of the public, media and fellow scrutineers over there, it is very nice to see you all. I will just point out the code of behaviour, which is mostly common sense, and turn off your mobile phones, please. Minister, thank you for coming. The Minister for Education, Sport and Culture: Thank you. 1 Deputy L.M.C. Doublet: I will introduce myself and my panel first. I am Deputy Louise Doublet, I am Chair of the panel and I am also Deputy for St. Saviour District No. 2. Deputy J.M. Maçon of St. Saviour (Vice-Chairman): Good morning, everyone. Deputy Jeremy Maçon of St. Saviour, representative of District Petit Longueville. Scrutiny Officer: I am Mick Robbins, Scrutiny Officer. Deputy L.M.C. Doublet: Can I just ask you, what do we call you now? Are you the Minister for Education or are you still the Minister for Education, Sport and Culture? The Minister for Education, Sport and Culture: I think until we make that distinction, Education, Sport and Culture is fine.
    [Show full text]
  • 202-03-55145 Company Name Address 1-2-1 MENTORING 1-2-1
    Freedom of Information Request Ref: 202-03-55145 Company Name Address 1-2-1 MENTORING 1-2-1 MENTORING , 14 HILL STREET , ST. HELIER , JE2 4UA ACET JERSEY 6 ACET JERSEY , PLAISANCE TERRACE , LA ROUTE DU FORT , ST. SAVIOUR , JE2 7PA ACREWOOD DAY NURSERY ACREWOOD DAY NURSERY , PETIT MENAGE , BELVEDERE HILL , ST. SAVIOUR , JE2 7RP ADVANCE PLUS SOCIAL SECURITY DEPARTMENT , PHILIP LE FEUVRE HOUSE, LA MOTTE STREET , ST. HELIER , JE4 8PE ADVANCE TO WORK SOCIAL SECURITY DEPARTMENT , PHILIP LE FEUVRE HOUSE, LA MOTTE STREET , ST. HELIER , JE4 8PE AGE CONCERN JERSEY AGE CONCERN , 37 WINDSOR HOUSE , VAL PLAISANT , ST. HELIER , JE2 4TA ALL CARE JERSEY LTD ALL CARE JERSEY LTD , 7 COMMERCIAL BUILDINGS , ST. HELIER , JE2 3NB AUTISM JERSEY TOP FLOOR , 2 BRITANNIA PLACE OFFICES , BATH STREET , ST. HELIER , JE2 4SU BAILIFF'S CHAMBERS - SOJ003 ROYAL COURT HOUSE, , ROYAL SQUARE, , ST. HELIER , JE11BA Freedom of Information Request Ref: 202-03-55145 BEAULIEU CONVENT SCHOOL BEAULIEU PRIMARY SCHOOL , WELLINGTON ROAD , ST. HELIER , JE2 4RJ BRIGHTER FUTURES BRIGHTER FUTURES , THE BRIDGE , LE GEYT ROAD , JE2 7NT BRIG-Y-DON CHILDREN'S CHARITY LARN A LOD , LA RUE DU COIN , GROUVILLE , JE3 9QR CAMBRETTE NURSING SERVICES 1ST FLOOR OFFICE , 17 QUEEN STREET , ST. HELIER , JE2 4WD CARING HANDS LTD SANCTUARY HOUSE , HIGH STREET , ST AUBIN , ST. BRELADE , JE3 8BZ CENTRE POINT TRUST CENTRE POINT TRUST , LE HUREL , LA POUQUELAYE , ST. HELIER , JE2 3FW CHARLIE FARLEY'S NURSERIES CHARLIE FARLEY'S NURSERIES , FAIRFIELDS , NORCOTT ROAD , ST. SAVIOUR , JE2 7PS CHILD CARE REGISTRATION EDUCATION, SPORT & CULTURE , PO BOX 142, HIGHLANDS COLLEGE , LA RUE DU FROID VENT , ST.
    [Show full text]
  • Report on the Revised Application
    Bel Royal Hearing (17th July 2006) CASE OFFICER’S REPORT ON THE REVISED APPLICATION (P/2004/2247) July 2006 File reference: P/2004/2247 Officer Report Site Address Fields 848, 851, 853, 854, 861, 862A & 863A, Bel Royal, St. Lawrence Applicant Bel Royal Jersey Ltd Description Category ‘A’ Housing Development to provide 140 homes, including road widening, drainage infrastructure, public amenity space and community building. AMENDED PLANS: Revised Category ‘A’ Housing Development to provide homes, road widening and improvement, drainage infrastructure, public amenity space and a community building. Type Planning Date Validated 28/09/05 – Revised Application 02/12/05 - Further amended plans submitted for treatment of western boundary. 16/12/05 – Amended Technical Reports submitted to support application. 05/05/06 – Amended ‘Design Statement’ and document on proposed design revisions submitted. Zones Built-up Area; Site to be zoned for Category ‘A’ Housing; Important Open Space; Land for Recreation. Policies Primarily IP Policy H2 EXECUTIVE SUMMARY / CONCLUSION The planning process associated with this particular revised application has been long and complex and many matters have arisen through the extensive consultation process. As such, it warrants a comprehensive report so that the Minister can be fully apprised of the relevant planning issues. It is hoped that this executive summary will give him an overview of the key considerations and provide a suitable context in which to address the details set out in the main bulk of the report. The site is the largest of those zoned by the States in the Island Plan for Category ‘A’ housing purposes, following a comprehensive evaluation and selection process, involving extensive public consultation.
    [Show full text]
  • Dear Parents Tion Highlighted the Talent, Imagination and Ambition That Runs Deep in Year 7
    QLearning to be yourNews best - through excellence and enjoyment Year 7, also new to Les Quennevais have settled in superbly. Their outstanding Transition Project Exhibi- Dear Parents tion highlighted the talent, imagination and ambition that runs deep in Year 7. Some of their projects are Welcome to our first edition of now on display at the Education Department at the ‘Q News’ - our way of collating request of the Education Minister. It is right that the a formal snapshot of ‘life’ at Les work of our students should be shared as an example Quennevais School each term to inspire and remind those leading Education in the to share with you all. Time Island of the creativity of our young people. passes so quickly at Les Quen- nevais and this edition is November was a month of great celebration begin- bursting with many of the ning with the Planning Committee’s approval of the things we have achieved application for a new Les Quennevais School building. during a very hectic but hugely This marked the end of a very long and at times very successful Autumn term. be worthwhile and as we begin 2018 I know I will not At the time of writing we are in be alone when driving past the site chosen, eagerly the midst of another ‘Christmas Jumper Day!’ The monitoring the project develop over time. I promise school is enlivened with festive spirit and of course you all it is going to be something quite amazing. Thank you for all the support we have received, lengths to raise funds for “Save the Children”, one of particularly from students past and present and the many international and local charities Les Quenne- parents in securing a public voice in support of the vais School supports throughout the year.
    [Show full text]
  • All Publicly Owned Sites Sorted by Parish Name
    All Publicly Owned Sites Sorted by Parish Name Sorted by Proposed for Then Sorted by Site Name Site Use Class Tenure Address Line 2 Address Line 3 Vingtaine Name Address Parish Postcode Controlling Department Parish Disposal Grouville 2 La Croix Crescent Residential Freehold La Rue a Don Vingtaine des Marais Grouville JE3 9DA COMMUNITY & CONSTITUTIONAL AFFAIRS Grouville B22 Gorey Village Highway Freehold Vingtaine des Marais Grouville JE3 9EB INFRASTRUCTURE Grouville B37 La Hougue Bie - La Rocque Highway Freehold Vingtaine de la Rue Grouville JE3 9UR INFRASTRUCTURE Grouville B70 Rue a Don - Mont Gabard Highway Freehold Vingtaine des Marais Grouville JE3 6ET INFRASTRUCTURE Grouville B71 Rue des Pres Highway Freehold La Croix - Rue de la Ville es Renauds Vingtaine des Marais Grouville JE3 9DJ INFRASTRUCTURE Grouville C109 Rue de la Parade Highway Freehold La Croix Catelain - Princes Tower Road Vingtaine de Longueville Grouville JE3 9UP INFRASTRUCTURE Grouville C111 Rue du Puits Mahaut Highway Freehold Grande Route des Sablons - Rue du Pont Vingtaine de la Rocque Grouville JE3 9BU INFRASTRUCTURE Grouville Field G724 Le Pre de la Reine Agricultural Freehold La Route de Longueville Vingtaine de Longueville Grouville JE2 7SA ENVIRONMENT Grouville Fields G34 and G37 Queen`s Valley Agricultural Freehold La Route de la Hougue Bie Queen`s Valley Vingtaine des Marais Grouville JE3 9EW HEALTH & SOCIAL SERVICES Grouville Fort William Beach Kiosk Sites 1 & 2 Land Freehold La Rue a Don Vingtaine des Marais Grouville JE3 9DY JERSEY PROPERTY HOLDINGS
    [Show full text]
  • Island Games Success THAT SERVES QUALITY the Sailing Events in St
    Welcome to our Autumn edition! www.labaguette.org.je THE OFFICIAL PARISH OF ST. BRELADE NEWSLETTER Edition 33 • Autumn 2015. Published by the Parish of St. Brelade, Jersey Long distance Prix d’Excellence! swimming treble Three swimmers, enter record books by Jeff Hathaway AUGUST saw a remarkable treble as St. Brelade swimmers set records tumbling in long-distance swimming feats. On 1st August St. Brelade Constable Steve Pallett became the oldest Jersey man to swim around the island. He completed the swim in just 11 hours and 8 minutes. It was his second attempt at the swim, and at 56, he becomes the oldest local man to have done so - and enters the record books. His daughter Amy posted on Facebook: “ He may have not known where he was going during the Bucharest/Budapest debacle but today my dad knew exactly where he was going when he swam all the way around Jersey in 11 hrs 8 mins. Respect to my dad who is not far off a superhero.” Then on 10th August Wendy Trehiou, a cancer survivor and ex- It was Neil Faudemer himself who Les Quennevais pupil became the then set the next record on 21st first person in history to August becoming the second only successfully complete a solo swim person in history to swim from between St Malo and Jersey. The 36 Guernsey to Jersey. Neil cleared the mile crossing took just under 24 water at Le Braye in St. Ouen’s Bay Photo credit: © Ben Buesnel hours. Her support team said that after leaving Guernsey at dawn and ‘conditions were far from perfect making the crossing in 14hrs and 57 due to a strong head wind and minutes.
    [Show full text]
  • Proposed Government Plan 2020-23
    Proposed Government Plan 2020-23 Government Plan 2020-23 3 Our purpose Our purpose as the Government of Jersey is to serve and represent the best interests of the Island and its citizens. In order to do this, we must: • provide strong, fair and trusted leadership for the Island and its people • deliver positive, sustainable economic, social and environmental outcomes for Jersey • ensure effective, efficient and sustainable management and use of public funds • ensure the provision of modern and highly-valued services for the public. Structure of the Government Plan 2020-23 The Government Plan 2020-23, is structured as follows: PART 1 INTRODUCTION Background and introductory information about the Government Plan and the process that the Government went through to develop it. PART 2 GOVERNMENT PRIORITIES Details of the priority initiatives that the Government is proposing to invest in 2020, and its ambition for 2021-23, to deliver the Common Strategic Policy and deal with the key risks we face. PART 3 GOVERNMENT FINANCES The detailed economic, financial and technical information for the 2020 Budget and our long-term public finances. 4 Contents Government Plan 2020-23 Contents PART 1 – INTRODUCTION 13 Headline commitments for 2020 14 1. Introducing the Government Plan 16 2. The strategic framework 18 3. How we will measure progress 20 4. How we manage risk 21 PART 2 – GOVERNMENT PRIORITIES 2424 Government spending 2020 and priority highlights 26 1. We will put children first 30 What we will do in 2020 34 What we will work towards in 2021-23 39 Funding this priority 40 Measuring the impacts 40 2.
    [Show full text]
  • R Infrastructure Capacity Study Report 2020 ARUP.Pdf
    Infrastructure Capacity Study December 2020 Photo credit: BAM Perspectives Government of Jersey Infrastructure Capacity Study Final Report Final | 2020 This report takes into account the particular instructions and requirements of our client. It is not intended for and should not be relied upon by any third party and no responsibility is undertaken to any third party. Job number 270796-00 Ove Arup & Partners Ltd 13 Fitzroy Street London W1T 4BQ United Kingdom www.arup.com Document verification Job title Infrastructure Capacity Study Job number 270796-00 Document title Final Report File reference Document ref Revision Date Filename Draft 1 07 Jul Description First draft 20 Prepared by Checked by Approved by Name AB / EHW / DE DE KH Signature FinalDraft Issue Oct Filename 2020 Description Prepared by Checked by Approved by Name AB / EHW / DE DE KH Signature Final March Filename 2021 Description Prepared by Checked by Approved by Name DE DE KH Signature Final 09 April Filename 2021 Description Prepared by Checked by Approved by Name EHW EHW KH Signature Issue Document verification with document ✓ | Final | 2020 Government of Jersey Infrastructure Capacity Study Final Report Contents Page Document verification 1 Contents 1 Appendices 3 1 Introduction 4 1.1 Overview of the Bridging Island Plan 4 1.2 Overview of the Infrastructure Capacity Study 4 1.3 Structure 7 2 Context 8 2.1 Infrastructure and its Importance Error! Bookmark not defined. 2.2 Planning for Infrastructure 12 3 Methodology 14 3.1 Scope 14 3.2 Overview of Methodology 15 4 Summary
    [Show full text]
  • H.M. Prison La Moye – Annual Report 2017
    STATES OF JERSEY PRISON SERVICE H.M. PRISON LA MOYE ANNUAL REPORT 2017 Presented to the States on 15th June 2018 by the Minister for Home Affairs R.75/2018 1. INTRODUCTION .................................................................................. 3 2. MISSION STATEMENT ........................................................................ 4 3. PRIMARY AIMS ................................................................................... 4 4. STATISTICS ......................................................................................... 5 4.1. Breakdown of Prisoner Accommodation ............................................... 5 4.2. Total population during 2017 ................................................................ 5 4.3. Discipline .............................................................................................. 7 4.4. Conditional Early Release .................................................................... 7 4.5. Staff in Post .......................................................................................... 7 5. Financial Report for 2017 ..................................................................... 8 6. Learning and Skills Department............................................................ 8 6.1 Staffing ................................................................................................. 8 6.2 Changes and events in 2017 ................................................................ 9 6.3 Learning opportunities .........................................................................
    [Show full text]
  • MEDIUM TERM FINANCIAL PLAN ADDITION for 2017-2019 (As Amended Following Debate at the States Sitting 26-30 September 2016)
    ANNEX TO THE MEDIUM TERM FINANCIAL PLAN ADDITION for 2017-2019 (as amended following debate at the States sitting 26-30 September 2016) Council of Ministers I.J. Gorst Senator Chief Minister A.J.H. Maclean Senator Treasury and Resources L.J. Farnham Senator Economic Development, Tourism, Sport and Culture R.G. Bryans Deputy Education S.G. Luce Deputy Environment Sir P.M. Bailhache Senator External Relations A.K.F. Green M.B.E. Senator Health and Social Services and Deputy Chief Minister K.L. Moore Deputy Home Affairs A.E. Pryke Deputy Housing E.J. Noel Deputy Infrastructure S.J. Pinel Deputy Social Security P.F.C. Ozouf Senator Assistant Chief Minister P.F. Routier M.B.E. Senator Assistant Chief Minister J.D. Richardson Chief Executive R.W. Bell Treasurer of the States CONTENTS PAGE Addendum 5 Introduction 9 Department Cash Limits for 2017 – 2019 (as amended) 21 Summary of states Revenue Expenditure Allocations 2017 – 2019 (as amended) 25 Consolidated Statement of Comprehensive Net Expenditure (as amended) 29 Estimates of States Funded Bodies 2017 – 2019 Chief Minister’s Department (as amended) 31 Jersey Overseas Aid Commission 43 External Relations 51 Community and Constitutional Affairs 59 Economic Development, Tourism, Sport and Culture (as amended) 69 Education (as amended) 81 Environment 93 Health and Social Services (as amended) 101 Infrastructure 113 Social Security 123 Treasury and Resources (as amended) 133 Non Ministerial States Funded Bodies 145 States Assembly and its Services 163 Central Contingency Allocation and Central
    [Show full text]
  • Revised 2011 Island Plan
    Revised 2011 Island Plan States of Jersey - Revised 2011 Island Plan Contents Introduction 12 Format of the Plan 14 Section 1 - Strategic Policy Context 1 Background and Context 16 2 Island Plan Strategic Policy Framework 20 Sustainable development 21 Efficient use of resources: energy, land and buildings 27 Sequential approach to development 29 Protecting the natural and historic environment 30 Economic growth and diversification 33 Reducing dependence on the car 34 Better by design 36 Section 2 - Policies 1 General Development Control Policies 38 GD: Introduction 38 GD: Objectives and indicators 38 GD: Policies and proposals 39 2 Natural Environment 53 NE: Introduction 53 NE: Objectives and indicators 57 NE: Policies and proposals 58 3 Historic Environment 98 HE: Introduction 98 HE: Objectives and indicators 100 HE: Policies and proposals 101 States of Jersey - Revised 2011 Island Plan Contents 4 Built Environment 111 BE: Introduction 111 BE: Objectives and indicators 113 BE: Policies and proposals 116 5 Economy 151 E: Introduction 151 E: Objectives and indicators 153 E: Policy 154 Offices 156 Retail 161 Light industry and warehousing 175 Rural and marine economy 184 Visitor economy 194 6 Housing 199 H: Introduction 199 H: Objectives and indicators 200 H: Policies and proposals 201 7 Social, Community and Open Space 235 SCO: Introduction 235 SCO: Objectives and indicators 236 SCO: Policies and proposals 237 8 Travel and Transport 254 TT: Introduction 254 TT: Objectives and Indicators 255 TT: Policies and proposals 255 States of Jersey
    [Show full text]