UT THREE UNDERWATER TECHNOLOGY Issue Six 2018 Issue SEABED MINING • UNDERWATER1 VEHICLES Capital-Efficient THREE Subsea Solutions UT UNDERWATER Society for Underwater TECHNOLOGY Production Tree Technology Unified Controls Lead time: 12 months 1 Fetter Lane Lead time: 12 months London EC4A 1BR Pump Lead time: 18 months Wellhead Lead time: 8 months Manifold Lead time: 18 months Connection System Lead time: 6 months Seabed nodule collector Image: Krypton Ocean ISSN: 1752-0592 Vol 12 No 6 +44 (0) 1480 370007 Editor: John Howes
[email protected] Editorial Assistant: Eddie Current Production: Redefine economic viability with a new Sue Denham approach to subsea production. Advertising: Zinat Hassan The OneSubsea portfolio of standardized designs supports streamlined processes, documentation,
[email protected] and manufacturing to deliver integrated production systems that enable achieving first oil as soon as 24 months after contract award. Customized to your field architecture, these capital-efficient solutions help you maximize recovery from new fields to transform deepwater economics across the life of the asset. Find out more at Published by UT2 Publishing for and on behalf of the Society for Underwater Technology. Reproduction of UT2 in whole or in part, onesubsea.slb.com/standardization without permission, is prohibited. The publisher and the SUT assumes no responsibility for unsolicited material, nor responsibility for content of any advertisement, particularly infringement of copyrights, trademarks, intellectual property rights and patents, nor liability for misrepresentations, false or misleading statements and illustrations. These are the sole responsibility of the advertiser. Opinions of the writers are not necessarily those of the SUT or the publishers.