Wind's Growing Role in Regional Australia
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
Wind Turbine Transportation
Wind Turbine Transportation Temporary delays – Gateway Motorway / Mt Gravatt-Capalaba Road intersection May 2019 – July 2019 Saturday to Thursday nights between 10pm and 12am Saturday to Thursday nights (six nights per week), between 10pm and 12am, the intersection of the Gateway Motorway and Mt Gravatt-Capalaba Road will be closed intermittently, for approximately 15-20 minutes, to allow for the safe movement of oversize vehicles transporting wind turbine blades and large tower sections to the Coopers Gap Wind Farm near Cooranga North. Traffic will be held at the Gateway Motorway / Mt Gravatt-Capalaba Road intersection and on the motorway off-ramp until it is safe to continue. We will try to minimise the disruption to other road users where possible, but some delays are to be expected. These temporary closures will be in place between May and July 2019. Closure times Gateway Motorway / Mt Gravatt-Capalaba Road intersection • Saturday to Thursday nights (six nights per week), intermittent closures between 10pm – 12am, from May to July 2019 Transportation of oversize wind turbine components Between January and November 2019, components for the wind farm’s 123 GE wind turbines will be transported over 300km from the Port of Brisbane to the Coopers Gap Wind Farm site. In total there will be approximately 1200 oversize transport movements to deliver all of the wind turbine components to site – including blades, tower sections, hubs and nacelles. The blades, which are up to 67.2 metres long, are the largest wind turbine blades ever transported in Australia. The movement of such large pieces of equipment requires detailed planning and coordination. -
Report: the Social and Economic Impact of Rural Wind Farms
The Senate Community Affairs References Committee The Social and Economic Impact of Rural Wind Farms June 2011 © Commonwealth of Australia 2011 ISBN 978-1-74229-462-9 Printed by the Senate Printing Unit, Parliament House, Canberra. MEMBERSHIP OF THE COMMITTEE 43rd Parliament Members Senator Rachel Siewert, Chair Western Australia, AG Senator Claire Moore, Deputy Chair Queensland, ALP Senator Judith Adams Western Australia, LP Senator Sue Boyce Queensland, LP Senator Carol Brown Tasmania, ALP Senator the Hon Helen Coonan New South Wales, LP Participating members Senator Steve Fielding Victoria, FFP Secretariat Dr Ian Holland, Committee Secretary Ms Toni Matulick, Committee Secretary Dr Timothy Kendall, Principal Research Officer Mr Terence Brown, Principal Research Officer Ms Sophie Dunstone, Senior Research Officer Ms Janice Webster, Senior Research Officer Ms Tegan Gaha, Administrative Officer Ms Christina Schwarz, Administrative Officer Mr Dylan Harrington, Administrative Officer PO Box 6100 Parliament House Canberra ACT 2600 Ph: 02 6277 3515 Fax: 02 6277 5829 E-mail: [email protected] Internet: http://www.aph.gov.au/Senate/committee/clac_ctte/index.htm iii TABLE OF CONTENTS MEMBERSHIP OF THE COMMITTEE ...................................................................... iii ABBREVIATIONS .......................................................................................................... vii RECOMMENDATIONS ................................................................................................. ix CHAPTER -
Project Updates Further Details Are Available in the Application Week Ending 28 April 2017 for Electricity Generation Authority: AGL Hydro
approximately 50km south-west of Kingaroy and 65km north of Dalby. The Regulator is seeking feedback from interested persons with regards to issuing AGL Hydro Partnership (the operator of the proposed generator) a generation authority for the Coopers Gap Wind Farm. Project Updates Further details are available in the Application Week ending 28 April 2017 for electricity generation authority: AGL Hydro Partnership for the Coopers Gap Wind Farm information paper. Off-Site Renewable Energy EOI 26 April Have your say Monash University (Monash) is inviting Written submissions about the proposed Expressions of Interest (EOI) from suitably Coopers Gap Wind Farm are welcome. Please qualified, experienced and resourced send your submissions to: providers for the long-term contract supply of 45 to 55 GWh of electricity from a renewable Email: energy source. The contract will also include [email protected] the provision of renewable energy certificates, namely Large-scale Generation Mail: Attn: Andrea Wold Certificates (LGC's). Regulation, Governance and Analytics Department of Energy and Water Supply More information available from PO Box 15456 https://www.tenderlink.com/monashuni/ CITY EAST QLD 4002 Source: Monash University Submissions close at 5pm on Monday, 1 May 2017. Source: Queensland Government Coopers Gap Wind Farm Click on project to go to online datasheet: Coopers Gap Wind Farm Under the Electricity Act 1994, the Regulator (i.e. the Director-General of the Department of Energy and Water Supply) issues authorities (licences) for generation, transmission and distribution activities in Queensland’s electricity industry. Storage to strengthen Victoria’s energy system When an applicant applies for a generation 27 April authority to connect generating plant with The Andrews Labor Government is calling for capacity greater than 30 megawatts (MW) to detailed proposals for large scale battery a transmission grid or supply network, the energy storage facilities in western Victoria. -
FINAL REPORT Annual Market Performance Review 2014
ghgh FINAL REPORT Annual Market Performance Review 2014 16 July 2015 Reference: REL0055 Final Report Inquiries Reliability Panel Australian Energy Market Commission PO Box A2449 Sydney South NSW 1235 E: [email protected] T: (02) 8296 7800 F: (02) 8296 7899 Reference: REL0055 Citation Reliability Panel, Annual Market Performance Review 2014, Final report, 16 July 2015, Sydney About the Reliability Panel The Reliability Panel (Panel) is a specialist body established by the AEMC and comprises industry and consumer representatives. It is responsible for monitoring, reviewing and reporting on reliability, security and safety of the national electricity system and advising the AEMC in respect of such matters. The Panel’s responsibilities are specified in section 38 of the National Electricity Law. This work is copyright. The Copyright Act 1968 permits fair dealing for study, research, news reporting, criticism and review. Selected passages, tables or diagrams may be reproduced for such purposes provided acknowledgement of the source is included. Foreword I am pleased to present this report setting out the findings of the Reliability Panel's annual review of market performance. The Panel carried out this review in accordance with the requirements of the National Electricity Rules where we have reviewed the performance of the National Electricity Market (NEM) in terms of reliability, security and safety over the 2013-14 financial year. The NEM regions experienced the warmest spring on record for Australia in 2013. Temperatures were warmer than average for Australia over summer and autumn with a number of heat waves affecting Victoria, South Australia and Tasmania during January 2014. -
Annual Report 2017/18 Overview Agency Performance Significant Issues Disclosures and Legal Compliance Appendices
OVERVIEW AGENCY PERFORMANCE SIGNIFICANT ISSUES DISCLOSURES AND LEGAL COMPLIANCE APPENDICES ANNUAL REPORT 2017/18 OVERVIEW AGENCY PERFORMANCE SIGNIFICANT ISSUES DISCLOSURES AND LEGAL COMPLIANCE APPENDICES Statement of compliance Hon. Ben Wyatt MLA Treasurer 11th Floor, Dumas House Havelock Street West Perth WA 6005 Dear Treasurer ECONOMIC REGULATION AUTHORITY 2017/18 ANNUAL REPORT In accordance with section 61 of the Financial Management Act 2006, I hereby submit for your information and presentation to Parliament, the annual report of the Economic Regulation Authority for the financial year ended 30 June 2018. The annual report has been prepared in accordance with the provisions of the Financial Management Act 2006, the Public Sector Management Act 1994 and the Treasurer’s Instructions. Yours sincerely, Nicola Cusworth Chair 2 / Economic Regulation Authority Annual Report 2017/18 OVERVIEW AGENCY PERFORMANCE SIGNIFICANT ISSUES DISCLOSURES AND LEGAL COMPLIANCE APPENDICES Contact details Accessing the annual report Office address The 2017/18 annual report and previous reports are Level 4, Albert Facey House available on the ERA’s website: www.erawa.com.au. 469 Wellington Street To make the annual report as accessible as possible, Perth WA 6000 we have provided it in the following formats: Office hours 9:00am to 5:00pm • An interactive PDF version, which has links to other Monday to Friday (except public holidays) sections of the annual report. Postal address • A version with separate chapters to reduce file size PO Box 8469 and download times. Perth WA 6849 • A text version, which is suitable for use with screen Telephone 08 6557 7900 reader software applications. Fax 08 6557 7999 Email [email protected] This report can also be made available in alternative formats upon request. -
Gippsland Roadmap
9 Dec 2019 The Energy Innovation Foreword Co-operative1, which has 10 years of experience On behalf of the Victorian Government, I am pleased to present the Victorian Regional Renewable Energy Roadmaps. delivering community-based As we transition to cleaner energy with new opportunities for jobs and greater security of supply, we are looking to empower communities, accelerate renewable energy and build a more sustainable and prosperous energy efficiency and state. renewable energy initiatives in Victoria is leading the way to meet the challenges of climate change by enshrining our Victorian Renewable Energy Targets (VRET) into law: 25 per the Southern Gippsland region, cent by 2020, rising to 40 per cent by 2025 and 50 per cent by 2030. Achieving the 2030 target is expected to boost the Victorian economy by $5.8 billion - driving metro, regional and rural industry and supply chain developed this document in development. It will create around 4,000 full time jobs a year and cut power costs. partnership with Community It will also give the renewable energy sector the confidence it needs to invest in renewable projects and help Victorians take control of their energy needs. Power Agency (community Communities across Barwon South West, Gippsland, Grampians and Loddon Mallee have been involved in discussions to help define how Victoria engagement and community- transitions to a renewable energy economy. These Roadmaps articulate our regional communities’ vision for a renewable energy future, identify opportunities to attract investment and better owned renewable energy understand their community’s engagement and capacity to transition to specialists)2, Mondo renewable energy. -
Alinta Energy Sustainability Report 2018/19
Alinta Energy Sustainability Report 2018/19 ABN 39 149 229 998 Contents A message from our Managing Director and CEO 2 Employment 50 FY19 highlights 4 Employment at Alinta Energy 52 Key sustainability performance measures 6 Employee engagement 53 Employee data 54 Our business 8 Supporting our people 55 Offices 10 Ownership 10 Our communities 60 Where we operate 12 Community development program 62 Electricity generation portfolio 14 Employee volunteering 62 Sales and customers 17 Sponsorships, donations and partnerships 64 Vision and values 18 Excellence Awards – community contribution 64 Business structure and governance 19 Community impacts from operations 65 Executive leadership team 20 Management committees 21 Markets and customers 66 Board biographies 21 Customer service 68 Risk management and compliance 23 Branding 72 Economic health 24 New products and projects 74 Market regulation and compliance 74 Safety 26 Fusion – our transformation program 77 Safety performance 28 Safety governance 29 Our report 80 Safety and wellbeing initiatives and programs 32 Reporting principles 82 Glossary 83 Environment 34 GRI and UNSDG content index 85 Climate change and energy industry 36 Sustainability materiality assessment 88 National government programs, policies and targets 39 Deloitte Assurance Report 96 State government programs, policies and targets 40 Energy consumption and emissions 42 Our approach to renewable energy 43 Energy efficiency and emission reduction projects 45 Environmental compliance 46 Waste and water 47 Case study 48 2018/19 Alinta Energy - Sustainability Report Page 1 Changes to our vision and leadership A message My comment above on our new vision to be the best energy company sounds a little different than in the past. -
National Greenpower Accreditation Program Annual Compliance Audit
National GreenPower Accreditation Program Annual Compliance Audit 1 January 2007 to 31 December 2007 Publisher NSW Department of Water and Energy Level 17, 227 Elizabeth Street GPO Box 3889 Sydney NSW 2001 T 02 8281 7777 F 02 8281 7799 [email protected] www.dwe.nsw.gov.au National GreenPower Accreditation Program Annual Compliance Audit 1 January 2007 to 31 December 2007 December 2008 ISBN 978 0 7347 5501 8 Acknowledgements We would like to thank the National GreenPower Steering Group (NGPSG) for their ongoing support of the GreenPower Program. The NGPSG is made up of representatives from the NSW, VIC, SA, QLD, WA and ACT governments. The Commonwealth, TAS and NT are observer members of the NGPSG. The 2007 GreenPower Compliance Audit was completed by URS Australia Pty Ltd for the NSW Department of Water and Energy, on behalf of the National GreenPower Steering Group. © State of New South Wales through the Department of Water and Energy, 2008 This work may be freely reproduced and distributed for most purposes, however some restrictions apply. Contact the Department of Water and Energy for copyright information. Disclaimer: While every reasonable effort has been made to ensure that this document is correct at the time of publication, the State of New South Wales, its agents and employees, disclaim any and all liability to any person in respect of anything or the consequences of anything done or omitted to be done in reliance upon the whole or any part of this document. DWE 08_258 National GreenPower Accreditation Program Annual Compliance Audit 2007 Contents Section 1 | Introduction....................................................................................................................... -
Landscape & Visual Impact Assessment
Collector Wind Farm View toward the proposed Collector Wind Farm LANDSCAPE & VISUAL IMPACT ASSESSMENT Prepared for: January 2012 Prepared by: GREEN BEAN DESIGN l a n d s c a p e a r c h i t e c t s 1 GREEN BEAN DESIGN l a n d s c a p e a r c h I t e c t s PO Box 3178 Austral NSW 2179 - Mobile 0430 599 995 Author: Andrew Homewood, Registered Landscape Architect, AILA BSc. (Dual Hons), DipLM, DipHort Principal Landscape Architect, Green Bean Design Date January 2012 Reference V5 – Final Green Bean Design – Capability Statement Green Bean Design is an experienced landscape architectural consultancy specialising in landscape and visual impact assessment. As an independent consultant Green Bean Design provide professional advice to a range of Clients involved in large infrastructure project development. Green Bean Design Principal Landscape Architect Andrew Homewood is a Registered Landscape Architect and member of the Australian Institute of Landscape Architects. With over 18 years continuous employment in landscape consultancy Andrew has completed numerous landscape and visual impact assessments for a variety of large scale electrical infrastructure and renewable energy projects, including wind energy and solar power developments. Green Bean Design has participated in fourteen wind energy projects across New South Wales and Victoria including assessments for: • Silverton Wind Farm • Boco Rock Wind Farm • Collector Wind Farm • Crookwell 3 Wind Farm • Sapphire Wind Farm • Willatook Wind Farm • Eden Wind Farm • Birrema Wind Farm • White Rock -
Draft Minutes of Meeting 8
Yass Valley Wind Farm & Conroys Gap Wind Farm Level 11, 75 Miller St NORTH SYDNEY, NSW 2060 Phone 02 8456 7400 Draft Minutes of Meeting 8 Yass Valley Wind Farm & Conroys Gap Wind Farm Community Consultation Committee Present: Nic Carmody Chairperson NC Paul Regan Non-involved landowner PR John McGrath Non-involved landowner JM Rowena Weir Non-involved landowner RW Tony Reeves Involved landowner TR Chris Shannon Bookham Ag Bureau CS Peter Crisp Observer PC Barbara Folkard Observer BF Brian Bingley Observer BB Wilma Bingley Observer LB Noeleen Hazell Observer NH Bruce Hazell Observer BH Alan Cole Observer AC Andrew Bray Observer AB Mark Fleming NSW OEH (Observer) MF Andrew Wilson Epuron AW Donna Bolton Epuron DB Julian Kasby Epuron JK Apologies: Sam Weir Bookham Ag Bureau Wendy Tuckerman Administrator Hilltops Council Neil Reid Hilltops Council Stan Waldren Involved landowner YASS VALLEY & CONROYS GAP WIND FARM PTY LTD COMMUNITY CONSULTATION COMMITTEE Page 2 of 7 Absent: Councillor Ann Daniel Yass Valley Council Date: Thursday 23rd June 2016 Venue: Memorial Hall Annex, Comur Street, Yass Purpose: CCC Meeting No 8 Minutes: Item Agenda / Comment / Discussion Action 1 NC opened the Community Consultation Committee (CCC) meeting at 2:00 pm. - Apologies were noted as above. 2 Pecuniary or other interests - No declarations were made. 3 Minutes of Previous meeting No comments were received on the draft minutes of meeting number 7, which had been emailed to committee members. The draft minutes were accepted without changes and the finalised minutes will be posted on the project website. AW 4 Matters arising from the Previous Minutes JM raised that the planned quarterly meetings had not been occurring and that the previous meeting was in March 2014. -
Surat Basin Non-Resident Population Projections, 2021 to 2025
Queensland Government Statistician’s Office Surat Basin non–resident population projections, 2021 to 2025 Introduction The resource sector in regional Queensland utilises fly-in/fly-out Figure 1 Surat Basin region and drive-in/drive-out (FIFO/DIDO) workers as a source of labour supply. These non-resident workers live in the regions only while on-shift (refer to Notes, page 9). The Australian Bureau of Statistics’ (ABS) official population estimates and the Queensland Government’s population projections for these areas only include residents. To support planning for population change, the Queensland Government Statistician’s Office (QGSO) publishes annual non–resident population estimates and projections for selected resource regions. This report provides a range of non–resident population projections for local government areas (LGAs) in the Surat Basin region (Figure 1), from 2021 to 2025. The projection series represent the projected non-resident populations associated with existing resource operations and future projects in the region. Projects are categorised according to their standing in the approvals pipeline, including stages of In this publication, the Surat Basin region is defined as the environmental impact statement (EIS) process, and the local government areas (LGAs) of Maranoa (R), progress towards achieving financial close. Series A is based Western Downs (R) and Toowoomba (R). on existing operations, projects under construction and approved projects that have reached financial close. Series B, C and D projections are based on projects that are at earlier stages of the approvals process. Projections in this report are derived from surveys conducted by QGSO and other sources. Data tables to supplement the report are available on the QGSO website (www.qgso.qld.gov.au). -
ROAM Consulting Report on Security of Supply and Tranmission Impacts Of
ROAM Consulting Pty Ltd A.B.N. 54 091 533 621 Report (EMC00017) to Impact of the LRET on the costs of FCAS, NCAS and Transmission augmentation 13 September 2011 Report to: Impact of the LRET on the costs of FCAS, NCAS and Transmission augmentation EMC00017 13 September 2011 VERSION HISTORY Version History Revision Date Issued Prepared By Approved By Revision Type Jenny Riesz Joel Gilmore Sam Shiao 0.9 2011-07-04 Ian Rose Preliminary Draft David Yeowart Richard Bean Matthew Holmes Jenny Riesz 1 2011-07-07 Ian Rose Complete Matthew Holmes 1.1 2011-07-07 Jenny Riesz Ian Rose Minor text edits Minor text edits - Appendix B 1.2 2011-09-01 Jenny Riesz - and explanation of Badgingarra Minor text edits – further 1.3 2011-09-13 Jenny Riesz - explanation of Badgingarra ROAM Consulting Pty Ltd VERSION HISTORY www.roamconsulting.com.au Report to: Impact of the LRET on the costs of FCAS, NCAS and Transmission augmentation EMC00017 13 September 2011 EXECUTIVE SUMMARY At the request of the Ministerial Council on Energy, the Australian Energy Market Commission (AEMC) is conducting an assessment of the impact of the Large-scale Renewable Energy Target (LRET) on security of energy supply, the price of electricity and emissions levels from the energy sector. The AEMC appointed consultants to develop a long-term generation expansion plan for meeting the LRET. Consequently, the ‘core’ scenarios for the portfolio and geographic distribution of technologies have been determined. ROAM Consulting was subsequently appointed to utilise these scenarios to forecast the cost of Frequency Control Ancillary Services (FCAS), Network Support and Control Ancillary Services (NSCAS) and transmission augmentation associated with the LRET for the National Electricity Market (NEM) and the South West Interconnected System (SWIS).