Environmental Clearance for expansion of the existing Medical campus Project (“Sreevalsam Institute of Medical Sciences”) to be developed by M/s Sreevalsam Educational Trust

The project site is located at Survey Nos. 157/2, 159/3, 158/1, 157/0 , 158/1, 159/3, 158/2, 158/5, 159/1, 159/2, 157, 159/3, 164/3, 164/7, 164/4, 163/3, 158/7, 158/3, 158/4, 166/2, 166/1, 156/3, 164/1, 156/3, 164/1, 164/2, 156/4, Village, Taluk, District, . The existing hospital project has Plot area of 9.4534 hectares with Built-up area of 53,889.72 sq.m. for 570 beds. The major details of expansion project are mentioned below:-

Objective of the project = Expansion of existing medical campus

Total Cost of the Project = About Rs. 180 Crores

Total plot area = 9.4534 ha. (94,534.56 sq.m.)

Total built-up area = 1,38,937.5 sq.m. (existing 53,889.72 sq.m. + proposed 85,047.78 sq.m.)

No. of Beds in hospital = 1,170 beds

Max. height of the building = 28 m.

Total Domestic Water Req. = 870 KL/day

Sewage Generation = 696 KL/day

Sewage Disposal Facility = Sewage Treatment Plant & Recycling

Treated Water Available from STP = 627 KL/day

Effluent Generation from ETP = 27 KL / day

Effluent disposal facility = Effluent Treatment Plant & Recycling

Treated water available from ETP = 24 KL / day

Source of Water = Roof Rain water (Non-flushing req.) (Rainy days-Concurrent use), Stored rain water / wells / KWA supply (Non flushing req.) (non- rainy days) & Treated waste water from STP / ETP (Flushing Req.) (Entire Year)

Total Power Requirement = 2,250 kVA

Source of Power = Kerala State Electricity Board & D.G. Sets (standby)

Capacity of D.G. Sets = Existing 500 kVA x 1 + 625 kVA x 1 Nos. & Proposed 500 kVA x 1 + 625 kVA x 1 Nos.

Parking Proposed = 1,184 Cars + 1,409 Two wheelers

Connectivity :- The access road to the project site is from 10 m. wide & 8 m. wide in the northern side which are well connected to - Road which is located at about 1 km. from the site. The nearest railway station (Kuttipuram Railway Station) is about 12 km. (N) and Calicut International Airport, Karipur is about 61 Km. (N) away from the project site.