Argyll and Bute Council Maintenance and Financial Update PDF 66 KB

Total Page:16

File Type:pdf, Size:1020Kb

Argyll and Bute Council Maintenance and Financial Update PDF 66 KB ARGYLL AND BUTE COUNCIL Duchess Wood Committee DEVELOPMENT AND INFRASTRUCTURE SERVICES 23th August 2016 Routine Maintenance & Budget Update 1.0 SUMMARY 1.1 The tree cutting at West Highland Line, the works have now been completed. 1.2 Litter bins have been getting emptied as normal over the last three months. Knotweed, first treatment has been completed and over coming next two weeks the second treatment will be carried out. 1.3 The tree at West Highland Line cost £1100 therefore funds available for works within Duchess Wood stands at £10,426.40. There is still works at Strathclyde Court garage still outstanding. 1.4 Strathclyde Court Garages, works are still outstanding and tender is set up for the works to be carried in autumn once leaves are of the trees. 2.0 RECOMMENDATIONS That the Committee note the report. 3.0 DETAILS 3.1 Litter Bins were emptied as normal over the summer period and will continue to be emptied over the next three months. 3.2 Tree works on the boundary between Duchess Wood and West Highland Railway has been completed at cost of £1,100.00 by QTS. 3.3 Knotweed should be treated for the second time this year over next two weeks. Areas include Car Park area, entrance at Rhu Road Higher, rear Duchess Park and top of playing field. 4.0 CONCLUSION 4.1 General maintenance has been completed on target and the tree work at the West Highland Line has been completed. Works at Strathclyde Court is still outstanding however it is planned for the autumn. 4.2 Budget for the wood is presently standing at £10,426.40. 1 5.0 IMPLICATIONS 5.1 Policy – None 5.2 Financial – The works Strathclyde Garages works will reduce it further once works have been completed. 5.3 Legal – None 5.4 HR – None 5.5 Equalities – None 5.6 Risk – There is still a Health and Safety issue with regards trees at Strathclyde Court Garages. 5.7 Customer Services –None Executive Director of Development and Infrastructure Policy Lead Councillor Ellen Morton For further information contact: Stuart McCracken, Performance Manager, North Argyll 01631 569184 2.
Recommended publications
  • Investing for the Future
    The new ScotRail franchise: good for passengers, staff and Scotland Improving your journey from door to door magazine Abellio ScotRail Investing for the future The Abellio Way Magazine – Abellio ScotRail special – Spring 2015 Travelling on the Forth Bridge and enjoying the wonderful view A northern gannet flying in front of Bass Rock SCOTRAIL SPECIAL - SPRING 2015 3 CONTENTS Ambitious plans and Abellio It is with enormous pleasure that I find myself writing 4 WE ARE ABELLIO the introduction to this special edition of The Abellio What can you expect from us? Way Magazine from my home in Edinburgh. When Abellio was granted the privilege of operating 6 JEFF HOOGESTEGER MEETS TRANSPORT Scotland’s rail services, I had no hesitation in making this my home. You may consider that a rather self- MINISTER DEREK MACKAY serving decision, after all who wouldn’t choose to live “This is an incredibly exciting period for transport in this beautiful country! However, as a Dutchman, it in Scotland” won’t surprise you that it was also a sensible business decision. 10 ABELLIO’S VISION FOR THE NEW The Scottish Government has ambitious plans to SCOTRAIL FRANCHISE transform its railways and I am grateful to them for Good for passengers, good for staff and choosing Abellio to assist in that purpose. We have many exciting and challenging plans for ScotRail, as good for Scotland you will read in this special edition, and it is my intention to work with the team wherever possible 13 WORKING TOGETHER FOR THE PASSENGER to deliver them. ScotRail and Network Rail Performance for passengers 14 BOOSTING TOURISM Living here, I will also be travelling by train most days to our new UK headquarters in Glasgow, and regularly Travel the Great Scenic Railways of Scotland using other parts of the ScotRail network.
    [Show full text]
  • Scotrail Franchise – Franchise Agreement
    ScotRail Franchise – Franchise Agreement THE SCOTTISH MINISTERS and ABELLIO SCOTRAIL LIMITED SCOTRAIL FRANCHISE AGREEMENT 6453447-13 ScotRail Franchise – Franchise Agreement TABLE OF CONTENTS 1. Interpretation and Definitions .................................................................................... 1 2. Commencement .......................................................................................................... 2 3. Term ............................................................................................................ 3 4 Franchisee’s Obligations ........................................................................................... 3 5 Unjustified Enrichment ............................................................................................... 4 6 Arm's Length Dealings ............................................................................................... 4 7 Compliance with Laws................................................................................................ 4 8 Entire Agreement ........................................................................................................ 4 9 Governing Law ............................................................................................................ 5 SCHEDULE 1 ............................................................................................................ 7 PASSENGER SERVICE OBLIGATIONS ............................................................................................. 7 SCHEDULE 1.1 ...........................................................................................................
    [Show full text]
  • POTENTIAL RAIL USER SURVEY FINAL REPORT, February 2017
    RAIL NEEDS SURVEY www.westhighlandcrp.com POTENTIAL RAIL USER SURVEY FINAL REPORT, February 2017 REPORT WRITTEN BY Centre for Recreation and Tourism Research FEBRUARY 2017 Survey carried out with support from: Survey commissioned by: Survey conducted by: West Highland CRP Dr. Steve Taylor PO Box 7061 Centre for Recreation and Tourism Research Fort William University of the Highlands and Islands PH33 9AS West Highland College +44 (0)1397 722295 Fort William, PH33 6FF +44 (0)1397 874000 Contents 1. Introduction 1 2. Methodology 1 3. Survey Findings: Locals 3 4. Survey Findings: Tourists 10 5. Discussion and Conclusions 17 Appendix One Verbatim Responses: Locals’ Survey 20 Appendix Two Verbatim Responses: Tourists’ Survey 40 Potential Rail User Survey Report, 2017 1 1 Introduction From March to November 2016 the Centre for Recreation and Tourism Research undertook a research exercise for the West Highland Community Rail Partnership (WHCRP), that aimed to survey, predominantly, locals and tourists who don’t currently use the regional rail services and to determine a more complete picture of the barriers to use. Funding for the exercise was provided by ScotRail, with additional in-kind contributions from members of the WHCRP project team. The WHCRP is a newly established community organization covering the West Highland railway corridor from Mallaig to Crianlarich, as well as its hinterland. With an overall aim of working in partnership with the railway industry to make train travel a more attractive option for locals and visitors alike, it commissioned the survey to identify the issues that constrain use of regional rail services. 2 Methodology As discussed and agreed with the WHCRP a two-stage methodology was adopted and used: a paper and web-based survey of local user needs and an ‘offline’ face-to-face survey of tourists.
    [Show full text]
  • Interchange Audit -- Mallaig Sustainable
    interchange audit MALLAIG RAILWAY STATION FERRY PORT Interchange Audit Susan Warren Jolin Warren 12 May 2014 Linking cycling with public transport Introduction Purpose of the Interchange Audit Transform Scotland has carried out a series of ‘Interchange Audits’ to assess how easy it is to combine cycling with other forms of sustainable transport. Railway stations, bus stations, and ferry terminals have been audited with consideration given both to cyclists who might want to park their bike and to those who plan to take their bike with them (for instance on the train or ferry). Each audit has involved an on-the-ground survey using the Interchange Toolkit which was developed for this project. The survey considers aspects that could make a cyclist’s journey easier or more difficult, starting from the station or terminal approach, through entering, to locating parking or the appropriate boarding point. Features such as signage, suitable routes, and access to facilities have been included. However, the project did not assess cycle carriage (for example, the number of cycle spaces on a train or ferry). overview of station and terminal The railway station and ferry terminal in Mallaig are located next to each other and so the proximity of these facilities makes it possible to switch between rail and ferry with ease. Local authority area Location Highland Council In the centre of the village which has a population of 790 e ra B 's ie v a D E a st A B n ay n i e ' s B r a e Mallaig Railway Station The railway station in Mallaig is the terminus station for the West Highland Line with services from Fort William.
    [Show full text]
  • Respondent Information Form and Questions
    Respondent Information Form and Questions Please Note this form must be returned with your response to ensure that we handle your response appropriately 1. Name/Organisation Organisation Name Glenfinnan Station Museum Title Mr Ms Mrs √ Miss Dr Please tick as appropriate Surname Hege Forename Hernes 2. Postal Address Glenfinnan Station Glenfinnan Inverness-shire Phone Email Postcode PH37 4LT 01397722295 [email protected] 3. Permissions - I am responding as… Individual / Group/Organisation Please tick as appropriate √ (a) Do you agree to your response being made (c) The name and address of your organisation available to the public (in Scottish will be made available to the public (in the Government library and/or on the Scottish Scottish Government library and/or on the Government web site)? Scottish Government web site). Please tick as appropriate Yes No (b) Where confidentiality is not requested, we Are you content for your response to be will make your responses available to the made available? public on the following basis Please tick ONE of the following boxes Please tick as appropriate Yes √ No Yes, make my response, name and address all available or Yes, make my response available, but not my name and address or Yes, make my response and name available, but not my address (d) We will share your response internally with other Scottish Government policy teams who may be addressing the issues you discuss. They may wish to contact you again in the future, but we require your permission to do so. Are you content for Scottish Government to contact you again in relation to this consultation exercise? Please tick as appropriate Yes √ No Consultation Questions The answer boxes will expand as you type.
    [Show full text]
  • Loch Eilt, North-West Scotland 22 January 2018
    Rail Accident Report Landslip and derailment at Loch Eilt, north-west Scotland 22 January 2018 Report 10/2018 August 2018 This investigation was carried out in accordance with: l the Railway Safety Directive 2004/49/EC; l the Railways and Transport Safety Act 2003; and l the Railways (Accident Investigation and Reporting) Regulations 2005. © Crown copyright 2018 You may re-use this document/publication (not including departmental or agency logos) free of charge in any format or medium. You must re-use it accurately and not in a misleading context. The material must be acknowledged as Crown copyright and you must give the title of the source publication. Where we have identified any third party copyright material you will need to obtain permission from the copyright holders concerned. This document/publication is also available at www.gov.uk/raib. Any enquiries about this publication should be sent to: RAIB Email: [email protected] The Wharf Telephone: 01332 253300 Stores Road Website: www.gov.uk/raib Derby UK DE21 4BA This report is published by the Rail Accident Investigation Branch, Department for Transport. Preface Preface The purpose of a Rail Accident Investigation Branch (RAIB) investigation is to improve railway safety by preventing future railway accidents or by mitigating their consequences. It is not the purpose of such an investigation to establish blame or liability. Accordingly, it is inappropriate that RAIB reports should be used to assign fault or blame, or determine liability, since neither the investigation nor the reporting process has been undertaken for that purpose. The RAIB’s findings are based on its own evaluation of the evidence that was available at the time of the investigation and are intended to explain what happened, and why, in a fair and unbiased manner.
    [Show full text]
  • Argyll and Bute
    Appendix 1 . ARGYLL AND BUTE Indicative Regional Spatial Strategy Argyll and Bute Indicative Regional Spatial Strategy Contents 1 Introduction 2 Strategic Overview 3 Tobermory-Oban-Dalmally Growth Corridor 4 Helensburgh and Lomond Growth Area 5 Argyll and Bute Western Seaboard 6 Delivery: Strategic Infrastructure 7 Appendix 1: Contribution to Strategic Outcomes Argyll and Bute Indicative Regional Spatial Strategy 1 Introduction This document is the indicative Regional Spatial Strategy (iRSS) for Argyll and Bute except that area lying within the Loch Lomond and Trossachs National Park which will have its own iRSS. It has been prepared on a voluntary basis to inform the preparation of the forthcoming Draft National Planning Framework 4. It is without prejudice to the content of the formal Regional Spatial Strategy and the Council’s formal response to Draft National Planning Framework 4 (NPF4). The Planning (Scotland) Act 2019, requires Regional Spatial Strategies (RSS)to be prepared by planning authorities or groups of planning authorities and for these RSS to help inform the national and regional planning priorities which will be set out in NPF4. Detailed regulations prescribing how RSS are to be prepared have not yet been produced by Scottish Government. However there is an expectation that iRSS will be prepared in advance of those regulations, for September 2020, so that their content can help to inform the forthcoming NPF4 and help to shape a national vision for 2050. At the time of writing a draft NPF4 is anticipated during the autumn of 2021. There will be a variety of styles of iRSS and it is anticipated that some other Local Authorities will produce collaborative / joint iRSS.
    [Show full text]
  • Respondent Information Form and Questions
    Respondent Information Form and Questions Please Note this form must be returned with your response to ensure that we handle your response appropriately 1. Name/Organisation Organisation Name Scottish Association for Public Transport Title Mr Ms Mrs Miss Dr √ Please tick as appropriate Surname McCormick Forename John 2. Postal Address 11 Queens Crescent Glasgow Postcode G4 9BL Phone 07760 381729 Email [email protected] 3. Permissions - I am responding as… Individual / Group/Organisation Please tick as appropriate √ (a) Do you agree to your response being made (c) The name and address of your organisation available to the public (in Scottish will be made available to the public (in the Government library and/or on the Scottish Scottish Government library and/or on the Government web site)? Scottish Government web site). Please tick as appropriate Yes No (b) Where confidentiality is not requested, we Are you content for your response to be will make your responses available to the made available? public on the following basis Please tick ONE of the following boxes Please tick as appropriate √ Yes No Yes, make my response, name and address all available or Yes, make my response available, but not my name and address or Yes, make my response and name available, but not my address (d) We will share your response internally with other Scottish Government policy teams who may be addressing the issues you discuss. They may wish to contact you again in the future, but we require your permission to do so. Are you content for Scottish Government to contact you again in relation to this consultation exercise? Please tick as appropriate √ Yes No Consultation Questions The answer boxes will expand as you type.
    [Show full text]
  • RAIL for ALL Delivering a Modern, Zero-Carbon Rail Network in Scotland
    RAIL FOR ALL Delivering a modern, zero-carbon rail network in Scotland Green GroupofMSPs Policy Briefing SUMMARY Photo: Times, CC BY-SA 2.5 BY-SA Times, CC Photo: The Scottish Greens are proposing the Rail for All investment programme: a 20 year, £22bn investment in Scotland’s railways to build a modern, zero-carbon network that is affordable and accessible to all and that makes rail the natural choice for commuters, business and leisure travellers. This investment should be a central component of Scotland’s green recovery from Covid, creating thousands of jobs whilst delivering infrastructure that is essential to tackle the climate emergency, that supports our long-term economic prosperity, and that will be enjoyed by generations to come. CONTENTS CHAPTER PAGE 1 Creating the delivery infrastructure 4 i. Steamline decision-making processes and rebalance 4 them in favour of rail ii. Create one publicly-owned operator 4 iii. Make a strategic decision to deliver a modern, 5 zero-carbon rail network and align behind this iv. Establish a task force to plan and steer the expansion 5 and improvement of the rail network 2 Inter-city services 6 3 Regional services 9 4 Rural routes and rolling stock replacement 10 5 TramTrains for commuters and urban connectivity 12 6 New passenger stations 13 7 Reopening passenger services on freight lines 14 8 Shifting freight on to rail 15 9 Zero-carbon rail 16 10 Rail for All costs 17 11 A green recovery from Covid 18 This briefing is based on the report Rail for All – developing a vision for railway investment in Scotland by Deltix Transport Consulting that was prepared for John Finnie MSP.
    [Show full text]
  • Polnish Railway Cottage Polnish Lochailort PH38 4NA
    MacPhee & Partners Polnish Railway Cottage Polnish Lochailort PH38 4NA PRICE GUIDE: £75,000 Arisaig 7 miles. Mallaig 15 miles. Fort William 28 miles. Situated in the small township of Polnish and enjoying views over the West Highland railway line to the surrounding countryside, the property forms a charming former railway cottage. The cottage, which requires fully renovated throughout, is ideal for stream train enthusiasts, with the Jacobite steam train passing daily on the summer months. The sale of Polnish Railway Cottage offers an opportunity for the purchasers to cre- ate a family home or due to the location a holiday or rental property. The property is single glazed and benefits from solid fuel fires. Enjoying rugged mountain views in an area renowned for its natural beauty and complemented by an abundance of wildlife, the property lies on the ‘Road to the Isles’ at the head of Loch Ailort. Lochailort is located between Fort William and Mallaig, which both offer a range of amenities. There is a local Inn located in nearby Lochailort. Stunning Countryside Views Detached Former Railway Cottage Renovation Project Desirable Rural Location on the West Highland Line Garden EPC Rating: B 86 The West Highland line is quoted to be, "The greatest railway journey in the world." MacPhee & Partners Airds House An Aird Fort William PH33 6BL 01397 702200 [email protected] www.macphee.co.uk Accommodation Entrance Vestibule With doors to bedroom and lounge. Bedroom 4.8 x 3.9 (about 15’9 x 12’9) With window to front. Fireplace. PAGE 3 Lounge 4.8 x 4.8 (about 15’9 x 15’9) With window to front.
    [Show full text]
  • 1983 to 2018 a Short History of Friends of the West Highland Lines
    1983 to 2018 A short history of Friends of the West Highland Lines 1983:- Society founded at Crianlarich to fight threatened closure of the lines north and west of Crianlarich recommended by the Serpel Report. Very shortly branches were formed in Oban, Glasgow and even London. The campaign was successful. After that some members felt the job was done and left. Others felt it would be good to hold on to such an organisation in case the line was threatened again in the future. So the Society continued. Members met regularly at all 3 branches, but more as a hobby club for people interested in the West Highland Lines. It became active again when the sleeper service from Fort William to London was threatened. This campaign was largely fought by the London Branch. The service was saved when the FRIENDS along with others pointed out that withdrawal of the daily trains over the Cowlairs Curve in Glasgow constituted a line closure and would have to go through the line closure procedure. At this point B.R. decided not to go through the closure procedure. They would continue to run the Fort William sleeper, but in a much truncated form of just 2 sleeping cars. By the time railway privatisation came along, society was changing and not so many people wanted to go out on winter nights to indulge in a hobby. The branches discontinued and the main Society Committee took on the role of being the lobbying and rail user group for the West Highland Lines. Some achievements since then are, starting just after privatisation.
    [Show full text]
  • Sleepershake-Up?
    Feature Operations Right: DB Schenker 90036 stands at London Euston on February 24, having arrived with the ‘Caledonian Sleeper’ from Glasgow Central. The crew that arrived on this train from Scotland will lodge in London, and return north that night. This is yet more additional operational cost for the sleepers. JACK BOSKETT/RAIL. shake-up? Sleeper Region territory. At a stroke this eliminates locomotive hire and reduces the number of leeper services, in their current shunting staff required (a large element of the format, are a very labour-intensive With the future of the Scottish sleepers under the fixed costs). operation. This is especially true of the spotlight, PETER MUGRIDGE suggests a radical On-board crew would still need to be in the ‘Caledonian Sleeper’, where rakes are same passenger/crew ratio for safety reasons, splitS and joined to serve different destinations change in how the services could operate… but operations could be more flexible. from one service. By choosing a five-car unit with four At Carstairs, the Lowland Sleeper from - it is possible to work a full day in an office So is it possible to increase flexibility and 20-metre vehicles and one 16m vehicle, four London Euston to the Central Belt splits, with anywhere within range of the M25, catch the reduce costs without compromising service units can couple together in the same space as portions running to Edinburgh and Glasgow. Sleeper, and arrive (refreshed from a night’s levels - and possibly even allow a modest a 16-vehicle locomotive-hauled ‘Caledonian At Edinburgh, the 18-coach 2115 Highland sleep) for an early meeting hundreds of miles expansion? Sleeper’ rake.
    [Show full text]