Transportation 2040 as amended in 2015 Appendix N: Regional Capacity Projects Note: Project costs are expressed in 2015 dollars and are sorted by sponsor.

Sponsor: AUBURN MTP Status: Candidate Project ID: 2858 Estimated Cost: $2,062,420 Title: A St Trail Description: Shared use bike path

Location / Facility: From: To: A St Trail 31st St SE Transit station at 1st & B St. County: Completion Year: Type: King County 2030 New Facility-Road

Sponsor: AUBURN MTP Status: Completed Project ID: 4516 Estimated Cost: $180,425 Title: Auburn Pacific Phase 2 (trail) Description: New east-west trail connection serving the residents of Auburn and Pacific and connecting through other existing trails to the Auburn urban center.

Location / Facility: From: To: 0 Ellingson Road SW Pacific Park County: Completion Year: Type: King County 2011 New Facility-Road Sponsor: AUBURN MTP Status: Candidate Project ID: 1744 Estimated Cost: $3,591,990 Title: Auburn Way South (SR 164) Corridor Improvements, Fir Street SE to Hemlock Street SEg & Non-Motorized Improvements Description: The Auburn Way South (SR 164) Corridor Improvement project is approximately 0.14 miles in length, from Fir ST SE to Hemlock ST SE. This project will design and construct a new 5 lane section of roadway with illumination. There will be 2 through lanes in each direction and a center turn-lane with a U-turn/Wedge and transit pullouts at Hemlock ST SE. There will also be 10-foot wide sidewalks and storm drainage improvements. The project includes a new traffic signal at the intersection of Hemlock ST SE and Auburn Way South (SR 164) with ADA compliant ramps, push buttons, and signal heads.

Location / Facility: From: To: Auburn Way South (SR 164) Fir St SE Hemlock St SE County: Completion Year: Type: King County 2015 New Facility-Road

Sponsor: AUBURN MTP Status: Candidate Project ID: 4515 Estimated Cost: $11,279,810 Title: BNSF Pedestrian/Bicycle Undercrossing Description: Non-motorized connection extending from the White River Trail to the Interurban Trail and all urban centers located proximate to the Interurban Trail.

Location / Facility: From: To: BNSF Underpass A Street SE Skinner Rd County: Completion Year: Type: King County 2017 New Facility-Road Sponsor: AUBURN MTP Status: Unprogrammed Project ID: 4510 Estimated Cost: $2,472,030 Title: BPA Trail Description: New east-west trail connection from Federal Way urban center to Covington.

Location / Facility: From: To: BPA Trail west city limits east city limits County: Completion Year: Type: King County 2020 New Facility-Road

Sponsor: AUBURN MTP Status: Completed Project ID: 2871 Estimated Cost: $349,879 Title: C St Trail Description: Shared Use bike path

Location / Facility: From: To: 0 Interurban Trail @ 15th St SW Pacific City Limits County: Completion Year: Type: King County 2011 New Facility-Road

Sponsor: AUBURN MTP Status: Candidate Project ID: 4504 Estimated Cost: $34,967,411 Title: Grade Separated Crossing of BNSF Railyard Description: Improved east-west connectivity and mitigation for potential future BNSF railyard expansion as a multimodal facility (at 6th Street SW/SE )

Location / Facility: From: To: 6th Street SW/SE C Street SW A Street SE County: Completion Year: Type: King County 2030 New Facility-Road Sponsor: AUBURN MTP Status: Candidate Project ID: 4511 Estimated Cost: $2,472,030 Title: Green River Trail Description: New north-south non-motorized corridor that links to Auburn's urban center through future on-street bicycle lanes and sidewalks.

Location / Facility: From: To: Green River Trail S. 277th Street SR 18 County: Completion Year: Type: King County 2020 New Facility-Road

Sponsor: AUBURN MTP Status: Candidate Project ID: 975 Estimated Cost: $26,116,619 Title: M Street Widening and Underpass Description: GRADE SEPARATE RAIL XING, WIDEN TO 4 LANES, ADD SIDEWALK, BIKE LANES, AND ROADWAY LIGHTING.

Location / Facility: From: To: M St SE E MAIN AUBURN WAY S County: Completion Year: Type: King County 2019 New Facility-Road

Sponsor: AUBURN MTP Status: Candidate Project ID: 976 Estimated Cost: $8,293,101 Title: S 272nd/277th St Corridor Capacity Non Motorized Trail Improvements Description: Widen roadway between Auburn Way North and L St NE. Includes 2 new EB lanes, 1 new WB lane, separated non-motorized trail, intersection improvements, lighting, ITS improvements, and associated storm improvements.

Location / Facility: From: To: 52nd St NE AUBURN WAY N GREEN RIVER County: Completion Year: Type: King County 2016 New Facility-Road Sponsor: AUBURN MTP Status: Unprogrammed Project ID: 4287 Estimated Cost: $18,540,225 Title: SR 164 Description: Widen to 4 lanes - Restrict access where appropriate (Project is from Dogwood to Auburn City limits with the exception of the segment between Fir and Hemlock that has been segmented out into a Candidate project - MTP 1744)

Location / Facility: From: To: SR 164 Dogwood Auburn City Limits County: Completion Year: Type: King County 2040 New Facility-Road

Sponsor: AUBURN MTP Status: Unprogrammed Project ID: 4513 Estimated Cost: $7,416,090 Title: White River Trail

Description: A new trail connection that will link south-east Auburn residents to the Auburn urban center via travel on the future BNSF Pedestrian/Bicycle Undercrossing, Auburn-Pacific Trail (Phase 2), and the Interurban Trail.

Location / Facility: From: To: White River Trail Pacific Southeast Auburn along the White River County: Completion Year: Type: King County 2030 New Facility-Road Sponsor: AUBURN MTP Status: Unprogrammed Project ID: 4514 Estimated Cost: $2,472,030 Title: Williams Trail Description: A new trail connection that will link south-east Auburn and Pierce County residents to the Auburn urban center via travel on the White River Trail, future BNSF Pedestrian/Bicycle Undercrossing, Auburn-Pacific Trail (Phase 2), and Interurban Trail.

Location / Facility: From: To: Williams Trail Kersey Way/White River Trail Lake Tapps Parkway County: Completion Year: Type: King County 2020 New Facility-Road Sponsor: BELLEVUE MTP Status: Approved Project ID: 4264 Estimated Cost: $58,187,427 Title: 120th Avenue NE Corridor Widening: NE 4th Street to Northup Way Description: Improve and widen the 120th Avenue NE corridor in phases to increase connectivity between the Downtown Bellevue and Overlake regional growth centers and the new Bel-Red TOD node. Widen to five lanes with bike lanes and continuous sidewalk between NE 4th and NE 8th Streets; realign the roadway with sidewalks and bike lanes between NE 8th Street and Old Bel-Red Road; widen to five lanes with sidewalks and bike lanes between Old Bel-Red Road and NE 15th Street; and widen to five lanes with sidewalks and a separated multi-use path between NE 15th Street and Northup Way (this segment may primarily be implemented with four lanes on an interim basis). Project to be designed and constructed in coordination with specifically in the segment where the East Link project will cross under roadway, between NE 14th and NE 16th Streets.

Location / Facility: From: To: 120th Ave NE NE 4th Street (new connection at 120th Ave Northup Way NE) County: Completion Year: Type: King County 2023 New Facility-Road

Sponsor: BELLEVUE MTP Status: Candidate Project ID: 2865 Estimated Cost: $1,516,547 Title: Bellevue Way Trail Description: Construct a multi-use pedestrian and bike facility. Project may be designed and constructed in coordination with Sound Transit and the implementation of the East Link project along this corridor.

Location / Facility: From: To: Bellevue Way Trail Parallel along Bellevue Way from SE 30th SE 8th St County: Completion Year: Type: King County 2029 New Facility-Road Sponsor: BELLEVUE MTP Status: Candidate Project ID: 4527 Estimated Cost: $44,990,889 Title: Bel-Red Regional Connectivity - 124th Ave NE Description: Improve and widen the 124th Avenue corridor in phases to increase connectivity between Downtown Bellevue and Overlake regional growth centers and the new Bel-Red TOD node. Widen for bike lanes between NE 8th Street and Bel-Red Road; widen to five lanes with sidewalks and bike facilities between Bel-Red Road and the planned NE 15th Street intersection; and widen to five lanes with sidewalks between NE 15th Street and Northup Way. Project to be designed and constructed in coordination with Sound Transit specifically in the segment where the East Link project will cross under roadway, between NE 14th and NE 18th Streets.

Location / Facility: From: To: 124th Avenue NE NE 8th Street Northup Way County: Completion Year: Type: King County 2019 New Facility-Road

Sponsor: BELLEVUE MTP Status: Approved Project ID: 4523 Estimated Cost: $46,813,017 Title: Bel-Red Regional Connectivity - NE 4th St Extension Description: Construct a four/five lane extension of NE 4th Street from 116th Ave to 120th Ave, including sidewalks, and bike lanes to increase connectivity between Downtown Bellevue and Overlake regional growth centers and the new Bel-Red TOD node. The extension will be designed to accommodate future development and uses of the BNSF corridor.

Location / Facility: From: To: NE 4th Street 116th Avenue NE 120th Avenue NE County: Completion Year: Type: King County 2015 New Facility-Road Sponsor: BELLEVUE MTP Status: Candidate Project ID: 4524 Estimated Cost: $86,666,660 Title: Bel-Red Regional Connectivity - NE 6th St Extension Description: Construct east half of NE 6th/I-405 HOV/HOT interchange to provide transit/HOV access east of I-405.

Location / Facility: From: To: NE 6th Street 112th Avenue NE 120th Avenue NE County: Completion Year: Type: King County 2020 New Facility-Road

Sponsor: BELLEVUE MTP Status: Unprogrammed Project ID: 1100 Estimated Cost: $3,714,693 Title: Coal Creek Parkway Description: Widen Coal Creek Pkwy to six lanes at the intersection between the I-405 ramps.

Location / Facility: From: To: COAL CREEK PKWY I-405 northbound on ramp I-405 southbound off ramp County: Completion Year: Type: King County 2020 New Facility-Road

Sponsor: BELLEVUE MTP Status: Candidate Project ID: 5497 Estimated Cost: $1,219,089 Title: Downtown-Overlake Connection Trail Description: Add a 10 to 14 foot wide off-street path on the north side of NE 12th Street from 100th Avenue NE to 116th Avenue NE. Component of priority bike corridor; Add 10-14 foot-wide off street path along the north side of NE 16th Street from 116th Avenue NE to 140th Avenue NE. Component of priority bike corridor;

Location / Facility: From: To: north side of NE 12th Street 100th Ave NE 140th Ave NE County: Completion Year: Type: King County 2029 New Facility-Road Sponsor: BELLEVUE MTP Status: Completed Project ID: 2868 Estimated Cost: $1,706,725 Title: I-90 Trail/124th Ave SE Connector Description: Add a 10-14 foot-wide off street path from the I-90 trail to SE 38th Street

Location / Facility: From: To: I-90 Trail/124th Ave SE Connector 124th Ave SE & SE 38th Pl I-90 Trail at Factoria Blvd. County: Completion Year: Type: King County 2011 New Facility-Road

Sponsor: BELLEVUE MTP Status: Candidate Project ID: 2888 Estimated Cost: $1,238,231 Title: Lake Blvd Trail Description: Shared use bike path

Location / Facility: From: To: Lake Washington Blvd Trail Southern terminus of existing Lk WA Blvd Trail Along BNSF Corridor to Bellevue/Newcastle near Bagley Ln limits County: Completion Year: Type: King County 2029 New Facility-Road

Sponsor: BELLEVUE MTP Status: Candidate Project ID: 5498 Estimated Cost: $1,857,346 Title: Lake-to-Lake Trail Description: Add a 10 to 14 foot wide off street path on the south side of Main Street from Bellevue Way NE to 116th Avenue NE. Component of priority bike corridor.

Location / Facility: From: To: Main St Bellevue Way 116th Ave NE County: Completion Year: Type: King County 2029 New Facility-Road Sponsor: BELLEVUE MTP Status: Candidate Project ID: 5499 Estimated Cost: $1,238,231 Title: Lake-to-Lake Trail Description: Add a 10-14 foot-wide off street path on the north side of Lake Hills Connector from Main Street to 140th Avenue SE. Component of priority bike corridor.

Location / Facility: From: To: north side of Lake Hills Connector Main St 140th Ave SE County: Completion Year: Type: King County 2029 New Facility-Road

Sponsor: BELLEVUE MTP Status: Candidate Project ID: 5500 Estimated Cost: $619,115 Title: Lake-to-Lake Trail

Description: Add a 10-14 foot-wide off street path on the south side of SE 8th Street from 114th Avenue SE to Lake Hills Connector. Component of priority bike corridor.

Location / Facility: From: To: on the south side of SE 8th Street 114th Ave SE Lake Hills Connector County: Completion Year: Type: King County 2029 New Facility-Road Sponsor: BELLEVUE MTP Status: Candidate Project ID: 5501 Estimated Cost: $30,676,746 Title: Mountain to Sound Greenway Description: A paved multiuse trail of 12 feet wide (where feasible) is proposed beginning at the current end of the trail at Factoria Blvd and running eastward along the south side of I-90 and the north side of SE 36th St to the curve near the 150th Ave SE interchange with I- 90, then following a new independent alignment to the south of the interchange and north of the 150th Avenue SE/SE 37th St intersection. Eastward from 150th Ave SE, the trail will continue on the south side of I-90 and the north side of SE 37th St. Eastward from the termination of SE 37th St, the trail will continue on the south side of I-90 and the north side of private properties and/or Newport Way to the intersection of Lakemont Blvd SE and Newport Way.

Location / Facility: From: To: Parallel to I-90 Factoria Blvd Lakemont Blvd County: Completion Year: Type: King County 2030 New Facility-Road

Sponsor: BELLEVUE MTP Status: Candidate Project ID: 4473 Estimated Cost: $12,046,583 Title: NE Spring Boulevard Multi-Modal Corridor – Zone 1A Description: The project includes one segment of a new multi-modal arterial street connection between 116th Ave NE to the West Abutment of West Bridge. All zones will include two travel lanes in each direction, turn pockets and center turn lanes where appropriate storm drainage and water quality treatment. Zone 1A will include a separated wide multi-use path on the north side and sidewalk on the south side; it will also include, new traffic signals connected to the city’s traffic adaptive control system, landscaping and irrigation, and illumination for both Zone 1A and Zone 1B.

Location / Facility: From: To: NE Spring Boulevard 116th Ave NE West Abutment of West Bridge County: Completion Year: Type: King County 2020 New Facility-Road Sponsor: BELLEVUE MTP Status: Approved Project ID: 4526 Estimated Cost: $22,607,475 Title: NE Spring Boulevard Multi-Modal Corridor -- Zone 1B Description: The project includes one segment of a new multi-modal arterial street connection, including two travel lanes in each direction, turn pockets and center turn lanes where appropriate, storm drainage, and water quality treatment. Zone 1B will include a separated wide multi-use path on the north side and sidewalk on the south side, and two bridges spanning the north-south and Sound Transit rail tracks.

Location / Facility: From: To: NE 15th Street West Abutment of West Bridge 120th Avenue NE County: Completion Year: Type: King County 2020 New Facility-Road

Sponsor: BELLEVUE MTP Status: Candidate Project ID: 4474 Estimated Cost: $27,050,306 Title: NE Spring Boulevard Multi-Modal Corridor – Zone 2 Description: The project includes one segment of a new multi-modal arterial street connection from 120th Ave NE to 124th Ave NE. All zones will include two travel lanes in each direction, turn pockets and center turn lanes where appropriate, new traffic signals connected to the city’s traffic adaptive control system, landscaping and irrigation, illumination, storm drainage and water quality treatment. Zone 2 will include widened outside lanes for shared bicycle use and sidewalks on both sides.

Location / Facility: From: To: NE Spring Boulevard 120th Ave NE 124th Ave NE County: Completion Year: Type: King County 2020 New Facility-Road Sponsor: BELLEVUE MTP Status: Candidate Project ID: 5495 Estimated Cost: $3,657,267 Title: SR 520 Trail Description: Add a 10-14 foot-wide off street path along the south side of NE Points Drive from the western part of the interchange area to the south side of Northup Way just east of the interchange. Component of priority bike corridor. Add a 10-14 foot-wide off street path along SR-520 connecting NE Points Drive to Northup Way over the Bellevue Way Interchange area (just north of SR-520). Component of priority bike corridor.

Location / Facility: From: To: SR 520 Trail Bellevue Way I/C Bellevue Way County: Completion Year: Type: King County 2015 New Facility-Road

Sponsor: BELLEVUE MTP Status: Candidate Project ID: 5496 Estimated Cost: $14,326,046 Title: SR 520 Trail Description: Construct 10-14 foot-wide path from Bellevue Way / Evergreen Point Bridge to the west terminus of existing SR-520 trail at 124th Avenue NE. This facility extends east of Bellevue Way along the south side of Northup Way to 108th Avenue NE; along the east side of 108th Avenue NE; continuing east along the north side of SR-520 and eventually leading back to the proposed BNSF regional trail. East of the BNSF regional trail, completing the connection along the north side of SR-520 and south side of NE 24th Street to the existing trail system. Component of priority bike corridor; EW-1: SR-520 Trail.

Location / Facility: From: To: SR 520 Trail Evergreen Point Bridge 124th Ave NE County: Completion Year: Type: King County 2015 New Facility-Road Sponsor: BELLEVUE MTP Status: Candidate Project ID: 5502 Estimated Cost: $36,572,670 Title: West Lake Sammamish Pkwy Path Description: Construct a ten foot multi-use path on the west side of the parkway and a four foot bike shoulder on the east side. Portions of the west side path will be separated from the vehicle travel lanes by two to five foot landscape planting. The project will include five mid- block pedestrian crossings, three intersection crossings, and rehabilitation of existing pavement throughout the corridor.

Location / Facility: From: To: on the west side of West Lake Sammamish North City Limit I-90 Pkwy County: Completion Year: Type: King County 2020 New Facility-Road Sponsor: BOTHELL MTP Status: Candidate Project ID: 4262 Estimated Cost: $36,184,339 Title: Bothell Way NE / Bothell-Everett Hwy Improvements Description: Widen to 4/5 lanes between NE 188th St and 240th St SE.

Location / Facility: From: To: SR 527 NE 188th St 240th St SE County: Completion Year: Type: King County 2030 New Facility-Road

Sponsor: BOTHELL MTP Status: Candidate Project ID: 5446 Estimated Cost: $32,308,938 Title: Bothell Way NE: Multiway Boulevard Project Description: Reconstruct and expand the existing 4-lane roadway between SR 522 and NE 188th St to a tree-lined boulevard with 5 travel lanes and business access lanes.

Location / Facility: From: To: SR 527 SR 522 NE 188th St County: Completion Year: Type: King County 2017 New Facility-Road Sponsor: BOTHELL MTP Status: Completed Project ID: 4271 Estimated Cost: $10,537,340 Title: Bothell-Everett Hwy Widening: 240th St SE to 228th St SE Description: This project will widen Bothell-Everett Hwy from two lanes to four lanes with a center dual left turn lane, bike lanes, transit stops and sidewalks, curb/gutter/plantings, minor side street improvements, interconnect and coordinate signals, provide access management, retaining walls, storm drainage facilities, landscaping and illumination.

Location / Facility: From: To: SR 527 240th St SE 228th St SE County: Completion Year: Type: Snohomish County 2015 New Facility-Road

Sponsor: BOTHELL MTP Status: Approved Project ID: 4172 Estimated Cost: $1,589,240 Title: North Creek Trail - 220th St SE to SR 524 (Woodlands Technology Campus) Description: The North Creek Trail north of 220th St SE to SR 524 will be constructed by project developers and the City of Bothell over the next several years. The project "Woodlands Technology Campus" has completed construction of a 12-foot wide mixed-use path on their property which runs from 220th St SE north to 214th St SE at SR 527. The next piece of mixed-use path from 214th St SE north to SR 524 will be built by a City contract in 2014/2015 using grant funding.

Location / Facility: From: To: North Creek 220th St SE SR 524 County: Completion Year: Type: Snohomish County 2016 New Facility-Road Sponsor: BOTHELL MTP Status: Completed Project ID: 4169 Estimated Cost: $1,047,307 Title: North Creek Trail, Section 1 Stage 1 Description: The North Creek Trail - Section 1, Stage 1 project will construct a Class I non-motorized trail (missing trail segment) on NE 195th Street between North Creek and I-405/NE 195th Street interchange in Bothell.

Location / Facility: From: To: parallel to NE 195th I-405 ramp/ NE 195th Street North Creek (waterway) County: Completion Year: Type: King County 2011 New Facility-Road

Sponsor: BOTHELL MTP Status: Completed Project ID: 4170 Estimated Cost: $1,220,896 Title: North Creek Trail, Section 1, Stage 2 (Schnitzer)

Description: The North Creek Trail, Section 1, Stage 2 (Schnitzer) project will construct Class I non-motorized trail segments along the North Creek levy top north of NE 195th Street to North Creek Parkway North in Bothell.

Location / Facility: From: To: along the North Creek levy (still on East NE 195th (just north of) North Creek Parkway North side of waterway) County: Completion Year: Type: King County 2011 New Facility-Road Sponsor: BOTHELL MTP Status: Completed Project ID: 4171 Estimated Cost: $1,098,311 Title: North Creek Trail, Section 2, Stage 2 (Canyon Park Business Park) Description: The North Creek Trail - Section 2, Stage 2 (Canyon Park Business Park) project will construct a Class I non-motorized trail from 228th Street SE north approximately 0.8 miles to 220th Street SE.

Location / Facility: From: To: North Creek Trail ROW 228th Street SE 220th Street SE County: Completion Year: Type: Snohomish County 2011 New Facility-Road

Sponsor: BOTHELL MTP Status: Completed Project ID: 4272 Estimated Cost: $9,590,163 Title: SR 522 - West City Limits to NE 180th Street Stage 2A Improvements

Description: The west segment of the project (M.P. 8.62 to M.P. 8.85) includes construction of an exclusive BAT lane from 91st Ave NE to 1300 feet west of 96th Ave NE, retaining walls, landscaping, curbs/gutter/sidewalk, signal interconnect and access management.

Location / Facility: From: To: SR 522 91st Ave NE 1300 feet west of 96th Ave NE County: Completion Year: Type: King County 2015 New Facility-Road Sponsor: BOTHELL MTP Status: ROW Conditionally Ap Project ID: 5537 Estimated Cost: $11,870,491 Title: SR 522 - West City Limits to NE 180th Street Stage 2b Improvements Description: The east segment of the project (M.P. 9.20 to M.P. 9.61) includes installation of curbs/gutter/sidewalk, signal interconnect and access management.

Location / Facility: From: To: SR 522 750 feet east of 96th Avenue NE Hall Road County: Completion Year: Type: King County 2019 New Facility-Road

Sponsor: BOTHELL MTP Status: Completed Project ID: 4002 Estimated Cost: $28,415,298 Title: SR 522 West City Limits to NE 180th St. Stage 1 Improvements (at 96th Ave NE) - Wayne Curve. Description: This project includes curb, gutters and sidewalks installation on both sides of the roadway; upgrade storm water facilities; street lighting improvements; widen through lanes; realign 96th Avenue NE approach, increase intersection capacity by adding left turn lanes; enhance transit operation by adding Business Access Transit (BAT) lanes and queue jump lane at the 96th Avenue NE intersection, and enhance traffic safety through access management and median installation.

Location / Facility: From: To: SR 522 @ 96th Ave NE SR 522 @ 96th Ave NE 1300' west of 96th Ave NE County: Completion Year: Type: King County 2012 New Facility-Road Sponsor: BOTHELL MTP Status: Candidate Project ID: 4254 Estimated Cost: $46,934,926 Title: SR 522, Stage 3 Description: The proposed project will provide corridor continuity, improve traffic flow (capacity), provide continuous westbound and eastbound BAT (Business Access and Transit) lanes and provide a continuous ADA pedestrian facility.

Location / Facility: From: To: SR 522 83rd Ave NE 91st Ave NE County: Completion Year: Type: King County 2020 New Facility-Road

Sponsor: BOTHELL MTP Status: Unprogrammed Project ID: 5536 Estimated Cost: $6,212,069 Title: SR 527

Description: Widen to 4/5 lanes between 228th St. SE and I-405.

Location / Facility: From: To: SR 527 228th St. SE I-405 County: Completion Year: Type: Snohomish County 2030 New Facility-Road Sponsor: BOTHELL MTP Status: Candidate Project ID: 4056 Estimated Cost: $47,679,266 Title: Transit Center and Parking Garage (Bothell) Description: Construct a transit center/park-and-ride with up to 400 stalls in the vicinity of SR 527/Bothell Way NE and NE 185th Street in downtown Bothell.

Location / Facility: From: To: Vicinity of SR 527/Bothell Way NE and NE Bothell Way NE at NE 185th Street #N/A 185th Street County: Completion Year: Type: Snohomish County 2040 New Facility-Road Sponsor: BUCKLEY MTP Status: Candidate Project ID: 2809 Estimated Cost: $7,331,877 Title: Foothills Trail - White River Crossing Description: Shared use path

Location / Facility: From: To: Foothills Trail South side of the White River North side of the White River County: Completion Year: Type: Pierce County 2016 New Facility-Road

Sponsor: BUCKLEY MTP Status: Candidate Project ID: 4286 Estimated Cost: $2,618,044 Title: SR-165 Realignment, P2 Description: Phase 2 includes: realignment of SR-165 to form a T intersection with SR-410, signals at the SR-410/SR-165 intersection and at the SR- 165/Ryan/112th Street intersection, the addition of a right turn lane on the west leg of the SR-410/SR165 intersection, realignment of River Avenue north of Pearl Street, realignment of the Foothills Trail north of the intersection of SR-165/Ryan/112th Street. The road improvements include curb, gutter and sidewalk north of Ryan Rd and paved shoulders south of Ryan Road. The project includes street illumination and wetland mitigation.

Location / Facility: From: To: Intersection of SR-410, SR-165, Ryan Road, Intersection of SR-165,Ryan Rd,112th St Intersection SR-165, SR410 112th Street County: Completion Year: Type: Pierce County 2015 New Facility-Road Sponsor: BUCKLEY MTP Status: Completed Project ID: 1239 Estimated Cost: $3,978,142 Title: SR-410/SR-165/Ryan Rd/ 112th St E Realignment, Phase 1 Description: Phase 1 includes: realignment of Ryan and 112th to intersect with SR165, realignment of River Avenue and the Foothills Trail. Roads include curbs, gutters and sidewalks. Phase 1 includes a storm trunk line along Ryan, 112th, easements and Hinkleman.

Location / Facility: From: To: Intersection of SR-410, SR-165, Ryan Road, Intersection of SR-410, SR-165, Ryan Road, Intersection of SR-410, SR-165, Ryan Road, 112th Street 112th Street 112th Street County: Completion Year: Type: Pierce County 2012 New Facility-Road Sponsor: BURIEN MTP Status: Completed Project ID: 5449 Estimated Cost: $10,089,781 Title: 1st Avenue South, Phase 2 (SW 140th Street to SW 146th Street) Description: Reconstruct 1st Avenue South from SW 140th Street to SW 146th Street. Maintain two travel lanes in each direction and a center turn lane. Provide curb, gutter, sidewalks, planter strips, illumination, storm water facilities, traffic signals and interconnections, and driveway consolidation where feasible. Utility undergrounding will be completed by the respective utility companies.

Location / Facility: From: To: 1st Ave S SW 140th Street SW 146th Street County: Completion Year: Type: King County 2013 New Facility-Road

Sponsor: BURIEN MTP Status: Unprogrammed Project ID: 5450 Estimated Cost: $20,296,217 Title: 1st Avenue South, Phase 3 (SW 128th Street to SW 140th Street) Description: Reconstruct 1st Avenue South from SW 128th Street to SW 140th Street. Maintain two travel lanes in each direction and a center turn lane. Provide curb, gutter, sidewalks, planter strips, illumination, storm water facilities, traffic signals and interconnections, and driveway consolidation where feasible. Utility undergrounding will be completed by the respective utility companies.

Location / Facility: From: To: 1st Ave S SW 128th Street SW 140th Street County: Completion Year: Type: King County 2018 New Facility-Road Sponsor: BURIEN MTP Status: Unprogrammed Project ID: 5451 Estimated Cost: $922,555 Title: Ambaum Boulevard SW Corridor Study (SW 116th Street to SW 153rd Street) Description: Conduct study to determine current and projected requirements for Transit HOV/BAT capabilities, non-motorized upgrades for bicycle and pedestrian uses, center turn lane/left turn pocket additions and coordinated signalization enhancement for safety and volume improvement requirements. The study will identify locations of anticipated significant purchases of ROW and easements.

Location / Facility: From: To: Ambaum Boulevard SW 116th Street SW 153rd Street County: Completion Year: Type: King County 2030 New Facility-Road Sponsor: COMMUNITY TRANSIT MTP Status: Approved Project ID: 5466 Estimated Cost: $51,286,830 Title: Core or Swift BRT - SR 527 Downtown Bothell to SR 526/I-5 Description: Swift II Bus Rapid Transit will be Community Transit`s 2nd line of BRT, traveling between the Canyon Park Park Ride and Paine Field/Boeing. This 12 mile corridor will have 15 stations in each direction served by 60 ft articulated buses. Swift II BRT will meet a critical need for east-west transportation options in Snohomish County, connecting a Regional Growth Center (Canyon Park) with a Regional Manufacturing and Industrial Growth Center (Paine Field). This service will be all day bi-directional service operating at a 10 min frequency during peak hours.

Location / Facility: From: To: Swift Corridor Canyon Park Park Ride Seaway and 75th Street County: Completion Year: Type: Snohomish County 2019 Transit Service Expansion

Sponsor: COMMUNITY TRANSIT MTP Status: Unprogrammed Project ID: 5478 Estimated Cost: $0 Title: Core or BRT - 20th St US 2 to SR 9 Description: Service hours and buses. Core Service or Bus Rapid Transit (BRT) on 20th St from US 2 to SR 9. Requires speed & reliability improvements and accessible transit stops.

Location / Facility: From: To: 20th St US 2 SR 9 County: Completion Year: Type: Snohomish County 2040 New Facility-Road Sponsor: COMMUNITY TRANSIT MTP Status: Unprogrammed Project ID: 5476 Estimated Cost: $0 Title: Core or BRT - 228th St Edmonds Ferry, SR 104, 228th, 236th, 228th to SR 9 Description: Service hours and buses. Core Service or Bus Rapid Transit (BRT) on 228th St from Edmonds Ferry to SR 9. Requires speed & reliability improvements and accessible transit stops.

Location / Facility: From: To: 228th St Edmonds Ferry SR 9 County: Completion Year: Type: Snohomish County 2040 New Facility-Road

Sponsor: COMMUNITY TRANSIT MTP Status: Unprogrammed Project ID: 5480 Estimated Cost: $0 Title: Core or BRT - 35th Ave SE Bothell to Everett

Description: Service hours and buses. Core Service or Bus Rapid Transit (BRT) on 35th Ave SE from downtown Bothell to Everett. Requires speed & reliability improvements and accessible transit stops.

Location / Facility: From: To: 35 Ave SE Downtown Bothell Everett County: Completion Year: Type: Snohomish County 2040 New Facility-Road Sponsor: COMMUNITY TRANSIT MTP Status: Unprogrammed Project ID: 5482 Estimated Cost: $0 Title: Core or BRT - I-5 Smokey Point to King County Description: Service hours and buses. Core Service or Bus Rapid Transit (BRT) on I-5 from Smokey Point to King County. Requires speed & reliability improvements and accessible transit stops.

Location / Facility: From: To: I-5 Smokey Point King County County: Completion Year: Type: Snohomish County 2040 New Facility-Road

Sponsor: COMMUNITY TRANSIT MTP Status: Unprogrammed Project ID: 5333 Estimated Cost: $7,688,635 Title: Core or BRT - Mukilteo Speedway

Description: Service hours and buses. Core Service or Bus Rapid Transit (BRT) on Mukilteo Speedway (SR 525) from Mukilteo Ferry to I-405 (ramp just short of I-405). Requires speed & reliability improvements and accessible transit stops.

Location / Facility: From: To: Mukilteo Speedway (SR 525) Mukilteo Ferry I-405 County: Completion Year: Type: Snohomish County 2040 New Facility-Road Sponsor: COMMUNITY TRANSIT MTP Status: Unprogrammed Project ID: 5484 Estimated Cost: $0 Title: Core or BRT - SR 522 Monroe to Bothell Description: Service hours and buses. Core Service or Bus Rapid Transit (BRT) on SR 522 Monroe to Bothell. Requires speed & reliability improvements and accessible transit stops.

Location / Facility: From: To: SR 522 Monroe Bothell County: Completion Year: Type: Snohomish County 2040 New Facility-Road

Sponsor: COMMUNITY TRANSIT MTP Status: Unprogrammed Project ID: 5312 Estimated Cost: $4,379,234 Title: Core or BRT - SR 526 from SR 525 to I-5

Description: Service hours and buses. Core service or Swift Bus Rapid Transit on SR 526 from SR 525 to I-5. Requires speed & reliability improvements and accessible transit stops.

Location / Facility: From: To: SR 526 SR 525 I-5 County: Completion Year: Type: Snohomish County 2040 New Facility-Road Sponsor: COMMUNITY TRANSIT MTP Status: Unprogrammed Project ID: 5470 Estimated Cost: $0 Title: Core or BRT - SR 528 I-5 to SR-9 Description: Service hours and buses. Core Service or Bus Rapid Transit (BRT) on SR 528 from I-5 to SR 9. Requires speed & reliability improvements and accessible transit stops.

Location / Facility: From: To: SR 528 I-5 SR 9 County: Completion Year: Type: Snohomish County 2040 New Facility-Road

Sponsor: COMMUNITY TRANSIT MTP Status: Unprogrammed Project ID: 5468 Estimated Cost: $0 Title: Core or BRT - SR 531 I-5 to downtown Arlington

Description: Service hours and buses. Core Service or Bus Rapid Transit (BRT) on SR 531 from I-5 to downtown Arlington. Requires speed & reliability improvements and accessible transit stops.

Location / Facility: From: To: SR 531 I-5 Downtown Arlington County: Completion Year: Type: Snohomish County 2040 New Facility-Road Sponsor: COMMUNITY TRANSIT MTP Status: Unprogrammed Project ID: 5474 Estimated Cost: $0 Title: Core or BRT - SR 9 Bothell to Arlington Description: Service hours and buses. Core Service or Bus Rapid Transit (BRT) on SR 9 from Bothell to Arlington. Requires speed & reliability improvements and accessible transit stops.

Location / Facility: From: To: SR 9 Downtown Bothell Arlington County: Completion Year: Type: Snohomish County 2040 New Facility-Road

Sponsor: COMMUNITY TRANSIT MTP Status: Unprogrammed Project ID: 5472 Estimated Cost: $0 Title: Core or BRT - US 2 Everett to Monroe (via Ave D and 2nd St in Snohomish)

Description: Service hours and buses. Core Service or Bus Rapid Transit (BRT) on US 2 from Everett to Monroe (via Ave D and 2nd St in Snohomish). Requires speed & reliability improvements and accessible transit stops.

Location / Facility: From: To: US 2 Everett Monroe County: Completion Year: Type: Snohomish County 2040 New Facility-Road Sponsor: COMMUNITY TRANSIT MTP Status: Candidate Project ID: 5335 Estimated Cost: $3,548,503 Title: Core or Swift BRT - 164th St Description: Service hours and buses. Core Service or Swift Bus Rapid Transit (BRT) on 164th from SR 99 to SR 527. Requires speed & reliability improvements and accessible transit stops.

Location / Facility: From: To: 164th SR 99 SR 527 County: Completion Year: Type: Snohomish County 2030 New Facility-Road

Sponsor: COMMUNITY TRANSIT MTP Status: Candidate Project ID: 5334 Estimated Cost: $9,452,531 Title: Core or Swift BRT - Airport Rd to Cathcart Way (Everett)

Description: Service hours and buses. Core Service or Swift Bus Rapid Transit (BRT) on Airport Rd, 128th, 132nd, Cathcart Way from SR 526 to SR 9. Requires speed & reliability improvements and accessible transit stops.

Location / Facility: From: To: Airport Rd, 128th, 132nd, Cathcart way SR 526 SR 9 County: Completion Year: Type: Snohomish County 2030 New Facility-Road Sponsor: COMMUNITY TRANSIT MTP Status: Candidate Project ID: 5332 Estimated Cost: $11,718,285 Title: Core or Swift BRT - Smokey Point Corridor Description: Service hours and buses. Core Service or Swift Bus Rapid Transit (BRT) on N Broadway (Smokey Point corridor) from Everett Station up N Broadway, SR 529, State Ave, Smokey Pt to Arlington (SR 531). Requires speed & reliability improvements and accessible transit stops.

Location / Facility: From: To: Smokey Point corridor up N Broadway, SR Everett Station SR 531 529, State Ave, Smokey Pt County: Completion Year: Type: Snohomish County 2030 New Facility-Road

Sponsor: COMMUNITY TRANSIT MTP Status: Candidate Project ID: 5331 Estimated Cost: $5,832,454 Title: Core or Swift BRT - SR 524 (196th) Description: Service hours and buses. Core service or Swift Bus Rapid Transit on SR 524 (196th, Filbert) from ferry to SR 527. Requires speed & reliability improvements and accessible transit stops.

Location / Facility: From: To: SR 524 (196th St and Filbert) Edmonds Ferry SR 527 County: Completion Year: Type: Snohomish County 2030 New Facility-Road Sponsor: COMMUNITY TRANSIT MTP Status: Unprogrammed Project ID: 3654 Estimated Cost: $7,753,460 Title: North Snohomish Co. Park & Ride Description: Create a new Park and Ride facility with approximately 350 stalls, bus bays and layover space, DART transfer space, platform with customer shelters, lighting, bike lockers & racks, information kiosks, driversÆ restroom/utility building, pedestrian walkways, landscaping, safety & security features, and on-site surface water detention & treatment facilities. The exact location is to be determined.

Location / Facility: From: To: Arlington/Smokey Point Area, Vicinity I-5 172nd in Smokey Pt County: Completion Year: Type: Snohomish County 2030 New Facility-Road

Sponsor: COVINGTON MTP Status: Candidate Project ID: 4288 Estimated Cost: $17,896,151 Title: SR 516 – Jenkins Creek to 185th Place SE Description: This project is to widen and reconstruct a portion of SR 516 (SE 272nd St) between Jenkins Creek and 185th Place SE. This project will include the crossing of Jenkins Creek with a new structure for the stream, widening the street from 2-lanes to 5-lanes including curb and gutter, 8’ sidewalks, access control features, landscaping and provisions for u-turns.

Location / Facility: From: To: SR 516 Jenkins Creek 185th Place SE County: Completion Year: Type: King County 2015 New Facility-Road Sponsor: DES MOINES MTP Status: Candidate Project ID: 4299 Estimated Cost: $1,731,106 Title: Barnes Creek Trail Description: Conduct prelimary design to provide a multipurpose non montorized trail connection to the regional Des Moines Creek Trail. Design will be developed in phases, from south to north, and will be used to assist in environmental assessement and identification of Right of Way requirements for the future trail as provided in the City of Des Moines Comprehensive Plan.

Location / Facility: From: To: Unused SR 509 Right of Way Des Moines Creek Trail Kent Des Moines Road County: Completion Year: Type: King County 2017 New Facility-Road

Sponsor: DES MOINES MTP Status: Approved Project ID: 4459 Estimated Cost: $11,330,587 Title: Connecting 28th/24th Avenue South (S 208th Street to S 216th Street) Description: The project will complete a five lane principal arterial corridor on 24th Avenue South between S. 216th Street and S. 208th Street. The improvements include bicycle lanes, curb, gutter, sidewalks, storm drainage collection and treatment facilities, street lighting, coordination of signal improvements at S. 216th Street, channelization, landscaping, utilities, and undergrounding of aerial utilities.

Location / Facility: From: To: 24th Avenue South S 208th Street S 216th Street County: Completion Year: Type: 2014 New Facility-Road Sponsor: DES MOINES MTP Status: Candidate Project ID: 4297 Estimated Cost: $10,408,022 Title: S. 216th Street Segment 1A Description: Utility coordination, finalize PS&E, acquire right of way and construct improvements as a Complete Street including widening of two additional lanes, a turn lane, transit stop improvements, bicycle lanes, curbs, gutters, sidewalks, stormwater retention and treatment, planter strips, sustainable street and pedestrian lights, utility undergrounding and signal modifications.

Location / Facility: From: To: South 216th Street 29th Avenue South 24th Avenue South County: Completion Year: Type: King County 2016 New Facility-Road

Sponsor: DUPONT MTP Status: Unprogrammed Project ID: 296 Estimated Cost: $31,013,839 Title: DuPont-Steilacoom Rd Description: Scope of the project has not been fully defined. Widening Improvements to DuPont-Steilacoom Rd are anticipated to be necessary to accommodate expected growth in the City of DuPont and increased traffic flows from nearby areas, such as JBLM. The existing road is two lanes with left turn pockets onto the I-5 Exit 119 Interchange (which has been identified in various corridor studies for recommended improvements.)

Location / Facility: From: To: DuPont-Steilacoom Rd [Not submitted] County: Completion Year: Type: Pierce County 2030 New Facility-Road Sponsor: EDGEWOOD MTP Status: Completed Project ID: 2890 Estimated Cost: $1,758,809 Title: Interurban Trail & Trailhead Construction Project (114th St, E to 900ft S of Military Rd) Description: Edgewood's segment of the Interurban Trail is a "missing link" in the Interurban/Green River Trail system and will eventually provide connection between Milton and Pacific, providing the only non-motorized route on and off "the hill".

Location / Facility: From: To: Interurban Trail 114th St. E 900ft south of military road County: Completion Year: Type: Pierce County 2012 New Facility-Road

Sponsor: EDGEWOOD MTP Status: Candidate Project ID: 4285 Estimated Cost: $16,097,002 Title: Interurban Trail Construction Project (114th Ave E to Edgewood/Pacific CL) Description: Edgewood's final segment of the Interurban Trail is a "missing link" in the Interurban/Green River Trail system and will eventually provide connection between Milton and Pacific, providing the only non-motorized route on and off "the hill". The project limits for the trail will extend from 114th St. E to Edgewood/ Pacific City Limits which will provide access to pedestrians and bicyclists, the trail improvements is approximately 1mile of a multi-use non-motorized path with shoulders, with viewing areas, interpretive display and seating.

Location / Facility: From: To: Interurban Trail Edgewood/ Pacific City Limits 114th St. E County: Completion Year: Type: Pierce County 2018 New Facility-Road Sponsor: EDMONDS MTP Status: Unprogrammed Project ID: 2483 Estimated Cost: $124,055,356 Title: Edmonds Terminal Relocation/Expansion Phase I Description: Bus/Rail connection, vehicle holding lanes, toll-booth, parking, ferry pier, slip and terminal relocation

Location / Facility: From: To: Edmonds Terminal Relocation/Expansion [Not submitted] Phase I County: Completion Year: Type: Snohomish County 2040 New Facility-Road

Sponsor: EDMONDS MTP Status: Unprogrammed Project ID: 3415 Estimated Cost: $103,896,361 Title: Edmonds Terminal Relocation/Expansion Phase II

Description: Phase II or relocation; people mover. See 4072 for the parking structure and Sounder Station.

Location / Facility: From: To: Edmonds Terminal Relocation/Expansion [Not submitted] Phase II County: Completion Year: Type: Snohomish County 2040 New Facility-Road Sponsor: EDMONDS MTP Status: Completed Project ID: 2812 Estimated Cost: $1,896,579 Title: Interurban Trail Description: The project will complete the missing link of the Interurban Trail between King and Snohomish counties. The project will include two 5- foot bike lanes along 76th Ave W. between SR 104 and 228th St SW. These bike lanes will then extend east on 228th St SW to the Interurban Trail. In addition, the project will include 1.37 miles of safety improvements along 74th Ave W., of which 2500 feet will be a 12’ paved and grade-separated path. The project will also feature the Lake Ballinger Station located at the intersection of 76th Avenue and McAleer Way.

Location / Facility: From: To: Interurban Trail 228th St SR 104 (Snohomish/King county line) County: Completion Year: Type: Snohomish County 2012 New Facility-Road Sponsor: ENUMCLAW MTP Status: Candidate Project ID: 361 Estimated Cost: $1,944,706 Title: SR 410 Channelization: Mtn. Villa Dr. to Watson St. N. Description: This project will provide for channelization, roadway, and pedestrian facility improvements along an existing section of the State Route 410 corridor within the City of Enumclaw. The project will modify and optimize the existing 65-foot wide, variable (2-to-4) lane channelization to a proposed 5-lane configuration; one-through lane and one general purpose (through/right turning) lane for each direction with medians, continuous two-way left turn lanes, or left turn pockets as approved by WSDOT. The project will add or upgrade curb, gutters, sidewalks, driveways, storm drainage, illumination, and curb ramps along the SR 410 corridor between mileposts 24.34 to 24.81.

Location / Facility: From: To: SR 410 `Roosevelt Avenue` Mtn. Villa Dr. (Monroe Ave) Watson St. N. County: Completion Year: Type: King County 2017 New Facility-Road

Sponsor: ENUMCLAW MTP Status: Unprogrammed Project ID: 362 Estimated Cost: $730,221 Title: SR 410 Description: Widen to 3 lanes, curb, gutter, sidewalk, Widening Project 2

Location / Facility: From: To: SR 410 Farman St E city lim County: Completion Year: Type: King County 2010 New Facility-Road Sponsor: ENUMCLAW MTP Status: Unprogrammed Project ID: 4470 Estimated Cost: $6,317,845 Title: SR 410 Description: Widen to 3 lanes, curb, gutter, sidewalk 244th to Mt Villa/Monroe Ave. Widen to 2/5 lanes Watson to Farman.

Location / Facility: From: To: SR 410 244th Ave SE to Mtn Villa Rd Watson St N to Farman St County: Completion Year: Type: King County 2020 New Facility-Road Sponsor: EVERETT MTP Status: Approved Project ID: 792 Estimated Cost: $69,597,117 Title: 112th St - Beverly Park Rd Corridor Description: Widen from 2 or 3 lanes to 5 lanes with sidewalks and bike lanes on both sides in 6 phases: 1) SR 99 to 3rd Ave SE 2) SR 99 to Airport Rd 3) Airport Rd to SR 525 4) 3rd Ave SE to I-5 5) I-5 to Silver Lake Road (No HOV ramps or P&R lot as part of this project) and 6) Silver Lake Road to SR 527.

Location / Facility: From: To: 112th St - Beverly Park Rd Corridor SR 527 SR 525 County: Completion Year: Type: Snohomish County 2013 New Facility-Road

Sponsor: EVERETT MTP Status: Unprogrammed Project ID: 5517 Estimated Cost: $42,024,510 Title: Broadway Corridor Improvements Description: Widen to 5 lanes with bike lanes, sidewalks, new bridge. Transit signal priority.

Location / Facility: From: To: Broadway Ave SR 526 37th St. County: Completion Year: Type: Snohomish County 2020 New Facility-Road Sponsor: EVERETT MTP Status: Unprogrammed Project ID: 4005 Estimated Cost: $38,813,777 Title: Everett Arterial Access Improvements Description: Arterial access improvements to US 2 and I-5 in Everett

Location / Facility: From: To: Vicinity of Walnut and Chestnut on various Everett Avenue Pacific streets County: Completion Year: Type: Snohomish County 2018 New Facility-Road

Sponsor: EVERETT MTP Status: Completed Project ID: 547 Estimated Cost: $70,935,523 Title: I-5 @ 41st Street Interchange Access Improvements

Description: 41st St Interchange improvement, improvement of arterial approaches and connections

Location / Facility: From: To: 41st Street Colby 3rd Ave County: Completion Year: Type: Snohomish County 2009 New Facility-Road

Sponsor: EVERETT MTP Status: Completed Project ID: 2834 Estimated Cost: $2,887,388 Title: Interurban Trail Description: Shared use bike path

Location / Facility: From: To: Interurban Trail Northern terminus of existing trail at Beverly 41st St Blvd County: Completion Year: Type: Snohomish County 2010 New Facility-Road Sponsor: EVERETT MTP Status: Completed Project ID: 1885 Estimated Cost: $85,288 Title: Riverfront Walkway Description: Complete Phase I of Riverfront Walkway non-motorized improvements and construct overcrossing of BNRR.

Location / Facility: From: To: Riverfront Walkway Lenora Street Pacific Avenue County: Completion Year: Type: Snohomish County 2011 New Facility-Road

Sponsor: EVERETT MTP Status: Candidate Project ID: 2680 Estimated Cost: $1,997,291 Title: Riverfront/Interurban Connector Description: Shared use bike path Not in local plans

Location / Facility: From: To: Riverfront/Interurban Connector Everett City limits Interurban Trail at 84th St County: Completion Year: Type: Snohomish County 2018 New Facility-Road Sponsor: EVERETT MTP Status: Candidate Project ID: 4467 Estimated Cost: $53,545,110 Title: SR 526 Hardeson Road Half Interchange Description: This proposed project would improve access to the Paine Field Manufacturing and Industrial Center, a key commercial, aerospace, and industrial area in southwest Everett. Improving access and travel time to this area will benefit the local businesses and regional businesses who are vendors or customers of businesses in SW Everett. Businesses in this area work in local, regional and international markets. The proposed project will construct access ramps on SR 526 at Hardeson Road to improve traffic flow on SR 526 and local streets within the SW Everett industrial area. Access will be provided for SR 526 traffic to/from the east. The westbound off ramp will access 80th Street SW instead of Hardeson Road due to the location of the Federal Post Office Facility.

Location / Facility: From: To: SR 526 Milepost 2.60 Milepost 3.00 County: Completion Year: Type: Snohomish County 2020 New Facility-Road

Sponsor: EVERETT MTP Status: Completed Project ID: 1879 Estimated Cost: $803,044 Title: SR 99/ Evergreen Way Description: Widen Evergreen Way from 5 to 7 lanes, with curb, gutters and sidewalks and drainage improvements.

Location / Facility: From: To: SR 99/ Evergreen Way 115th Street Airport Road County: Completion Year: Type: Snohomish County 2012 New Facility-Road Sponsor: EVERETT MTP Status: Unprogrammed Project ID: 621 Estimated Cost: $1,606,087 Title: SR 99/ Evergreen Way Transit HOV Treatments Description: Construct BAT lanes on Evergreen Way / Highway 99 from 115th Street SW to 46th Street.

Location / Facility: From: To: Evergreen Way Transit HOV Treatments 115th St 46th Street County: Completion Year: Type: Snohomish County 2019 New Facility-Road

Sponsor: EVERETT TRANSIT MTP Status: Candidate Project ID: 4007 Estimated Cost: $29,444,934 Title: Everett Station Parking Structure Description: Everett Transit Project that provides structured parking for up to 900 vehicles at Everett Station. Providing additional parking on the East side of Rail tracks and close to the bus platforms.

Location / Facility: From: To: Smith Street 33rd Street 35th Street County: Completion Year: Type: Snohomish County 2020 New Facility-Road Sponsor: FEDERAL WAY MTP Status: Unprogrammed Project ID: 2103 Estimated Cost: $3,094,918 Title: 21st Ave SW Description: Major Widening (5 lanes). Provides sidewalks; Bikes provided for on parallel route per Comp Plan

Location / Facility: From: To: 21st Ave SW SW 344th St SW 356th St County: Completion Year: Type: King County 2030 New Facility-Road

Sponsor: FEDERAL WAY MTP Status: Candidate Project ID: 3351 Estimated Cost: $2,474,904 Title: BPA Trail Phase IV Description: Class 1 bike trail

Location / Facility: From: To: BPA Trail 51st Ave S 32nd Av S County: Completion Year: Type: King County 2020 New Facility-Road

Sponsor: FEDERAL WAY MTP Status: Unprogrammed Project ID: 3659 Estimated Cost: $9,159,667 Title: City Center Access Phase 3C--32nd Ave S. Description: Extend and widen 32nd Ave S to 3 lane collector from Military Rd S to S 320th St and 3 intersection signal improvements at Military Rd S, S 312th St and S 320th S. The new facility to be constructed with bike lanes and sidewalks

Location / Facility: From: To: 32nd Ave S Military Rd S S 320th St County: Completion Year: Type: King County 2030 New Facility-Road Sponsor: FEDERAL WAY MTP Status: Candidate Project ID: 3660 Estimated Cost: $120,615,838 Title: City Center Access Phase 4A: S 320th St @ I-5 I/C HOV lanes Description: Add two HOV lanes and widen existing bridge structure to the south with HOV lanes on S 320th St from 25th Ave S to 32nd Ave S, retrofit to current standards existing HAL loop ramp, modify existing ramps, add CD lane.

Location / Facility: From: To: S 320th St @ I-5 I/C S 320th St @ I-5 I/C County: Completion Year: Type: King County 2025 New Facility-Road

Sponsor: FEDERAL WAY MTP Status: Candidate Project ID: 3350 Estimated Cost: $1,953,872 Title: Federal Way Trail to Transit Center

Description: Class 1 bike trail

Location / Facility: From: To: Trail to Transit Center 28th Ave S S 288th St County: Completion Year: Type: King County 2030 New Facility-Road

Sponsor: FEDERAL WAY MTP Status: Candidate Project ID: 2019 Estimated Cost: $10,961,167 Title: S 348th St Description: HOV - Widen to a 6 lane cross section, 2 GP, 1 HOV each direction.

Location / Facility: From: To: S 348th St 1st Ave S 9th Ave S County: Completion Year: Type: King County 2030 New Facility-Road Sponsor: FEDERAL WAY MTP Status: Candidate Project ID: 2023 Estimated Cost: $7,710,214 Title: S 356th St Description: Major Widening to 5 lanes. Provides sidewalks and bike lanes; improves freight movement; fixes bottlenecks at SR 161/S 356 St

Location / Facility: From: To: S 356th St SR 99 SR 161 County: Completion Year: Type: King County 2015 New Facility-Road

Sponsor: FEDERAL WAY MTP Status: Candidate Project ID: 2863 Estimated Cost: $575,307 Title: S Park-and-Ride Trail Description: Shared use bike path

Location / Facility: From: To: S Park-and-Ride Trail S 348th St S 352nd St County: Completion Year: Type: King County 2020 New Facility-Road

Sponsor: FEDERAL WAY MTP Status: Approved Project ID: 2061 Estimated Cost: $19,214,281 Title: SR 99 Description: Add HOV lanes, sidewalks, street lighting, raised medians, access management, construct new traffic signal at S 344th Street, add southbound left-turn lane at SR 18.

Location / Facility: From: To: SR 99 S 359th St S 340th St County: Completion Year: Type: King County 2017 New Facility-Road Sponsor: FEDERAL WAY MTP Status: Completed Project ID: 1200 Estimated Cost: $25,455,371 Title: SR 99 Phase IV Description: CONSTRUCT HOV LANES

Location / Facility: From: To: SR 99 S 312TH ST SR 509 (S 297th vicinity) County: Completion Year: Type: King County 2012 New Facility-Road

Sponsor: FEDERAL WAY MTP Status: Candidate Project ID: 3352 Estimated Cost: $1,953,872 Title: Steel Lake Trail Description: Class 1 Bike path

Location / Facility: From: To: Steel Lake Trail 28th Ave S S 290th Pl County: Completion Year: Type: King County 2030 New Facility-Road Sponsor: FIFE MTP Status: Candidate Project ID: 2897 Estimated Cost: $2,550,888 Title: Puyallup Riverfront Trail Description: Shared use bike path

Location / Facility: From: To: Puyallup Riverfront Trail Fife/Tacoma city limits Fife/Pierce Co limits County: Completion Year: Type: Pierce County 2025 New Facility-Road

Sponsor: FIFE MTP Status: Completed Project ID: 122 Estimated Cost: $17,265,439 Title: Valley Ave E Description: Widen and reconstruct existing two-lane roadway to major arterial standards (to four lanes), including non-motorized plan elements.

Location / Facility: From: To: Valley Ave E Freeman Rd E 70th Ave E County: Completion Year: Type: Pierce County 2008 New Facility-Road Sponsor: GIG HARBOR MTP Status: Candidate Project ID: 5520 Estimated Cost: $3,747,504 Title: Cushman Trail (phase 3 and 4) Description: Shared Use path

Location / Facility: From: To: new 96th Street NW Borgen Boulevard NW County: Completion Year: Type: Pierce County 2015 New Facility-Road

Sponsor: GIG HARBOR MTP Status: Candidate Project ID: 5504 Estimated Cost: $3,551,912 Title: Cushman Trail (Phase 4) Description: Shared use path

Location / Facility: From: To: Cushman Trail Borgen Blvd NW Purdy County: Completion Year: Type: Pierce County 2040 New Facility-Road Sponsor: ISSAQUAH MTP Status: Unprogrammed Project ID: 4113 Estimated Cost: $7,134,529 Title: 12th Ave NW/SR900/NW Sammamish Rd Widening Description: Widen 12th Avenue NW at SR900/NW Sammamish Road to provide for an additional westbound left-turn lane that will provide dual left-turn lane capacity. In addition, add a northbound right turn lane approaching 12th Ave NW. Right of way will be required and the cost and amount necessary is undertermined at this time.

Location / Facility: From: To: SR-900 and 12th Ave NW SR-900 Lake Drive County: Completion Year: Type: King County 2015 New Facility-Road

Sponsor: ISSAQUAH MTP Status: Approved Project ID: 265 Estimated Cost: $9,657,716 Title: E Lake Sammamish Pkwy Description: Design and roadway widening construction to provide for an additional south bound lane widening, constructing curb, gutter, bike lanes, street lights, sidewalks, landscaping and drainage system.

Location / Facility: From: To: E. Lake Sammamish Pkwy SE 56th St Issaquah-Fall City Rd County: Completion Year: Type: King County 2016 New Facility-Road Sponsor: ISSAQUAH MTP Status: Completed Project ID: 2883 Estimated Cost: $1,856,951 Title: I-90 High Point Trail Description: Shared use bike path

Location / Facility: From: To: I-90 Trail Planned E Lake Sammamish Trial Easterly End of 1st Ave NE County: Completion Year: Type: King County 2007 New Facility-Road

Sponsor: ISSAQUAH MTP Status: Unprogrammed Project ID: 4543 Estimated Cost: $74,590,158 Title: I-90 HOV Direct Access Ramp Description: Will improve speed and reliability of transit and other HOV modes and, therefore, increase ridership and decrease SOV travel. Van- and car-pools, jitneys and buses all can use this to complement and support HCT and to provide smaller transit and HOV usage to activity centers that are too small to support HCT but of which there are many in King County. This project was identified in the I-90 Corridor Study.

Location / Facility: From: To: I-90 @ SR 900 I-90 @ SR 900 County: Completion Year: Type: King County 2019 New Facility-Road Sponsor: ISSAQUAH MTP Status: Candidate Project ID: 2270 Estimated Cost: $12,080,205 Title: Newport Way Description: Widen Southbound direction to 2 lanes from Maple Street to south of Holly Street then transition to one lane each direction to Sunset Way. Northbound will continue to be one lane from Sunset Way to Maple St. Includes 3 roundabout intersections, bike lanes, sidewalk on one side, shared use facility with landscaping buffer on other side and stormwater system.

Location / Facility: From: To: Newport Way NW Maple St W. Sunset Way County: Completion Year: Type: King County 2016 New Facility-Road

Sponsor: ISSAQUAH MTP Status: Completed Project ID: 4112 Estimated Cost: $7,785,642 Title: SR 900 Pedestrian/Non-Motorized Improvement Description: New non-motorized multi-use trail along SR 900

Location / Facility: From: To: SR 900 I-90 Eastbound Ramps 12th Avenue NW/NW Sammamish Rd County: Completion Year: Type: King County 2012 New Facility-Road

Sponsor: KENMORE MTP Status: Unprogrammed Project ID: 2292 Estimated Cost: $3,690,221 Title: 68th Ave NE Description: Widen to add additional GP lanes - estimated additional NB lane

Location / Facility: From: To: 68th Ave NE NE 175th St NE 170th St. County: Completion Year: Type: King County 2018 New Facility-Road Sponsor: KENT MTP Status: Candidate Project ID: 1563 Estimated Cost: $37,295,079 Title: 212th Street Description: Grade Separated Railroad Crossing

Location / Facility: From: To: 212th St BNSF railroad crossing BNSF railroad crossing County: Completion Year: Type: King County 2019 New Facility-Road

Sponsor: KENT MTP Status: Completed Project ID: 3612 Estimated Cost: $9,168,082 Title: East Valley Highway (84th Ave. S.) Improvement Project Description: This project will widen East Valley Highway (84th Ave. S.) between SR 167 and S. 212th St by providing: Continuous SB GP lane from S. 216th St. to SR 167; Continuous NB GP lane from SR 167 to S. 212th St.; New deceleration lane SB at 216th St.; Complete sidewalk system on the E side of road with new curb, gutter, sidewalk where not currently existing; new sidewalk on W side of roadway from S. 212th to S. 224th where missing currently; overlay of entire roadway; upgrades to existing traffic signal system at S. 212th, S. 216th, S. 220th, and S. 224th streets as needed to accommodate widening.

Location / Facility: From: To: East Valley Highway (84th Ave. S.) SR 167 S. 212th St. County: Completion Year: Type: King County 2012 New Facility-Road Sponsor: KENT MTP Status: Approved Project ID: 3643 Estimated Cost: $29,911,563 Title: S 228th St Grade Separation Description: Grade separation of the roadway from the Union Pacific Railroad tracks. A bridge will be constructed at the track locations, and the road will run over the tracks and the adjacent Interurban Trail.

Location / Facility: From: To: S 228th St 500 ft west of the Union Pacific Railroad tracks 500 ft west of the Burlington Northern Santa- Fe railroad tracks County: Completion Year: Type: King County 2018 New Facility-Road

Sponsor: KENT MTP Status: Completed Project ID: 5538 Estimated Cost: $28,428,345 Title: S 228th St Grade Separation Description: Grade separation of the roadway from and BNSF railroad tracks. Bridges will be constructed at the track locations and the road will run under the tracks.

Location / Facility: From: To: new S 228th / BNSF railroad County: Completion Year: Type: King County 2009 New Facility-Road Sponsor: KENT MTP Status: Candidate Project ID: 2007 Estimated Cost: $9,471,766 Title: S 272nd St Description: Major Widening Phase I (including HOV, sidewalks and bike lanes)

Location / Facility: From: To: S 272nd St Military Road Pacific Highway South County: Completion Year: Type: King County 2019 New Facility-Road

Sponsor: KENT MTP Status: Candidate Project ID: 1564 Estimated Cost: $31,967,211 Title: South 212th Street Description: Grade Separated Railroad Crossing in Kent - Fast Phase II

Location / Facility: From: To: 212th St UPRR crossing UPRR crossing County: Completion Year: Type: King County 2020 New Facility-Road

Sponsor: KENT MTP Status: Unprogrammed Project ID: 2026 Estimated Cost: $23,679,415 Title: West Valley Highway Description: Major Widening including Complete Streets, three lanes each direction and center left-turn lane

Location / Facility: From: To: W Valley Hwy West Meeker Street Vicinity of South 218th Street County: Completion Year: Type: King County 2023 New Facility-Road Sponsor: KENT MTP Status: Candidate Project ID: 5289 Estimated Cost: $55,646,626 Title: Willis Street Grade Separations Description: Provides a critical, grade-separated link through the commercial/industrial center of Kent. Links the valley warehouse/industrial center to SR 167 and I-5.

Location / Facility: From: To: Willis St SR 167 Central Avenue South County: Completion Year: Type: King County 2021 New Facility-Road Sponsor: KING COUNTY DEPT. OF TRANSPORTATION (MARINE) MTP Status: Unprogrammed Project ID: 5375 Estimated Cost: $10,135,323 Title: Passenger Only Ferry: Kenmore-UW Description: Passenger Only Ferry - new route: Kenmore-UW This future King County Ferry District passenger-only ferry route is a 8.3 nautical mile route serving Tracy Owen Station Park in Kenmore to the University of Washington.

Location / Facility: From: To: POF route Kenmore UW County: Completion Year: Type: Multicounty 2020 New Facility-Road

Sponsor: KING COUNTY DEPT. OF TRANSPORTATION (MARINE) MTP Status: Unprogrammed Project ID: 5368 Estimated Cost: $494,406 Title: Passenger Only Ferry: Kirkland-UW

Description: Passenger Only Ferry - new route: Kirkland-UW This future King County Ferry District passenger-only ferry route is a 6.0 nautical mile route serving Marina Park in downtown Kirkland to the University of Washington.

Location / Facility: From: To: POF route Kirkland UW County: Completion Year: Type: Multicounty 2020 New Facility-Road Sponsor: KING COUNTY DEPT. OF TRANSPORTATION (MARINE) MTP Status: Unprogrammed Project ID: 5374 Estimated Cost: $10,135,323 Title: Passenger Only Ferry: Renton-Leschi Description: Passenger Only Ferry - new route: Renton-Leschi This future King County Ferry District passenger-only ferry route is a 7.1 nautical mile route serving the City of RentonÆs Gene Coulon Memorial Beach Park to Leschi Park on Lakeside Avenue South.

Location / Facility: From: To: POF route Renton Leschi Park in County: Completion Year: Type: Multicounty 2040 New Facility-Road

Sponsor: KING COUNTY DEPT. OF TRANSPORTATION (ROADS) MTP Status: Approved Project ID: 4471 Estimated Cost: $5,747,954 Title: East Lake Sammamish Trail, South Sammamish Segment A

Description: Develop a 1.3 mile-long paved regional trail segment within the City of Samammish. The trail will be constructed from SE 43rd Way to SE 33rd Street.

Location / Facility: From: To: County Owned ROW SE 43rd Way SE 33rd Street County: Completion Year: Type: King County New Facility-Road Sponsor: KING COUNTY/METRO MTP Status: Unprogrammed Project ID: 4551 Estimated Cost: $23,774,749 Title: 140th/132nd Avenue SE Description: Provide continuity in the north/south corridor by capacity, operational, and safety improvements. Will add additional lanes in the south portion of the corridor.

Location / Facility: From: To: 140/132nd Ave SE SE Petrovitsky Road SE 240th St County: Completion Year: Type: King County 2020 New Facility-Road

Sponsor: KING COUNTY/METRO MTP Status: Completed Project ID: 3418 Estimated Cost: $73,074,865 Title: Atlantic / Central Base Expansion

Description: Pre-design and property acquisition toward expanding the Phase One bus base capacity in the North Duwamish area of Seattle to cost effectively repair, service and dispatch buses for transit service planned by both King County METRO and Sound Transit for King County. This three phase will increase area capacity by approximately 385 buses. Phase One is estimated at approximately $58 million and will add capacity for approximately 100 buses to the existing bases.

Location / Facility: From: To: Atlantic / Central Base Expansion 1270 Sixth Ave S County: Completion Year: Type: King County 2011 New Facility-Road Sponsor: KING COUNTY/METRO MTP Status: Completed Project ID: 4026 Estimated Cost: $64,235,530 Title: Aurora Village Rapid Ride BRT (E line) Description: Bus Rapid Transit between Aurora Village and Downtown Seattle, providing more frequent service, transit signal priority, enhanced bus zones, queue jumps and rider information kiosks (in coordination with SWIFT).

Location / Facility: From: To: SR 99 (Aurora Avenue) Aurora Village Downtown Seattle County: Completion Year: Type: King County 2013 New Facility-Road

Sponsor: KING COUNTY/METRO MTP Status: Completed Project ID: 423 Estimated Cost: $0 Title: Avondale Rd

Description: Widen to 4 lanes, 2-way L turn, traffic signal, replace bridge, bike lane, curb, gutter, sidewalk

Location / Facility: From: To: 0 Avondale Pl NE NE 132nd St County: Completion Year: Type: King County 2000 New Facility-Road

Sponsor: KING COUNTY/METRO MTP Status: Unprogrammed Project ID: 4554 Estimated Cost: $51,992,906 Title: Avondale Road Description: Capacity and pedestrian improvements will aid traffic flow in the Avondale Corridor. (Avondale ITS Phases I and II have been funded.)

Location / Facility: From: To: Avondale Road City of Redmond Woodinville Duvall Road County: Completion Year: Type: King County 2020 New Facility-Road Sponsor: KING COUNTY/METRO MTP Status: Completed Project ID: 3601 Estimated Cost: $25,231,273 Title: Burien Transit Oriented Development/ Park and Ride Expansion Description: 117 additional stalls. This project will assist in meeting the City's goals by constructing a 550-stall transit-oriented development (TOD) Facility that will occupy 50% less land than the present 385-stall park and ride surface lot. $12.5m contribution

Location / Facility: From: To: Burien P & R Burien P & R County: Completion Year: Type: King County 2011 New Facility-Road

Sponsor: KING COUNTY/METRO MTP Status: Candidate Project ID: 4029 Estimated Cost: $23,205,827 Title: Cedar River to Sammamish Trail

Description: Acquisition, design, and construction of paved off-road multi-purpose facility linking the with East Lake Sammamish Trail

Location / Facility: From: To: Off-road Cedar River Trail (Renton) East Lake Sammamish Trail (Issaquah) County: Completion Year: Type: King County 2018 New Facility-Road Sponsor: KING COUNTY/METRO MTP Status: Unprogrammed Project ID: 4596 Estimated Cost: $49,726,772 Title: Cedar River Trail - Landsburg to Cedar Falls Description: Design and construct paved regional trail from southern terminus of Cedar River Trail at Landsburg to southern terminus of Snoqualmie Valley Road at Rattlesnake Lake. Change of current land use would be required for development.

Location / Facility: From: To: Abandoned railway alignment. Existing terminus of Cedar River Trail at Rattlesnake Lake at junction of Snoqualmie Landsburg Road SE. Valley Trail and John Wayne Trail. County: Completion Year: Type: King County 2040 New Facility-Road

Sponsor: KING COUNTY/METRO MTP Status: Unprogrammed Project ID: 2672 Estimated Cost: $1,780,194 Title: Chief Sealth Trail Extension Description: Shared use bike path. Not in local plans Continuation of Seattle's Chief Sealth Trail from south Seattle CL through Unincorporated King County to Renton CL

Location / Facility: From: To: Chief Sealth Trail Extension Southern terminus of planned Chief Sealth Renton City Limits Trail County: Completion Year: Type: King County 2030 New Facility-Road Sponsor: KING COUNTY/METRO MTP Status: Completed Project ID: 4630 Estimated Cost: $2,670,334 Title: Des Moines Creek Trail Description: Lake to Sound Trail corridor - complete paving of Des Moines Creek Trail as part of the Lake to Sound corridor

Location / Facility: From: To: 0 Near 13th Ave S at treatment plant Western terminus of Des Moines Creek Trail County: Completion Year: Type: King County 2011 New Facility-Road

Sponsor: KING COUNTY/METRO MTP Status: Completed Project ID: 4038 Estimated Cost: $10,549,821 Title: East Lake Sammamish Trail - Issaquah Segment Description: The project will provide a 12-foot-wide paved facility with 2-foot-wide soft surface shoulders. The project will include related drainage improvements, site amenities and sensitive areas mitigation.

Location / Facility: From: To: County Owned ROW Gilman Blvd Vicinity of SE 43rd Way County: Completion Year: Type: King County 2014 New Facility-Road Sponsor: KING COUNTY/METRO MTP Status: Candidate Project ID: 4598 Estimated Cost: $4,143,898 Title: East Lake Sammamish Trail - North Description: Design and construct paved regional trail link between northern terminus of the East Lake Sammamish Trail at SR520 and Bear Creek Trail at Bear Creek Parkway in Redmond; incorporates grade separation between trail and SR520.

Location / Facility: From: To: Abandoned railway alignment, dedicated East Lake Sammamish Trail at SR 520. Bear Creek Trail near SR 520. trail right-of-way. County: Completion Year: Type: King County 2015 New Facility-Road

Sponsor: KING COUNTY/METRO MTP Status: Completed Project ID: 4290 Estimated Cost: $4,448,685 Title: East Lake Sammamish Trail – Redmond Segment Description: The project will provide a 12-foot-wide paved facility with 2-foot-wide soft surface shoulders. The project will include related drainage improvements, site amenities and sensitive areas mitigation. The project includes parking at NE 70th St.

Location / Facility: From: To: 0 187th Ave NE Vicinity of SR 520 County: Completion Year: Type: King County 2011 New Facility-Road Sponsor: KING COUNTY/METRO MTP Status: Candidate Project ID: 4289 Estimated Cost: $24,206,506 Title: East Lake Sammamish Trail - Sammamish Segment Description: The project will provide a 12-foot-wide paved facility with 2-foot-wide soft surface shoulders. The project will include related drainage improvements, site amenities and sensitive areas mitigation. The project includes parking near Inglewood Hill Rd and SE 33rd St.

Location / Facility: From: To: County Owned ROW SE 33rd Street 187th Ave NE County: Completion Year: Type: King County 2019 New Facility-Road

Sponsor: KING COUNTY/METRO MTP Status: Candidate Project ID: 4599 Estimated Cost: $10,774,134 Title: East Plateau Trail - Klahanie to Soaring Eagle Park

Description: Design and construct paved regional trail from existing East Plateau Trail at Issaquah-Beaver Lake Road at SE Duthie Hill Road to Soaring Eagle Park via Trossachs community in Sammamish.

Location / Facility: From: To: Dedicated trail right-of-way, Duthie Hill Existing East Plateau Trail at SE Duthie Hill Soaring Eagle Park n/o SE 9th Way. Road, Trossachs Boulevard SE. Road at Issaquah-Beaver Lake Road. County: Completion Year: Type: King County 2018 New Facility-Road Sponsor: KING COUNTY/METRO MTP Status: Unprogrammed Project ID: 4600 Estimated Cost: $22,377,047 Title: East Plateau Trails - Issaquah Highlands to Duthie Hill Park Description: Develop regional trail between Duthie Hill Park at Duthie Hill Road and Issaquah-Preston Trail near High Point.

Location / Facility: From: To: Dedicated trail right-of-way. Existing Issaquah-Preston Trail e/o Sunset SE Issaquah-Fall City Road at Duthie Hill Park. interchange. County: Completion Year: Type: King County 2040 New Facility-Road

Sponsor: KING COUNTY/METRO MTP Status: Candidate Project ID: 4011 Estimated Cost: $2,083,884 Title: Eastside ERC Trail, Woodinville Spur (NE 124th Street to Woodinville)

Description: Paved bike path to AASHTO standards Connecting Totem Lake to the Trail in Woodinville

Location / Facility: From: To: BNSF Corridor Woodinville rail junction@rail spur and SR 202 NE 124th Street County: Completion Year: Type: King County 2020 New Facility-Road

Sponsor: KING COUNTY/METRO MTP Status: Candidate Project ID: 4444 Estimated Cost: $11,392,608 Title: ERC Trail, Main Line, North Bellevue Description: Design, and construction of a paved and soft-surface regional trail

Location / Facility: From: To: Eastside Rail Corridor (BNSF) NE 8th Street, Bellevue 108th Avenue NE, Bellevue County: Completion Year: Type: King County 2020 New Facility-Road Sponsor: KING COUNTY/METRO MTP Status: Candidate Project ID: 4445 Estimated Cost: $20,021,663 Title: ERC Trail, Mainline, Woodinville Description: Design, and construction of a paved and soft-surface regional trail

Location / Facility: From: To: Eastside Rail Corridor (BNSF) 132nd Place NE, Kirkland Woodinville rail junction@rail spur and SR202 County: Completion Year: Type: King County 2020 New Facility-Road

Sponsor: KING COUNTY/METRO MTP Status: Candidate Project ID: 4040 Estimated Cost: $33,125,551 Title: ERC, Main Line South Description: Acquisition, design, and construction of a paved and soft-surface regional trail

Location / Facility: From: To: Eastside Rail Corridor (BNSF) Eastside Rail Corridor @ north end of Coulon Eastside Rail Corridor @ Interstate 90 in south Park in Renton Bellevue County: Completion Year: Type: King County 2020 New Facility-Road

Sponsor: KING COUNTY/METRO MTP Status: Candidate Project ID: 4443 Estimated Cost: $15,002,147 Title: ERC, Main Line, Central Bellevue Description: Design, and construction of a paved and soft-surface regional trail.

Location / Facility: From: To: Eastside Rail Corridor (BNSF) Eastside Rail Corridor @ Interstate 90 in south Eastside Rail Corridor @ NE 8th Street, Bellevue Bellevue County: Completion Year: Type: King County 2020 New Facility-Road Sponsor: KING COUNTY/METRO MTP Status: Candidate Project ID: 4601 Estimated Cost: $19,535,518 Title: Foothills (Enumclaw Plateau) Trail - Central Description: Design and construct new paved regional trail segment between Enumclaw and Nolte State Park along BNSF rail line near Veazie- Cumberland Road.

Location / Facility: From: To: Abandoned railway corridor. Chinook Avenue, Enumclaw. 304th Avenue SE; Nolte State Park. County: Completion Year: Type: King County 2020 New Facility-Road

Sponsor: KING COUNTY/METRO MTP Status: Unprogrammed Project ID: 4602 Estimated Cost: $17,877,959 Title: Foothills (Enumclaw Plateau) Trail - North

Description: Design and construct new paved regional trail segment between Nolte State Park along BNSF rail line near Cumberland-Kanaskat Road to southern terminus of the Landsburg-Kanaskat Trail in Kanaskat .

Location / Facility: From: To: Abandoned railway alignment, dedicated 304th Avenue SE; Nolte State Park; Foothills Cumberland-Kanaskat Road at the Green River; trail right-of-way. Trail - Central (RTNR ID FH-4). southern terminus of Landsburg-Kanaskat Trail (RTNR ID LK-1), Kanaskat. County: Completion Year: Type: King County 2022 New Facility-Road Sponsor: KING COUNTY/METRO MTP Status: Candidate Project ID: 4603 Estimated Cost: $4,617,486 Title: Foothills (Enumclaw Plateau) Trail - South Description: Develops 0.9-mile paved regional trail to continue Foothills Trail south of Enumclaw to White River.

Location / Facility: From: To: Railway corridor 252nd Avenue SE, Enumclaw Mud Mountain Road County: Completion Year: Type: King County 2016 New Facility-Road

Sponsor: KING COUNTY/METRO MTP Status: Unprogrammed Project ID: 4604 Estimated Cost: $7,103,825 Title: Foothills (Enumclaw Plateau) Trail - White River Bridge Description: Design and construct a pedestrian/regional trail bridge over the White River between Enumclaw and Pierce County to link Foothills Trail between King County and Pierce County.

Location / Facility: From: To: Railway corridor Terminus of Foothills Trail (RTNR ID FH-1) at Terminus of Foothills Trail at City of Buckley Mud Mountain Road County: Completion Year: Type: King County 2018 New Facility-Road Sponsor: KING COUNTY/METRO MTP Status: Candidate Project ID: 4605 Estimated Cost: $1,302,368 Title: Green River 2.2 (S. 259th St) Description: Design and construct new paved regional trail link along S. 259th Street between Interurban Trail and Green River Trail Phase 2.

Location / Facility: From: To: S. 259th Street Green River Trail at Interurban Trail at S. Green River Trail Phase 2 (RTNR ID GR-1) at S. 259th Street 259th Street County: Completion Year: Type: King County 2018 New Facility-Road

Sponsor: KING COUNTY/METRO MTP Status: Candidate Project ID: 4032 Estimated Cost: $1,183,971 Title: Green River Trail - North

Description: Continues Green River Trail north from current terminus at S. 102nd Street to Seattle CL. Acquisition, design, and construction of a paved regional trail

Location / Facility: From: To: Off-road North Terminus of Green River Trail at S. Seattle City boundary 102nd Street County: Completion Year: Type: King County 2015 New Facility-Road Sponsor: KING COUNTY/METRO MTP Status: Candidate Project ID: 4033 Estimated Cost: $1,070,725 Title: Green River Trail - Phase 2 Description: Construction of paved regional trail

Location / Facility: From: To: Off-road and on S. 259th St S. 259th Street (Kent) Near Central Avenue S. (Kent) County: Completion Year: Type: King County 2020 New Facility-Road

Sponsor: KING COUNTY/METRO MTP Status: Candidate Project ID: 4034 Estimated Cost: $11,247,722 Title: Green River Trail - Phase 3 Description: Design and construction of paved regional trail link between cities of Kent and Auburn.

Location / Facility: From: To: Off-road Green River Bridge (86th Avenue S. - Kent) Brannan Park (Auburn) County: Completion Year: Type: King County 2018 New Facility-Road

Sponsor: KING COUNTY/METRO MTP Status: Candidate Project ID: 4035 Estimated Cost: $19,535,518 Title: Green River Trail - Phase 4 Description: Acquisition, design, permitting, and construction of paved regional trail

Location / Facility: From: To: Off-road Brannan Park (Auburn) SR-18 County: Completion Year: Type: King County 2020 New Facility-Road Sponsor: KING COUNTY/METRO MTP Status: Candidate Project ID: 4036 Estimated Cost: $3,196,721 Title: Green River Trail Bridge Description: Construction of multi-purpose (non-vehicular) Bridge across Green River

Location / Facility: From: To: Off-road 86th Avenue S. (Kent) 86th Avenue S. (Unincorporated King County) County: Completion Year: Type: King County 2018 New Facility-Road

Sponsor: KING COUNTY/METRO MTP Status: Candidate Project ID: 4606 Estimated Cost: $33,624,770 Title: Green River Trail Phase 5 (Upper) Description: Develop paved regional trail along Green River from intersection of Auburn-Black Diamond Road at SE Green Valley Road to Green-to- Cedar Rivers Trail near Flaming Geyser State Park.

Location / Facility: From: To: Dedicated trail right-of-way along Green SR18. SE Green Valley Road near 227th Avenue SE at River and SE Green Valley Road. Flaming Geyser State Park. County: Completion Year: Type: King County 2025 New Facility-Road Sponsor: KING COUNTY/METRO MTP Status: Candidate Project ID: 4607 Estimated Cost: $21,548,268 Title: Green-to-Cedar Rivers Trail Description: Design and construct paved regional trail between existing terminus at Kent-Kangley Road in Maple Valley to Green River Trail at SE Green Valley Road.

Location / Facility: From: To: Dedicated trail right-of-way. Green-to Cedar River Trail at Kent-Kangley SE Green Valley Road near 227th Avenue SE. Road, Maple Valley. County: Completion Year: Type: King County 2018 New Facility-Road

Sponsor: KING COUNTY/METRO MTP Status: Candidate Project ID: 4128 Estimated Cost: $28,106,528 Title: Highline Community College Intermodal Transit Facility and Parking Garage Description: Construct a Transit Center with bus layover to facilitate a potential Bus Rapid Transit route on SR 99 in south King County. In addition, the project will construct a parking garage with up to 500 stalls that will provide commuter parking, vanpool and carpool stalls as well as joint use parking for Highline Community College students and staff.

Location / Facility: From: To: SR 99 South 240th Street@SR 99 South County: Completion Year: Type: King County 2020 New Facility-Road Sponsor: KING COUNTY/METRO MTP Status: Candidate Project ID: 4031 Estimated Cost: $9,945,354 Title: Interurban Trail (south) Extension Description: Construction of paved regional trail extension of the Interurban Trail

Location / Facility: From: To: Off-road facility Terminus of Interurban Trail in Pacific at 3rd Pierce County Boundary (Edgewood) Ave SW (Pacific) County: Completion Year: Type: King County 2018 New Facility-Road

Sponsor: KING COUNTY/METRO MTP Status: Unprogrammed Project ID: 4555 Estimated Cost: $43,728 Title: Issaquah Fall City / Duthie Hill Road

Description: Widen 4 lane arterial to 5 lanes with turn pockets, bicycle and pedestrain faciltities and ITS.

Location / Facility: From: To: Issaquah Fall City/Duthie Hill Road Issaquah Pine Lake Road SR 202 County: Completion Year: Type: King County 2020 New Facility-Road

Sponsor: KING COUNTY/METRO MTP Status: Unprogrammed Project ID: 4556 Estimated Cost: $123,623 Title: Issaquah Hobart Road Description: Operational, ITS and safety improvements to congested corridor used as an Urban Connector between the Maple Valley/SR-18 area and Issaquah Plateau.

Location / Facility: From: To: Issaquah-Hobart Road I-90 SR-18 County: Completion Year: Type: King County 2030 New Facility-Road Sponsor: KING COUNTY/METRO MTP Status: Completed Project ID: 4609 Estimated Cost: $2,879,915 Title: Issaquah-Preston Trail - High Point to Preston (WSDOT Lead) Description: Design and construct new regional trail along I-90 and Issaquah Creek between High Point Way interchange and Preston-Snoqualmie Trail near the Preston Park and Ride in Preston.

Location / Facility: From: To: Dedicated trail right-of-way, High Point High Point Way interchange on I-90 High Point Way approx. 07 mile from Preston- Way Snoqualmie Trail County: Completion Year: Type: King County 2010 New Facility-Road

Sponsor: KING COUNTY/METRO MTP Status: Candidate Project ID: 4027 Estimated Cost: $11,247,722 Title: Issaquah-Snoqualmie Corridor - Preston-Snoqualmie Trail Extension Description: Construction of paved trail, including new bridge facilities; easternmost segment provides a link between urban areas and cross-state trail system.

Location / Facility: From: To: Off-road Preston-Snoqualmie Trail terminus 1 mile east Junction of SR202 at Snoqualmie Parkway of Lake Alice Road County: Completion Year: Type: King County 2018 New Facility-Road Sponsor: KING COUNTY/METRO MTP Status: Unprogrammed Project ID: 2665 Estimated Cost: $22,081,853 Title: Kennydale P&R Description: 400 new stalls

Location / Facility: From: To: Kennydale P&R I-405 County: Completion Year: Type: King County 2030 New Facility-Road

Sponsor: KING COUNTY/METRO MTP Status: Candidate Project ID: 4030 Estimated Cost: $13,197,378 Title: Lake to Sound Trail 1 Description: Acquisition, design, and construction of paved regional trail or in-road track from Cedar River Trail to Black River Forest at Naches Ave S.

Location / Facility: From: To: On-road and off-road Cedar River Trail (Renton) Naches Ave S (Renton) County: Completion Year: Type: King County 2016 New Facility-Road

Sponsor: KING COUNTY/METRO MTP Status: Candidate Project ID: 4441 Estimated Cost: $4,703,681 Title: Lake to Sound Trail 2 (Segment A) Description: Acquisition, design, and construction of paved regional trail from Naches Ave S. through Black River Forest to Green River Trail.

Location / Facility: From: To: Off-road Naches Ave S (Renton) Green River Trail (Tukwila) County: Completion Year: Type: King County 2017 New Facility-Road Sponsor: KING COUNTY/METRO MTP Status: Candidate Project ID: 4628 Estimated Cost: $2,030,366 Title: Lake to Sound Trail 3 Description: Design and construction of a paved regional trail from Green River Trail in Tukwila to trail on S 154th Street in SeaTac

Location / Facility: From: To: Alignment along South Center Blvd and Green River Trail (Tukwila) S 154th Street (SeaTac) 154th Ave S County: Completion Year: Type: King County 2018 New Facility-Road

Sponsor: KING COUNTY/METRO MTP Status: Candidate Project ID: 4629 Estimated Cost: $7,636,431 Title: Lake to Sound Trail 4 (Segment B)

Description: Acquisition, design, and construction of paved regional trail along Des Moines Memorial Drive from S 156th Street in SeaTac to 8th Ave S in Burien

Location / Facility: From: To: SW 7th Street, Green R. Trail, Southcenter Cedar River Trail at I-405 Eastern terminus of Des Moines Creek Trail. Blvd, S. 154th Street, S. 156th Way, Des Moines Memorial Dr., Des Moines Creek Trail. County: Completion Year: Type: King County 2016 New Facility-Road Sponsor: KING COUNTY/METRO MTP Status: Candidate Project ID: 4442 Estimated Cost: $1,127,981 Title: Lake to Sound Trail 5 Description: Acquisition, design, and construction of paved regional trail along Des Moines Memorial Drive from S Normandy Road to 8th Ave S in Burien

Location / Facility: From: To: Des Moines Memorial Drive S Normandy Road (Burien) 8th Ave S (Burien) County: Completion Year: Type: King County 2018 New Facility-Road

Sponsor: KING COUNTY/METRO MTP Status: Candidate Project ID: 4627 Estimated Cost: $2,255,962 Title: Lake to Sound Trail Trail 6

Description: Acquisition, design, and construction of paved regional trail from 8th Ave S in SeaTac to Des Moines Creek Trail (S 200th Stree) in Des Moines.

Location / Facility: From: To: SW 7th Street, Green R. Trail, Southcenter 8th Ave S (Burien) Des Moines Creek Trail (S 200th Street) (Des Blvd, S. 154th Street, S. 156th Way, Des Moines) Moines Memorial Dr., Des Moines Creek Trail. County: Completion Year: Type: King County 2020 New Facility-Road Sponsor: KING COUNTY/METRO MTP Status: Candidate Project ID: 4611 Estimated Cost: $13,378,870 Title: Lake Youngs to Cedar River Trail (Soft-Surface) Description: Develop regional trail between Lake Youngs Trail near intersection of SE Lake Youngs Road at 184th Avenue SE to Cedar River Trail in Maple Valley near junction of Cedar River Trail at SR18.

Location / Facility: From: To: Pipeline corridor. Lake Youngs Trail near South Lake Youngs Junction of Cedar River Trail at Green-to-Cedar Road.. Rivers Trail, Maple Valley. County: Completion Year: Type: King County 2020 New Facility-Road

Sponsor: KING COUNTY/METRO MTP Status: Unprogrammed Project ID: 4612 Estimated Cost: $34,453,549 Title: Landsburg-Kanaskat Trail Description: Develop paved regional trail between terminus of existing Cedar River Trail at Landsburg to intersection of Kanaskat Kangley Road and Retreat Kanaskat Road in Kanaskat.

Location / Facility: From: To: Dedicated trail right-of-way, abandoned Eastern terminus of Cedar River Trail at Cumberland-Kanaskat Road at the Green River; railway alignment. Landsburg Road SE northern terminus of Foothills Trail (RTNR ID FH-5), Kanaskat. County: Completion Year: Type: King County 2020 New Facility-Road Sponsor: KING COUNTY/METRO MTP Status: Unprogrammed Project ID: 4613 Estimated Cost: $2,131,147 Title: Laughing Jacobs Creek Trail Segment Description: Design and construct new regional trail segment between East Lake Sammamish Trail on East Lake Sammamish Parkway SE in Issaquah and existing trail terminus w/o 229th Place SE in Sammamish.

Location / Facility: From: To: Abandoned railway alignment. East Lake Sammamish Trail (RTNR ID ELS-2) at Western terminus of East Plateau Trail near E. Lake Sammamish Parkway at SE 43rd Way. Providence Point Place SE. County: Completion Year: Type: King County 2018 New Facility-Road

Sponsor: KING COUNTY/METRO MTP Status: Candidate Project ID: 4447 Estimated Cost: $5,639,905 Title: Madison Street Corridor Description: Transit Priority and Speed improvements on Madison Street

Location / Facility: From: To: Madison Street Alaskan Way Madison Park County: Completion Year: Type: King County 2020 New Facility-Road Sponsor: KING COUNTY/METRO MTP Status: Unprogrammed Project ID: 4559 Estimated Cost: $25,552,849 Title: Military Rd S Description: Reconstruct the road to urban standards with facilities for bicyclists and pedestrians. In the north where Military Rd intersects with S 272 St, partner with the City of Federal Way to add travel lanes.

Location / Facility: From: To: Military Rd south King County line S 272 St County: Completion Year: Type: King County 2020 New Facility-Road

Sponsor: KING COUNTY/METRO MTP Status: Unprogrammed Project ID: 2891 Estimated Cost: $1,302,581 Title: Milton-Edgewood Interurban Trail

Description: Shared use bike path

Location / Facility: From: To: Milton-Edgewood Interurban Trail Milton city limits near Hylebos Ave Edgewood city limits County: Completion Year: Type: King County 2010 New Facility-Road

Sponsor: KING COUNTY/METRO MTP Status: Completed Project ID: 3364 Estimated Cost: $593,115 Title: Montlake Flyer Bike Station Description: Construct a bicycle commuter station

Location / Facility: From: To: Montlake Flyer Bike Station SR 520 County: Completion Year: Type: King County 2010 New Facility-Road Sponsor: KING COUNTY/METRO MTP Status: Unprogrammed Project ID: 447 Estimated Cost: $11,376,452 Title: NE 132nd/NE 128th St Description: Widen NE 128 St for right-turn lane and shoulder. Widen Avondale Rd and add right-turn lane. Modify signals at NE 132 St and NE 128 St. Widen NE 132 St from 3 to 4 lanes. Insall a new signal at Bear Creek Rd.

Location / Facility: From: To: NE 132nd/NE 128th St 184th Ave NE 196th Ave NE County: Completion Year: Type: King County 2020 New Facility-Road

Sponsor: KING COUNTY/METRO MTP Status: Unprogrammed Project ID: 4562 Estimated Cost: $122,852,757 Title: Novelty Hill Road

Description: Capacity, ITS and operational improvements will improve flow through this heavily used commuting corridor in the Bear Creek area between Duvall area and Redmond. Project results in additional lanes, operational, and safety improvements between the UPDs and Redmond.

Location / Facility: From: To: Novelty Hill Road; 196th Ave NE Union Hill Rd West Snoqualmie Road NE County: Completion Year: Type: King County 2020 New Facility-Road Sponsor: KING COUNTY/METRO MTP Status: Candidate Project ID: 4059 Estimated Cost: $64,086,379 Title: Parking Garage at South Kirkland Park-and-Ride Description: Construct parking garage for a 850 stalls upon completion.

Location / Facility: From: To: South Kirkland Park-and-Ride NE 38th St @ 108th Ave NE County: Completion Year: Type: King County 2027 New Facility-Road

Sponsor: KING COUNTY/METRO MTP Status: Unprogrammed Project ID: 4614 Estimated Cost: $8,287,795 Title: Puget Power (PSE) Trail - East Segment Description: Design and construct regional trail segment between Ferrel-McWhirter Park and Redmond Watershed Preserve and between Preserve and Novelty Hill Road at Redmond Ridge. Continues existing regional trail east.

Location / Facility: From: To: Power line corridor. Eastern terminus of existing trail at Ferrel- Novelty Hill Road near Redmond Ridge Drive. McWhirter Park near 196th Avenue NE. County: Completion Year: Type: King County 2018 New Facility-Road Sponsor: KING COUNTY/METRO MTP Status: Completed Project ID: 4025 Estimated Cost: $33,261,619 Title: Rapid Ride (BRT) - A line (K Co Metro) - Pacific Hwy S Description: Bus Rapid Transit between Federal Way and SeaTac, providing more frequent service, transit signal priorty, enhanced bus zones, queue jumps and rider information kiosks. Rapid Ride - Bus Rapid Transit (A line) along Pacific Highway S. Corridor from existing Link Light Rail station in Tukwila to the Federal Way Transit Center.

Location / Facility: From: To: SR 99 (Pacific Hwy S) Federal Way Transit Center Tukwila Light Rail Station County: Completion Year: Type: King County 2010 New Facility-Road

Sponsor: KING COUNTY/METRO MTP Status: Completed Project ID: 4022 Estimated Cost: $51,847,242 Title: Rapid Ride BRT: Ballard to Downtown (D line) Description: Bus Rapid Transit between Ballard and Downtown Seattle via lower Queen Anne, providing more frequent service, transit signal priority, enhanced bus zones, queue jumps and rider information kiosks. Routing alternatives on 15th Ave NW or 24th Ave NW and is Route 15 Rapid Ride or E line).

Location / Facility: From: To: via lower Queen Anne (exact alignment Ballard Downtown Seattle TBD) County: Completion Year: Type: King County 2012 New Facility-Road Sponsor: KING COUNTY/METRO MTP Status: Completed Project ID: 4024 Estimated Cost: $36,215,668 Title: Rapid Ride BRT: Redmond TC to Bellevue TC (B line) Description: Bus Rapid Transit between Bellevue and Redmond, providing more frequent service, transit signal priority, enhanced bus zones, queue jumps and rider information kiosks. From the Redmond Transit Center (NE 90th to 148th Ave NE) to Overlake Transit Center then (along 156th Ave NE and NE 8th ST) to the Bellevue Transit Center.

Location / Facility: From: To: NE 90th, 148th Ave NE, NE 40th, 156th Redmond Transit Center Bellevue Transit Center Ave NE, NE 8th County: Completion Year: Type: King County 2012 New Facility-Road

Sponsor: KING COUNTY/METRO MTP Status: Completed Project ID: 4023 Estimated Cost: $38,294,672 Title: Rapid Ride BRT: West Seattle to Downtown (C line) Description: Bus Rapid Transit between West Seattle and Downtown Seattle. Station, providing more frequent service, transit signal priority, enhanced bus zones, queue jumps and rider information kiosks. Westwood Village in West Seattle to Seattle CBD bia Fauntleroy and Alaska Junction. This is the Route 54 Rapid Ride or Bus Rapid Transit C line.

Location / Facility: From: To: Fauntleroy and Alaska junction West Seattle Downtown Seattle County: Completion Year: Type: King County 2012 New Facility-Road Sponsor: KING COUNTY/METRO MTP Status: Completed Project ID: 5526 Estimated Cost: $43,624,401 Title: RapidRide BRT: Burien to Renton (F line) Description: Provide a direct East/West routing between Burien and Renton via Tukwila International Blvd Link Station, Southcenter Mall, Tukwila Sounder Station and South Renton P&R. 10 minute peak, 15 minute off-peak midday and early evening, 30 minute night. Span 5:30AM-12:00AM. 1/2 mile stop spacing.

Location / Facility: From: To: S 156 St to 24th Ave S to S 154th St onto Burien Transit Center Renton Transit Center Southcenter Blvd to 66 Ave S (serve Link station) to Tukwila Parkway to Andover Parkway to Strander Blvd to SW Grady Way (serve Sounder Station) to S Renton P&R to Renton TC County: Completion Year: Type: King County 2013 New Facility-Road

Sponsor: KING COUNTY/METRO MTP Status: Unprogrammed Project ID: 4569 Estimated Cost: $59,733,840 Title: SE 212th Way/SE 208th Street Description: Capacity, ITS, operational and pedestrian improvements will provide access to the business district and link two regional trails.

Location / Facility: From: To: SE 212th Way/SE 208th Street SR 167 148th Ave SE County: Completion Year: Type: King County 2020 New Facility-Road Sponsor: KING COUNTY/METRO MTP Status: Candidate Project ID: 4451 Estimated Cost: $7,600,000 Title: Seattle South End Transit Pathways Description: Establish transit pathway between 1st and 3rd Avenues, includes reconstruction of two-way Columbia Street between 1st and 3rd Avenues, including turn radius improvements, curb ramps, signal modifications, and potential bus stop improvements.

Location / Facility: From: To: Columbia Street 1st Avenue 3rd Avenue County: Completion Year: Type: King County 2018 New Facility-Road

Sponsor: KING COUNTY/METRO MTP Status: Candidate Project ID: 3597 Estimated Cost: $28,783,726 Title: Shoreline Park and Ride TOD

Description: Replace existing 385 , and add additional 200, for a total of 585 stalls in parking structure supporting new mixed use housing development. In King County TOD Work plan to issue 2010 RFP seeking development.

Location / Facility: From: To: Shoreline P&R Shoreline P&R at 18821 Aurora Ave. N. County: Completion Year: Type: King County 2020 New Facility-Road Sponsor: KING COUNTY/METRO MTP Status: Unprogrammed Project ID: 4616 Estimated Cost: $3,078,324 Title: Snoqualmie Regional Connector Description: Design and construct paved regional trail from eastern terminus of Preston-Snoqualmie Trail near intersection of Snoqualmie Parkway at SR202 to Snoqualmie Valley Trail near Tokul Road.

Location / Facility: From: To: Dedicated trail right-of-way. Snoqualmie River Bridge (RTNR ID PS-2) at Snoqualmie Valley Trail at Tokul Road. SR202. County: Completion Year: Type: King County 2018 New Facility-Road

Sponsor: KING COUNTY/METRO MTP Status: Candidate Project ID: 4617 Estimated Cost: $1,894,353 Title: Snoqualmie River Bridge at SR202, Snoqualmie Description: Design and construct regional trail/pedestrian bridge across Snoqualmie River at or near SR202 in Snoqualmie. (Partner with WSDOT)

Location / Facility: From: To: SR202. Eastern terminus of Preston-Snoqualmie Trail North side of Snoqualmie River at SR202; at Snoqualmie Parkway/SR202/Snoqualmie terminus of Snoqualmie Regional Connector River. (RTNR ID PS-3). County: Completion Year: Type: King County 2018 New Facility-Road Sponsor: KING COUNTY/METRO MTP Status: Candidate Project ID: 4028 Estimated Cost: $7,222,222 Title: Snoqualmie Valley Trail - Snoqualmie Mill Segment Description: Acquisition, design, and construction of soft-surface regional trail link.

Location / Facility: From: To: Off-road Tokul Road Reinig Road County: Completion Year: Type: King County 2016 New Facility-Road

Sponsor: KING COUNTY/METRO MTP Status: Candidate Project ID: 4042 Estimated Cost: $13,260,473 Title: Snoqualmie Valley Trail (North) Description: Design and construction of regional trail

Location / Facility: From: To: Off-road Woodinville-Duvall Road Snohomish County boundary County: Completion Year: Type: King County 2012 New Facility-Road

Sponsor: KING COUNTY/METRO MTP Status: Candidate Project ID: 4619 Estimated Cost: $4,585,616 Title: Soos Creek Trail Phase 6 (Petro - CRT) Description: Continue development of paved Soos Creek regional trail from Petrovitsky Road to Cedar River Trail at SR 169.

Location / Facility: From: To: Parkland corridor, utility corridor Cedar River Trail near intersection of 140th Petrovitsky Road Way SE at SR169 County: Completion Year: Type: King County 2018 New Facility-Road Sponsor: KING COUNTY/METRO MTP Status: Unprogrammed Project ID: 4620 Estimated Cost: $3,315,118 Title: Soos Creek Trail Phase 7 (To SR18) Description: Design and construct continuation of paved Soos Creek Trail from southern terminus of existing trail to SR18.

Location / Facility: From: To: Dedicated trail right-of-way. Southern terminus of existing Soos Creek Trail SR18. near 148th Avenue SE at SE 266th Street. County: Completion Year: Type: King County 2016 New Facility-Road

Sponsor: KING COUNTY/METRO MTP Status: Unprogrammed Project ID: 4621 Estimated Cost: $2,723,133 Title: Soos Creek Trail Phase 8 (SR18-GRT)

Description: Develop paved regional trail from SR18 to Green River Trail near intersection of Auburn-Black Diamond Road at SE Green Valley Road. Bridge/underpass at SR18.

Location / Facility: From: To: Dedicated trail right-of-way, railway right- SR18. Green River Trail Phase 4 (RTNR ID GR-4) near of-way, road right of way, power line SR18 at SE Green Valley Road. corridor. County: Completion Year: Type: King County 2035 New Facility-Road Sponsor: KING COUNTY/METRO MTP Status: Unprogrammed Project ID: 4622 Estimated Cost: $473,588 Title: Soos Creek Trail to Lake Youngs Trail Description: Design and construct on-road and off-road connector trail between Soos Creek and Lake Youngs Trails via SE 216th Street.

Location / Facility: From: To: SE 116th Street alignment, power corridor. Soos Creek Trail at SE 116th Street. Lake Youngs Trail at SE 116th Street/148th Avenue SE. County: Completion Year: Type: King County 2020 New Facility-Road

Sponsor: KING COUNTY/METRO MTP Status: Candidate Project ID: 2273 Estimated Cost: $4,341,937 Title: Soos Creek Trail, Phase 5 (192nd to Petro)

Description: Design and construct a regional trail from SE 192nd Street to Petrovitsky Road

Location / Facility: From: To: Parkland corridor, utility corridor Petrovitsky Road SE 192nd Street, Kent County: Completion Year: Type: King County 2016 New Facility-Road

Sponsor: KING COUNTY/METRO MTP Status: Candidate Project ID: 2860 Estimated Cost: $103,597,442 Title: SR 18 Trail (Auburn to Snoqualmie Trail) Description: Shared use bike path

Location / Facility: From: To: Auburn to Snoqualmie Trail Interurban Trail Auburn eastern city limits County: Completion Year: Type: King County 2018 New Facility-Road Sponsor: KING COUNTY/METRO MTP Status: Unprogrammed Project ID: 4045 Estimated Cost: $1,539,162 Title: Tolt Pipeline Trail (East Extension) Description: Extend regional trail

Location / Facility: From: To: Off-road NE Big Rock Road NE North Fork Road County: Completion Year: Type: King County 2016 New Facility-Road

Sponsor: KING COUNTY/METRO MTP Status: Unprogrammed Project ID: 4044 Estimated Cost: $4,143,898 Title: Tolt Pipeline Trail (West) Description: Design and construct an approach to Tolt Pipeline Trail

Location / Facility: From: To: Off-road (near W. Riverside 104th Avenue NE Drive) County: Completion Year: Type: King County 2020 New Facility-Road

Sponsor: KING COUNTY/METRO MTP Status: Unprogrammed Project ID: 4624 Estimated Cost: $4,617,486 Title: Tolt Pipeline Trail Bridge - Snoqualmie River Description: Design and construct regional trail crossing of Snoqualmie River near alignment of NE 165th Street west of SR203.

Location / Facility: From: To: Existing pipeline corridor. Tolt Pipeline at Snoqualmie River. Tolt Pipeline at Snoqualmie River. County: Completion Year: Type: King County 2040 New Facility-Road Sponsor: KING COUNTY/METRO MTP Status: Unprogrammed Project ID: 4625 Estimated Cost: $26,994,533 Title: Tolt River Trail Description: Develop paved regional trail along Tolt River from Snoqualmie Valley Trail in Carnation to Moss Lake.

Location / Facility: From: To: Dedicated trail right-of-way along Tolt Snoqualmie Valley Trail at Tolt River. Moss Lake, junction with Tolt Pipeline Trail River. (RTNR ID TP-4). County: Completion Year: Type: King County 2032 New Facility-Road

Sponsor: KING COUNTY/METRO MTP Status: Completed Project ID: 5524 Estimated Cost: $42,806,566 Title: Transit priority infrastructure for RapidRide BRT: Burien to Renton (F line)

Description: Improve RapidRide corridor - 10 stations, real-time info sighs, transit signal priority and fiber communications - realize approx 10-15% running time improvement

Location / Facility: From: To: S 156 and S 154 st. Andover Parkway to Burien Transit Center Renton Transit Center Strander to Grady Way to S. Renton P&R to Renton TC County: Completion Year: Type: King County 2013 New Facility-Road Sponsor: KING COUNTY/METRO MTP Status: Candidate Project ID: 4626 Estimated Cost: $17,641,164 Title: W Sammamish River Trail (Soft-Surface) Description: Develop soft-surface regional trail along west bank of Sammamish River from Redmond to 102nd Avenue NE in Bothell.

Location / Facility: From: To: River levee, abandoned railway right-of- Sammamish River Trail at Leary Way NE. 102nd Avenue NE at E. Riverside Drive way. County: Completion Year: Type: King County 2030 New Facility-Road

Sponsor: KING COUNTY/METRO MTP Status: Approved Project ID: 4571 Estimated Cost: $54,906,419 Title: Woodinville-Duvall Road

Description: Operational, safety, nonmotorized, ITS and capacity improvements in this congested corridor heavily used by regional traffic.

Location / Facility: From: To: Woodinville-Duvall Road SR-522 SR-203 County: Completion Year: Type: King County 2030 New Facility-Road Sponsor: KIRKLAND MTP Status: Candidate Project ID: 2293 Estimated Cost: $11,839,707 Title: 124th Ave NE Roadway Improvements (North) Description: Widen to 5 lanes n. of NE 116th St with ped/bike facilities

Location / Facility: From: To: 124th Ave NE NE 116th NE 124th Ave County: Completion Year: Type: King County 2022 New Facility-Road

Sponsor: KIRKLAND MTP Status: Unprogrammed Project ID: 4469 Estimated Cost: $35,932,328 Title: 124th Ave NE Roadway Improvements (South) Description: Widen to 3 lanes s. of NE 116th St with ped/bike facilities

Location / Facility: From: To: 124th Ave NE NE 85th NE 116th County: Completion Year: Type: King County 2040 New Facility-Road

Sponsor: KIRKLAND MTP Status: Approved Project ID: 4041 Estimated Cost: $58,091,022 Title: Cross Kirkland Corridor Description: The project will be completed in phases. The first phase of the project, an interim trail is currently underway. Subsequent phases include facilities for pedestrians and bicycles, and in the future, transit.

Location / Facility: From: To: BNSF Corridor 108th Ave Northern Kirkland City Limits County: Completion Year: Type: King County 2016 New Facility-Road Sponsor: KITSAP COUNTY MTP Status: Unprogrammed Project ID: 3647 Estimated Cost: $8,335,536 Title: Bethel Road/Bethel Ave SE Description: Widen the roadway from 2 lanes to 5 lanes (center lane likely to be median interspersed with turn lanes) with bike lanes, street lighting, and sidewalks

Location / Facility: From: To: Bethel Road/Bethel Ave SE Lincoln Ave SE Bay St County: Completion Year: Type: Kitsap County 2020 New Facility-Road

Sponsor: KITSAP COUNTY MTP Status: Approved Project ID: 485 Estimated Cost: $18,286,335 Title: Bucklin Hill Rd Estuary Enhancement and Road Widening

Description: Widen to 4/5 lanes, new bridge

Location / Facility: From: To: Bucklin Hill Rd Mickelberry Road + 300' Clear Creek Crossing County: Completion Year: Type: Kitsap County 2015 New Facility-Road

Sponsor: KITSAP COUNTY MTP Status: Candidate Project ID: 4465 Estimated Cost: $3,000,000 Title: Kitsap County Regional Trail Description: 2.8 mile segment of Shared Use Path

Location / Facility: From: To: WSDOT Hwy 3 Corridor ROW, Kitsap Mountain View Rd Sherman Heights Road County County: Completion Year: Type: Kitsap County 2018 New Facility-Road Sponsor: KITSAP COUNTY MTP Status: Candidate Project ID: 1264 Estimated Cost: $2,072,451 Title: Newberry Hill Rd Description: Widen to 4 lanes

Location / Facility: From: To: Newberry Hill Road Chico Way NW SR 3 SB on Ramp County: Completion Year: Type: Kitsap County 2020 New Facility-Road

Sponsor: KITSAP COUNTY MTP Status: Candidate Project ID: 491 Estimated Cost: $6,202,768 Title: Silverdale Way Description: Widen to 4 lanes

Location / Facility: From: To: Silverdale Way Byron Chico Way NW County: Completion Year: Type: Kitsap County 2020 New Facility-Road

Sponsor: KITSAP COUNTY MTP Status: Candidate Project ID: 4518 Estimated Cost: $1,236,015 Title: Sound to Olympics Trail Description: The basic concept of this plan is to develop a shared use path from the WSF Bainbridge ferry terminal in Winslow to connect with the Discovery Trail in Jefferson County. Components of this concept on Bainbridge would include a shared use path on one side of the highway if safe and efficient crossing can be provided.

Location / Facility: From: To: Sound to Olympics Trail WSF Bainbridge ferry terminal in Winslow Agate Pass Bridge County: Completion Year: Type: Kitsap County 2020 New Facility-Road Sponsor: KITSAP COUNTY MTP Status: Candidate Project ID: 4519 Estimated Cost: $12,405,500 Title: Sound to Olympics Trail Description: a) Separated grade crossings would be preferable at intersections. Overhead bicycle/pedestrian bridges could be adapted to existing terrain in places. Microtunnels might be feasible in places.

Location / Facility: From: To: Sound to Olympics Trail - County: Completion Year: Type: Kitsap County 2020 New Facility-Road

Sponsor: KITSAP COUNTY MTP Status: Candidate Project ID: 4520 Estimated Cost: $12,405,500 Title: Sound to Olympics Trail

Description: b) A separated non-motorized facility should be constructed at the Agate Pass Bridge, either by cantilever off the existing bridge, or separate construction (possibly in conjunction with constructing a new facility for rapid transit).

Location / Facility: From: To: Sound to Olympics Trail - County: Completion Year: Type: Kitsap County 2020 New Facility-Road Sponsor: KITSAP COUNTY MTP Status: Candidate Project ID: 5292 Estimated Cost: $2,802,788 Title: Sound to Olympics Trail Description: The basic concept of this plan is to develop a shared use path from the WSF Bainbridge ferry terminal in Winslow to connect with the Discovery Trail in Jefferson County. Components of this concept connect Kingston to Port Gamble

Location / Facility: From: To: Sound to Olympics Trail Kingston Port Gamble County: Completion Year: Type: Kitsap County 2020 New Facility-Road

Sponsor: KITSAP COUNTY MTP Status: Candidate Project ID: 5503 Estimated Cost: $12,405,500 Title: Sound to Olympics Trail

Description: The basic concept of this plan is to develop a shared use path from the WSF Bainbridge ferry terminal in Winslow to connect with the Discovery Trail in Jefferson County. Components of this concept north of Bainbridge Island would extend the trail from the Agate Pass Bridge to the Hood Canal Bridge (via Poulsbo)

Location / Facility: From: To: Sound to Olympics Trail Agate Pass Bridge Hood Canal Bridge County: Completion Year: Type: Kitsap County 2020 New Facility-Road Sponsor: KITSAP COUNTY MTP Status: Candidate Project ID: 2820 Estimated Cost: $1,085,484 Title: SR 305 Trail (Sound to Olympics) Description: Shared use bike path

Location / Facility: From: To: SR 305 Trail Winslow ferry terminal High School Rd County: Completion Year: Type: Kitsap County 2016 New Facility-Road Sponsor: KITSAP TRANSIT MTP Status: Candidate Project ID: 3436 Estimated Cost: $1,495,802 Title: Annapolis Ferry Terminal Description: Improve existing passenger-only dock owned by the Port of Bremerton. Extend the dock, provide ADA accessibility and build a larger float to accommodate both Bremerton ferries and smaller, fast POFs to Seattle. Connections to Port Orchard Pedestrian Pathway.

Location / Facility: From: To: Annapolis Ferry Terminal Bay Street/Marine Drive #N/A County: Completion Year: Type: Kitsap County 2018 New Facility-Road

Sponsor: KITSAP TRANSIT MTP Status: Candidate Project ID: 3308 Estimated Cost: $1,550,692 Title: Bainbridge Island Multimodal Center

Description: Replace old ferry terminal with a new multimodal terminal in the same location.

Location / Facility: From: To: Bainbridge Island Multimodal Center Olympic Dr County: Completion Year: Type: Kitsap County 2030 New Facility-Road

Sponsor: KITSAP TRANSIT MTP Status: Candidate Project ID: 2480 Estimated Cost: $2,819,953 Title: Bremerton POFF Terminal Expansion Description: Outfit the large multi-berth float to the initial passenger-only ferry (POF) float, to serve multiple POF vessels and provide utility, moorage and fueling services.

Location / Facility: From: To: Bremerton POFF Terminal Expansion Bremerton Transportation Center #N/A County: Completion Year: Type: Kitsap County 2015 New Facility-Road Sponsor: KITSAP TRANSIT MTP Status: Candidate Project ID: 5318 Estimated Cost: $13,426,191 Title: BRT on SR 303 Silverdale POF to Bethel Description: Bus Rapid Transit on SR 303 from Silverdale to Bremerton POF to Bay Street, Port Orchard and Bethel to SR 160. This route was identified in the Transit Competitive Index (PSRC Index)

Location / Facility: From: To: SR 303 and Viking Central Kitsap South Kitsap County: Completion Year: Type: Kitsap County 2025 New Facility-Road

Sponsor: KITSAP TRANSIT MTP Status: Candidate Project ID: 5319 Estimated Cost: $12,335,849 Title: BRT on SR 305 (matching congested corridor) to Bainbridge Ferry Dock

Description: Bus Rapid Transit on SR 305 from SR 3 to Bainbridge Ferry Dock. This route was identified in the Transit Competitive Index

Location / Facility: From: To: SR 305 SR 3 (Poulsbo) Bainbridge Ferry Dock County: Completion Year: Type: Kitsap County 2030 New Facility-Road

Sponsor: KITSAP TRANSIT MTP Status: Candidate Project ID: 3310 Estimated Cost: $6,202,768 Title: East Bremerton Bus Transit Center Description: Relocated and improved intermodal transit center and park n ride (250 stalls)

Location / Facility: From: To: East Bremerton Bus Transit Center Wheaton Way #N/A County: Completion Year: Type: Kitsap County 2018 New Facility-Road Sponsor: KITSAP TRANSIT MTP Status: Candidate Project ID: 5365 Estimated Cost: $16,933,406 Title: Passenger Only Ferry: Bremerton-Downtown Seattle Description: Passenger Only Ferry - new route: Bremerton-Downtown Seattle

Location / Facility: From: To: POF route Bremerton Downtown Seattle County: Completion Year: Type: Multicounty 2018 New Facility-Road

Sponsor: KITSAP TRANSIT MTP Status: Candidate Project ID: 5366 Estimated Cost: $10,073,522 Title: Passenger Only Ferry: Kingston-Downtown Seattle Description: Passenger Only Ferry - new route: Kingston-Downtown Seattle

Location / Facility: From: To: POF route Kingston Downtown Seattle County: Completion Year: Type: Multicounty 2020 New Facility-Road

Sponsor: KITSAP TRANSIT MTP Status: Candidate Project ID: 5367 Estimated Cost: $16,686,203 Title: Passenger Only Ferry: Southworth-Downtown Seattle Description: Passenger Only Ferry - new route: Southworth-Downtown Seattle

Location / Facility: From: To: POF route Southworth Downtown Seattle County: Completion Year: Type: Multicounty 2023 New Facility-Road Sponsor: KITSAP TRANSIT MTP Status: Approved Project ID: 2589 Estimated Cost: $3,433,515 Title: Phase I Poulsbo SR 3/ SR 305 Hub (Olhava II) P&R Description: Development of a 250-300 stall park and ride at the intersection of SR 3 and SR 305. Located in Poulsbo, Kistap Co., the park and ride will consist of 4.7 acres near the Olhava Master Plan development.

Location / Facility: From: To: Viking Ave SR 3/ SR 305 SR 305 / SR 307 / SR 3 County: Completion Year: Type: Kitsap County 2017 New Facility-Road

Sponsor: KITSAP TRANSIT MTP Status: Candidate Project ID: 4294 Estimated Cost: $5,571,793 Title: Phase II and Phase III SR305 Corridor P&Rs

Description: This is a placeholder project for the remaining 500-550 stalls for the SR305 P&R's from the city of Poulsbo to Suquamish to Bainbridge Island.

Location / Facility: From: To: TBD SR3 Bainbridge Island Ferry Terminal County: Completion Year: Type: Kitsap County 2025 New Facility-Road

Sponsor: KITSAP TRANSIT MTP Status: Candidate Project ID: 2576 Estimated Cost: $4,652,076 Title: Silverdale P&R Description: 250 new stalls in the Regional Center

Location / Facility: From: To: Newberry Hill Road Central Kitsap SR 3 County: Completion Year: Type: Kitsap County 2018 New Facility-Road Sponsor: KITSAP TRANSIT MTP Status: Candidate Project ID: 3602 Estimated Cost: $1,163,019 Title: SR 104 Kingston Park and Ride Expansion Description: 100 additional stalls (350 total) AKA George's Corner Park and Ride, behind the George's Corner PUD

Location / Facility: From: To: Kingston P & R SR 104@Hansville Rd #N/A County: Completion Year: Type: Kitsap County 2030 New Facility-Road

Sponsor: KITSAP TRANSIT MTP Status: Candidate Project ID: 2582 Estimated Cost: $3,489,057 Title: SR 16 P&R (Mullenix) Description: 250 new stalls

Location / Facility: From: To: SR 16 P&R (Mullenix) South Kitsap SR 16 County: Completion Year: Type: Kitsap County 2025 New Facility-Road

Sponsor: KITSAP TRANSIT MTP Status: Candidate Project ID: 3604 Estimated Cost: $1,163,019 Title: SR 16/SR 160 Port Orchard Park and Ride Expansion Description: up to 250 Stalls total

Location / Facility: From: To: Port Orchard P & R SR 16/SR 160@Port Orchard County: Completion Year: Type: Kitsap County 2030 New Facility-Road Sponsor: KITSAP TRANSIT MTP Status: Candidate Project ID: 2575 Estimated Cost: $3,489,057 Title: SR 303 (North of Bremerton/Riddell) P&R Description: 250 new stalls

Location / Facility: From: To: SR 303 (North of Bremerton) P&R Central Kitsap SR 303 County: Completion Year: Type: Kitsap County 2020 New Facility-Road

Sponsor: KITSAP TRANSIT MTP Status: Candidate Project ID: 2585 Estimated Cost: $3,489,057 Title: SR 303 P&R (N Silverdale) Description: 250 new stalls (near NE Silverdale)

Location / Facility: From: To: SR 3 / SR 303 P&R Central Kitsap SR 303 County: Completion Year: Type: Kitsap County 2025 New Facility-Road

Sponsor: KITSAP TRANSIT MTP Status: Candidate Project ID: 2574 Estimated Cost: $23,260,379 Title: SR 304 (Bremerton) P&R (Gateway) Description: 250 new stalls at SR310 (6th) and Montgomery in surface lot and parking structure

Location / Facility: From: To: SR 304 (Bremerton) P&R Central Kitsap SR 304 County: Completion Year: Type: Kitsap County 2020 New Facility-Road Sponsor: LAKEWOOD MTP Status: Unprogrammed Project ID: 5523 Estimated Cost: $8,347,059 Title: Bridgeport Way Description: Widen roadway to accommodate continuous 2-way center turn lane. Add 5 foot bike lanes OR widen outside travel lane to be a shared bike/vehicle facility. Add curb, gutter, sidewalks, streetlights, landscaping, and upgraded storm drainage. Signal upgrades as required to accommodate improvements.

Location / Facility: From: To: Bridgeport Way Steilacoom Blvd N. City Limits County: Completion Year: Type: Pierce County 2014 New Facility-Road

Sponsor: LAKEWOOD MTP Status: Candidate Project ID: 2806 Estimated Cost: $2,255,962 Title: City Water Ditch Bike Trail Description: Shared use bike path or dedicated bicycle lanes and sidewalks along South Tacoma Way to tie into Tacoma's Water Ditch Trail.

Location / Facility: From: To: City Water Ditch Bike Trail Tacoma city limits 84th St S County: Completion Year: Type: Pierce County 2019 New Facility-Road Sponsor: LYNNWOOD MTP Status: Candidate Project ID: 4119 Estimated Cost: $19,406,888 Title: 44th Ave. W. (SR 524 Spur) Description: Widen roadway to 7 lanes with 8 lanes just south of 196th St. SW. The City of Lynnwood is proposing BAT lanes on this corridor but this is still subject to public process.

Location / Facility: From: To: 44th Ave. 194th St. I-5 County: Completion Year: Type: Snohomish County 2020 New Facility-Road

Sponsor: LYNNWOOD MTP Status: Candidate Project ID: 4631 Estimated Cost: $157,324,981 Title: I-5/44th Avenue Interchange Improvements

Description: Completion of existing half diamond interchange by adding access to the north. Project includes two braided ramps.

Location / Facility: From: To: I-5 @ 44th Ave W 196th St SW 220th St SW County: Completion Year: Type: Snohomish County 2020 New Facility-Road

Sponsor: LYNNWOOD MTP Status: Approved Project ID: 4634 Estimated Cost: $988,812 Title: Interurban Regional Trail - Missing Link Description: Completion of a multi-use trail that provides direct access to a designated urban centers and a high capacity transit station

Location / Facility: From: To: PUD Right of Way 212th St SW 52nd Ave W County: Completion Year: Type: Snohomish County 2015 New Facility-Road Sponsor: LYNNWOOD MTP Status: Completed Project ID: 3442 Estimated Cost: $5,294,025 Title: Interurban Trail Missing Link Pedestrian Bridge at I-5/44th Ave W Description: This project will complete the 'missing link' in Lynnwood's Interurban Trail by constructing a Class I bicycle/ pedestrian trail and bridge over 44th Ave W and the southbound on-ramp to I-5 and a missing section of the Interurban trail.

Location / Facility: From: To: 0 Lynnwood P&R Landmark Inn/PUD ROW County: Completion Year: Type: Snohomish County 2010 New Facility-Road

Sponsor: LYNNWOOD MTP Status: Candidate Project ID: 4009 Estimated Cost: $22,835,617 Title: SR 524 (196th St SW) Widening

Description: Increase capacity of existing major east-west 5 lane arterial by increasing roadway section to 7 lanes, curb, gutter and sidewalk (12 feet). The City of Lynnwood is proposing BAT lanes on this corridor but this is still subject to public process.

Location / Facility: From: To: SR 524 (196th St SW) 48th Ave W 37th Ave W County: Completion Year: Type: Snohomish County 2016 New Facility-Road Sponsor: MAPLE VALLEY MTP Status: Unprogrammed Project ID: 5445 Estimated Cost: $5,376,249 Title: SR 169 Description: SR 169 Widening to 4 lanes, center turn lanes or left turn pockets and Bike Lanes (SE 270th to SE 290th)

Location / Facility: From: To: SR 169 SE 270th St SE 290th St County: Completion Year: Type: King County 2020 New Facility-Road

Sponsor: MAPLE VALLEY MTP Status: Unprogrammed Project ID: 4118 Estimated Cost: $5,065,700 Title: SR 516 (Kent-Kangley Road), 213th Place SE to SR 169 Description: SR 516 Widening from 2 to 4 lanes, center turn lane/ left turn pockets, bike lanes and sidewalks (from 213th SE to SR 169)

Location / Facility: From: To: SR 516 (Kent-Kangley Road) 213th Place SE SR 169 County: Completion Year: Type: King County 2020 New Facility-Road Sponsor: MARYSVILLE MTP Status: Unprogrammed Project ID: 5528 Estimated Cost: $15,867,951 Title: 156th St NE Widening to 3/5 lanes: State Ave to 51st St NE Vic. Description: Widen to 3 to 5 lanes w/ curb gutter and sidewalk

Location / Facility: From: To: 156th/152nd St NE State Ave 51st Ave County: Completion Year: Type: Snohomish County 2017 New Facility-Road

Sponsor: MARYSVILLE MTP Status: Candidate Project ID: 4411 Estimated Cost: $31,838,817 Title: 156th St. NE Interchange Description: The project would complete the Interchange Justification Report for converting the 156th St. NE Overcrossing (currently under construction) to a full Single Point Urban Interchange.

Location / Facility: From: To: 156th St. NE Twin Lakes Blvd State Ave. County: Completion Year: Type: Snohomish County 2020 New Facility-Road

Sponsor: MARYSVILLE MTP Status: Unprogrammed Project ID: 5527 Estimated Cost: $13,100,285 Title: 1st St Bypass: 3/5 lane new alignment Description: 3/5 lane new alignment

Location / Facility: From: To: First St or new parallel alignment SR 529 Sunnyside Blvd County: Completion Year: Type: Snohomish County 2017 New Facility-Road Sponsor: MARYSVILLE MTP Status: Unprogrammed Project ID: 5532 Estimated Cost: $22,141,327 Title: 40th St NE - 3/5 lanes on existing and new alignment: Sunnyside Blvd to SR9 Description: 3/5 lane on existing and new alignment

Location / Facility: From: To: 40th St NE/87th Ave NE/35th St NE Sunnyside Blvd SR9 at SR 92 County: Completion Year: Type: Snohomish County 2015 New Facility-Road

Sponsor: MARYSVILLE MTP Status: Approved Project ID: 4123 Estimated Cost: $34,820,580 Title: 88th St NE Description: Upgrade existing 2 lane roadway to 5 lanes, upgrade State Ave. intersection.

Location / Facility: From: To: 88th St NE State Avenue 67th Avenue NE County: Completion Year: Type: Snohomish County 2016 New Facility-Road

Sponsor: MARYSVILLE MTP Status: Unprogrammed Project ID: 5533 Estimated Cost: $2,337,140 Title: 88th St NE new WB lane: Quil Ceda Crk Bridge to I-5 Description: Add new westbound lane

Location / Facility: From: To: 88th St NE Quil Ceda Crk Bridge I-5 NB on ramp County: Completion Year: Type: Snohomish County 2017 New Facility-Road Sponsor: MARYSVILLE MTP Status: Completed Project ID: 4127 Estimated Cost: $6,057,653 Title: Ingraham Boulevard Description: New 3/4 lane arterial to finish 88th Street NE Corridor between I-5 and SR 9

Location / Facility: From: To: Ingraham Boulevard 67th Ave. NE 83rd Ave. NE County: Completion Year: Type: Snohomish County 2011 New Facility-Road

Sponsor: MARYSVILLE MTP Status: Completed Project ID: 5529 Estimated Cost: $18,943,532 Title: Lakewood Triangle Access/156th St NE Overcrossing Description: New I-5 overcrossing 2/4 lane

Location / Facility: From: To: 156th St. NE Twin Lakes Blvd State Ave County: Completion Year: Type: Snohomish County 2012 New Facility-Road

Sponsor: MARYSVILLE MTP Status: Candidate Project ID: 4410 Estimated Cost: $46,782,911 Title: SR 529 Interchange Description: Complete the current half interchange by constructing a new Interstate 5 northbound off-ramp onto SR 529 and new southbound on- ramps from SR 529 to Interstate 5

Location / Facility: From: To: I-5 SR 529 I-5 County: Completion Year: Type: Snohomish County 2017 New Facility-Road Sponsor: MARYSVILLE MTP Status: Unprogrammed Project ID: 5534 Estimated Cost: $14,760,885 Title: SR528/I-5 additional lanes under I-5 interchange Description: Add one new east and west bound lane under I-5 at the interchange

Location / Facility: From: To: SR 528 I-5 SR 528 NB ramps I-5 SR 528 SB ramps County: Completion Year: Type: Snohomish County 2015 New Facility-Road

Sponsor: MARYSVILLE MTP Status: Candidate Project ID: 4124 Estimated Cost: $4,279,440 Title: State Ave. 116th St. NE to 136th St. NE Description: Widening the segment of State Avenue between 116th Street NE and 136th Street NE from three lanes to five. Other elements include installation of sidewalk on the east side of the road, improvements to the "Arlington Spur" railroad crossing, and upgrade of the traffic signal at 128th Street NE.

Location / Facility: From: To: State Avenue 116th St. NE 136th St. NE County: Completion Year: Type: Snohomish County 2015 New Facility-Road

Sponsor: MARYSVILLE MTP Status: Completed Project ID: 4125 Estimated Cost: $11,144,078 Title: State Avenue Description: Upgrade existing 2 lane roadway to 5 lanes

Location / Facility: From: To: 0 136th St. NE 152nd St. NE County: Completion Year: Type: Snohomish County 2010 New Facility-Road Sponsor: MARYSVILLE MTP Status: Unprogrammed Project ID: 4126 Estimated Cost: $26,719,852 Title: State Avenue Description: Upgrade existing 3 lane roadway to 5 lanes

Location / Facility: From: To: State Avenue 100th St. NE 116th St. NE County: Completion Year: Type: Snohomish County 2016 New Facility-Road

Sponsor: MARYSVILLE MTP Status: Unprogrammed Project ID: 5531 Estimated Cost: $16,298,477 Title: Sunnyside Blvds Widening: 47th Ave NE to 52nd St NE Description: Widen to 5 lane on existing alignment and connect to 1st St Bypass

Location / Facility: From: To: Sunnyside Blvd 47th Ave NE 52nd St NE County: Completion Year: Type: Snohomish County 2017 New Facility-Road Sponsor: MILTON MTP Status: Unprogrammed Project ID: 1958 Estimated Cost: $1,662,342 Title: Milton Way Description: Road widening / sidewalk install

Location / Facility: From: To: Milton Way 28th Ave 20th St E County: Completion Year: Type: Pierce County 2010 New Facility-Road

Sponsor: MILTON MTP Status: Candidate Project ID: 2892 Estimated Cost: $1,335,146 Title: Milton-Edgewood Interurban Trail Description: Shared use bike path

Location / Facility: From: To: Milton-Edgewood Interurban Trail Milton city limits at 70th Ave E northeast to city limits at King Co limits County: Completion Year: Type: Pierce County 2010 New Facility-Road Sponsor: MONROE MTP Status: Unprogrammed Project ID: 2829 Estimated Cost: $5,313,661 Title: Centennial Trail Description: Shared use bike path

Location / Facility: From: To: Centennial Trail Terminus of existing trail Monroe city limits (by SR 203) County: Completion Year: Type: Snohomish County 2030 New Facility-Road

Sponsor: MONROE MTP Status: Candidate Project ID: 2826 Estimated Cost: $3,962,040 Title: SR 522 Trail Description: Shared use bike path

Location / Facility: From: To: SR 522 Trail City Limits Proposed Centennial Trail County: Completion Year: Type: Snohomish County 2030 New Facility-Road

Sponsor: MONROE MTP Status: Unprogrammed Project ID: 2687 Estimated Cost: $3,116,211 Title: US Hwy 2 Trail Extension Description: Shared use bike path

Location / Facility: From: To: US Hwy 2 Trail Extension Planned Hwy 2 trail terminus at Monroe city Planned Centennial Trail at SR 203 limits County: Completion Year: Type: Snohomish County 2025 New Facility-Road Sponsor: MUKILTEO MTP Status: Unprogrammed Project ID: 807 Estimated Cost: $7,361,234 Title: Ferry Holding Lanes Description: Mitigation measure for traffic congestion associated with Ferry traffic backup on SR 525.Options include off-street storage, traffic warning measures, signals at 5th, Goat Trail Rd, 76th St SW, 84th St SW.

Location / Facility: From: To: Ferry Holding Lanes Mukilteo Ferry Terminal County: Completion Year: Type: Snohomish County 2010 New Facility-Road

Sponsor: MUKILTEO MTP Status: Candidate Project ID: 4010 Estimated Cost: $8,298,118 Title: Mukilteo Lane Waterfront Access

Description: Construct Parking Lot (80-100 stalls) and Pedestrian Access Bridge connecting Mukilteo with Mukilteo Multi-modal Terminal

Location / Facility: From: To: Mukilteo Lane Park Ave Mt. Baker Crossing County: Completion Year: Type: Snohomish County 2020 New Facility-Road

Sponsor: NEWCASTLE MTP Status: Completed Project ID: 2313 Estimated Cost: $61,123,755 Title: Coal Creek Pkwy (Phase I, II & III) Description: Widen to 4/5 lanes + CGS, bike lanes, traffic signals; (PSRC ID No. NC-5)

Location / Facility: From: To: Coal Creek Pkwy Newcastle Way SE 95th Way County: Completion Year: Type: King County 2010 New Facility-Road Sponsor: PACIFIC MTP Status: Candidate Project ID: 2884 Estimated Cost: $1,085,484 Title: Interurban Trail Description: Shared use bike path

Location / Facility: From: To: Interurban Trail 8th St E southern terminus of existing Interurban Trail at 3rd Ave SW County: Completion Year: Type: King County 2018 New Facility-Road

Sponsor: PACIFIC MTP Status: Candidate Project ID: 127 Estimated Cost: $28,508,050 Title: Stewart Rd (8th St E.)

Description: Widen existing two-lane roadway to 5 lanes. East 0.69 mile is within City of Pacific jurisdiction and is a joint project with City of Pacific. Includes replacement of Br #1204-A over the White River. May include construction of Br #1204-B over the BNSFRR tracks. Includes non-motorized facilities.

Location / Facility: From: To: Stewart Rd (8th St E.) E Valley Hwy E W Valley Hwy County: Completion Year: Type: Pierce County 2020 New Facility-Road Sponsor: PIERCE COUNTY MTP Status: Approved Project ID: 116 Estimated Cost: $16,258,206 Title: 112th St E/S Description: Widen and reconstruct existing (two-lane in sections) roadway to 5 lanes, improve intersections and provide non-motorized features.

Location / Facility: From: To: 112th St E/S 86th Avenue E Steele Street County: Completion Year: Type: Pierce County 2030 New Facility-Road

Sponsor: PIERCE COUNTY MTP Status: Unprogrammed Project ID: 1937 Estimated Cost: $14,183,272 Title: 160th St E Description: Widen and reconstruct existing arterial roadway including NMF

Location / Facility: From: To: 160th St E 56th Ave Ct E 70th Ave E County: Completion Year: Type: Pierce County 2040 New Facility-Road

Sponsor: PIERCE COUNTY MTP Status: Completed Project ID: 115 Estimated Cost: $73,019,029 Title: 176th St E Description: Widen and reconstruct existing 2/4-lane road to 5 lanes. Provide non-motorized features.

Location / Facility: From: To: 176th St E SR 161 (Meridian E) SR 7 (Pacific Avenue) County: Completion Year: Type: Pierce County 2014 New Facility-Road Sponsor: PIERCE COUNTY MTP Status: Unprogrammed Project ID: 1938 Estimated Cost: $56,356,415 Title: 176th St E Description: Construct the eastern two miles of 176 St E to provide for the future connection of SR-704 to SR-162 and to provide evacuation route from the Orting Valley. Construct urban section with 4-5 lanes and NMF. Construct rural section with 2-3 lanes and NMF (sidewalks, bicycle facilities, and a raised median).

Location / Facility: From: To: 176th St E 130th Ave E Calistoga Ave County: Completion Year: Type: Pierce County 2040 New Facility-Road

Sponsor: PIERCE COUNTY MTP Status: Unprogrammed Project ID: 522 Estimated Cost: $93,319,133 Title: 224th St E Description: Widen and reconstruct existing arterial to 3 lanes including NMF

Location / Facility: From: To: 224th St E SR 7 SR 161 County: Completion Year: Type: Pierce County 2040 New Facility-Road

Sponsor: PIERCE COUNTY MTP Status: Unprogrammed Project ID: 1473 Estimated Cost: $43,260,525 Title: 72nd St E Description: Reconstruct existing arterial roadway including NMF, add center left turn lane

Location / Facility: From: To: 72nd St E Tacoma City Limits Fruitland Avenue E County: Completion Year: Type: Pierce County 2040 New Facility-Road Sponsor: PIERCE COUNTY MTP Status: Unprogrammed Project ID: 1474 Estimated Cost: $78,795,957 Title: 96th St E Description: Reconstruct existing arterial roadway including NMF, add center left turn lane

Location / Facility: From: To: 96th St E SR 7 Fruitland Ave E County: Completion Year: Type: Pierce County 2040 New Facility-Road

Sponsor: PIERCE COUNTY MTP Status: Completed Project ID: 1489 Estimated Cost: $8,652,105 Title: Br #36193-A / 176th St E Description: Widen to 4 lanes with NMF and replace bridge to eliminate the bottleneck caused by this being the only two-lane section of 176 St E.

Location / Facility: From: To: Br #36193-A / 176th St E 176th St E over Tacoma Eastern Railroad County: Completion Year: Type: Pierce County 2012 New Facility-Road

Sponsor: PIERCE COUNTY MTP Status: Approved Project ID: 113 Estimated Cost: $89,884,863 Title: Canyon Rd E Description: Widen and reconstruct existing 2/4-lane roadway to provide 7 through lanes, turn lanes, wider curb lanes, curbs, gutters, and sidewalks; signal modifications included.

Location / Facility: From: To: Canyon Rd E 106th St E 192nd St E County: Completion Year: Type: Pierce County 2020 New Facility-Road Sponsor: PIERCE COUNTY MTP Status: Unprogrammed Project ID: 134 Estimated Cost: $68,907,837 Title: Canyon Rd E Description: Southerly Ext. Extend Major arterial roadway from 192nd Street E to SR-7 in two phases. The proposed roadway will be 4 to 5 lanes wide with paved shoulders and sidewalks to accommodate nonmotorized modes in the first phase to 224th Street E. The roadway would narrow to 2-lane with paved shoulders south of 224th Street E.

Location / Facility: From: To: Canyon Rd E Mountain Hwy (SR 7) 192nd Street E County: Completion Year: Type: Pierce County 2040 New Facility-Road

Sponsor: PIERCE COUNTY MTP Status: ROW Conditionally Ap Project ID: 135 Estimated Cost: $52,009,335 Title: Canyon Rd E Description: Northerly Ext. Extend major arterial roadway from it's current northerly terminus to connect with the planned completion of SR-167, crossing over 2 railroads and the Puyallup River. The project would be a four-lane roadway with paved shoulders (to accommodate non-motorized modes). This roadway would link the planned employment center in Frederickson with the Port of Tacoma and destinations northward (e.g. Seattle)

Location / Facility: From: To: Canyon Rd E Pioneer Way E 52nd St E / 62nd Ave E County: Completion Year: Type: Pierce County 2026 New Facility-Road Sponsor: PIERCE COUNTY MTP Status: Candidate Project ID: 528 Estimated Cost: $17,097,028 Title: Canyon Rd E Description: Widen to 5 lanes, reconstruct existing arterial including NMF.

Location / Facility: From: To: Canyon Rd E 84th St. E 99th St Ct E County: Completion Year: Type: Pierce County 2020 New Facility-Road

Sponsor: PIERCE COUNTY MTP Status: Candidate Project ID: 4439 Estimated Cost: $22,684,343 Title: Canyon Rd E Description: Widen and reconstruct existing roadway to provide additional lanes, add turn lane(s) at intersections, add auxiliary lane where appropriate, and provide non-motorized features.

Location / Facility: From: To: Canyon Rd E 72nd St E Pioneer Wy E County: Completion Year: Type: Pierce County 2030 New Facility-Road

Sponsor: PIERCE COUNTY MTP Status: ROW Conditionally Ap Project ID: 4438 Estimated Cost: $8,778,504 Title: Canyon Rd East Corridor Improvements Description: Widen and reconstruct existing roadway to provide additional lanes, add turn lane(s) at intersections, add center turning lane where appropriate, and provide non-motorized features.

Location / Facility: From: To: Canyon Rd E 84th St E 72nd St E County: Completion Year: Type: Pierce County 2030 New Facility-Road Sponsor: PIERCE COUNTY MTP Status: Candidate Project ID: 4475 Estimated Cost: $63,320,331 Title: Canyon Road East Northerly Extension Description: Extend major arterial roadway from its current northerly terminus to connect with the planned completion of SR- 167, crossing over 2 railroads and the Puyallup River. The project would be a four-lane roadway with paved shoulders (to accommodate non-motorized modes). This roadway would link the planned employment center in Frederickson with the Port of Tacoma and destinations northward (e.g. Seattle)

Location / Facility: From: To: Canyon Road E 52nd st E/62nd Ave E Intersection 70th Ave E County: Completion Year: Type: Pierce County 2025 New Facility-Road

Sponsor: PIERCE COUNTY MTP Status: Completed Project ID: 2851 Estimated Cost: $6,180,075 Title: Cushman Trail (phase 2) Description: Shared use path

Location / Facility: From: To: Cushman Trail Pierce Transit Park and Ride (Kimball Dr NW) 96th Street NW County: Completion Year: Type: Pierce County 2011 New Facility-Road Sponsor: PIERCE COUNTY MTP Status: Candidate Project ID: 5522 Estimated Cost: $3,910,050 Title: Fennel Creek Trail – Segment 2 Description: Shared use path

Location / Facility: From: To: Fennel Creek corridor Fennel Creek Park Sumner-Buckley Highway (SR 410) County: Completion Year: Type: Pierce County 2018 New Facility-Road

Sponsor: PIERCE COUNTY MTP Status: Approved Project ID: 4472 Estimated Cost: $3,477,533 Title: Foothills Trail – South Prairie, East Segment Description: The East Segment includes construction of 1.3 miles of 12 foot wide porous asphalt multi-use trail. A shoulder composed of natural materials will vary in width from 0 to 5 feet depending on topographic restrictions. The project will extend from approximately 1,900 ft. south of Borell Road East to 268th Avenue Court East where it will connect to the already complete Middle Segment.

Location / Facility: From: To: Foothills Trail 1,900 ft. south of Borell Road East 268th Avenue Court East County: Completion Year: Type: Pierce County 2017 New Facility-Road Sponsor: PIERCE COUNTY MTP Status: Candidate Project ID: 3439 Estimated Cost: $7,781,407 Title: Foothills Trail-Carbonado Description: Design and construct the Cascade Jct. to Wilkeson/Carbonado section of Foothills Trail. Pierce County owns about half of this 7 mile section. The design portion will include engineering and all environmental requirements.

Location / Facility: From: To: Foothills Trail Cascade Junction Carbonado County: Completion Year: Type: Pierce County 2022 New Facility-Road

Sponsor: PIERCE COUNTY MTP Status: Candidate Project ID: 2835 Estimated Cost: $2,999,467 Title: Foothills Trail-S. Prairie

Description: Design and construct the remaining 2.7 mile sections of Foothills Trail that will complete the 19.2 mile trail from east Puyallup to Buckley. The design portion will include engineering and all environmental requirements.

Location / Facility: From: To: Foothills Trail South Prairie city limits 268th Ave Ct East County: Completion Year: Type: Pierce County 2015 New Facility-Road Sponsor: PIERCE COUNTY MTP Status: Unprogrammed Project ID: 125 Estimated Cost: $63,988,497 Title: Military Rd S/152nd St E Description: Widen and reconstruct 2-3 lane existing road (east of SR-7) to provide 2 additional general purpose lanes and non-motorized features along entire length.

Location / Facility: From: To: Military Rd S/152nd St E Waller Rd E Spanaway Loop Rd County: Completion Year: Type: Pierce County 2040 New Facility-Road

Sponsor: PIERCE COUNTY MTP Status: Completed Project ID: 2894 Estimated Cost: $651,291 Title: Milton-Edgewood Interurban Trail

Description: Shared use bike path

Location / Facility: From: To: Milton-Edgewood Interurban Trail 70th Ave E Milton City Limits County: Completion Year: Type: Pierce County 2008 New Facility-Road

Sponsor: PIERCE COUNTY MTP Status: Completed Project ID: 131 Estimated Cost: $9,234,368 Title: Spanaway Loop Rd Description: Southerly Ext. Widen existing roadway and construct new roadway on new alignment including non-motorized features.

Location / Facility: From: To: 0 Pacific Avenue S (SR 7) 10th Ave S County: Completion Year: Type: Pierce County 2006 New Facility-Road Sponsor: PIERCE COUNTY MTP Status: Unprogrammed Project ID: 5505 Estimated Cost: $13,950,871 Title: SR 302 Trail Description: Shared use path

Location / Facility: From: To: SR 302 and/or Tacoma Utility ROW Mason County SR 16 County: Completion Year: Type: Pierce County 2040 New Facility-Road

Sponsor: PIERCE COUNTY MTP Status: Completed Project ID: 880 Estimated Cost: $14,500,196 Title: WOLLOCHET DR NW Description: Widen existing road between Fillmore Dr NW and Artondale Dr NW to five lanes and between Artondale Dr NW and 40 St NW to 3 lanes to accommodate existing traffic. Construct NMF that will complete the nonmotorized route between the heart of Fox Island and SR-16 and the nonmotorized trail systems in Gig Harbor and Tacoma.

Location / Facility: From: To: WOLLOCHET DR NW FILLMORE DR NW 40TH ST NW County: Completion Year: Type: Pierce County 2014 New Facility-Road Sponsor: PIERCE TRANSIT MTP Status: Candidate Project ID: 5489 Estimated Cost: $60,673,315 Title: BRT - Meridian / SR 161 Description: Bus Rapid Transit on SR 161 from 176th Street to Downtown Puyallup

Location / Facility: From: To: SR 161 176th St. Downtown Puyallup County: Completion Year: Type: Pierce County 2030 New Facility-Road

Sponsor: PIERCE TRANSIT MTP Status: Candidate Project ID: 5320 Estimated Cost: $15,674,713 Title: BRT (Route 1) on SR 7 from Roy Y to Downtown Tacoma (PC Congested Corridor) Description: Bus Rapid Transit from on SR 7 from Roy Y to downtown Tacoma. This route was identified in the Transit Competitive Index

Location / Facility: From: To: SR 7/ Pacific/ Commerce Roy Y Downtown Tacoma County: Completion Year: Type: Pierce County 2020 New Facility-Road

Sponsor: PIERCE TRANSIT MTP Status: Unprogrammed Project ID: 2606 Estimated Cost: $47,683,777 Title: Fife I-5 P&R Description: 1000 new stalls

Location / Facility: From: To: I-5 / Fife P&R I-5 Central County: Completion Year: Type: Pierce County 2030 New Facility-Road Sponsor: PIERCE TRANSIT MTP Status: Unprogrammed Project ID: 2596 Estimated Cost: $9,428,207 Title: South Hill P & R Description: 433 new stalls

Location / Facility: From: To: South Hill P & R Valley SR 512 / SR 161 County: Completion Year: Type: Pierce County 2030 New Facility-Road

Sponsor: PIERCE TRANSIT MTP Status: Unprogrammed Project ID: 2602 Estimated Cost: $14,654,039 Title: SR 512 / SR 7 (Parkland) P&R Description: 550 new stalls

Location / Facility: From: To: Parkland P&R Vicinity SR 512@SR 7 County: Completion Year: Type: Pierce County 2030 New Facility-Road Sponsor: PORT OF SEATTLE MTP Status: Completed Project ID: 1224 Estimated Cost: $47,245,735 Title: E MARGINAL WAY GRADE SEPARATION Description: GRADE SEPARATION OF ON/OFF RAMPS AT SR 99 OVER UP LEAD TRACK FROM HARBOR ISLAND

Location / Facility: From: To: E MARGINAL WAY Duwamish Ave S & East Marginal Way S SW Spokane St County: Completion Year: Type: King County 2009 New Facility-Road

Sponsor: PORT OF SEATTLE MTP Status: Candidate Project ID: 5347 Estimated Cost: $497,927 Title: Grade separation at Atlantic St. - South End Viaduct local access: Holgate to King stage 3 Description: This new grade separation is the local access portion of the Alaskan Way Viaduct Holgate to King street project at Atlantic. It allows a grade separated roadway to get traffic from East Marginal Way to Colorado St and the freeway system east when the at-grade Atlantic roadway is blocked by a train.

Location / Facility: From: To: U tube road (looping underneath Viaduct East Marginal Way north-west of S Atlantic St S Atlantic St east of SR-99 between Atlantic and S. Royal Brougham Way County: Completion Year: Type: King County 2013 New Facility-Road Sponsor: PORT OF SEATTLE MTP Status: Unprogrammed Project ID: 5348 Estimated Cost: $356,807 Title: Hanford & Main SIG's Entry Gate Improvements Description: Add a center turn lane and, if warranted, a traffic signal for east-to-north bound truck traffic entering the Main SIG Yard entrance on Hanford

Location / Facility: From: To: S. Hanford St. Colorado Ave S East Marginal Way County: Completion Year: Type: King County 2020 New Facility-Road

Sponsor: PORT OF SEATTLE MTP Status: Unprogrammed Project ID: 5346 Estimated Cost: $497,927 Title: North Argo Truck Roadway

Description: Create a new southbound one-way truck-only street from the south-east end of Duwamish Ave S to the north-west end of Colorado Ave S just east of East Marginal Way/ Alaskan Way viaduct. Project grade-separates truck traffic headed fro the Argo Rail Yard from mainline SR-99 and eliminates a difficult weaving maneuver

Location / Facility: From: To: North Argo Truck Roadway south-east end of Duwamish Ave S north-west end of Colorado Ave S County: Completion Year: Type: King County 2014 New Facility-Road Sponsor: PORT OF SEATTLE MTP Status: Candidate Project ID: 5512 Estimated Cost: $247,203,001 Title: South Access Description: New construction of a two-lane, limited access arterial connecting the planned South Airport Link roadway to the planned extension of SR 509 to I-5.

Location / Facility: From: To: New Alignment SR 509 extension to I-5 S 188th St County: Completion Year: Type: King County 2025 New Facility-Road

Sponsor: PORT OF SEATTLE MTP Status: Candidate Project ID: 2074 Estimated Cost: $465,208 Title: South Airport Link Project

Description: New Construction of a south airport expressway to connect the existing north airport expressway and airport terminal drives to the planned South Access roadway and extension of SR 509 to I-5. The project would close the existing south airport entrance at S 182nd Street and International Boulevard and create a new at grade connection to the local roadway network at S. 188th Street and 28th Ave S.

Location / Facility: From: To: South Airport Link Project S 188th St Airport County: Completion Year: Type: King County 2025 New Facility-Road Sponsor: PORT OF SEATTLE MTP Status: Unprogrammed Project ID: 5350 Estimated Cost: $694,628 Title: West Marginal Way/Chelan Street/Spokane Street intersection Description: Re-stripe & change the signal timing at West Marginal Way/Chelan Street/Spokane Street intersection to maintain freight flows during commute hours (particularly morning commute) but using existing lanes to designate current left/through lane on northwest-bound West Marginal Way and eastbound Chelan Avenue as left turn only lanes. Also, need to change signal phasing to provide for concurrent through movements on these same two approaches.

Location / Facility: From: To: West Marginal Way/Chelan West Marginal Way/Chelan Street/Spokane Street/Spokane Street intersection Street intersection County: Completion Year: Type: King County 2020 New Facility-Road

Sponsor: PORT OF TACOMA MTP Status: Candidate Project ID: 4639 Estimated Cost: $446,516,768 Title: Port of Tacoma Road/Rail/Infrastructure Description: The project supports anticipated marine terminal development by eliminating at-grade railroad crossings; provides new Port-owned rail support infrastructure including new arrival/dispatch tracks and intermodal support tracks to facilitate efficient and reliable freight movement.

Location / Facility: From: To: I-5/54th Avenue East I/C Ramps; 54th Milwaukee Way and SR 509, City of Tacoma Taylor Way and SR 509, City of Tacoma Avenue East; 54th Avenue East/SR509/Taylor Way intersection; Taylor Way; East 11th Street County: Completion Year: Type: Pierce County 2020 New Facility-Road Sponsor: PORT ORCHARD MTP Status: Candidate Project ID: 2832 Estimated Cost: $2,312,082 Title: Bay Street Pedestrian Path Description: Design approximately one mile of curb, sidewalk and bike lane along Bay Street.

Location / Facility: From: To: Shared use bike path city limits city limits County: Completion Year: Type: Kitsap County 2013 New Facility-Road

Sponsor: PORT ORCHARD MTP Status: Approved Project ID: 3646 Estimated Cost: $28,938,202 Title: Bethel Road SE Description: Widen the roadway from 2 lanes to 3/4/5 lanes with a planted median island, bike lanes, street lighting, and sidewalks separated from the roadway by a planting strip. Bus pullouts will be constructed at major intersections, traffic signals will be installed at the intersections of Blueberry/Bethel Road and Salmonberry/Bethel Road. The existing signals at Sedgwick Road, Wal-Mart, and Lund Ave will be retrofitted to accommodate the additional traffic lanes. The intersection of Bethel Mitchell/Lund Rd will be replaced with a roundabout. Blueberry and Salmonberry Rd will be widened at the intersection to provide right and left turn lanes and U-turn movements. Property purchase will be approximately 60 acquisitions. Of the 60 acquisitions approximately 55 are 10'-20' wide frontage strips and 5 are total takes with relocation assistance.

Location / Facility: From: To: Bethel Road Lincoln Ave SE Ives Mill Rd SE County: Completion Year: Type: Kitsap County 2025 New Facility-Road Sponsor: PUYALLUP MTP Status: Approved Project ID: 141 Estimated Cost: $6,667,975 Title: 31st Ave SW Description: Widen 31st Ave SW between S Meridian/SR 161 to SR-512 westbound ramp including widening 31st Avenue SW overpass across SR- 512, signal modifications, addition of curb, gutter, sidewalks, and shared bike lanes, and add transit signal priority.

Location / Facility: From: To: 31st Ave SW SR 512 off ramp S Meridian/SR 161 County: Completion Year: Type: Pierce County 2005 New Facility-Road

Sponsor: PUYALLUP MTP Status: Approved Project ID: 2844 Estimated Cost: $1,476,088 Title: East Puyallup Riverfront Trail

Description: Shared use path

Location / Facility: From: To: Foothills Trail Terminus of Existing Foothills Trail at 134th Puyallup Riverfront Trail at easterly Puyallup Ave E city limits County: Completion Year: Type: Pierce County 2011 New Facility-Road Sponsor: PUYALLUP MTP Status: Completed Project ID: 2899 Estimated Cost: $1,139,759 Title: Puyallup Riverfront Trail Description: Shared use bike path

Location / Facility: From: To: Puyallup Riverfront Trail western terminus of existing Puyallup Puyallup city limits Riverfront Trail County: Completion Year: Type: Pierce County 2010 New Facility-Road

Sponsor: PUYALLUP MTP Status: Completed Project ID: 2900 Estimated Cost: $2,496,614 Title: Puyallup Riverfront Trail

Description: Shared use bike path

Location / Facility: From: To: Puyallup Riverfront Trail Eastern terminus of existing Puyallup Sumner city limits at river Riverfront Trail County: Completion Year: Type: Pierce County 2010 New Facility-Road Sponsor: PUYALLUP MTP Status: Completed Project ID: 138 Estimated Cost: $4,768,378 Title: S Meridian (SR 161) Description: This three phase project will reconstruct S Meridian with new infrastructure, curb, gutter and sidewalk. Interconnect signals, improve road base to support truck traffic and provide improved pedestrian friendly environment with street scape items.

Location / Facility: From: To: 0 7th Ave Stewart St County: Completion Year: Type: Pierce County 2000 New Facility-Road

Sponsor: PUYALLUP MTP Status: Candidate Project ID: 494 Estimated Cost: $3,644,126 Title: Shaw Rd

Description: Widen Shaw Road from 2 lanes to 5 lanes to include curb, gutter, sidewalk, shared bike lanes, transit signal priority, and street lighting. This project is critical as the other portion of Shaw Road connecting E Main and E Pioneer is currently under construction and will be completed by 2010. As a parallel route to S Meridian/SR 161, Shaw Road improvements would also help ease the traffic congestion along S Meridian/SR 161.

Location / Facility: From: To: Shaw Rd E Pioneer 39th Ave SE County: Completion Year: Type: Pierce County 2004 New Facility-Road Sponsor: PUYALLUP MTP Status: Unprogrammed Project ID: 129 Estimated Cost: $38,767,299 Title: Shaw Rd E Description: Conduct corridor study and environmental documentation for proposed north-south arterial roadway. Widen, and realign as needed, the existing two-lane roadway and/or construct new roadway (in portions) to include non-motorized features.

Location / Facility: From: To: Shaw Rd E SR 410 Orting-Kapowsin Hwy County: Completion Year: Type: Pierce County 2030 New Facility-Road

Sponsor: PUYALLUP MTP Status: Completed Project ID: 1222 Estimated Cost: $28,370,079 Title: Shaw Rd Extension in Puyallup

Description: The extension is a grade-separated crossing of the BNSF railway tracks, connecting Shaw road directly to E Main. This project also includes the addition of pedestrian and bicycle facilities and direct access to from E. Pioneer Ave. and Shaw Rd to E. Main.

Location / Facility: From: To: E MAIN AVE E. PIONEER AVE County: Completion Year: Type: Pierce County 2010 New Facility-Road Sponsor: PUYALLUP TRIBE MTP Status: Unprogrammed Project ID: 3443 Estimated Cost: $71,798 Title: Lister Gulch Bicycle-Pedestrian Improvements Description: Design and construction of 500 LF pedestrian and bicycle path, lighting and 40 LF bridge over Lister Gulch linking the Portland Avenue area neighborhood of Tacoma to the Puyallup Tribal campus thereby decreasing traffic at the I-5 and Hwy 167 interchange.

Location / Facility: From: To: Lister Gulch Bicycle-Pedestrian Tribal Administrative Center Portland Ave area Improvements County: Completion Year: Type: Tribal Nations 2010 New Facility-Road Sponsor: REDMOND MTP Status: Candidate Project ID: 5516 Estimated Cost: $12,300,737 Title: 148th Ave NE Description: Create third northbound through lane on 148th Ave NE from NE 22nd St to SR 520 eastbound on-ramp using primarily existing right turn lanes and modify SR 520 eastbound on-ramp to allow HOV access. At NE 24th St and 148th Ave NE intersection add second left turn lane on the eastbound and westbound approaches, add right turn lane on northbound approach, and extend right turn lane on westbound approach.

Location / Facility: From: To: 148th Ave NE NE 22nd St SR 520 eastbound on-ramp County: Completion Year: Type: King County 2022 New Facility-Road

Sponsor: REDMOND MTP Status: Approved Project ID: 2862 Estimated Cost: $11,391,899 Title: Bear and Evans Creek Trail Description: Shared use bike path

Location / Facility: From: To: Bear and Evans Creek Trail South of Union Hill Rd at Avondale Way Energy Trail and East Lake Sammamish Trail County: Completion Year: Type: King County 2035 New Facility-Road Sponsor: REDMOND MTP Status: Candidate Project ID: 5513 Estimated Cost: $2,164,930 Title: Bear Creek Trail Connector, Redmond Town Center to Marymoor Park Description: Construct paved multi-use trail that would cross over Bear Creek on a new bridge and pass under SR 520 on the east side of the Sammamish River.

Location / Facility: From: To: Bear Creek Trail Bear Creek Trail Sammamish River Trail County: Completion Year: Type: King County 2025 New Facility-Road

Sponsor: REDMOND MTP Status: Unprogrammed Project ID: 836 Estimated Cost: $22,073,478 Title: Bel-Red Rd

Description: Widen Bel-Red Rd. Improvements include 4-5 lanes, curb, gutter, sidewalks, street lights, storm drainage, underground power, right- of-way and easement acquisition. (exist- 2NB, 1SB)

Location / Facility: From: To: Bel-Red Rd NE 30th ST NE 40th ST County: Completion Year: Type: King County 2030 New Facility-Road Sponsor: REDMOND MTP Status: Candidate Project ID: 4116 Estimated Cost: $9,294,582 Title: Cleveland St Description: Convert Cleveland St to 1 through lane in each direction. Improvements include parking, curb bulbouts, widened sidewalks, pedestrian amenities and realignment of street at eastern connection to Redmond Way to improve traffic flow.

Location / Facility: From: To: Cleveland St Redmond Way Redmond Way (SR 202) County: Completion Year: Type: King County 2015 New Facility-Road

Sponsor: REDMOND MTP Status: Unprogrammed Project ID: 840 Estimated Cost: $22,513,063 Title: East Lake Sammamish Pkwy

Description: Widen East Lake Sammamish Pkwy from Redmond Way to 187th Ave NE. Improvements include 1 through lane in each direction, left turn lanes, bike lanes, curb, gutter, sidewalks, street lights, storm drainage, underground power, and right-of-way. (exist- 1NB, 1SB)

Location / Facility: From: To: East Lake Sammamish Pkwy Redmond Way 187th AVE NE County: Completion Year: Type: King County 2030 New Facility-Road Sponsor: REDMOND MTP Status: Unprogrammed Project ID: 5518 Estimated Cost: $6,150,369 Title: Puget Sound Energy Trail Improvements Description: Improve existing soft surface trail with newly paved multi-use trail that meets AASHTO standards. The trail corridor will also include a parallel soft surface trail.

Location / Facility: From: To: Puget Sound Energy Trail Sammamish River Trail Avondale Rd County: Completion Year: Type: King County 2035 New Facility-Road

Sponsor: REDMOND MTP Status: Candidate Project ID: 4115 Estimated Cost: $6,692,030 Title: Puget Sound Energy Trail, Rose Hill Extension

Description: Extend Puget Sound Energy Trail from its terminus west of Willows Road to 132nd Avenue NE and 142nd Ave NE. Trail project would also design and construct a new crossing of Willows Road in the vicinity of the trail crossing. Provides a connection to Kirkland.

Location / Facility: From: To: Puget Sound Energy Trail Willows Rd 132nd Ave NE/NE 142nd St County: Completion Year: Type: King County 2030 New Facility-Road

Sponsor: REDMOND MTP Status: Candidate Project ID: 2919 Estimated Cost: $31,696,314 Title: Redmond Central Connector Description: Shared use bike path

Location / Facility: From: To: Redmond Central Connector NE 124th St E Lake Sammamish Bike Trail @ SR 520 County: Completion Year: Type: King County 2025 New Facility-Road Sponsor: REDMOND MTP Status: Candidate Project ID: 4117 Estimated Cost: $8,670,398 Title: Redmond Way Description: Convert Redmond Way from 159th Pl NE to 170th Ave NE to 1 through lane in each direction and center turn lane except at west end where there would be two westbound through lanes from 159th Ave NE to 160th Ave NE. Improvements include curb bulbouts, sidewalk improvements, pedestrian amenities and parking.

Location / Facility: From: To: Redmond Way 159th Pl NE 170th Ave NE County: Completion Year: Type: King County 2015 New Facility-Road

Sponsor: REDMOND MTP Status: Candidate Project ID: 3662 Estimated Cost: $23,260,379 Title: Redmond Way Widening Description: Widen Redmond Way bridge at Bear Creek. Improvements would include 2 through lanes in each direction, 2 eastbound left turn lanes to NE 76th St, 1 eastbound right turn lane to westbound SR 520 on-ramp, sidewalks, Bear Creek and E Lake Sammamish Trail connections

Location / Facility: From: To: Redmond Way Bear Creek (171st Ave NE Vicinity) SR 520 Westbound on-ramp County: Completion Year: Type: King County 2030 New Facility-Road Sponsor: REDMOND MTP Status: Unprogrammed Project ID: 830 Estimated Cost: $25,801,963 Title: REDMOND-WOODINVILLE RD Description: Widen Red-Wood Rd from intersection with new 160th Ave NE Extension near the Puget Power trail north to NE 124th St. Improvements include 1 through lane in each direction, left turn and extended right turn lanes if appropriate, access management, bike lanes, curb, gutter, sidewalks, street lights, storm drainage, underground power and right-of-way acquisition. Redmond and WSDOT will coordinate a planning process to finalize final design for segment between 116th and 124th; the latter might not be widened. See also WSDOT project 1755.

Location / Facility: From: To: REDMOND-WOODINVILLE RD 160TH AVE NE NE 124th ST County: Completion Year: Type: King County 2035 New Facility-Road

Sponsor: REDMOND MTP Status: Candidate Project ID: 3476 Estimated Cost: $43,419,375 Title: SR 520/Avondale Rd/Union Hill Rd Intersection Description: heavily congestions at grade intersection. Solutions to study include: 1. High capacity continuous flow three lane roundabout. 2. Grade separation of critical movements such as: -- Westbound Union Hill Rd to Southbound SR 520 left turn, or -- Northbound and southbound through movements between SR 520 and Avondale Rd., or--All left turns at intersection. Flyover Ramp: This option would provide a flyover ramp from westbound Union Hill Road to westbound SR 520. To accommodate this flyover from center of Union Hill Road to the center of SR 520, it would be necessary to widen both roadways, modify NE 76th Street ramps, build retaining walls and potentially require additional right of way.

Location / Facility: From: To: Coal Creek Pkwy Novelty Hill Rd Union Hill Road County: Completion Year: Type: King County 2030 New Facility-Road Sponsor: REDMOND MTP Status: Unprogrammed Project ID: 3665 Estimated Cost: $15,227,795 Title: West Lake Sammamish Parkway Widening Description: Widen West Lake Sammamish Pkwy from NE 51st St to Bel-Red Rd. Improvements include 2 through lane in each direction, left turn lanes, bike lanes, curb, gutter, sidewalks, street lights, storm drainage, underground power and right-of-way.

Location / Facility: From: To: West Lake Sammamish Parkway NE 51st St Bel-Red Rd County: Completion Year: Type: King County 2030 New Facility-Road Sponsor: RENTON MTP Status: Candidate Project ID: 2671 Estimated Cost: $334,602 Title: Cedar River Trail Description: Shared use bike path

Location / Facility: From: To: Cedar River Trail Terminus of existing Cedar River Trail Rainier and 88th County: Completion Year: Type: King County 2020 New Facility-Road

Sponsor: RENTON MTP Status: Approved Project ID: 1308 Estimated Cost: $52,568,302 Title: Central Renton Transit Corridor - Rainier Ave S (SR 167) S Grady Way to S 2nd St Description: Reconfiguration of Rainier Ave S to accommodate Business Access and Transit (BAT) lanes specifically for use by transit, vehicles entering and exiting businesses and for right turn use at intersections.

Location / Facility: From: To: Rainier Ave S Grady Way N Airport Way County: Completion Year: Type: King County 2018 New Facility-Road

Sponsor: RENTON MTP Status: Candidate Project ID: 2326 Estimated Cost: $14,629,068 Title: Duvall Ave NE Description: Widen to 5 lanes, CGS (curb, gutter, and sidewalk), bike lanes, other amenities, channelization.

Location / Facility: From: To: Duvall Ave NE NE 4th St NE Sunset Blvd (SR 900) County: Completion Year: Type: King County 2020 New Facility-Road Sponsor: RENTON MTP Status: Completed Project ID: 4295 Estimated Cost: $18,744,786 Title: Duvall Ave NE Description: Widen to 5 lanes, CGS (curb, gutter and sidewalks), add bike lanes, add amenities, channelization

Location / Facility: From: To: Duvall Ave NE NE Sunset Blvd NE 25th Ct (Renton City Limit) County: Completion Year: Type: King County 2009 New Facility-Road

Sponsor: RENTON MTP Status: Candidate Project ID: 4296 Estimated Cost: $29,599,269 Title: Lake Washington Loop Trail Description: Shared use regional bike path

Location / Facility: From: To: Rainier Ave N/Airport Way/Logan Ave Rainier Ave N (city limits) Cedar River Trail/Logan Ave Bridge County: Completion Year: Type: King County 2015 New Facility-Road

Sponsor: RENTON MTP Status: Candidate Project ID: 2347 Estimated Cost: $14,629,068 Title: Logan Ave N Description: Reconstruction of roadway, installation of sidewalks, HOV/Rapid Ride improvements to the Boeing Renton Plant.

Location / Facility: From: To: Logan Ave N Renton Transit Center I-405 (NE Park Dr) County: Completion Year: Type: King County 2020 New Facility-Road Sponsor: RENTON MTP Status: Candidate Project ID: 2341 Estimated Cost: $31,940,132 Title: NE Sunset Blvd (SR-900) Corridor Improvements Description: Project involves a series of key improvements in this corridor to improve traffic operations, Transit Signal Priority (TSP) and adaptive system control improvements, pedestrian and bicycle needs. Phase 1 will construct multi-modal improvements along NE Sunset Blvd from Edmonds Ave NE to Monroe Ave NE. Improvements include access management through center medians, non-motorized improvements by adding bicycle lanes, multi-use trail, new sidewalks and landscaped buffers separating the sidewalk from the travel lanes, pedestrian ramps per current ADA standards, streetlights, traffic signal upgrades and coordination.

Location / Facility: From: To: NE Park Dr and NE Sunset Blvd Garden Ave East City limits (148th) County: Completion Year: Type: King County 2020 New Facility-Road

Sponsor: RENTON MTP Status: Unprogrammed Project ID: 4468 Estimated Cost: $23,679,415 Title: New P&R Lot-Renton Urban Center North Description: Construct new Park and Ride lot (250-300 spaces), in conjuction with I-405/N 8th St interchange (WSDOT I-405 BRT Project).

Location / Facility: From: To: I-405/N 8th St interchange vicinity I-405/N 8th St interchange vicinity - County: Completion Year: Type: King County 2030 New Facility-Road Sponsor: RENTON MTP Status: Unprogrammed Project ID: 2328 Estimated Cost: $29,599,269 Title: Oakesdale Ave SW Description: Widen Monster Rd Bridge; widen the roadway to 4/5 lanes +Bike Lanes + CGS

Location / Facility: From: To: Oakesdale Ave SW Monster Rd SR 900 County: Completion Year: Type: King County 2020 New Facility-Road

Sponsor: RENTON MTP Status: Candidate Project ID: 4433 Estimated Cost: $21,311,474 Title: Rainier Ave S Corridor Improvements – Phase 2 Description: Phase 2 improvements include installation of BAT lanes, medians, curb, gutter, wider sidewalks, planted pedestrian buffer, street lighting including pedestrian scale illumination.

Location / Facility: From: To: Rainier Ave S (SR 167) S 3rd St N Airport Way County: Completion Year: Type: King County 2018 New Facility-Road

Sponsor: RENTON MTP Status: Candidate Project ID: 910 Estimated Cost: $85,245,895 Title: SE Carr RD Description: Widen roadway to provide capacity improvements, assume an estimated 3 lanes each direction for widening

Location / Facility: From: To: SE Carr RD 108th Ave SE SR 167 County: Completion Year: Type: King County 2030 New Facility-Road Sponsor: RENTON MTP Status: Candidate Project ID: 2856 Estimated Cost: $2,367,942 Title: Springbrook/Interurban Connection (SW 27th St) Description: Shared use bike path

Location / Facility: From: To: Springbrook/Interurban Connection (SW Oakesdale Ave SW SR 181 27th St) County: Completion Year: Type: King County 2020 New Facility-Road

Sponsor: RENTON MTP Status: Candidate Project ID: 4164 Estimated Cost: $30,062,202 Title: SW 27th St / Strander Blvd Ph 1 Segment 2b

Description: Design and construction of the railroad bridge at the Union Pacific (UP) railroad tracks and a four lane roadway connecting SW27th St (in Renton) to Strander Blvd (in Tukwila).

Location / Facility: From: To: SW 27th St connecting to Strander Blvd SW 27th St Strander Blvd County: Completion Year: Type: King County 2020 New Facility-Road Sponsor: RENTON MTP Status: Candidate Project ID: 4165 Estimated Cost: $7,361,234 Title: SW 27th St/Strander Blvd Ph 2 Description: Improve the existing access along SW 27th St between Oakesdale Ave SW and East Valley Rd through signalization and/or limited channelization.

Location / Facility: From: To: SW 27th St Oakesdale Ave SW East Valley Rd County: Completion Year: Type: King County 2020 New Facility-Road

Sponsor: SAMMAMISH MTP Status: Unprogrammed Project ID: 1978 Estimated Cost: $30,247,978 Title: Sahalee Way NE

Description: 3 lanes with raised median/turn lanes, bike lanes and sidewalks

Location / Facility: From: To: Sahalee Way NE NE 25th Way NE 37th/City Limit County: Completion Year: Type: King County 2030 New Facility-Road

Sponsor: SEATAC MTP Status: Approved Project ID: 192 Estimated Cost: $11,513,447 Title: 28th/24th Ave S Description: It is to construct a new five lane arterial including bicycle lanes, curb, gutter, sidewalk, storm drainage, street lighting, signalization, channelization, landscaping, utilities, undergrounding of utility lines and paving.

Location / Facility: From: To: 28th/24th Ave S S 200th St S 208th Street County: Completion Year: Type: King County 2016 New Facility-Road Sponsor: SEATTLE MTP Status: Candidate Project ID: 5164 Estimated Cost: $24,720,300 Title: Seattle Center City Priority Bus Corridor: Jefferson/Yesler Description: Make capital improvements to support high frequency bus service, 18 hours a day, 7 days a week, in both directions. Make speed & reliability improvements. Improve accessibility of transit stops.

Location / Facility: From: To: James St Alaskan Way First Hill / Capitol Hill Regional Growth Center County: Completion Year: Type: King County 2025 New Facility-Road

Sponsor: SEATTLE MTP Status: Candidate Project ID: 5219 Estimated Cost: $30,900,375 Title: Seattle Center City Priority Bus Corridor: Pike/Pine

Description: Make capital improvements to support high frequency bus service, 18 hours a day, 7 days a week, in both directions. Make speed & reliability improvements. Improve accessibility of transit stops.

Location / Facility: From: To: Pike St 1st Ave First Hill / Capitol Hill Regional Growth Center County: Completion Year: Type: King County 2024 New Facility-Road Sponsor: SEATTLE MTP Status: Candidate Project ID: 5095 Estimated Cost: $6,180,075 Title: Seattle Center city Priority Bus Corridor: Seattle Center East Description: Make capital improvements to support high frequency bus service, 18 hours a day, 7 days a week, in both directions. Make speed & reliability improvements. Improve accessibility of transit stops.

Location / Facility: From: To: 3rd Ave Seattle Center S Jackson St County: Completion Year: Type: King County 2025 New Facility-Road

Sponsor: SEATTLE MTP Status: Candidate Project ID: 2857 Estimated Cost: $2,656,122 Title: 6th Ave Bike Path - Incorporated into 5145

Description: Shared use bike path

Location / Facility: From: To: 6th Ave Bike Path Mountain to Sound Trail at Royal Brougham SW Spokane St County: Completion Year: Type: King County 2020 New Facility-Road

Sponsor: SEATTLE MTP Status: Candidate Project ID: 2859 Estimated Cost: $1,238,231 Title: Alaskan Way Bicycle Facility Description: Separated bike facility in the Alaskan Way / East Marginal Way corridor.

Location / Facility: From: To: Alaskan Way Atlantic St SW Spokane St County: Completion Year: Type: King County 2020 New Facility-Road Sponsor: SEATTLE MTP Status: Approved Project ID: 2668 Estimated Cost: $20,430,810 Title: Burke-Gilman Trail Extension Description: The project encompasses design and construction of a final segment of the Burke-Gilman Trail, a multi-use trail located along the north side of the Ship Canal, from 11th Ave NW to the Chittenden Locks

Location / Facility: From: To: Burke-Gilman Trail 11th Ave NW Chittenden Locks County: Completion Year: Type: King County 2019 New Facility-Road

Sponsor: SEATTLE MTP Status: Candidate Project ID: 5136 Estimated Cost: $2,476,462 Title: Chesiahud Lake Union Loop Trail (Columbia Trail)

Description: Provides multi-use trail facilities for the Portage Bay area, connecting to the Burke-Gilman Trail.

Location / Facility: From: To: NE Columbia Rd/NE Boat St Montlake Bridge University Bridge County: Completion Year: Type: King County 2020 New Facility-Road

Sponsor: SEATTLE MTP Status: Completed Project ID: 3610 Estimated Cost: $12,229,900 Title: Chief Sealth Trail--Seattle--Center Segment Description: Through a partnership between Sound Transit and the City of Seattle, will construct a multi-use, non-motorized, asphalt path within Seattle City Light ROW.

Location / Facility: From: To: Chief Sealth Trail/Seattle City Light ROW Beacon Ave. S. @ S. Dawson St. 51st Ave. S. @ S. Gazelle St. County: Completion Year: Type: King County 2006 New Facility-Road Sponsor: SEATTLE MTP Status: Candidate Project ID: 3609 Estimated Cost: $3,714,693 Title: Chief Sealth Trail--Seattle--North Segment Description: Regional multi-use nonmotorized trail linking south and central Seattle

Location / Facility: From: To: Chief Sealth Trail/Seattle City Light ROW I-90 @ I-5 Beacon Ave. S. @ S. Dawson St. County: Completion Year: Type: King County 2020 New Facility-Road

Sponsor: SEATTLE MTP Status: Candidate Project ID: 3611 Estimated Cost: $3,714,693 Title: Chief Sealth Trail--Seattle--South Segment Description: Regional multi-use nonmotorized trail linking south and central Seattle.

Location / Facility: From: To: Chief Sealth Trail/Possibly Seattle City Light 51st Ave. S. @ S. Gazelle S. Leo St. @ 59th Ave. S. ROW County: Completion Year: Type: King County 2020 New Facility-Road

Sponsor: SEATTLE MTP Status: Candidate Project ID: 5153 Estimated Cost: $187,422,572 Title: First Hill Streetcar Line Description: Provides streetcar service with connections to First Hill via LINK Light Rail stations at Chinatown / International District and Capitol Hill.

Location / Facility: From: To: Jackson / Boren / Broadway 1st Ave S E Aloha St County: Completion Year: Type: King County 2016 New Facility-Road Sponsor: SEATTLE MTP Status: Completed Project ID: 5448 Estimated Cost: $9,649,569 Title: Greenwood Avenue North Corridor Improvement Description: Widen from an existing 4 lanes 40 ft to 5 lanes 55 ft. and include a center two-way-left turn lane. This improvement will include parking , curb, planting strip and concrete walkways on both sides of street which is a total improvement of the street right-of-way. Upgrade and interconnect two signals in project area. Upgrade street lighting, and drainage systems as needed. Transportation Improvement Board - Arterial Improvement Program funding - TIB FY05

Location / Facility: From: To: Greenwood Avenue North North 105th Street North 112th Street County: Completion Year: Type: King County 2008 New Facility-Road

Sponsor: SEATTLE MTP Status: Completed Project ID: 610 Estimated Cost: $34,670,466 Title: King St Multimodal Terminal Description: Intermodal; MIS Redevelop as inter/multimodal terminal

Location / Facility: From: To: King St Multimodal Terminal [Not submitted] County: Completion Year: Type: King County 2010 New Facility-Road Sponsor: SEATTLE MTP Status: Candidate Project ID: 5167 Estimated Cost: $1,114,408 Title: Lake to Bay Loop Trail Description: Figure-eight pedestrian and bicycling trail connecting Myrtle Edwards Park, Olympic Sculputre Park, Seattle Center, Lake Union Park and area neighborhoods in Uptown/Queen Anne and South Lake Union.

Location / Facility: From: To: various Elliott Bay Trail Elliott Bay Trail County: Completion Year: Type: King County 2020 New Facility-Road

Sponsor: SEATTLE MTP Status: Completed Project ID: 5168 Estimated Cost: $3,624,119 Title: Lake Union Ship Canal Trail

Description: This project completes Phase II of a multi-use trail, extending from the Fremont Bridge to Fisherman's Terminal, just west of 15th Ave. NW.

Location / Facility: From: To: West Nickerson Street 6th Ave W 15th Ave W County: Completion Year: Type: King County 2020 New Facility-Road Sponsor: SEATTLE MTP Status: Completed Project ID: 5509 Estimated Cost: $235,460,858 Title: Mercer Corridor East Phase Description: Improvements in the Mercer Corridor area between I-5 and Dexter Ave. Improvements include Roy St and 8th Ave reconstruction between Westlake and Dexter, Thomas St center turn lane and signals between Fairview and 5th, two-way conversion of Westlake Ave and 9th Ave between Aloha and Denny, two-way conversion of Mercer St between Yale Ave N and Dexter, two-way conversion of Valley St between Fairview and Westlake. All project activities will include Complete Street elements.

Location / Facility: From: To: Roy St, 8th Ave, Thomas St, Westlake Ave, I-5 Dexter 9th Ave, Mercer St, Valley St County: Completion Year: Type: King County 2012 New Facility-Road

Sponsor: SEATTLE MTP Status: Approved Project ID: 5510 Estimated Cost: $107,383,792 Title: Mercer Corridor West Phase Description: Improvements in the Mercer Corridor area between Dexter and Elliott Ave. Improvements include two-way conversion of Mercer St between Dexter and 2nd Ave, widening of Mercer St between Dexter and 5th Ave, two-way conversion of Roy St between 6th and Queen Anne Ave N, extension of 6th Ave from Mercer St to Harrison St, demolition of Broad St between 9th Ave and Harrison St. All project activities will include Complete Streets elements. Incorporates prior projects 5510, 5104, 5125, 5179.

Location / Facility: From: To: Mercer St, Dexter, Roy St, 6th Ave 9th Ave N Elliott Ave W County: Completion Year: Type: King County 2014 New Facility-Road Sponsor: SEATTLE MTP Status: Unprogrammed Project ID: 5183 Estimated Cost: $6,191,155 Title: MLK Jr Way Trail Description: Construct new trail from S Massachusetts St to S McClellan St. Provides access to Mt Baker Station.

Location / Facility: From: To: MLK Jr Way S Massachusetts St S McClellan St County: Completion Year: Type: King County 2040 New Facility-Road

Sponsor: SEATTLE MTP Status: Candidate Project ID: 5187 Estimated Cost: $29,599,269 Title: Montlake Blvd NE HOV Lane and ITS Improvements Description: Extend HOV lane on s/b Montlake Blvd and install ITS improvements to increase speed of HOV vehicles and encourage new transit service.

Location / Facility: From: To: Montlake Boulevard NE Pacific Place 25th Ave NE County: Completion Year: Type: King County 2020 New Facility-Road

Sponsor: SEATTLE MTP Status: Candidate Project ID: 2895 Estimated Cost: $7,429,386 Title: Mountain to Sound Trail Description: Shared use bike path

Location / Facility: From: To: Mountain to Sound Trail western terminus of existing I-90 Trail at 12th E Marginal Way Ave County: Completion Year: Type: King County 2020 New Facility-Road Sponsor: SEATTLE MTP Status: Candidate Project ID: 5212 Estimated Cost: $44,496,540 Title: Northgate Multimodal Transportation Hub Description: Make improvements to improve transfer opportunities between transit services. Provide multimodal connectivity to link to regional bus and light rail service, including but not limited to protected bike lanes, enhanced sidewalks, new pedestrian crossing and bicycle/pedestrian bridge over I-5.

Location / Facility: From: To: 3rd Ave NE NE 103rd Pinehurst County: Completion Year: Type: King County 2018 New Facility-Road

Sponsor: SEATTLE MTP Status: Candidate Project ID: 5215 Estimated Cost: $2,476,462 Title: Northlake Way Trail Description: Multi-use trail connecting Gasworks and Lake Union Parks, linking more than 35 pocket parks, street ends and waterways that ring Lake Union, and improving lake access from adjacent neighborhoods, downtown, and the University of Washington. Provides local access parallel to the Burke-Gilman Trail.

Location / Facility: From: To: N/NE Northlake Way University Bridge Stone Way N County: Completion Year: Type: King County 2020 New Facility-Road Sponsor: SEATTLE MTP Status: Unprogrammed Project ID: 5225 Estimated Cost: $2,476,462 Title: Puget Park Trail Description: Pedestrian Pathway w/ Bicycles Permitted

Location / Facility: From: To: Puget Park SW Dakota St SW Dawson St County: Completion Year: Type: King County 2020 New Facility-Road

Sponsor: SEATTLE MTP Status: Unprogrammed Project ID: 5229 Estimated Cost: $495,292 Title: Ravenna Ave NE Corridor Trail Improvements Description: Improve off-street multi-use trail parallel to Ravenna Ave NE.

Location / Facility: From: To: Ravenna Ave NE NE 55th St NE Ravenna Boulevard County: Completion Year: Type: King County 2040 New Facility-Road

Sponsor: SEATTLE MTP Status: Candidate Project ID: 5091 Estimated Cost: $8,652,105 Title: Seattle Bus Priority Corridor 10 Description: Make capital improvements to support high frequency bus service, 18 hours a day, 7 days a week, in both directions. Make speed & reliability improvements. Improve accessibility of transit stops.

Location / Facility: From: To: 15th Ave NW Northgate Multimodal Transportation Hub Pioneer Square / Chinatown / International District County: Completion Year: Type: King County 2020 New Facility-Road Sponsor: SEATTLE MTP Status: Candidate Project ID: 5177 Estimated Cost: $45,732,555 Title: Seattle Bus Priority Corridor 13/13A Description: Make capital improvements to support high frequency bus service, 18 hours a day, 7 days a week, in both directions. Make speed reliability improvements. Improve accessibility of transit stops.

Location / Facility: From: To: Seattle 32nd Ave NW Children`s Hospital and UW Medical Center County: Completion Year: Type: King County 2024 New Facility-Road

Sponsor: SEATTLE MTP Status: Candidate Project ID: 5156 Estimated Cost: $49,440,600 Title: Seattle Bus Priority Corridor 15

Description: Make capital improvements to support high frequency bus service, 18 hours a day, 7 days a week, in both directions. Make speed & reliability improvements. Improve accessibility of transit stops.

Location / Facility: From: To: Greenwood Ave N N 145th St (Seattle city limits) N 38th St County: Completion Year: Type: King County 2024 New Facility-Road Sponsor: SEATTLE MTP Status: Candidate Project ID: 5087 Estimated Cost: $58,092,705 Title: Seattle Bus Priority Corridor 2 Description: Make capital improvements to support high frequency bus service, 18 hours a day, 7 days a week, in both directions. Make speed and reliability improvements. Improve accessibility of transit stops.

Location / Facility: From: To: Seattle Downtown Seattle Seattle City Limits County: Completion Year: Type: King County 2024 New Facility-Road

Sponsor: SEATTLE MTP Status: Candidate Project ID: 5088 Estimated Cost: $86,521,050 Title: Seattle Bus Priority Corridor 5

Description: Make capital improvements to support high frequency bus service, 18 hours a day, 7 days a week, in both directions. Make speed & reliability improvements. Improve accessibility of transit stops.

Location / Facility: From: To: 23rd Ave E / 24th Ave E University District Link Light Rail Station Rainier Beach Link Light Rail Station County: Completion Year: Type: King County 2020 New Facility-Road Sponsor: SEATTLE MTP Status: Candidate Project ID: 5084 Estimated Cost: $135,961,651 Title: Seattle Center City Connector Description: Make capital improvements to connect South Lake Union and First Hill Streetcar lines. Provide infrastructure and expand streetcar fleet to ensure good speed and reliabilit5y and access to stations.

Location / Facility: From: To: 1st Ave N South Lake Union Pioneer Square / Chinatown/International District County: Completion Year: Type: King County 2020 New Facility-Road

Sponsor: SEATTLE MTP Status: Candidate Project ID: 5282 Estimated Cost: $24,720,300 Title: Seattle Center City Priority Bus Corridor: Jackson Description: Make capital improvements to support high frequency bus service, 18 hours a day, 7 days a week, in both directions. Make speed & reliability improvements. Improve accessibility of transit stops.

Location / Facility: From: To: Jackson St 1st Ave S Martin Luther King Jr Way County: Completion Year: Type: King County 2025 New Facility-Road Sponsor: SEATTLE MTP Status: Candidate Project ID: 5141 Estimated Cost: $86,521,050 Title: Seattle High Capacity Transit Corridor 11 Description: Make capital improvements to support rail service frequency, 18 hours a day, 7 days a week, in both directions. Make speed & reliability improvements. Improve accessibility of transit stops.

Location / Facility: From: To: Dexter / Nickerson NW 65 St King Street Station Multimodal Transportation Hub County: Completion Year: Type: King County 2020 New Facility-Road

Sponsor: SEATTLE MTP Status: Candidate Project ID: 5173 Estimated Cost: $148,321,801 Title: Seattle High Capacity Transit Corridor 6 Description: Make capital improvements to support high capacity transit service frequency, 18 hours a day, 7 days a week, in both directions. Make speed & reliability improvements. Improve accessibility of transit stops.

Location / Facility: From: To: Madison St Colman Dock Multimodal Transportation Hub Martin Luther King Jr Way County: Completion Year: Type: King County 2020 New Facility-Road Sponsor: SEATTLE MTP Status: Candidate Project ID: 5152 Estimated Cost: $152,029,846 Title: Seattle High Capacity Transit Corridor 8 Description: Make capital improvements to support rail service frequency, 18 hours a day, 7 days a week, in both directions. Make speed & reliability improvements. Improve accessibility of transit stops.

Location / Facility: From: To: Fairview Ave E Northgate Multimodal Transportation Hub King Street Station Multimodal Transportation Hub County: Completion Year: Type: King County 2020 New Facility-Road

Sponsor: SEATTLE MTP Status: Candidate Project ID: 5097 Estimated Cost: $30,900,375 Title: Seattle Priority Bus Corridor 1 Description: Make capital improvements to support high frequency bus service, 18 hours a day, 7 days a week, in both directions. Make speed and reliability improvements. Improve accessibility of transit stops.

Location / Facility: From: To: 4th Ave S South Lake Union White Center County: Completion Year: Type: King County 2020 New Facility-Road Sponsor: SEATTLE MTP Status: Candidate Project ID: 5079 Estimated Cost: $6,038,251 Title: Seattle Priority Bus Corridor 12 Description: Make capital improvements to support high frequency bus service, 18 hours a day, 7 days a week, in both directions. Make speed & reliability improvements. Improve accessibility of transit stops.

Location / Facility: From: To: 15th Ave NE Seattle city limits University District Link Light Rail Station County: Completion Year: Type: King County 2025 New Facility-Road

Sponsor: SEATTLE MTP Status: Candidate Project ID: 5075 Estimated Cost: $12,360,150 Title: Seattle Priority Bus Corridor 14

Description: Make capital improvements to support high frequency bus service, 18 hours a day, 7 days a week, in both directions. Make speed & reliability improvements. Improve accessibility of transit stops.

Location / Facility: From: To: 15th Ave NE 32nd Ave NW University District Link Light Rail Station County: Completion Year: Type: King County 2035 New Facility-Road Sponsor: SEATTLE MTP Status: Candidate Project ID: 5073 Estimated Cost: $38,791,493 Title: SEattle Priority Bus Corridor 3 Description: Make capital improvements to support high frequency bus service, 18 hours a day, 7 days a week, in both directions. Make speed and reliability improvements. Improve accessibility of transit stops.

Location / Facility: From: To: 14th Ave Othello Link Light Rail Station University district Link Light Rail Station County: Completion Year: Type: King County 2035 New Facility-Road

Sponsor: SEATTLE MTP Status: Candidate Project ID: 5165 Estimated Cost: $1,854,023 Title: Seattle Priority Bus Corridor 4

Description: Make capital improvements to support high frequency bus service, 18 hours a day, 7 days a week, in both directions. Make speed and reliability improvements. Improve accessibility of transit stops.

Location / Facility: From: To: Cherry St King Street Station Multimodal Transportation Mount Baker Transit Center Hub County: Completion Year: Type: King County 2025 New Facility-Road Sponsor: SEATTLE MTP Status: Candidate Project ID: 5218 Estimated Cost: $12,360,150 Title: Seattle Priority Bus Corridor 7 Description: Make capital improvements to support high frequency bus service, 18 hours a day, 7 days a week, in both directions. Make speed & reliability improvements. Improve accessibility of transit stops.

Location / Facility: From: To: E John St W Garfield St 23rd Ave County: Completion Year: Type: King County 2025 New Facility-Road

Sponsor: SEATTLE MTP Status: Candidate Project ID: 4092 Estimated Cost: $187,067,381 Title: Seattle Priority Bus Corridor 9: Aurora Village to Downtown via SR 99

Description: Make capital improvements to support high frequency bus service, 18 hours a day, 7 days a week, in both diretions, including business, access and transit lanes, where necessary. Make speed and reliability improvements, including ITS improvements. Improve accessibility of transit stops. Corridor incorporates T2040 project 4092, 1743.

Location / Facility: From: To: SR 99 Battery Street Tunnel N 145th St. County: Completion Year: Type: King County 2040 New Facility-Road Sponsor: SEATTLE MTP Status: Completed Project ID: 2902 Estimated Cost: $10,974,930 Title: Ship Canal Trail Extension Description: Shared use bike path

Location / Facility: From: To: Ship Canal Trail Extension Nickerson 15th W County: Completion Year: Type: King County 2008 New Facility-Road

Sponsor: SEATTLE MTP Status: Candidate Project ID: 5252 Estimated Cost: $21,431,029 Title: SODO Rail Corridor Grade Separations Description: Improve access to manufacturing and industrial center and Port facilities.

Location / Facility: From: To: BNSF RR S Royal Brougham Way S Spokane St County: Completion Year: Type: King County 2030 New Facility-Road

Sponsor: SEATTLE MTP Status: Candidate Project ID: 5254 Estimated Cost: $213,114,737 Title: South Lander Street Grade Separation Description: This project develops a grade separation of the Lander St. roadway and the Burlington Northern mainline railroad tracks between 1st Ave. S near the Starbucks Center and 4th Ave. S. to facilitate freight movement

Location / Facility: From: To: S Lander St 1st Ave S 4th Ave S County: Completion Year: Type: King County 2030 New Facility-Road Sponsor: SEATTLE MTP Status: Completed Project ID: 2905 Estimated Cost: $705,565 Title: Spokane St. Description: Shared use bike path

Location / Facility: From: To: Spokane St. 6th Ave S E Marginal Way County: Completion Year: Type: King County 2010 New Facility-Road

Sponsor: SEATTLE MTP Status: Completed Project ID: 958 Estimated Cost: $177,824,767 Title: Spokane Street Description: Widening, bridge strengthening and seismic improvements. Improve transit operations and access to the Port of Seattle by: a) removing and replacing traffic signal controllers; b) installing a full signal interconnect; c) providing loops for signal actuation; d) providing left turn lanes at 6th Ave S and at 4th Ave S; e) providing spot pavement resurfacing; f) providing transit a separate turn lane; g) installing a video system to monitor traffic in the corridor and on the viaduct; h) providing U-Turn facilities for trucks; i) improving signing to Port of Seattle facilities; j) improving x-walls; k) connecting signals to the central traffic computer, and; l) proving landscaping enhancements.

Location / Facility: From: To: SPOKANE STREET VIADUCT I-5 SR 99 County: Completion Year: Type: King County 2012 New Facility-Road Sponsor: SEATTLE MTP Status: Completed Project ID: 4263 Estimated Cost: $58,348,752 Title: Spokane Street Viaduct 4th Avenue Off-Ramp Description: Construct an off-ramp from the eastbound S. Spokane St Viaduct connecting to 4th Avenue South. The new ramp will help relieve congestion by providing a grade-separated route over three Burlington Northern-Santa Fe rail lines. The ramp will help relieve congestion by providing an alternate route over the rail lines and helping redistribute traffic across the arterial network, making more efficient use of local street capacity to help move regional traffic. The ramp will be part of a continuous HOV connection from West Seattle to the Seattle CBD and will also provide significant mitigation for the Alaskan Way Viaduct Project by providing an alternate access to I-5, I-90 and the Seattle CBD when SR 99 is closed for construction.

Location / Facility: From: To: 4th Ave Off-ramp EB Spokane St. Viaduct 4th Ave S. County: Completion Year: Type: King County 2010 New Facility-Road

Sponsor: SEATTLE MTP Status: Unprogrammed Project ID: 5274 Estimated Cost: $2,476,462 Title: Westcrest Park Trail Description: Pedestrian Pathway w/ Bicycles Permitted

Location / Facility: From: To: Watercrest Park/4th Ave SW SW Webster St 4th Ave SW County: Completion Year: Type: King County 2040 New Facility-Road Sponsor: SEATTLE MTP Status: Candidate Project ID: 5279 Estimated Cost: $6,180,075 Title: Westlake Multimodal Transportation Hub Description: Make improvements to improve transfer opportunities between transit and other modes, create clear routes and improved wayfinding, provide real-time transit rider information and maximize fare integration.

Location / Facility: From: To: 2nd, 3rd, 4th Ave Pine St County: Completion Year: Type: King County 2035 New Facility-Road

Sponsor: SEATTLE MTP Status: Unprogrammed Project ID: 5281 Estimated Cost: $2,476,462 Title: Woodland Park Trail

Description: Pedestrian Pathway w/ Bicycles Permitted

Location / Facility: From: To: Woodland Park Ave N N 50th St W Green Lake Way N County: Completion Year: Type: King County 2040 New Facility-Road Sponsor: SHORELINE MTP Status: Candidate Project ID: 4434 Estimated Cost: $236,794,153 Title: 145th Street Improvements Description: Construct improvements that include the following: * Improvements to vehicular capacity, safety and traffic flow, transit speed and reliability and accessibility to I-5 and the future light rail station. * Upgrade existing substandard, non-ADA compliant sidewalks and construct new sidewalk for a continuous system along the corridor * Install continuous illumination and landscaping, bus stop improvements. * Upgrade existing stormwater management system to improve water quality and provide flow control. * Install bicycle facilities.

Location / Facility: From: To: 145th Street 3rd Avenue NW Bothell Way NE (SR 522) County: Completion Year: Type: King County 2023 New Facility-Road

Sponsor: SHORELINE MTP Status: Candidate Project ID: 4435 Estimated Cost: $1,889,617 Title: 15th Ave NE Corridor Improvement Description: A corridor study will be performed for this Principal Arterial to identify a preferred transportation solution for this roadway segment, which could include a lane reduction from four to three and installation of bicycle lanes. This project would construct sidewalks where needed to result in continuous sidewalks along the corridor.

Location / Facility: From: To: 15th Ave NE NE 172nd St NE 195th St County: Completion Year: Type: King County 2018 New Facility-Road Sponsor: SHORELINE MTP Status: Completed Project ID: 3569 Estimated Cost: $19,057,936 Title: Aurora Avenue North Multi-Modal Corridor Project (N 185th St to N 192nd St) Description: The corridor improvement will include access management, sidewalks, pedestrian crossings, landscaping and urban amenities, intersection improvements, congestion reduction and Business Access and Transit (BAT) lanes. The improvements will occur on Aurora Avenue N (SR 99) between N 185th Street and N 192nd Street. Partners include: WSDOT, King Count Metro and TIB.

Location / Facility: From: To: SR 99 N 185th St N 192nd St County: Completion Year: Type: King County 2012 New Facility-Road

Sponsor: SHORELINE MTP Status: Approved Project ID: 4283 Estimated Cost: $54,684,245 Title: Aurora Avenue North Multi-Modal Corridor Project (N 192nd St to N 205th St) Description: The corridor improvement will include access management, sidewalks, pedestrian crossings, landscaping and urban amenities, intersection improvements, congestion reduction and Business Access and Transit (BAT) lanes. The improvements will occur on Aurora Avenue N (SR 99) between N 192nd Street and N 205th Street. Partners include: WSDOT, King Count Metro and TIB.

Location / Facility: From: To: SR 99 N 192nd St N 205th St/ 244th St SW County: Completion Year: Type: King County 2015 New Facility-Road Sponsor: SHORELINE MTP Status: Candidate Project ID: 1028 Estimated Cost: $24,478,467 Title: N 175th St Description: Roadway capacity improvements (additional turn and through lanes, extension of turn pockets), sidewalks, bicycle lanes, transit transfer upgrade at Meridian Avenue N and intersection improvements at Meridican Avenue N.

Location / Facility: From: To: N 175th St Stone Avenue N Interstate 5 County: Completion Year: Type: King County 2018 New Facility-Road

Sponsor: SHORELINE MTP Status: Completed Project ID: 4277 Estimated Cost: $57,465,684 Title: SR 99--Shoreline--North Segment

Description: This corridor improvement will include access management, sidewalks, pedestrian crossings, landscaping and urban amenities, intersection improvements, congestion reduction, and Business Access and Transit (BAT) lanes. The improvements will occur on Aurora Avenue N (SR 99) between N 165th Street and N 185th Street.

Location / Facility: From: To: SR 99 (Aurora Ave N) N 165th St. N 185th St. County: Completion Year: Type: King County 2011 New Facility-Road Sponsor: SNOHOMISH MTP Status: Candidate Project ID: 3577 Estimated Cost: $1,427,226 Title: Riverfront Trail, Western Section Description: Shared Use Bike Path along Snohomish River

Location / Facility: From: To: Riverfront alignment S. of First St. Hwy 9 on the Snohomish River Avenue D County: Completion Year: Type: Snohomish County 2020 New Facility-Road

Sponsor: SNOHOMISH MTP Status: Completed Project ID: 2823 Estimated Cost: $3,125,683 Title: Snohomish Centennial Trail Description: The Centennial Trail Extension project will construct approximately 0.75 miles of 12’-wide asphalt nonmotorized trail completing the missing link between the City’s existing Centennial Trail terminus at Bowen Street and the existing Snohomish County Centennial Trail at Pine Avenue. The project includes approximately 4 acres of landscaping, five street crossings, street frontage and other improvements. The trail will be located within abandoned railroad right-of-way purchased by the City using FHWA STP(E), CMAQ and City funds.

Location / Facility: From: To: Former BNSF RR route Bowen Street (existing Centennial Trail) intersection of Maple and Pine Avenues County: Completion Year: Type: Snohomish County 2011 New Facility-Road Sponsor: SNOHOMISH COUNTY MTP Status: Completed Project ID: 1956 Estimated Cost: $19,460,698 Title: 112th Street SW/Beverly Edmonds Road Description: Improve to 5 lanes urban standards with bicycle lanes

Location / Facility: From: To: Beverly Park Rd Airport Road SR 525 County: Completion Year: Type: Snohomish County 2009 New Facility-Road

Sponsor: SNOHOMISH COUNTY MTP Status: Unprogrammed Project ID: 584 Estimated Cost: $13,427,159 Title: Airport Way Description: Widening to 2/3 lane urban standards with bicycle lanes

Location / Facility: From: To: Airport Way SR 9 Snohomish C/L County: Completion Year: Type: Snohomish County 2020 New Facility-Road

Sponsor: SNOHOMISH COUNTY MTP Status: Candidate Project ID: 2822 Estimated Cost: $37,524,711 Title: Centennial Trail Description: Shared use bicycle path

Location / Facility: From: To: Centennial Trail Monroe southern city limits High Rock Rd County: Completion Year: Type: Snohomish County 2025 New Facility-Road Sponsor: SNOHOMISH COUNTY MTP Status: Unprogrammed Project ID: 2842 Estimated Cost: $37,524,711 Title: Centennial Trail Description: Shared use bicycle path

Location / Facility: From: To: Centennial Trail City of Snohomish city limits Existing Centennial Trail at Monroe city limits County: Completion Year: Type: Snohomish County 2025 New Facility-Road

Sponsor: SNOHOMISH COUNTY MTP Status: Completed Project ID: 2850 Estimated Cost: $24,535,388 Title: Centennial Trail Description: Shared use bicycle path

Location / Facility: From: To: Centennial Trail Snohomish/Skagit County Line Arlington City limits County: Completion Year: Type: Snohomish County 2012 New Facility-Road Sponsor: SNOHOMISH COUNTY MTP Status: Candidate Project ID: 4161 Estimated Cost: $5,353,624 Title: Eastside BNSF Trail (Segment C, Woodinville to Snohomish) Description: Study and possibly implement acquisition, design, and construction of a paved and soft-surface regional trail. Rail freight to continue from Woodinville to BNSF main Stevens pass East-West line while trail is under consideration.

Location / Facility: From: To: BNSF Corridor Woodinville rail junction@rail spur coming City of Snohomish from Redmond at Woodinville-Redmond Road/SR202 County: Completion Year: Type: Snohomish County 2020 New Facility-Road

Sponsor: SNOHOMISH COUNTY MTP Status: Completed Project ID: 1950 Estimated Cost: $16,679,407 Title: Granite Falls Alternative Route (Bypass) Description: New 2-lane principal arterial

Location / Facility: From: To: Granite Falls Alternative Route State Route 92 Mountain Loop Highway County: Completion Year: Type: Snohomish County 2011 New Facility-Road Sponsor: SNOHOMISH COUNTY MTP Status: Completed Project ID: 2805 Estimated Cost: $206,242 Title: Interurban Trail--124th Street SW I-5 overcrossing Description: Shared use bicycle path. See http://www1.co.snohomish.wa.us/Departments/Public_Works/Services/Roads/Projects/RC1022.htm

Location / Facility: From: To: Interurban Trail--124th St SW I-5 128th St SE I-5 overcrossing County: Completion Year: Type: Snohomish County 2006 New Facility-Road

Sponsor: SNOHOMISH COUNTY MTP Status: Candidate Project ID: 4016 Estimated Cost: $6,946,280 Title: North Creek Trail - Bothell to Mill Creek

Description: Regional Non-motorized trail

Location / Facility: From: To: North Creek Trail North Creek Park Filbert Road County: Completion Year: Type: Snohomish County 2025 New Facility-Road

Sponsor: SNOHOMISH COUNTY MTP Status: Candidate Project ID: 2263 Estimated Cost: $5,427,422 Title: North Creek Trail Link Description: New Class I bike/ped trail. Construct missing links in the North Creek Trail from Bothell to Everett.

Location / Facility: From: To: North Creek Trail Link North Creek Park McCollum Pk County: Completion Year: Type: Snohomish County 2025 New Facility-Road Sponsor: SNOHOMISH COUNTY MTP Status: Candidate Project ID: 2679 Estimated Cost: $499,323 Title: Riverfront/Interurban Connector Description: Shared use bike path Not in local plans

Location / Facility: From: To: Riverfront/Interurban Connector Planned Riverfront Trail Everett City Limits County: Completion Year: Type: Snohomish County 2025 New Facility-Road

Sponsor: SNOHOMISH COUNTY MTP Status: Unprogrammed Project ID: 2853 Estimated Cost: $23,880,656 Title: White Horse Trail Description: Shared use bike path, currently gravel, future will be paved. Existing bridge structures will need to be decked and railed.

Location / Facility: From: To: White Horse Trail Intersection of White Horse Trail and the Darrington Centennial Trail north of Arlington County: Completion Year: Type: Snohomish County 2020 New Facility-Road Sponsor: SNOQUALMIE MTP Status: Unprogrammed Project ID: 2676 Estimated Cost: $911,807 Title: Meadowbrook Farm Trail Extension Description: Shared use bike path In local plans

Location / Facility: From: To: Meadowbrook Farm Trail Extension Planned Meadowbrook Trail southern Snoqualmie City Boundary terminus County: Completion Year: Type: King County 2012 New Facility-Road

Sponsor: SNOQUALMIE MTP Status: Candidate Project ID: 4409 Estimated Cost: $5,302,511 Title: SR 202/Tokul Road Roundabout

Description: Intersections of Tokul Rd/SR 202 and Mill Pond Rd/SR 202 will be reconstructed and combined into a single lane modern roundabout

Location / Facility: From: To: SR 202 SR 202/Tokul Road - County: Completion Year: Type: King County 2014 New Facility-Road Sponsor: SOUND TRANSIT MTP Status: Candidate Project ID: 4081 Estimated Cost: $41,265,569 Title: Auburn Station improvements Description: Station/transit center access improvements. Make new improvements or modifications at or adjacent to the station/transit center that improve access for transit users. Potential improvements include pedestrian and bicycle support facilities, parking management and capacity expansion (up to 500 spaces), facilities and systems that enhance operation and access to the station/transit center by bus and other public transport systems, and information and wayfinding systems.

Location / Facility: From: To: Auburn Sounder Station 23 A St (Auburn) County: Completion Year: Type: King County 2023 New Facility-Road

Sponsor: SOUND TRANSIT MTP Status: Approved Project ID: 3477 Estimated Cost: $5,327,868 Title: Bellevue Way HOV Lanes and Transit Priority Description: Construct an inside southbound HOV lane and transit signal priority improvements between I-90 and the South Bellevue Park and Ride. The project will be designed and constructed in coordination with Sound Transit and will be designed to accommodate the potential extension of the HOV lane between the park and ride and the “Y” intersection between Bellevue Way and 112th Avenue SE.

Location / Facility: From: To: Bellevue Way South Bellevue P&R I-90 County: Completion Year: Type: King County 2015 New Facility-Road Sponsor: SOUND TRANSIT MTP Status: Unprogrammed Project ID: 5296 Estimated Cost: $1,650,493,801 Title: BNSF - Eastside Description: Utilize the Eastside BNSF rail corridor from Snohomish - Woodinville to Renton/ Tukwila for Commuter Rail

Location / Facility: From: To: Eastside BNSF alignment Snohomish Tukwila County: Completion Year: Type: Multicounty 2040 New Facility-Road

Sponsor: SOUND TRANSIT MTP Status: Approved Project ID: 2523 Estimated Cost: $3,284,228,474 Title: East Link light rail extension Description: Light rail. Extension from International District/Chinatown Station to Overlake Transit Center. Stations at Rainier Ave S/I-90 (Rainier), 77th Ave SE/I-90 (Mercer Island), Bellevue Way SE/112th Ave SE (South Bellevue), Main St/112th Ave SE (East Main), NE 4th St/110th Ave NE (Bellevue Transit Center), NE 8th St/116th Ave NE (Hospital), NE 15th St/120th Ave NE (120th), NE 16th St/130th Ave NE (130th), and 152nd Ave NE/SR520 (Overlake Village). Construct up to 2000 parking spaces at three stations.

Location / Facility: From: To: HCT Extension Downtown Bellevue Overlake Transit Center County: Completion Year: Type: King County 2021 New Facility-Road Sponsor: SOUND TRANSIT MTP Status: Completed Project ID: 4050 Estimated Cost: $18,428,641 Title: Edmonds Station Description: Commuter Rail Station including two platforms, shelters for weather protection, off-street bus area, short-term parking, and about 150 parking spaces

Location / Facility: From: To: Sounder Commuter Rail Edmonds Way / James Street @ BNSF RR County: Completion Year: Type: Snohomish County 2011 New Facility-Road

Sponsor: SOUND TRANSIT MTP Status: Unprogrammed Project ID: 4075 Estimated Cost: $925,814,088 Title: Extension of Tacoma Link to Tacoma Community College with Tacoma Link Technology Description: Construct a 5.5-mile at-grade extension of the existing Tacoma Link system from the 9th Street/Theater District Station in Downtown Tacoma to Tacoma Community College. Stations under consideration: stations at Stadium High School, Tacoma General Hospital (see project 5459), 6th/Sprague, the University of Puget Sound (on 6th), 6th/Stevens, 6th/Pearl, Tacoma Community College (S. 19th and Mildred in University Place). NOTE: This alignment is also subject to change, extension to Pacific Lutheran University (121st ST. S and Park Ave S in Parkland) is being considered. Undetermined which aligment will be chosen at this time but funded by ST2.

Location / Facility: From: To: 25th/Pacific/6th Mary Bridge Children's Hospital Tacoma Community College County: Completion Year: Type: Pierce County 2040 New Facility-Road Sponsor: SOUND TRANSIT MTP Status: Unprogrammed Project ID: 2529 Estimated Cost: $1,650,622,756 Title: HCT Extension from South Bellevue to Issaquah Description: HCT Corridor. COST ESTIMATE ASSUMES GRADE-SEPARATED AERIAL ALIGNMENT. PER-MILE AERIAL COST ESTIMATE USED. PROJECT COMPLETION POST-2027.

Location / Facility: From: To: I-90 Corridor S Bellevue Issaquah County: Completion Year: Type: King County 2040 New Facility-Road

Sponsor: SOUND TRANSIT MTP Status: Unprogrammed Project ID: 5359 Estimated Cost: $2,063,278,445 Title: HCT Northgate to Bothell

Description: HCT (mode TBD) from Northgate to Bothell via Roosevelt, NE 125th St., SR 522

Location / Facility: From: To: Roosevelt, NE 125th St., SR 522 Northgate Bothell County: Completion Year: Type: King County 2040 New Facility-Road Sponsor: SOUND TRANSIT MTP Status: Unprogrammed Project ID: 5294 Estimated Cost: $2,063,278,445 Title: HCT Redmond to UW Description: New HCT alignment (mode and exact alignment TBD) starting from Redmond TC and generally following the Link LRT Extension from Overlake to Redmond (MTP 2524) but then following SR 520 to vicinity of the UW LRT station.

Location / Facility: From: To: LRT new alignment (SR 520 corridor, N Redmond UW 45th St) County: Completion Year: Type: King County 2040 New Facility-Road

Sponsor: SOUND TRANSIT MTP Status: Unprogrammed Project ID: 2527 Estimated Cost: $7,221,474,558 Title: I-405 HCT Corridor from I-5 Interchange (Lynnwood) to Burien Description: HCT Corridor. COST ESTIMATE ASSUMES GRADE-SEPARATED AERIAL ALIGNMENT. PER-MILE AERIAL COST ESTIMATE USED. PROJECT COMPLETION POST-2027. HAS ABSORBED 2528, 2531, AND 2532. Intersects the Central Link line between the Airport and downtown Seattle but does not serve the airport directly.

Location / Facility: From: To: I-405 / SR 518 Corridor I-5 / I-405 Interchange (Alderwood) Burien Transit Center County: Completion Year: Type: King County 2040 New Facility-Road Sponsor: SOUND TRANSIT MTP Status: Completed Project ID: 4276 Estimated Cost: $48,204,585 Title: I-90 Two-Way Transit & HOV Operations (Stage 2) Description: Stage 2: This stage will design and construct (a) an eastbound HOV lane in the outer roadway between 80th Ave SE (Mercer Island) and Bellevue Way. Components of the project include: New HOV lane in the eastbound outer roadway; (b) 80th Ave SE HOV ramp modification to connect to the eastbound HOV lane; (c) Modification of Bellevue Way and I-405 HOV direct access from the eastbound HOV lane; (d) Eastbound I-90 to I-405 auxiliary lane extension west to East Mercer Way' and Variable speed limit system eastbound from 80th Ave SE to Bellevue Way.

Location / Facility: From: To: I-90, I-405, Bellevue Way, Rainier Ave/I-5 80th Avenue SE (Mercer Island) Bellevue Way / I-405 in Seattle County: Completion Year: Type: King County 2012 New Facility-Road

Sponsor: SOUND TRANSIT MTP Status: Approved Project ID: 3658 Estimated Cost: $67,600,000 Title: I-90 Two-Way Transit & HOV Operations (Stage 3) Description: Stage 3: This stage will design and construct eastbound and westbound HOV lanes in the outer roadway between I-5 in Seattle and 80th Avenue SE in Mercer Island. Components of the project include: Mount Baker Ridge and First Hill Lid tunnel system improvements

Location / Facility: From: To: I-90, 80th Avenue SE (Mercer Island) Rainier Ave/I-5 in Seattle 80th Avenue SE (Mercer Island) County: Completion Year: Type: King County 2016 New Facility-Road Sponsor: SOUND TRANSIT MTP Status: Candidate Project ID: 2644 Estimated Cost: $38,686,471 Title: Kent Station improvements Description: Station/transit center access improvements. Make new improvements or modifications at or adjacent to the station/transit center that improve access for transit users. Potential improvements include pedestrian and bicycle support facilities, parking management and capacity expansion (up to 450 spaces), facilities and systems that enhance operation and access to the station/transit center by bus and other public transport systems, and information and wayfinding systems.

Location / Facility: From: To: Kent Station P&R SR 167 County: Completion Year: Type: King County 2023 New Facility-Road

Sponsor: SOUND TRANSIT MTP Status: Completed Project ID: 4160 Estimated Cost: $18,477,105 Title: Kirkland Transit Center(3rd Street Downtown) Description: Provide a new transit center on 3rd Street between Central Way and Kirkland Avenue. The project will transform the existing bus facility into a regional transit hub with expanded bus capacity and routing options, improved waiting areas and passenger shelters, and enhanced pedestrian crossings. Signal, intersection, and traffic circulation improvements will increase bus speed and schedule reliability. Bicycle amenities, landscaping and public art are also elements of the project.

Location / Facility: From: To: Transit Center 3rd Street between Central Way and Kirkland Avenue County: Completion Year: Type: King County 2010 New Facility-Road Sponsor: SOUND TRANSIT MTP Status: Candidate Project ID: 4086 Estimated Cost: $47,713,314 Title: Lakewood Station improvements Description: Station/transit center access improvements. Make new improvements or modifications at or adjacent to the station/transit center that improve access for transit users. Potential improvements include pedestrian and bicycle support facilities, parking management and capacity expansion (up to 600 spaces), facilities and systems that enhance operation and access to the station/transit center by bus and other public transport systems, and information and wayfinding systems.

Location / Facility: From: To: Lakewood Station Pacific Hwy SW near 47th Ave SW @ BNSF RR County: Completion Year: Type: Pierce County 2023 New Facility-Road

Sponsor: SOUND TRANSIT MTP Status: Candidate Project ID: 4088 Estimated Cost: $486,517,450 Title: Link LRT Extension from Federal Way Transit Center to South Federal Way Description: Alignment and stations. From Federal Way TC (see #2525 for Fed Way TC info) to S 348th (vicinity: W side of I-5 and S. 348th).

Location / Facility: From: To: I-5 Corridor Federal Way Transit Center South Federal Way County: Completion Year: Type: King County 2040 New Facility-Road Sponsor: SOUND TRANSIT MTP Status: Candidate Project ID: 5391 Estimated Cost: $572,559,769 Title: Link LRT Extension from Highline Community College to Redondo/Star Lake Station Description: Alignment and Stations: From S 272nd St to Kent-DesMoines Rd (Near Highline CC).

Location / Facility: From: To: SR 99 Corridor Highline Community College Redondo/Star Lake County: Completion Year: Type: King County 2023 New Facility-Road

Sponsor: SOUND TRANSIT MTP Status: Candidate Project ID: 2519 Estimated Cost: $2,888,589,823 Title: Link LRT Extension from Lynnwood to Everett Description: Light Rail extension. COST ESTIMATE ASSUMES GRADE-SEPARATED AERIAL ALIGNMENT. PER-MILE AERIAL COST ESTIMATE USED. PROJECT COMPLETION POST-2027.

Location / Facility: From: To: I-5 Corridor Link LRT Everett Lynnwood Transit Center (202nd St SW & 46th Ave W) County: Completion Year: Type: Snohomish County 2040 New Facility-Road Sponsor: SOUND TRANSIT MTP Status: Candidate Project ID: 2524 Estimated Cost: $1,037,774,229 Title: Link LRT Extension from Overlake Transit Center to Redmond Description: Alignment and Stations. East Link project from the Overlake Transit Center to downtown Redmond. This segment would have three stations at SR-202 @ SR-520 (SE Redmond), BNSF ROW @ ~ 165th Ave. NE (Redmond Town Center), 161st Ave. NE @ NE 83rd St. (Redmond TC)

Location / Facility: From: To: Link LRT Extension Overlake Transit Center Redmond County: Completion Year: Type: King County 2030 New Facility-Road

Sponsor: SOUND TRANSIT MTP Status: Candidate Project ID: 2526 Estimated Cost: $1,111,404,796 Title: Link LRT Extension from Port of Tacoma to Tacoma Dome Description: HCT Corridor. COST ESTIMATE ASSUMES GRADE-SEPARATED AERIAL ALIGNMENT. PER-MILE AERIAL COST ESTIMATE USED. PROJECT COMPLETION POST-2027.

Location / Facility: From: To: I-5 Corridor Port of Tacoma Tacoma Dome County: Completion Year: Type: Pierce County 2040 New Facility-Road Sponsor: SOUND TRANSIT MTP Status: Candidate Project ID: 5392 Estimated Cost: $541,610,592 Title: Link LRT Extension from Redondo/Star Lake Station to Federal Way Transit Center Description: Alignment and Stations: Federal Way Transit Center (at S. 316/317th - track extends E from SR99 btwn 312th and 316th to meet the transit station) to S 272nd (272nd Street Station - S of 272nd to serve existing Redondo Heights P&R but opposite side of SR99 from P&R to be connected by ped bridge).

Location / Facility: From: To: SR 99 Corridor Redondo/Star Lake Federal Way Transit Center County: Completion Year: Type: King County 2040 New Facility-Road

Sponsor: SOUND TRANSIT MTP Status: Approved Project ID: 2525 Estimated Cost: $959,424,477 Title: Link LRT Extension from SeaTac Airport to Highline Community College Description: Alignment and Stations : Kent-DesMoines Rd (Near Highline CC) to S 200th St (Station). From 200th to SeaTac/ Airport Station

Location / Facility: From: To: SR 99 Corridor SeaTac Airport Station Highline Community College County: Completion Year: Type: King County 2020 New Facility-Road

Sponsor: SOUND TRANSIT MTP Status: Candidate Project ID: 4089 Estimated Cost: $819,383,186 Title: Link LRT Extension from South Federal Way to Port of Tacoma Description: Alignment and stations. From S 348th St. to Port of Tacoma (station in vicinity between I-5 and 58th Ave).

Location / Facility: From: To: I-5 Corridor South Federal Way Port of Tacoma County: Completion Year: Type: King County 2040 New Facility-Road Sponsor: SOUND TRANSIT MTP Status: Unprogrammed Project ID: 5295 Estimated Cost: $2,269,606,290 Title: LRT Ballard, Seattle, W Seattle Description: Light Rail from Ballard to Seattle CBD then to West Seattle (exact alignment TBD but potentially along previously studied monorail alignment)

Location / Facility: From: To: LRT new alignment (TBD) Ballard West Seattle County: Completion Year: Type: King County 2040 New Facility-Road

Sponsor: SOUND TRANSIT MTP Status: Unprogrammed Project ID: 5345 Estimated Cost: $618,983,534 Title: LRT UW to Ballard

Description: New LRT alignment (exact alignment TBD) generally following Pacific St. from the UW LRT station to the U District, then along N 45th St. to Ballard (at 15th)

Location / Facility: From: To: New LRT alignment UW Ballard County: Completion Year: Type: King County 2040 New Facility-Road Sponsor: SOUND TRANSIT MTP Status: Candidate Project ID: 2520 Estimated Cost: $1,894,353,222 Title: Lynnwood Link light rail extension Description: Light rail. Extension from Northgate to Lynnwood. Potential stations at NE 130th St, NE 145th ST or NE 155th ST along I-5 (Jackson Park/North Seattle), NE 185th St/I-5 (Shoreline), 236th St SW or 220th St SW along I-5 (Montlake Terrace), and at or adjacent to Lynnwood Transit Center (Lynnwood). Construct up to 1500 parking spaces at four stations.

Location / Facility: From: To: Link LRT Extension Lynnwood Transit Center (202nd St SW & 46th Northgate Ave W) County: Completion Year: Type: King County 2023 New Facility-Road

Sponsor: SOUND TRANSIT MTP Status: Candidate Project ID: 4072 Estimated Cost: $33,758,921 Title: New Permanent Sounder Station at Edmonds Crossing Description: This project would relocate the interim station at Edmonds to the permanent location and expand parking by up to 300 structured stalls for Sound Transit riders, in conjunction with Washington State Ferries' Edmonds Crossing multimodal terminal project.

Location / Facility: From: To: Edmonds Crossing 11400 Block Admiral Way @ BNSF RR County: Completion Year: Type: Snohomish County 2023 New Facility-Road Sponsor: SOUND TRANSIT MTP Status: Unprogrammed Project ID: 4073 Estimated Cost: $47,873,762 Title: New Sounder Station at Broad Street Description: Construct new station at the north end of the downtown Seattle core in the vicinity of Broad Street

Location / Facility: From: To: Broad Street Vicinity Broad Street@BNSF tracks County: Completion Year: Type: King County 2040 New Facility-Road

Sponsor: SOUND TRANSIT MTP Status: Unprogrammed Project ID: 4082 Estimated Cost: $80,243,426 Title: New Station in North Sumner Description: Construct a new Sounder station including station facilities, bus boarding area, and a surface parking lot with up to 400 stalls upon completion.

Location / Facility: From: To: North Sumner Sounder Station SW of East Valley Hwy / 8th St E @ BNSF RR (Sumner) County: Completion Year: Type: Pierce County 2040 New Facility-Road Sponsor: SOUND TRANSIT MTP Status: Approved Project ID: 2492 Estimated Cost: $2,486,338,604 Title: North Link light rail extension Description: Light rail. Extension from University of Washington to Northgate. Stations at Brooklyn/NE 45th (U-District), 12th Ave NE/NE 65th St (Roosevelt), and Northgate Transit Center @ 1st Ave NE/NE 103rd St (Northgate). Construct up to 450 parking spaces at one station.

Location / Facility: From: To: Link LRT Extension Northgate University of Washington Station County: Completion Year: Type: King County 2021 New Facility-Road

Sponsor: SOUND TRANSIT MTP Status: Completed Project ID: 4110 Estimated Cost: $0 Title: Pacific Avenue at S.26th/South Tacoma Way Rail grade separation crossing

Description: Build a rail grade separation crossing on Pacific Avenue in Tacoma to eliminate construction of two new at-grade crossings at Pacific Avenue and South Tacoma Way and would substantially improve safety and capacity for future operating expansion of passenger train service along the rail corridor. Cost reflected in 4047.

Location / Facility: From: To: Pacific Avenue@S 26th Street (downtown S 26th St S 26th St (over Pacific Ave) Tacoma) County: Completion Year: Type: Pierce County 2010 New Facility-Road Sponsor: SOUND TRANSIT MTP Status: Candidate Project ID: 4071 Estimated Cost: $19,366,229 Title: Parking Garage at Mukilteo Sounder Station Description: Joint Development of a garage at the Mukilteo Sounder station. ST to provide funding to construct up to 130 additional structured parking stalls for Sounder riders in a joint-use parking garage developed as part of Washington State Ferries' Mukilteo Landing multimodal terminal project. See 808 for main terminal project.

Location / Facility: From: To: Mukilteo Sounder Station First St E of SR 525 (Mukilteo) County: Completion Year: Type: Snohomish County 2023 New Facility-Road

Sponsor: SOUND TRANSIT MTP Status: Approved Project ID: 4080 Estimated Cost: $43,844,667 Title: Permanent Station at Tukwila Description: Build permanent station facilities, bus loading area, and new parking facilities (400 new stalls) for a total of 620 stalls at the station upon completion. See also 3557 for Tukwila street access project.

Location / Facility: From: To: Tukwila Sounder Station Longacres Way @ BNSF RR (Tukwila) County: Completion Year: Type: King County 2015 New Facility-Road Sponsor: SOUND TRANSIT MTP Status: Candidate Project ID: 4084 Estimated Cost: $73,504,295 Title: Puyallup Station improvements Description: Station/transit center access improvements. Make new improvements or modifications at or adjacent to the station/transit center that improve access for transit users. Potential improvements include pedestrian and bicycle support facilities,parking management and capacity expansion (up to 600 spaces), facilities and systems that enhance operation and access to the station/transit center by bus and other public transport systems, and information and wayfinding systems.

Location / Facility: From: To: Puyallup Sounder Station 131 W Main St (Puyallup) County: Completion Year: Type: Pierce County 2023 New Facility-Road

Sponsor: SOUND TRANSIT MTP Status: Approved Project ID: 2372 Estimated Cost: $89,773,928 Title: Renton HOV Access/N 8th Description: Construct a direct-access HOV interchange on I-405 at North 8th Street in north Renton. PROJECT IMPLEMENTATION IS DEPENDENT ON WSDOT OBTAINING FUNDING FOR THE I-405 WIDENING PROJECT.

Location / Facility: From: To: I-405 @ N 8th St I-405@N 8th St. County: Completion Year: Type: King County 2011 New Facility-Road Sponsor: SOUND TRANSIT MTP Status: Approved Project ID: 2640 Estimated Cost: $0 Title: S. 200th Park and Ride Description: 630 new stalls

Location / Facility: From: To: S. 200th Park and Ride I-5 South County: Completion Year: Type: King County 2020 New Facility-Road

Sponsor: SOUND TRANSIT MTP Status: Completed Project ID: 2502 Estimated Cost: $255,330,708 Title: Sounder Commuter Rail Auburn-Tacoma Track & Signal Description: Track and signal improvements.

Location / Facility: From: To: Sounder Commuter Rail Auburn Tacoma County: Completion Year: Type: King County 2008 New Facility-Road

Sponsor: SOUND TRANSIT MTP Status: Unprogrammed Project ID: 2533 Estimated Cost: $161,542,687 Title: Sounder Lakewood to Dupont Extension Description: Extension of service to DuPont, upgrade of track & signals between Lakewood and DuPont, and a new station at DuPont HAS ABSORBED 3314

Location / Facility: From: To: Sounder Commuter Rail Lakewood Dupont County: Completion Year: Type: Pierce County 2040 New Facility-Road Sponsor: SOUND TRANSIT MTP Status: Candidate Project ID: 4087 Estimated Cost: $229,652,441 Title: Sounder South service expansion Description: Expansion of Seattle-Tacoma-Lakewood Sounder service beyond the level provided in Sound Move, and related track and signal improvements along the Seattle/Tacoma Sounder line to support the service expansion. Up to 26 trains (13 round trips) in the south will be provided through agreements with the BNSF.

Location / Facility: From: To: Sounder Commuter Rail Seattle Lakewood County: Completion Year: Type: Pierce County 2023 New Facility-Road

Sponsor: SOUND TRANSIT MTP Status: Unprogrammed Project ID: 3311 Estimated Cost: $43,199,892 Title: Sounder station in Ballard Description: Sounder commuter rail. Construct new station (boarding platforms and related access improvements ) along north Sounder line at approximately NW 70th St in Ballard (Seattle).

Location / Facility: From: To: Sounder Commuter Rail NW 70th Block @ BNSF RR County: Completion Year: Type: King County 2040 New Facility-Road Sponsor: SOUND TRANSIT MTP Status: Candidate Project ID: 4085 Estimated Cost: $49,002,863 Title: South Tacoma Station improvements Description: Station/transit center access improvements. Make new improvements or modifications at or adjacent to the station/transit center that improve access for transit users. Potential improvements include pedestrian and bicycle support facilities, parking management and capacity expansion (up to 400 spaces), facilities and systems that enhance operation and access to the station/transit center by bus and other public transport systems, and information and wayfinding systems.

Location / Facility: From: To: South Tacoma Station S 56th St & Washington St (Tacoma) County: Completion Year: Type: Pierce County 2023 New Facility-Road

Sponsor: SOUND TRANSIT MTP Status: Candidate Project ID: 4083 Estimated Cost: $51,581,961 Title: Sumner Station improvements Description: Station/transit center access improvements. Make new improvements or modifications at or adjacent to the station/transit center that improve access for transit users. Potential improvements include pedestrian and bicycle support facilities, parking management and capacity expansion (up to 400 spaces), facilities and systems that enhance operation and access to the station/transit center by bus and other public transport systems, and information and wayfinding systems.

Location / Facility: From: To: Sumner Sounder Station 810 Maple St (Sumner) County: Completion Year: Type: Pierce County 2023 New Facility-Road Sponsor: SOUND TRANSIT MTP Status: Candidate Project ID: 4079 Estimated Cost: $16,764,137 Title: Surface Parking Expansion at Tacoma Dome Station Description: Construct a new surface parking lot with up to 300 stalls, for a total of 2,700 stalls upon completion.

Location / Facility: From: To: Tacoma Dome Station 605 Puyallup Ave (Tacoma) County: Completion Year: Type: Pierce County 2023 New Facility-Road

Sponsor: SOUND TRANSIT MTP Status: Candidate Project ID: 5459 Estimated Cost: $177,595,615 Title: Tacoma Link light rail expansion Description: Light rail. Expansion of existing Tacoma Link system. Places served include: Tacoma General and St. Joseph's medical campuses; mixed-use centers at Stadium High School.

Location / Facility: From: To: new UWT Station Via Mary Bridge Hospital to MLK Jr. Way and 19th County: Completion Year: Type: Pierce County 2023 New Facility-Road Sponsor: SOUND TRANSIT MTP Status: Completed Project ID: 4047 Estimated Cost: $232,118,825 Title: Tacoma-Lakewood Track & Signal Description: Track and signal improvements needed to implement the Tacoma-to-Lakewood Commuter Rail project. May include a rail grade- separated overcrossing at Pacific Avenue and S 26th Street in downtown Tacoma listed in project 4110.

Location / Facility: From: To: Sounder Commuter Rail Tacoma Lakewood County: Completion Year: Type: Pierce County 2012 New Facility-Road

Sponsor: SOUND TRANSIT MTP Status: Approved Project ID: 2493 Estimated Cost: $2,249,544,451 Title: University Link light rail extension

Description: Light rail. Extension from downtown Seattle transit tunnel to University of Washington. Stations at Broadway Ave/E John St (Capitol Hill) and Montlake Blvd/NE Pacific St (UW).

Location / Facility: From: To: Link Light Rail Westlake Station University of Washington Station (stadium) County: Completion Year: Type: King County 2016 New Facility-Road

Sponsor: SOUTH PRAIRIE MTP Status: Candidate Project ID: 2814 Estimated Cost: $868,387 Title: Foothills Trail Description: Shared use bike path

Location / Facility: From: To: Foothills Trail eastern city limits western city limits County: Completion Year: Type: Pierce County 2010 New Facility-Road Sponsor: SUMNER MTP Status: Candidate Project ID: 4460 Estimated Cost: $12,438,132 Title: Stewart Road (8th Street) Bridge Description: Replace existing bridge over the White River with a four lane bridge The Stewart Road corridor provides service to West Valley Highway, East Valley Highway and SR-167 from Auburn, Pacific, Bonney Lake, Pierce County and Sumner. Stewart Road sees significant truck traffic from the industrial and manufacturing centers located in north Sumner and south Pacific. The existing bridge structure consists of two 12-foot lanes, with no shoulders, and has been classified as “functionally obsolete”. This project will replace the existing two lane bridge over the White River at Stewart Road. The bridge replacement will accommodate four lanes of traffic, two 12-foot center lanes, two 15-foot outer lanes to accommodate both motorized and bicycle traffic, a 6.5-foot sidewalk on the south side, and a 10.5-foot sidewalk on the north side of the roadway. The overall bridge width, with guardrail, will be approximately 74-feet. The overall bridge length will be approximately 260-feet.

Location / Facility: From: To: Stewart Road (8th Street) in Sumner WA East bank of the White River West bank of the White River County: Completion Year: Type: Pierce County 2018 New Facility-Road

Sponsor: SUMNER MTP Status: Unprogrammed Project ID: 499 Estimated Cost: $15,533,696 Title: Stuck River Bridge Description: Widen existing bridge to improve access to Sumner and SR-410 weave

Location / Facility: From: To: Stuck River Bridge Vicinity of Stuck River County: Completion Year: Type: Pierce County 2016 New Facility-Road Sponsor: SUMNER MTP Status: Candidate Project ID: 2684 Estimated Cost: $6,202,768 Title: Sumner Trail Description: Construct multiuse trail on the east side of the Stuck River from the Tacoma Avenue Bridge to 24th Street E. This trail will provide access to the proposed Interurban and Foothill Trail extensions to the north and to the Foothills and Puyallup Trails to the south.

Location / Facility: From: To: Sumner Pacific Trail Extension Tacoma Avenue Bridge 24th Street County: Completion Year: Type: Pierce County 2014 New Facility-Road

Sponsor: SUMNER MTP Status: Completed Project ID: 2913 Estimated Cost: $5,427,422 Title: Sumner Trail

Description: Construct multiuse trail on the east side of the Stuck River from the Stuck River Bridge on Stewart Road to 16th Street E in the City of Sumner. This project will include constructed a trail along the western edge of the golf course and constructing a pedestrian bridge over the Stuck River.Houston Road to 24th Street E. This trail will provide access to the proposed Interurban and Foothill Trail extensions to the north and to existing, developer-built trails on the west bank of the Stuck River to the south.

Location / Facility: From: To: Sumner Pacific Trail The Stuck River Bridge on Stewart Road 16th Street E County: Completion Year: Type: Pierce County 2012 New Facility-Road Sponsor: SUMNER MTP Status: Candidate Project ID: 2914 Estimated Cost: $4,652,076 Title: Sumner Trail Description: Construct multiuse trail on the east side of the Stuck River from the SR 410 overpass on State Street to the Tacoma Avenue Bridge. This trail will provide access to the proposed Interurban and Foothill Trail extensions to the north and to the Foothills and Puyallup Trails to the south.

Location / Facility: From: To: Sumner Pacific Trail SR 410 Overpass on State Street Tacoma Avenue Bridge Terminus County: Completion Year: Type: Pierce County 2014 New Facility-Road

Sponsor: SUMNER MTP Status: Candidate Project ID: 500 Estimated Cost: $7,753,460 Title: Traffic Ave/Puyallup Riv Bridge Replacement Description: Widen Traffic Ave in Sumner and replace bridge across Puyallup River.

Location / Facility: From: To: Traffic Ave/Puyallup Riv Bridge Main (Sumner) Puyallup Replacement County: Completion Year: Type: Pierce County 1998 New Facility-Road Sponsor: SUMNER MTP Status: Candidate Project ID: 4466 Estimated Cost: $2,221,095 Title: West bound ramps Highway 410 and 166th Avenue E. Description: Reconstruct West bound on and off ramps to tie into 64th Street East.

Location / Facility: From: To: SR 410 SR 410 mile post 2.3 SR 410 mile post 2.8 County: Completion Year: Type: Pierce County 2018 New Facility-Road Sponsor: TACOMA MTP Status: Candidate Project ID: 4432 Estimated Cost: $22,210,951 Title: Brewery District Roadway Improvement Description: This project will implement the “Complete Streets” concept in the area of south downtown known as the brewery district. Improvements will include bike lanes, sidewalks, street bulb outs, transit improvements, signalization improvements, channelization, stormwater improvements, utilities and more to transform several arterial streets into a multimodal network that improves efficiency for all modes of transportation. The project will improve connections to the LINK Light Rail transit center and to the Tacoma Dome Station, (Regional Transit Center).

Location / Facility: From: To: Tacoma Brewery District Pacific Avenue to Jefferson Street and from S. S. 19th St. and S. 21st St. also extend to 19th Street to S. 25th Street Tacoma Avenue South County: Completion Year: Type: Pierce County 2019 New Facility-Road

Sponsor: TACOMA MTP Status: Completed Project ID: 2847 Estimated Cost: $2,140,063 Title: Historic Water Ditch Trail Description: Phase II--construct a Class 1 trail aligned on Tacoma's flume line right-of-way along Clement Ave. The trail length is approximately 1.8 miles. Trail amenities include bike racks, signage, trash receptacles, benches, and lighting. An existing small parking lot at South 76th Street and Cedar Street will be bought up to standards and will include trailhead elements.

Location / Facility: From: To: Tacoma's flume line right-of-way along Washington Street/S. 43rd to S. 47th Street, S. 80th at South Tacoma Way Clement Ave South 56th to South 60th Street, and South 72nd to South Tacoma Way, Trail to Sounder Rail Station in South Tacoma along S. 58th Street County: Completion Year: Type: Pierce County 2013 New Facility-Road Sponsor: TACOMA MTP Status: Completed Project ID: 4291 Estimated Cost: $1,875,933 Title: Historic Water Ditch Trail Description: Phase I--construct a Class 1 trail aligned on Tacoma's flume line right-of-way along Clement Ave. Total trail length all phases is approximately 6.5 miles

Location / Facility: From: To: 0 South 47th Street to South 56th Street, South - 60th Street to South 72nd Street County: Completion Year: Type: Pierce County 2009 New Facility-Road

Sponsor: TACOMA MTP Status: Candidate Project ID: 4292 Estimated Cost: $3,800,000 Title: Historic Water Ditch Trail Phase III Description: Phase III --construct an active transportation shared use path adjacent to South Tacoma Way between S. Pine Street and S. M Street.

Location / Facility: From: To: South Tacoma Way S.Pine St. S. M St. County: Completion Year: Type: Pierce County 2018 New Facility-Road

Sponsor: TACOMA MTP Status: Candidate Project ID: 4293 Estimated Cost: $2,489,828 Title: Historic Water Ditch Trail Phase IV Description: Phase IV -- construct an active transportation shared use path adjacent to South Tacoma Way from South M Street to South C Street.

Location / Facility: From: To: South Tacoma Way South M Street South C Street County: Completion Year: Type: Pierce County 2015 New Facility-Road Sponsor: TACOMA MTP Status: Completed Project ID: 4104 Estimated Cost: $21,079,896 Title: Hylebos Bridge, on E. 11th Street corridor between Taylor Way and Marine View Drive Description: Bridge Construction

Location / Facility: From: To: Hylebos Bridge Taylor Way Marine View Drive County: Completion Year: Type: Pierce County 2011 New Facility-Road

Sponsor: TACOMA MTP Status: Completed Project ID: 3550 Estimated Cost: $56,882,259 Title: Lincoln Ave Grade Separation Description: Grade Separation. This project will construct a three-lane overpass on Lincoln Avenue from Thorne Road to Marc Avenue for a total length of 3,000 feet. The completion of the Lincoln Avenue Overpass will allow for the unimpeded movement of vehicles and trains that move freight and goods in the Port of Tacoma. The overpass will allow rail-switching activity to take place without compromising over the road freight movements between Port Terminals and other businesses in the Puget Sound Region and beyond. The bridge will be a 3-lane structure at the time of implementation in 2009, but will be built to support five lanes; the additional lanes are expected to be added based on capacity needs by 2015. The total cost for all phases of this project (2006 estimate) is $42.5 M.

Location / Facility: From: To: Lincoln Ave Thorne Ave Marc Ave County: Completion Year: Type: Pierce County 2011 New Facility-Road Sponsor: TACOMA MTP Status: Candidate Project ID: 4431 Estimated Cost: $35,537,521 Title: MLK Mixed Use Center Complete Streets Improvement Project Description: This project will implement the “Complete Streets” concept in the area anchored by our two major healthcare facilities. Improvements will include bike lanes, sidewalks, street bulb outs, transit improvements, signalization improvements, channelization, stormwater improvements, utilities and more to transform several arterial streets into a multimodal network that improves efficiency for all modes of transportation. The project will improve connections to the LINK Light Rail transit center and to the Tacoma Dome Station, (Regional Transit Center).

Location / Facility: From: To: MLK Jr. Way MLK Jr. Way to J St. and from Division St. to S. - 25th St. County: Completion Year: Type: Pierce County 2019 New Facility-Road

Sponsor: TACOMA MTP Status: Completed Project ID: 4121 Estimated Cost: $5,548,119 Title: Pacific Ave. Safety and Mobility Improvements Description: Increase SOUNDER passenger rail capacity without degrading existing/future arterial capacity by grade separating the two travel modes.

Location / Facility: From: To: Pacific Ave S. 17th Street S. 25th Street County: Completion Year: Type: Pierce County 2013 New Facility-Road Sponsor: TACOMA MTP Status: Candidate Project ID: 2827 Estimated Cost: $4,143,898 Title: Pipeline Trail Description: Multimodal trail on Pipeline ROW from E. 40th to south City limits at S. 72nd St.

Location / Facility: From: To: Existing Roadways and existing Tacoma Tacoma Dome Sounder Station South City Limits Water Pipeline Trail County: Completion Year: Type: Pierce County 2016 New Facility-Road

Sponsor: TACOMA MTP Status: Candidate Project ID: 2688 Estimated Cost: $5,919,854 Title: Prairie Line Trail

Description: Active transportation path in the heart of downtown Tacoma along the historic Prairie Line trail corridor from 400' south of S. 25th, through University of Washington Tacoma campus and down to the Foss Waterway.

Location / Facility: From: To: Prairie Line Rail ROW South Tacoma Way Thea Foss Waterway County: Completion Year: Type: Pierce County 2016 New Facility-Road

Sponsor: TACOMA MTP Status: Candidate Project ID: 3648 Estimated Cost: $47,358,831 Title: Puyallup Bridge F16A & F16B Replacement Description: Bridge Construction, from 3 to 4 lanes.

Location / Facility: From: To: Puyallup Ave/Ells Street Portland Ave Milwaukee Way County: Completion Year: Type: Pierce County 2015 New Facility-Road Sponsor: TACOMA MTP Status: Unprogrammed Project ID: 4105 Estimated Cost: $71,038,246 Title: Puyallup River Bridge Rehabilitation (F16C, F16D, F16E). Description: Bridge Construction. Widen from 1 to 2 lanes WB

Location / Facility: From: To: Puyallup Ave/Ells Street Portland Ave Milwaukee Way County: Completion Year: Type: Pierce County 2021 New Facility-Road

Sponsor: TACOMA MTP Status: Candidate Project ID: 5514 Estimated Cost: $10,079,921 Title: Schuster Parkway Promenade Description: Multimodal Trail along Schuster Parkway linking downtown Tacoma with Ruston Way and north end neighborhoods.

Location / Facility: From: To: Thea Foss Esplanade to Ruston Way McCarver S 4th Street County: Completion Year: Type: Pierce County 2020 New Facility-Road

Sponsor: TACOMA MTP Status: Unprogrammed Project ID: 5507 Estimated Cost: $96,716,177 Title: Train To The Mountain Trail Description: Shared use path from Tacoma to Mt. Rainier

Location / Facility: From: To: Tacoma Rail ROW Downtown Tacoma Elbe County: Completion Year: Type: Pierce County 2040 New Facility-Road Sponsor: TUKWILA MTP Status: Candidate Project ID: 1294 Estimated Cost: $5,295,613 Title: BNSF Intermodal Railyard Access Description: Design and construct a new access to BNSF intermodal railyard

Location / Facility: From: To: BNSF Intermodal Railyard Access [Not submitted] County: Completion Year: Type: King County 2020 New Facility-Road

Sponsor: TUKWILA MTP Status: Unprogrammed Project ID: 1299 Estimated Cost: $3,031,603 Title: E Marginal Way Description: Design and construct widening to 3 lanes including curbs, gutters, sidewalks, drainage, and paving

Location / Facility: From: To: E Marginal Way Boeing Access Road S 112th St County: Completion Year: Type: King County 2020 New Facility-Road

Sponsor: TUKWILA MTP Status: Completed Project ID: 3429 Estimated Cost: $1,053,045 Title: Interurban Trail/Green River Trail Description: Construct a bicycle and pedestrian trail between and Strander and Southcenter Blvds completing the Green River / Interurban trail between Alki and Flaming Geyser trail. Segment is expected to interface with future multimodal center.

Location / Facility: From: To: Interurban Trail Southcenter Blvd Strander Blvd County: Completion Year: Type: King County 2010 New Facility-Road Sponsor: TUKWILA MTP Status: Completed Project ID: 3431 Estimated Cost: $11,513,188 Title: SR 99/ Pacific Highway South (Tukwila) Description: Reconstruct existing roadway which is two (2) through lanes in each direction, a center two-way left turn lane, left and right turn lanes at intersections, and bus pullouts. Other improvements will include curb and gutter, sidewalks, landscaping, drainage, curb ramps, signing, illumination, burying of overhead utilities, traffic signal modifications, and interconnect.

Location / Facility: From: To: 0 S 152nd St S 138th St County: Completion Year: Type: King County 2012 New Facility-Road

Sponsor: TUKWILA MTP Status: Unprogrammed Project ID: 1300 Estimated Cost: $4,652,076 Title: Tukwila International Blvd Description: Design and construct widening including paving, curbs, gutters, sidewalks, drainage

Location / Facility: From: To: Tukwila International Blvd Boeing Access Road S 116th Way County: Completion Year: Type: King County 2018 New Facility-Road Sponsor: TUKWILA MTP Status: Unprogrammed Project ID: 3557 Estimated Cost: $39,077,437 Title: Tukwila Station Access with 156th St to 16th Ave S Link Description: The project will construct approximately 1500 feet of new roadway, curb, gutter and sidewalks, and rail bridges to pass under the BNSF and UP tracks; connecting S 156th St in Tukwila to 16th Ave in Renton. Projects 4051 and 4080 describe the accompanying rail station (for Sound Transit and Amtrak) and Park & Ride facilities. Express bus and light rail may also serve the site.

Location / Facility: From: To: I-405 156th St 16th Ave S County: Completion Year: Type: King County 2020 New Facility-Road

Sponsor: TUKWILA MTP Status: Completed Project ID: 1303 Estimated Cost: $15,506,919 Title: Tukwila Urban Center Transit Center Description: Construct Transit Center in the CBD

Location / Facility: From: To: Tukwila CBD Bus Transit Center Strander Blvd Tukwila Parkway County: Completion Year: Type: King County 2015 New Facility-Road Sponsor: TULALIP TRIBES MTP Status: Candidate Project ID: 5429 Estimated Cost: $39,140,941 Title: I-5 @ 116th Street NE Interchange Description: This project replaces and upgrades a bottlenecked two signal diamond interchange overcrossing with a higher capacity Single Point Urban Interchange with one signal. Key project elements include adding an additional thru lane in each direction on 116th ST NE, widening of all interchange ramps and turn lanes, HOV bypass lanes on the on ramps, ramp metering, ITS equipment, replacement of the existing 3-lane overpass (116th ST NE) with an 8-lane bridge, bike lanes and sidewalks across I 5, and local road improvements.

Location / Facility: From: To: I-5 (at 116th ST NE Interchange) I-5 @ 116th Street NE I/C #N/A County: Completion Year: Type: Snohomish County 2015 New Facility-Road Sponsor: WOODINVILLE MTP Status: Candidate Project ID: 2377 Estimated Cost: $16,315,398 Title: BNRP: Trestle Replacement and Sammamish Bridge Replacement Description: Trestle Replacement: Widen existing roadway, including bridge sections, trestle removal, re-channelization, additional lanes, non- motorized improvements, signal and operational studies as needed to improve travel time and LOS. SBRP: Widen two-lane road and bridge section to provide additional lanes, curb-gutter, sidewalks and bike lanes for travel and queue storage.

Location / Facility: From: To: SR 202 NE 175th SR 522 County: Completion Year: Type: King County 2011 New Facility-Road

Sponsor: WOODINVILLE MTP Status: Unprogrammed Project ID: 2383 Estimated Cost: $8,030,437 Title: SR 202 Corridor Widening Improvement Description: Widening, bike and ped facilities, ped bridge, landscaping, widened to 3 lanes

Location / Facility: From: To: SR 202 NE 145th SR 202 (NE 175th) County: Completion Year: Type: King County 2010 New Facility-Road Sponsor: WOODINVILLE MTP Status: Unprogrammed Project ID: 4019 Estimated Cost: $49,521,026 Title: SR 202 Intersection Corridor Improvement (CCRP) Description: Rechannelization and reconfiguration of SR 202, including new turn pockets, widening, new traffic signal, and on-ramps, New connection between SR 202 and 175th. New ramp.

Location / Facility: From: To: SR 202 NE 175th NE 182nd County: Completion Year: Type: King County 2020 New Facility-Road

Sponsor: WOODINVILLE MTP Status: Candidate Project ID: 2815 Estimated Cost: $249,661 Title: Woodinville Valley Trail

Description: Shared use bike path (exact location needs to be verified)

Location / Facility: From: To: Woodinville Valley Trail Tolt Pipeline Trail in vicinity of 145th Tolt Pipeline Trail County: Completion Year: Type: King County 2010 New Facility-Road

Sponsor: WOODINVILLE MTP Status: Unprogrammed Project ID: 4017 Estimated Cost: $4,282,900 Title: Woodinville-Sno Rd Widening Description: Widen existing two lanes to provide additional lanes, turn lanes, curb/gutter and bike lanes, street lighting and signal improvements, 2 lanes to 3 lanes

Location / Facility: From: To: Woodinville-Snohomish NE 195th St NE 205th St County: Completion Year: Type: King County 2015 New Facility-Road Sponsor: WOODINVILLE MTP Status: Unprogrammed Project ID: 4018 Estimated Cost: $4,015,218 Title: Woodinville-Sno Rd Widening Description: Widen existing two lanes to provide an additional continuous left turn lane; also bike lanes

Location / Facility: From: To: Woodinville-Snohomish NE 185th St NE 195th St County: Completion Year: Type: King County 2012 New Facility-Road Sponsor: WSDOT MTP Status: Candidate Project ID: 4528 Estimated Cost: $334,601,525 Title: Bel-Red Regional Connectivity - SR 520 @ 124th I/C Description: Pending Interchange Justification effort currently underway. Upgrade the interchange to provide additional access to and from the east and construct an auxilary lane each direction between 124th and 148th Ave. NE.

Location / Facility: From: To: SR 520 @ 124th I/C SR 520 @ 124th I/C County: Completion Year: Type: King County 2025 New Facility-Road

Sponsor: WSDOT MTP Status: Candidate Project ID: 3541 Estimated Cost: $6,357,837 Title: Cedar River Trail / Lake WA Blvd Connector

Description: Add ped / bike facilities

Location / Facility: From: To: Cedar River Trail / Lake WA Blvd Connector Cedar River Trail Lake Washington Blvd Loop County: Completion Year: Type: King County 2030 New Facility-Road

Sponsor: WSDOT MTP Status: Candidate Project ID: 3542 Estimated Cost: $3,721,661 Title: Cedar-Duwamish Trail Connection Description: Add ped / bike facility

Location / Facility: From: To: Cedar-Duwamish Trail I-405 Interurban Ave S County: Completion Year: Type: King County 2030 New Facility-Road Sponsor: WSDOT MTP Status: Unprogrammed Project ID: 4106 Estimated Cost: $24,720,300 Title: East D Street Slip Ramps at SR 509 Description: Construct a half diamond interchange at East D Street.

Location / Facility: From: To: SR-509 and D Street East D Street@SR 509 East D Street County: Completion Year: Type: Pierce County 2030 New Facility-Road

Sponsor: WSDOT MTP Status: Candidate Project ID: 3540 Estimated Cost: $6,692,030 Title: I-405 Corridor: Cedar River Trail S Extension Description: Add ped / bike facility

Location / Facility: From: To: Cedar River Trail S I-405 Burnett Ave County: Completion Year: Type: King County 2030 New Facility-Road

Sponsor: WSDOT MTP Status: Unprogrammed Project ID: 4304 Estimated Cost: $35,844,435 Title: I-405 Corridor: Green River Crossing Description: (b) Rebuilds the Green River crossing.

Location / Facility: From: To: I-405 @ Green River Crossing I-405 @ Green River Crossing County: Completion Year: Type: King County 2040 New Facility-Road Sponsor: WSDOT MTP Status: Candidate Project ID: 3543 Estimated Cost: $5,892,629 Title: I-405 Corridor: I-405 / SR 167 Trail Connection Description: Add trail connection

Location / Facility: From: To: I-405 / SR 167 Trail Lind Ave SE Talbot Rd S County: Completion Year: Type: King County 2030 New Facility-Road

Sponsor: WSDOT MTP Status: Candidate Project ID: 4148 Estimated Cost: $29,664,360 Title: I-405 Corridor: I-405 interchange at 132nd St. NE Description: Build half diamond interchange to and from north at the NE 132nd St.

Location / Facility: From: To: I-405 @ NE 132nd St I-405 @ NE 132nd St County: Completion Year: Type: King County 2025 New Facility-Road

Sponsor: WSDOT MTP Status: Candidate Project ID: 5441 Estimated Cost: $127,309,545 Title: I-405 Corridor: I-405/I-90 HOV/HOT connections Description: WB I-90 to NB I-405 Freeway to Freeway HOV/HOT Connection

Location / Facility: From: To: I-405 @ I-90 I/C I-405 @ I-90 I/C County: Completion Year: Type: King County 2030 New Facility-Road Sponsor: WSDOT MTP Status: Candidate Project ID: 3544 Estimated Cost: $3,721,661 Title: I-405 Corridor: I-405@I-5 bike/ped facility via or around I-405@I-5 Interchange Description: Add ped / bike facility

Location / Facility: From: To: I-405 I-5 County: Completion Year: Type: King County 2030 New Facility-Road

Sponsor: WSDOT MTP Status: Candidate Project ID: 4363 Estimated Cost: $70,452,855 Title: I-405 Corridor: I-5 Improvements Description: (g) Reconstructs NB I-5 through the interchange.

Location / Facility: From: To: I-5 I-5 through I-405 I/C County: Completion Year: Type: King County 2030 New Facility-Road

Sponsor: WSDOT MTP Status: Candidate Project ID: 4360 Estimated Cost: $140,905,711 Title: I-405 Corridor: I-5 Interchange Description: (a) Reconstruct the following I-5/I-405 Interchange ramps: NB I-5 to NB I-405 (c) adds new GP direct connector flyover ramp from SB I- 405 to SB I-5 (d) SB I-5 to NB I-405

Location / Facility: From: To: I-405 @ I-5 I/C I-405 @ I-5 I/C County: Completion Year: Type: King County 2030 New Facility-Road Sponsor: WSDOT MTP Status: Completed Project ID: 4311 Estimated Cost: $173,042,101 Title: I-405 Corridor: I-5 to SR 169 - Stg. 2 (SR 167 to SR 169: Widening) Description: SR 167 to SR 169: (a) Widens I-405 from SR 167 to SR 169 by one lane NB and SB resulting in 4 lanes (1 HOV, 2 GP & 1 Aux.) in each direction. Minimizes investments in non-future compatible elements by using some non-standard lanes and shoulders.

Location / Facility: From: To: I-405 SR 167 SR 169 County: Completion Year: Type: King County 2011 New Facility-Road

Sponsor: WSDOT MTP Status: Completed Project ID: 4313 Estimated Cost: $0 Title: I-405 Corridor: I-5 to SR 169 - Stg. 2 (Benson Crossing)

Description: (c) Reconstruct the Benson Rd. crossing. Cost included in 4311.

Location / Facility: From: To: 0 I-405 @ Benson - County: Completion Year: Type: King County 2011 New Facility-Road

Sponsor: WSDOT MTP Status: Unprogrammed Project ID: 4368 Estimated Cost: $35,844,435 Title: I-405 Corridor: I-5 to SR 169 (Rainier Ave HOV direct access) Description: (l) Add HOV direct access ramp in vicinity of Rainier Ave S.

Location / Facility: From: To: I-405 @ Rainier Ave I/C I-405 @ Rainier Ave I/C County: Completion Year: Type: King County 2040 New Facility-Road Sponsor: WSDOT MTP Status: Unprogrammed Project ID: 4369 Estimated Cost: $0 Title: I-405 Corridor: I-5 to SR 169 (SR 167 component) Description: (n) SR 167 - Add one lane NB and SB from SW 41st to I-405 resulting in 5 lanes (1 HOV & 4 GP or 2 HOV & 3 GP).

Location / Facility: From: To: SR 167 SW 41st St I-405 County: Completion Year: Type: King County 2040 New Facility-Road

Sponsor: WSDOT MTP Status: Unprogrammed Project ID: 4367 Estimated Cost: $530,250,437 Title: I-405 Corridor: I-5 to SR 169 (SR 167 I/C and HOV direct access) Description: SR 167 Interchange: (k) Add GP direct connection ramp from SR 167 NB to I-405 SB. (m) Add NB and SB HOV flyover direct connector ramps connecting I-405 HOV lanes south of SR 167 I/C and SR 167 HOV/HOT lanes.

Location / Facility: From: To: I-405 @ SR 167 I/C I-405 @ SR 167 I/C County: Completion Year: Type: King County 2040 New Facility-Road

Sponsor: WSDOT MTP Status: Unprogrammed Project ID: 4366 Estimated Cost: $140,905,711 Title: I-405 Corridor: I-5 to SR 169 (SR 181 direct access) Description: (j) HOV direct access in SR 181 vicinity south of I-405.

Location / Facility: From: To: I-405 @ SR 181I/C I-405 @ SR 181I/C County: Completion Year: Type: King County 2040 New Facility-Road Sponsor: WSDOT MTP Status: Completed Project ID: 4302 Estimated Cost: $5,847,067 Title: I-405 Corridor: I-5 to SR 169 Widening Stage 1 (SR 167 component) Description: (c) On SR 167, extend the SB HOV lane north to I-405 and add a SB auxiliary lane from I-405 to the off-connection at SW 41st St.

Location / Facility: From: To: 0 SW 41st St I-405 County: Completion Year: Type: King County 2010 New Facility-Road

Sponsor: WSDOT MTP Status: Candidate Project ID: 4364 Estimated Cost: $140,905,711 Title: I-405 Corridor: I-5 to SR 181 Widening Description: (h) Add one lane NB and SB resulting in 5 lanes (1 HOV & 4 GP) between I-5 and SR 181

Location / Facility: From: To: I-405 I-5 SR 181 County: Completion Year: Type: King County 2030 New Facility-Road

Sponsor: WSDOT MTP Status: Unprogrammed Project ID: 4362 Estimated Cost: $705,764,568 Title: I-405 Corridor: I-5/ I-405 HOV direct connector ramps Description: (f) adds HOV direct connector ramps between I-405 and I-5 in all directions.

Location / Facility: From: To: I-405 @ I-5 I/C I-405 @ I-5 I/C County: Completion Year: Type: King County 2040 New Facility-Road Sponsor: WSDOT MTP Status: Candidate Project ID: 4330 Estimated Cost: $229,898,791 Title: I-405 Corridor: I-90 I/C and braided ramps Description: (a) Add NB I-405 to EB I-90 and (b) EB I-90 to SB I-405 braided ramps between Coal Ck Pkwy. and I-90.

Location / Facility: From: To: I-405 @ I-90 I/C I-405 @ I-90 I/C I-90 County: Completion Year: Type: King County 2030 New Facility-Road

Sponsor: WSDOT MTP Status: ROW Conditionally Ap Project ID: 4336 Estimated Cost: $43,260,525 Title: I-405 Corridor: I-90 to NE 6th Street (widening) Description: Add one lane NB and SB between I-90 and NE 6th Street resulting in 6 lanes NB and SB.

Location / Facility: From: To: I-405 I-90 SR 520 County: Completion Year: Type: King County 2030 Major Widening-GP

Sponsor: WSDOT MTP Status: Unprogrammed Project ID: 4339 Estimated Cost: $0 Title: I-405 Corridor: I-90 to SR 520 (114th Ave NE ramps) Description: (d) Modify ramps to accommodate lane addition and reconstruct and close a portion of 114th Ave NE. Costs included in 4382.

Location / Facility: From: To: I-405 @ 114th Ave NE I-405 @ 114th Ave NE County: Completion Year: Type: King County 2040 New Facility-Road Sponsor: WSDOT MTP Status: ROW Conditionally Ap Project ID: 4337 Estimated Cost: $70,452,855 Title: I-405 Corridor: I-90 to SR 520 (Main St. Bridge component) Description: (b) Reconstruct the Main Street bridge. Cost included in 4336.

Location / Facility: From: To: I-405 @ Main St bridge I-405 @ Main St bridge County: Completion Year: Type: King County 2030 Bridge Replace

Sponsor: WSDOT MTP Status: Candidate Project ID: 4338 Estimated Cost: $239,786,911 Title: I-405 Corridor: I-90 to SR 520 (SE 8th braided ramps) Description: (c) Construct NB and SB braided crossings for the on and off ramps on the north legs of the SE 8th St Interchange.

Location / Facility: From: To: I-405 @ SE 8th St I/C I-405 @ SE 8th St I/C County: Completion Year: Type: King County 2030 New Facility-Road

Sponsor: WSDOT MTP Status: Candidate Project ID: 4345 Estimated Cost: $70,452,855 Title: I-405 Corridor: NE 10th I/C Description: (b) Includes the EB SR 520 off-ramp to NE 10th.

Location / Facility: From: To: SR 520 @ NE 10th I/C SR 520 @ NE 10th I/C County: Completion Year: Type: King County 2030 New Facility-Road Sponsor: WSDOT MTP Status: Completed Project ID: 4341 Estimated Cost: $936,210 Title: I-405 Corridor: NE 10th ramp Description: (c) Includes constructing the NE 10th to EB SR 520 ramp.

Location / Facility: From: To: SR 520 @ NE 10th I/C SR 520 @ NE 10th I/C County: Completion Year: Type: King County 2012 New Facility-Road

Sponsor: WSDOT MTP Status: Completed Project ID: 4343 Estimated Cost: $936,210 Title: I-405 Corridor: NE 12th improvements Description: (e) Requires replacement of the NE 12th structure and ramp and collector distributor revisions on EB SR 520.

Location / Facility: From: To: I-405 @ NE 12th structure/ SR 520 I-405 @ NE 12th structure/ SR 520 County: Completion Year: Type: King County 2012 New Facility-Road

Sponsor: WSDOT MTP Status: Unprogrammed Project ID: 4380 Estimated Cost: $0 Title: I-405 Corridor: NE 2nd St Description: (e) NE 2nd St.: Construct half-diamond interchange with ramps to and from the south. Costs included in 4382.

Location / Facility: From: To: I-405 @ NE 2nd St I/C I-405 @ NE 2nd St I/C County: Completion Year: Type: King County 2040 New Facility-Road Sponsor: WSDOT MTP Status: Completed Project ID: 4340 Estimated Cost: $274,295,023 Title: I-405 Corridor: NE 4th to SR 520 and NE 8th to SR 520 -NB Braided Ramps Description: (a) Construct NB to SR 520 EB braided ramp to separate NB I-405 to EB SR 520 off-ramp from NE 8th to NB I-405 on-ramp and (b) Separating I-405 to EB SR 520 traffic from SR 520 EB off-ramp to 124th Ave NE traffic. (d) Adds one NB auxiliary lane from NE 4th to SR 520. (f) Convert WB SR 520 to SB I-405 ramp to auxiliary lane.

Location / Facility: From: To: I-405 @ SR 520 I/C I-405 @ SR 520 I/C #N/A County: Completion Year: Type: King County 2012 New Facility-Road

Sponsor: WSDOT MTP Status: Candidate Project ID: 4479 Estimated Cost: $18,540,225 Title: I-405 Corridor: NE 6th Street to SR 520 (widening): Description: Add one lane NB and SB between NE 6th Street and SR 520 resulting in 6 lanes NB and SB.

Location / Facility: From: To: I-405 NE 6th St SR 520 County: Completion Year: Type: King County 2020 Major Widening-GP Sponsor: WSDOT MTP Status: Unprogrammed Project ID: 4351 Estimated Cost: $38,316,465 Title: I-405 Corridor: NE 85th - NE 124th Description: (h) NE 85th to NE 116th: Add one lane NB and SB resulting in 6 lanes (1 HOV, 4 GP & 1 Aux. or 2 HOV, 3 GP & 1 Aux.) in each direction including Managed Lanes buffer. (i) NE 116th to NE 124th: Add one lane NB and SB resulting in 6 lanes (1 HOV, 4 GP & 1 Aux. or 2 HOV, 3 GP & 1 Aux.) in each direction including Managed Lanes buffer.

Location / Facility: From: To: I-405 NE 85th NE 124th County: Completion Year: Type: King County 2040 New Facility-Road

Sponsor: WSDOT MTP Status: Unprogrammed Project ID: 4381 Estimated Cost: $0 Title: I-405 Corridor: NE 8th St Description: (f) NE 8th St.: Revise NE 8th Interchange configuration. Costs included in 4382.

Location / Facility: From: To: I-405 @ NE 8th St I/C I-405 @ NE 8th St I/C County: Completion Year: Type: King County 2040 New Facility-Road

Sponsor: WSDOT MTP Status: Candidate Project ID: 4344 Estimated Cost: $70,452,855 Title: I-405 Corridor: NE 8th to SR 520 - SB Braided Ramps Description: (a) Construct SB braided ramp to separate SB I-405 to NE 8th and EB SR 520 to NE 10th traffic from EB SR 520 to SB I-405 traffic.

Location / Facility: From: To: I-405 @ SR 520 I/C I-405 @ SR 520 I/C County: Completion Year: Type: King County 2030 New Facility-Road Sponsor: WSDOT MTP Status: Approved Project ID: 4133 Estimated Cost: $396,203,923 Title: I-405 Corridor: SR 167 Direct HOV Ramps Description: SR 167 Interchange: Construct NB and SB HOV flyover ramps directly connecting SR 167 HOV/HOT lanes with I-405 HOV lanes north of the SR 167 Interchange. (a) Provides SB I-405 HOV/HOT to SB SR 167 HOV/HOT and (b) NB SR 167 HOV/HOT to NB I-405 HOV/HOT.

Location / Facility: From: To: I-405 SR 167 SR 167 County: Completion Year: Type: King County 2018 New Facility-Road

Sponsor: WSDOT MTP Status: Unprogrammed Project ID: 4306 Estimated Cost: $35,844,435 Title: I-405 Corridor: SR 167 Interchange

Description: (a) Add one GP lane NB and SB through the SR 167 Interchange resulting in 1 HOV and 3 GP lanes in each direction.

Location / Facility: From: To: I-405 @ SR 167 I/C I-405 @ SR 167 I/C County: Completion Year: Type: King County 2040 New Facility-Road

Sponsor: WSDOT MTP Status: Unprogrammed Project ID: 4309 Estimated Cost: $106,297,290 Title: I-405 Corridor: SR 167 Interchange Description: (d) Construct GP ramp connecting I-405 SB to SR 167 SB.

Location / Facility: From: To: I-405 @ SR 167 I/C I-405 @ SR 167 I/C County: Completion Year: Type: King County 2040 New Facility-Road Sponsor: WSDOT MTP Status: Unprogrammed Project ID: 4307 Estimated Cost: $70,452,855 Title: I-405 Corridor: SR 167 Interchange (Lind half-diamond component) Description: (b) Construct half-diamond interchange at Lind Ave.

Location / Facility: From: To: I-405 @ Lind Ave I-405 @ Lind Ave County: Completion Year: Type: King County 2040 New Facility-Road

Sponsor: WSDOT MTP Status: Unprogrammed Project ID: 4308 Estimated Cost: $17,304,210 Title: I-405 Corridor: SR 167 Interchange (Lind to Talbot frontage roads) Description: (c) Construct NB and SB frontage roads connecting half-diamond interchanges at Lind and Talbot (SR 515).

Location / Facility: From: To: Frontage roads parallel to I-405 Lind Talbot (SR 515) County: Completion Year: Type: King County 2040 New Facility-Road

Sponsor: WSDOT MTP Status: Unprogrammed Project ID: 4310 Estimated Cost: $61,800,750 Title: I-405 Corridor: SR 167 Interchange (SR 167 component) Description: (e) Add one NB lane on SR 167 between S 180th (SW 43rd) and I-405 resulting in 4 lanes (1 HOV and 3 GP).

Location / Facility: From: To: SR 167 S 180th (SW 43rd) I-405 County: Completion Year: Type: King County 2030 New Facility-Road Sponsor: WSDOT MTP Status: Unprogrammed Project ID: 4314 Estimated Cost: $194,040,760 Title: I-405 Corridor: SR 167 to SR 169 Widening Description: (a) Rebuilds I-405 to Master Plan resulting in 5 lanes (1 HOV & 4 GP or 2 HOV & 3 GP) in each direction. Includes the 4 ft. HOV buffer.

Location / Facility: From: To: I-405 SR 167 SR 169 County: Completion Year: Type: King County 2040 New Facility-Road

Sponsor: WSDOT MTP Status: Unprogrammed Project ID: 4315 Estimated Cost: $87,757,065 Title: I-405 Corridor: SR 167 to SR 169 Widening Description: (b) Rebuilds the SR 169 Interchange.

Location / Facility: From: To: I-405 @ SR 169 I/C I-405 @ SR 169 I/C County: Completion Year: Type: King County 2040 New Facility-Road

Sponsor: WSDOT MTP Status: Unprogrammed Project ID: 4317 Estimated Cost: $123,601,500 Title: I-405 Corridor: SR 167 to SR 169 Widening (BNRR and Cedar Bridge crossings) Description: (d) Reconstructs the bridge over the Cedar R and realigns and reconstructs the BNRR over the Cedar River.

Location / Facility: From: To: I-405 @ Cedar River crossing I-405 @ Cedar River crossing County: Completion Year: Type: King County 2040 New Facility-Road Sponsor: WSDOT MTP Status: Unprogrammed Project ID: 4316 Estimated Cost: $35,844,435 Title: I-405 Corridor: SR 167 to SR 169 Widening (Renton Hill access component) Description: (c) Reconstructs access to Renton Hill.

Location / Facility: From: To: unknown unknown County: Completion Year: Type: King County 2040 New Facility-Road

Sponsor: WSDOT MTP Status: Unprogrammed Project ID: 4373 Estimated Cost: $35,844,435 Title: I-405 Corridor: SR 169 Direct Connection Ramp Description: (a) Construct NB SR 169 to NB I-405 direct connection ramp.

Location / Facility: From: To: I-405 @ SR 169 I/C I-405 @ SR 169 I/C County: Completion Year: Type: King County 2040 New Facility-Road

Sponsor: WSDOT MTP Status: ROW Conditionally Ap Project ID: 4320 Estimated Cost: $247,203,001 Title: I-405 Corridor: SR 169 to I-90 Description: (b) Modify or rebuild N 3rd St. I/C (to accommodate future direct ramp to SR 169); Cost includes part of the 4318 widening through this segment.

Location / Facility: From: To: I-405 @ N 3rd St I-405 @ N 3rd St County: Completion Year: Type: King County 2020 Major Interchange-GP Sponsor: WSDOT MTP Status: ROW Conditionally Ap Project ID: 4324 Estimated Cost: $144,613,756 Title: I-405 Corridor: SR 169 to I-90 (112th St I/C component) Description: (f) Modify or rebuild 112th St I/C (to accommodate future flyer stop and park & ride expansion). Cost includes part of the 4318 widening through this segment.

Location / Facility: From: To: I-405 @ 112th St I/C I-405 @ 112th St I/C County: Completion Year: Type: King County 2020 Major Interchange-HOV

Sponsor: WSDOT MTP Status: Candidate Project ID: 4478 Estimated Cost: $71,688,870 Title: I-405 Corridor: SR 169 to I-90 (Coal Creek Pkwy component NB lane)

Description: Add 1 NB GP/Aux lane between 112th and I-90

Location / Facility: From: To: I-405 112th St I-90 County: Completion Year: Type: King County 2025 Major Widening-GP

Sponsor: WSDOT MTP Status: ROW Conditionally Ap Project ID: 4325 Estimated Cost: $71,688,870 Title: I-405 Corridor: SR 169 to I-90 (Coal Creek Pkwy Component) Description: (g) Modify or rebuild Coal Ck Pkwy I/C; add SB lane and rebuild the existing roadway half way to the 112th St interchanges in the south and all the way to I-90 in the north. Cost includes part of the 4318 widening through this segment.

Location / Facility: From: To: I-405 @ Coal Creek Pkwy I-405 @ Coal Creek Pkwy County: Completion Year: Type: King County 2025 Major Interchange-GP Sponsor: WSDOT MTP Status: ROW Conditionally Ap Project ID: 4329 Estimated Cost: $15,506,919 Title: I-405 Corridor: SR 169 to I-90 (Lk Wa bike path realignment) Description: (l) Realignment and reconstruction of Lk. Washington bike path.

Location / Facility: From: To: Lk. Washington bike path SR 169 I-90 County: Completion Year: Type: King County 2020 Regional Trail (Sep.)

Sponsor: WSDOT MTP Status: ROW Conditionally Ap Project ID: 4322 Estimated Cost: $144,613,756 Title: I-405 Corridor: SR 169 to I-90 (NE 30th I/C component) Description: (d) Modify or rebuild NE 30th I/C. Cost includes part of the 4318 widening through this segment. Cost includes part of the 4318 widening through this segment.

Location / Facility: From: To: I-405 @ NE 30th St I-405 @ NE 30th St County: Completion Year: Type: King County 2020 Major Interchange-GP

Sponsor: WSDOT MTP Status: ROW Conditionally Ap Project ID: 4323 Estimated Cost: $247,203,001 Title: I-405 Corridor: SR 169 to I-90 (NE 44th I/C component) Description: (e) Modify or rebuild NE 44th I/C (to accommodate future HOV Direct Access); Cost includes part of the 4318 widening through this segment.

Location / Facility: From: To: I-405 @ NE 44th I/C I-405 @ NE 44th I/C County: Completion Year: Type: King County 2020 Major Interchange-HOV Sponsor: WSDOT MTP Status: ROW Conditionally Ap Project ID: 4326 Estimated Cost: $95,173,155 Title: I-405 Corridor: SR 169 to I-90 (SR 169 Direct Connection Ramp) Description: (i) Construct SB I-405 to SB SR 169 direct connection ramp. Cost includes part of the 4318 widening through this segment.

Location / Facility: From: To: I-405 @ SR 169 I/C I-405 @ SR 169 I/C County: Completion Year: Type: King County 2020 Major Interchange-GP

Sponsor: WSDOT MTP Status: ROW Conditionally Ap Project ID: 4321 Estimated Cost: $206,414,506 Title: I-405 Corridor: SR 169 to I-90 (SR 900 I/C component) Description: (c) Modify or rebuild SR 900 I/C; Cost includes part of the 4318 widening through this segment.

Location / Facility: From: To: I-405 @ SR 900 I/C I-405 @ SR 900 I/C County: Completion Year: Type: King County 2020 Major Interchange-GP

Sponsor: WSDOT MTP Status: ROW Conditionally Ap Project ID: 4318 Estimated Cost: $0 Title: I-405 Corridor: SR 169 to I-90 (widening) Description: (a) Add lanes NB and SB and rebuild the existing roadway from SR 169 to I-90, including the 4 ft. HOV buffer, resulting in 6 lanes (1 HOV & 4 GP & 1 Aux or 2 HOV & 3 GP & 1 Aux) in both directions. Costs of this widening are split between the various interchange projects (4320, 4321, 4322, 4323, 4324, 4325 and 4326).

Location / Facility: From: To: I-405 SR 169 I-90 County: Completion Year: Type: King County 2020 Major Widening-GP Sponsor: WSDOT MTP Status: Unprogrammed Project ID: 4305 Estimated Cost: $140,905,711 Title: I-405 Corridor: SR 181 I/C Description: (c) Rebuilds the SR 181 Interchange.

Location / Facility: From: To: I-405 @ SR 181 I-405 @ SR 181 County: Completion Year: Type: King County 2040 New Facility-Road

Sponsor: WSDOT MTP Status: Unprogrammed Project ID: 4365 Estimated Cost: $283,047,436 Title: I-405 Corridor: SR 181 to SR 167 Description: (i) 6 lanes (1 HOV, 4 GP & 1 Aux.) between SR 181 and SR 167 in each direction.

Location / Facility: From: To: I-405 SR 181 SR 167 County: Completion Year: Type: King County 2040 New Facility-Road

Sponsor: WSDOT MTP Status: Unprogrammed Project ID: 4303 Estimated Cost: $106,297,290 Title: I-405 Corridor: SR 181 to SR 167 Widening Description: (a) Rebuilds I-405 adding one auxiliary lane NB and SB from SR 181 to the SR 167 I/C resulting in 5 lanes (1 HOV, 3 GP & 1 Aux.) in each direction in this section. I-5 to SR 181 remains at 4 lanes (1 HOV & 3 GP) each direction. Includes the 4 ft. HOV buffer from SR 181 to SR 167.

Location / Facility: From: To: I-405 SR 181 SR 167 County: Completion Year: Type: King County 2040 New Facility-Road Sponsor: WSDOT MTP Status: Completed Project ID: 4312 Estimated Cost: $0 Title: I-405 Corridor: SR 515/Talbot half diamond Description: (b) Constructs the SR 515 (Talbot Rd.) half diamond interchange which is a first phase of the redevelopment of the SR 167 Interchange. Provides SR 515 to NB I-405 and SB I-405 to SR 515 movements. Cost included in 4311.

Location / Facility: From: To: 0 I-405 @ SR 515/Talbot Rd - County: Completion Year: Type: King County 2011 New Facility-Road

Sponsor: WSDOT MTP Status: Candidate Project ID: 4361 Estimated Cost: $140,905,711 Title: I-405 Corridor: SR 518 Interchange

Description: (b) Reconstruct of the following Interchange ramps: EB SR 518 to NB I-5, (e) EB SR 518 to SB I-5

Location / Facility: From: To: I-405 @ SR 518 I/C I-405 @ SR 518 I/C County: Completion Year: Type: King County 2030 New Facility-Road

Sponsor: WSDOT MTP Status: Candidate Project ID: 4383 Estimated Cost: $355,314,016 Title: I-405 Corridor: SR 520 Interchange Description: Rebuild the interchange to include direct HOV connectors in the SE quadrant. This requires shifting the NB I-405 and EB SR 520 mainline lanes to accommodate this rebuild.

Location / Facility: From: To: I-405 @ SR 520 I/C I-405 @ SR 520 I/C County: Completion Year: Type: King County 2040 New Facility-Road Sponsor: WSDOT MTP Status: Unprogrammed Project ID: 4382 Estimated Cost: $1,320,865,755 Title: I-405 Corridor: SR 520 Interchange (HOV direct connection ramps) Description: (g) Rebuild the interchange to include direct HOV connectors in the NW and SW quadrants.

Location / Facility: From: To: I-405 @ SR 520 I/C I-405 @ SR 520 I/C County: Completion Year: Type: King County 2040 New Facility-Road

Sponsor: WSDOT MTP Status: ROW Conditionally Ap Project ID: 4352 Estimated Cost: $0 Title: I-405 Corridor: SR 520 to I-5 Widening Description: (a) Add one lane SB from SR 520 to NE 85th St resulting in 5 lanes (1 HOV & 4 GP or 2 HOV & 3 GP) in this section. Cost included in 4354.

Location / Facility: From: To: I-405 SR 520 NE 85th County: Completion Year: Type: King County 2015 New Facility-Road

Sponsor: WSDOT MTP Status: Completed Project ID: 4356 Estimated Cost: $43,962,153 Title: I-405 Corridor: SR 520 to I-5 Widening (NB NE 195th to SR 527) Description: (e) Add one NB lane from between NE 195th St. and SR 527 resulting in 4 lanes (1 HOV & 3 GP) in this section and includes Managed Lanes buffer.

Location / Facility: From: To: 0 NE 195th St SR 527 County: Completion Year: Type: King County 2010 New Facility-Road Sponsor: WSDOT MTP Status: ROW Conditionally Ap Project ID: 4353 Estimated Cost: $0 Title: I-405 Corridor: SR 520 to I-5 Widening (NB NE 70th to NE 85th) Description: (b) Add one lane NB between NE 70th and NE 85th Streets resulting in 5 lanes (1 HOV & 4 GP or 2 HOV & 3 GP) in this section. Cost included in 4354.

Location / Facility: From: To: I-405 NE 85th NE 70th County: Completion Year: Type: King County 2015 New Facility-Road

Sponsor: WSDOT MTP Status: Approved Project ID: 4354 Estimated Cost: $391,816,756 Title: I-405 Corridor: SR 520 to I-5 Widening (NE 124th to SR 522)

Description: (c) Add one lane NB and SB from NE 124th St. to SR 522 resulting in 5 lanes (1 HOV & 4 GP or 2 HOV & 3 GP) in each direction. Includes Managed Lanes buffer. Managed Lanes: Should the decisions be made to implement Managed Lanes they could be incorporated

Location / Facility: From: To: I-405 NE 124th St SR 522 County: Completion Year: Type: King County 2015 New Facility-Road

Sponsor: WSDOT MTP Status: Approved Project ID: 4355 Estimated Cost: $0 Title: I-405 Corridor: SR 520 to I-5 Widening (NE 132nd structures) Description: (d) Rebuild the structures over NE 132nd St. Cost included in 4354.

Location / Facility: From: To: I-405 @ NE 132nd St I-405 @ NE 132nd St County: Completion Year: Type: King County 2025 New Facility-Road Sponsor: WSDOT MTP Status: Approved Project ID: 4390 Estimated Cost: $16,068,195 Title: I-405 Corridor: SR 520 to SR 522 Description: (e) SR 522: Add SB climbing auxiliary lane through NE 160th Interchange to SR 522.

Location / Facility: From: To: I-405 NE 160th I/C SR 522 County: Completion Year: Type: King County 2020 New Facility-Road

Sponsor: WSDOT MTP Status: Unprogrammed Project ID: 4346 Estimated Cost: $30,900,375 Title: I-405 Corridor: SR 520 to SR 522 (aux lanes) Description: (a) Add NB and SB auxiliary lanes from SR 520 to NE 70th including Managed Lanes buffer.

Location / Facility: From: To: I-405 SR 520 NE 70th County: Completion Year: Type: King County 2040 New Facility-Road

Sponsor: WSDOT MTP Status: Unprogrammed Project ID: 4393 Estimated Cost: $40,965,693 Title: I-405 Corridor: SR 520 to SR 522 (Central Kirkland Transit Station) Description: (h) Transit/HOV: Central Kirkland Transit Station.

Location / Facility: From: To: Central Kirkland Transit Station Central Kirkland Transit Station County: Completion Year: Type: King County 2030 New Facility-Road Sponsor: WSDOT MTP Status: Candidate Project ID: 4392 Estimated Cost: $24,720,300 Title: I-405 Corridor: SR 520 to SR 522 (NB Aux lane NE 160th to NE 195th) Description: (g) Add NB auxiliary lane extending from NE 160th to NE 195th.

Location / Facility: From: To: I-405 NE 160th NE 195th County: Completion Year: Type: King County 2020 New Facility-Road

Sponsor: WSDOT MTP Status: Unprogrammed Project ID: 4388 Estimated Cost: $306,494,997 Title: I-405 Corridor: SR 520 to SR 522 (NE 124th I/C) Description: (c) Reconfigure and rebuild the NE 124th St. Interchange.

Location / Facility: From: To: I-405 @ NE 124th St I/C I-405 @ NE 124th St I/C County: Completion Year: Type: King County 2040 New Facility-Road

Sponsor: WSDOT MTP Status: Unprogrammed Project ID: 4389 Estimated Cost: $60,564,735 Title: I-405 Corridor: SR 520 to SR 522 (NE 160th I/C) Description: (d) Rebuild the NE 160th St. Interchange.

Location / Facility: From: To: I-405 @ NE 160th St I/C I-405 @ NE 160th St I/C County: Completion Year: Type: King County 2040 New Facility-Road Sponsor: WSDOT MTP Status: Unprogrammed Project ID: 4348 Estimated Cost: $247,203,001 Title: I-405 Corridor: SR 520 to SR 522 (NE 70th I/C) Description: (c) Reconfigure and rebuild the NE 70th and NE 85th Interchanges including HOV bypasses. Rebuilding of NE 70th requires abandonment of the Houghton Park & Ride.

Location / Facility: From: To: I-405 @ NE 70th I/C and NE 85th I/C I-405 @ NE 70th I/C and NE 85th I/C County: Completion Year: Type: King County 2040 New Facility-Road

Sponsor: WSDOT MTP Status: Unprogrammed Project ID: 4349 Estimated Cost: $24,720,300 Title: I-405 Corridor: SR 520 to SR 522 (NE 85th I/C connections and direct access)

Description: (d) Construct HOV direct access at NE 85th (g) Improve NE 85th connection to I-405 from Kirkland Way to 148th Ave NE including transit and HOV queue bypass and upgrade arterial.

Location / Facility: From: To: NE 85th IC and I-405 @ NE 85th I/C Kirkland Way 148th County: Completion Year: Type: King County 2040 New Facility-Road Sponsor: WSDOT MTP Status: Candidate Project ID: 4391 Estimated Cost: $577,219,007 Title: I-405 Corridor: SR 520 to SR 522 (SR 522 I/C and HOV direct access) Description: (f) SR 522 Interchange Rebuild: Reconfigure and rebuild the SR 522 Interchange. The existing SR 522 WB to I-405 SB ramp will remain. Include HOV direct connection in center.

Location / Facility: From: To: I-405 @ SR 522 I/C I-405 @ SR 522 I/C County: Completion Year: Type: King County 2020 New Facility-Road

Sponsor: WSDOT MTP Status: Unprogrammed Project ID: 4387 Estimated Cost: $152,578,295 Title: I-405 Corridor: SR 520 to SR 522 (Widening - SR 520 to NE 124th St)

Description: (b) Add one lane NB and SB resulting in 6 lanes (1 HOV, 4 GP & 1 Aux. or 2 HOV, 3 GP & 1 Aux.) in each direction.

Location / Facility: From: To: I-405 SR 520 NE 124th St County: Completion Year: Type: King County 2040 New Facility-Road

Sponsor: WSDOT MTP Status: Unprogrammed Project ID: 4399 Estimated Cost: $123,601,500 Title: I-405 Corridor: SR 522 to I-5 (240th St. SE direct access ramp) Description: (d) Construct direct access ramp to 240th St. SE.

Location / Facility: From: To: I-405 @ 240th St SR I/C I-405 @ 240th St SR I/C County: Completion Year: Type: Snohomish County 2040 New Facility-Road Sponsor: WSDOT MTP Status: Unprogrammed Project ID: 4403 Estimated Cost: $40,965,693 Title: I-405 Corridor: SR 522 to I-5 (Canyon Park Transit Station) Description: (j) Canyon Park Transit Station,

Location / Facility: From: To: Canyon Park Transit Station Canyon Park Transit Station County: Completion Year: Type: Snohomish County 2030 New Facility-Road

Sponsor: WSDOT MTP Status: Unprogrammed Project ID: 4400 Estimated Cost: $56,856,690 Title: I-405 Corridor: SR 522 to I-5 (Direct Access to Canyon Park P&R) Description: (e) Construct direct access to the Canyon Park - Park & Ride.

Location / Facility: From: To: I-405 @ Canyon Park - Park & Ride I-405 @ Canyon Park - Park & Ride County: Completion Year: Type: Snohomish County 2040 New Facility-Road

Sponsor: WSDOT MTP Status: Unprogrammed Project ID: 4405 Estimated Cost: $40,965,693 Title: I-405 Corridor: SR 522 to I-5 (DT Woodinville Transit Center) Description: (l) Downtown Woodinville Transit Center,

Location / Facility: From: To: Downtown Woodinville Transit Center Downtown Woodinville Transit Center County: Completion Year: Type: King County 2030 New Facility-Road Sponsor: WSDOT MTP Status: Unprogrammed Project ID: 4402 Estimated Cost: $317,655,856 Title: I-405 Corridor: SR 522 to I-5 (I-5 north/ I-405 I/C and HOV direct access ramps) Description: (g) Construct HOV direct connection ramps connecting I-405 managed lanes with I-5 HOV lanes north and south of the I-5 Interchange. (h) Reconfigure the NB I-405 to NB I-5 from 1 lane to a 2 lane on connection. (i) Addresses I-5 connecting capacity to I-405 as necessary by adding one lane approaching ramp to I-405 to avoid congestion.

Location / Facility: From: To: I-405 @ I-5 I/C I-405 @ I-5 I/C County: Completion Year: Type: Snohomish County 2040 New Facility-Road

Sponsor: WSDOT MTP Status: Unprogrammed Project ID: 4398 Estimated Cost: $56,856,690 Title: I-405 Corridor: SR 522 to I-5 (NE 195th I/C) Description: (c) Rebuild the NE 195th St. Interchange.

Location / Facility: From: To: I-405 @ NE 195th St I/C I-405 @ NE 195th St I/C County: Completion Year: Type: King County 2040 New Facility-Road

Sponsor: WSDOT MTP Status: Unprogrammed Project ID: 4397 Estimated Cost: $112,477,365 Title: I-405 Corridor: SR 522 to I-5 (SR 522 I/C braided ramps) Description: (b) Remove ramp weaves north of the SR 522 Interchange by constructing NB and SB braided ramps.

Location / Facility: From: To: I-405 @ SR 522 I/C I-405 @ SR 522 I/C County: Completion Year: Type: King County 2040 New Facility-Road Sponsor: WSDOT MTP Status: Unprogrammed Project ID: 4401 Estimated Cost: $161,917,966 Title: I-405 Corridor: SR 522 to I-5 (SR 527 I/C) Description: (f) Reconfigure the SR 527 Interchange.

Location / Facility: From: To: I-405 @ SR 527 I/C I-405 @ SR 527 I/C County: Completion Year: Type: Snohomish County 2040 New Facility-Road

Sponsor: WSDOT MTP Status: Unprogrammed Project ID: 4404 Estimated Cost: $40,965,693 Title: I-405 Corridor: SR 522 to I-5 (UW Bothell Transit Station) Description: (k) UW Bothell Transit Station,

Location / Facility: From: To: UW Bothell Transit Station UW Bothell Transit Station County: Completion Year: Type: King County 2030 New Facility-Road

Sponsor: WSDOT MTP Status: Candidate Project ID: 4396 Estimated Cost: $236,897,879 Title: I-405 Corridor: SR 522 to I-5 (widening between NE 195th St to SR 527) Description: (a) Add 2 lanes NB and SB, except 1 lane NB between NE 195th St. and SR 527 where NB lane previously built, resulting in 5 lanes (1 HOV & 4 GP or 2 HOV & 3 GP) in each direction. Includes the 4 ft. managed lane buffer.

Location / Facility: From: To: I-405 NE 195th SR 527 County: Completion Year: Type: Snohomish County 2030 New Facility-Road Sponsor: WSDOT MTP Status: Candidate Project ID: 4328 Estimated Cost: $0 Title: I-405 Corridor: SR 900 to NE 30th Description: (k) Construct NB auxiliary lane between SR 900 and NE 30th. Cost included in 4321

Location / Facility: From: To: I-405 SR 900 NE 30th County: Completion Year: Type: King County 2020 New Facility-Road

Sponsor: WSDOT MTP Status: ROW Conditionally Ap Project ID: 4327 Estimated Cost: $0 Title: I-405 Corridor: Sunset Blvd undercrossing Description: (j) Realign and reconstruct undercrossing at Sunset Blvd. Cost included in 4320.

Location / Facility: From: To: I-405 @ Sunset Blvd undercrossing I-405 @ Sunset Blvd undercrossing County: Completion Year: Type: King County 2020 Bridge Rehab

Sponsor: WSDOT MTP Status: Unprogrammed Project ID: 4376 Estimated Cost: $1,002,408,169 Title: I-405/I-90 Interchange (HOV direct connector ramps) Description: (a) Construct HOV direct connector ramps between I-405 and I-90 in all four quadrants of the interchange.

Location / Facility: From: To: I-405 @ I-90 I/C I-405 @ I-90 I/C County: Completion Year: Type: King County 2040 New Facility-Road Sponsor: WSDOT MTP Status: Unprogrammed Project ID: 4379 Estimated Cost: $0 Title: I-405/I-90 Interchange (I--90 approach) Description: I-90 Interchange: (d) Address I-90 connecting capacity to I-405 as necessary by adding one lane approaching ramp to I-405 to avoid congestion. Cost included in 4376.

Location / Facility: From: To: I-405 @ I-90 I/C I-405 @ I-90 I/C County: Completion Year: Type: King County 2040 New Facility-Road

Sponsor: WSDOT MTP Status: Unprogrammed Project ID: 4378 Estimated Cost: $0 Title: I-405/I-90 Interchange (new NB bridge)

Description: I-90 Interchange: (c) Construct a new 5 lane NB bridge over I-90 including 4 ft. HOV buffer replacing the existing two bridges. Cost included in 4376.

Location / Facility: From: To: I-405 @ I-90 I/C I-405 @ I-90 I/C County: Completion Year: Type: King County 2040 New Facility-Road Sponsor: WSDOT MTP Status: Unprogrammed Project ID: 4377 Estimated Cost: $0 Title: I-405/I-90 Interchange (SB bridge widening) Description: I-90 Interchange: (b) Widen SB bridge by 2 lanes including 4 ft. HOV buffer resulting in 5 lanes (1 HOV & 4 GP or 2 HOV & 3 GP). Cost included in 4376.

Location / Facility: From: To: I-405 @ I-90 I/C I-405 @ I-90 I/C County: Completion Year: Type: King County 2040 New Facility-Road

Sponsor: WSDOT MTP Status: Candidate Project ID: 4190 Estimated Cost: $65,118,392 Title: I-5 @ SR 512 Interchange (Tier 1)

Description: Tier 1 -Constructs short term improvements to address congestion at the SR 512 interchange; including auxiliary lanes between NB I-5 Bridgeport Way and EB SR 512, NB I-5 between SR 512 and 84th.

Location / Facility: From: To: I-5 SR 512 I/C E Steele St. County: Completion Year: Type: Pierce County 2020 New Facility-Road Sponsor: WSDOT MTP Status: Unprogrammed Project ID: 4425 Estimated Cost: $620,389,552 Title: I-5 @ SR 512 Interchange (Tier 2) Description: "Tier 2 - In addition to the short term improvements described in Tier 1, Tier 2 rebuilds the interchange to provide free movements for all directions. Flyover ramps will be provided for the movements from I-5 NB to SR 512 EB, SR 512 EB to I-5 NB and I-5 NB to SR 512 WB. A loop ramp will be provided for the movement from SR 512 WB to I-5 SB."

Location / Facility: From: To: I-5 I-5/SR 512 I/C County: Completion Year: Type: Pierce County 2020 New Facility-Road

Sponsor: WSDOT MTP Status: Candidate Project ID: 4006 Estimated Cost: $55,541,548 Title: I-5 @ 100th and Everett Mall: South Everett Interchange Improvements Description: Construct a new crossing under I-5 at 100th St and provide NB and SB HOV access south of SR 526/SR527/South Broadway interchange. This entails a new on-ramp from NB ever mall way to SB I-5 Undercrossing at 100th St. SE which terminates at E side of freeway. This involves an arterial under I-5 then surface on W side of I-5. Those arterial improvements extend on that side up to 7th. NB Everett mall way to SB I-5 (on collector distributor on W side of I-5) starts from 526 to SB I-5 - on ramp traffic will connect.

Location / Facility: From: To: I-5; 100th Street SE SR 527/South Broadway I/C SB I-5; 7th Avenue SE County: Completion Year: Type: Snohomish County 2030 New Facility-Road Sponsor: WSDOT MTP Status: Candidate Project ID: 4278 Estimated Cost: $74,160,900 Title: I-5 @ 196th St (SR 524) Interchange Northbound Braided Ramp Project Description: This project adds a braided ramp NB at the I-5/ 196th St I/C

Location / Facility: From: To: I-5 @ 196th St I-5 @ 196th St County: Completion Year: Type: Snohomish County 2030 New Facility-Road

Sponsor: WSDOT MTP Status: Completed Project ID: 1625 Estimated Cost: $39,864,210 Title: I-5 @ 196th St (SR 524) Interchange Southbound Braided Ramp Project Description: This project will construct a braided ramp configuration where the SR 525 to southbound I-5 ramp and the I-405 to southbound I-5 ramp will be grade separated over the southbound I-5 to 196th St. ramp. It is expected this concept will improve the I-5 mainline operations, eliminate the weave and address a high accident location.

Location / Facility: From: To: 0 I-5 @ 196th St - County: Completion Year: Type: Snohomish County 2012 New Facility-Road

Sponsor: WSDOT MTP Status: Candidate Project ID: 4091 Estimated Cost: $100,661,773 Title: I-5 @ 272nd Street Interchange Description: Reconstruct the S. 272nd Street I/C. Current concept is for a SPUI, This project includes a flyer stop.

Location / Facility: From: To: I-5 @ 272nd Street Interchange I-5 @ 272nd Street Interchange County: Completion Year: Type: King County 2030 New Facility-Road Sponsor: WSDOT MTP Status: Candidate Project ID: 1945 Estimated Cost: $63,000,000 Title: I-5 @ 88th St. N Interchange Description: Reconstruct interchange to a SPUI configuration

Location / Facility: From: To: I-5 @ 88th Street NE I/C I-5 @ 88th Street NE I/C - County: Completion Year: Type: Snohomish County 2020 New Facility-Road

Sponsor: WSDOT MTP Status: Candidate Project ID: 1595 Estimated Cost: $95,516,451 Title: I-5 @ Airport/Industrial Way Description: HOV direct access connection to South Industrial Way/E3 bus way.

Location / Facility: From: To: I-5 0.5 miles south of West Seattle Freeway Metro's E3 Busway County: Completion Year: Type: King County 2025 New Facility-Road

Sponsor: WSDOT MTP Status: Candidate Project ID: 4198 Estimated Cost: $72,433,309 Title: I-5 @ Lake City Way Description: Extend right lane that drops to Lake City Way up to the N 85th St. exit and braid the N 70th on ramp into the mainline.

Location / Facility: From: To: I-5 Lake City Way I/C County: Completion Year: Type: King County 2025 New Facility-Road Sponsor: WSDOT MTP Status: Unprogrammed Project ID: 4200 Estimated Cost: $876,059,886 Title: I-5 @ Mercer and SR 520 I/C's Description: Reconstruct the Mercer Street and SR 520 Interchanges to eliminate the left side exit ramps.

Location / Facility: From: To: I-5 E Denny Way NE 45th St. County: Completion Year: Type: King County 2040 New Facility-Road

Sponsor: WSDOT MTP Status: Candidate Project ID: 4529 Estimated Cost: $35,444,286 Title: I-5 @ Port of Tacoma Interchange Improvement Description: Reconstruct the Port of Tacoma Road interchange (study underway to determine final configuration)

Location / Facility: From: To: I-5 Port of Tacoma Road Port of Tacoma Road County: Completion Year: Type: Pierce County 2025 New Facility-Road Sponsor: WSDOT MTP Status: Completed Project ID: 2567 Estimated Cost: $129,052,813 Title: I-5 @ SR 18/SR 161 (Triangle) - phase 1 Description: Phase 1 - The interchange will be modified to eliminate the current weave ramps on I-5 both southbound and northbound, and on SR 18 westbound and eastbound. The project will rebuild the I-5 / SR-18 interchange by replacing the northwest and southeast cloverleaf ramps with a westbound SR 18 to southbound I -5 "flyover" ramp and an eastbound SR 18 to northbound I-5 flyover" ramp. It will also build a new direct connection from westbound SR 18 to SR 161 in the vicinity of S 359th ST, realign the eastbound SR 18 to Southbound I-5 at-grade access ramp and associated elements.

Location / Facility: From: To: I-5 @ SR 18/SR 161 I/C I-5 @ SR 18/SR 161 I/C County: Completion Year: Type: King County 2012 New Facility-Road

Sponsor: WSDOT MTP Status: ROW Conditionally Ap Project ID: 5535 Estimated Cost: $125,566,166 Title: I-5 @ SR 18/SR 161 (Triangle) - phase 2 Description: Phase 2 - This project completes the reconstruction of the I-5/SR 18/SR 161 interchange by constructing a southbound Collector- Distributor lane from SB I-5 to the intersection of 359TH ST and 356TH St along SR 161, Weyerhauser Way to westbound SR 18 flyover ramp, replace the SR 161 Bridge that crosses over I-5, and making other interchange modifications.

Location / Facility: From: To: I-5 @ SR 18/SR 161 I/C I-5 @ SR 18/SR 161 I/C County: Completion Year: Type: King County 2020 New Facility-Road Sponsor: WSDOT MTP Status: Unprogrammed Project ID: 5430 Estimated Cost: $4,000,000 Title: I-5 @ SR 526 I/C Description: Construct on ramp to southbound I-5. Either at SR 526 I/C or SR 99/ Everett Mall Way. Exact location TBD

Location / Facility: From: To: I-5 SR 526 I/C SR 526 I/C County: Completion Year: Type: Snohomish County 2015 New Facility-Road

Sponsor: WSDOT MTP Status: Unprogrammed Project ID: 1706 Estimated Cost: $119,478,912 Title: I-5 @ SR 96 / 128th St SW Description: Reconstruct interchange. Current concept is for a SPUI

Location / Facility: From: To: I-5 SR 96/128th St. SW I/C County: Completion Year: Type: Snohomish County 2035 New Facility-Road

Sponsor: WSDOT MTP Status: Candidate Project ID: 5427 Estimated Cost: $312,000,000 Title: I-5 HOV to HOT lane Conversion: I-405 to US 2 Description: Convert HOV lanes to HOT lanes. Assume existing HOV conversion and shoulder for dual HOT lanes. Cost does not include shoulder prep.

Location / Facility: From: To: I-5 I-405 (Tukwila) US 2 County: Completion Year: Type: King County 2020 New Facility-Road Sponsor: WSDOT MTP Status: Candidate Project ID: 5425 Estimated Cost: $31,000,000 Title: I-5 HOV to HOT lane Conversion: Pierce/ King County Line to S. 260th Description: Convert HOV lanes to HOT lanes. Assume existing HOV conversion and shoulder for dual HOT lanes. Cost does not include shoulder prep.

Location / Facility: From: To: I-5 Pierce/King County Line S. 260th St County: Completion Year: Type: King County 2020 New Facility-Road

Sponsor: WSDOT MTP Status: Candidate Project ID: 5426 Estimated Cost: $192,000,000 Title: I-5 HOV to HOT lane Conversion: S. 260th to I-405

Description: Convert HOV lanes to HOT lanes. Assume existing HOV conversion and shoulder for dual HOT lanes. Cost does not include shoulder prep.

Location / Facility: From: To: I-5 S. 260th St I-405 County: Completion Year: Type: King County 2020 New Facility-Road Sponsor: WSDOT MTP Status: Candidate Project ID: 5424 Estimated Cost: $28,000,000 Title: I-5 HOV to HOT lane Conversion: SR 16 to Pierce/ King County Line Description: Convert HOV lanes to HOT lanes. Assume existing HOV conversion and shoulder for dual HOT lanes. Cost does not include shoulder prep.

Location / Facility: From: To: I-5 SR 16 Pierce/King County Line County: Completion Year: Type: Pierce County 2015 New Facility-Road

Sponsor: WSDOT MTP Status: Candidate Project ID: 4194 Estimated Cost: $48,000,000 Title: I-5 Steilacoom/DuPont I/C to Thorne Lane

Description: Construct additional SB and NB lanes

Location / Facility: From: To: I-5 Steilacoom/DuPont I/C to Thorne Lane Sreilacoom/DuPont I/C Thorne Lane I/C I/C County: Completion Year: Type: Pierce County 2024 New Facility-Road Sponsor: WSDOT MTP Status: Candidate Project ID: 4421 Estimated Cost: $71,000,000 Title: I-5/JBLM Berkeley Drive I/C Description: This project would replace the interchange with a more modern design that could accommodate the levels of traffic anticipated in the future as well as provide additional width to add new lanes on I-5.

Location / Facility: From: To: I-5 Berkeley Drive I/C Berkeley Drive I/C County: Completion Year: Type: Pierce County 2018 New Facility-Road

Sponsor: WSDOT MTP Status: Candidate Project ID: 4430 Estimated Cost: $6,598,689 Title: I-5/JBLM Corridor Planning and NEPA documentation

Description: Complete interchange justification reports and begin NEPA documentation for DuPont Steilacoom Road, 41st Division St. Berkley St., and Thorne Lane interchanges reconstruction and corridor widening.

Location / Facility: From: To: I-5 JBLM Vicinity JBLM Vicinity County: Completion Year: Type: Pierce County 2015 New Facility-Road Sponsor: WSDOT MTP Status: Candidate Project ID: 4419 Estimated Cost: $149,000,000 Title: I-5/JBLM DuPont-Steilacoom-New Interchange Description: This project would replace the interchange with one that would have more capacity to move more traffic and allow additional lanes to be added to I-5.

Location / Facility: From: To: I-5 Dupont-Steilacoom I/C Dupont-Steilacoom I/C County: Completion Year: Type: Pierce County 2018 New Facility-Road

Sponsor: WSDOT MTP Status: Candidate Project ID: 4422 Estimated Cost: $77,000,000 Title: I-5/JBLM Thorne Lane Interchange

Description: This project would replace the interchange with a more modern design that could accommodate the levels of traffic anticipated in the future as well as provide additional width to add new lanes on I-5.

Location / Facility: From: To: I-5 Thorne Lane I/C Thorne Lane I/C County: Completion Year: Type: Pierce County 2018 New Facility-Road Sponsor: WSDOT MTP Status: Unprogrammed Project ID: 4420 Estimated Cost: $24,195,193 Title: I-5/JBLM, 41st Division Dr. I/C Description: This project builds a new bridge that allows one ramp to pass over the other allowing traffic to flow smoother. This results in a reduction of congestion and an improvement of safety on I-5.

Location / Facility: From: To: I-5 41st Division Dr. I/C 41st Division Dr. I/C County: Completion Year: Type: Pierce County 2020 New Facility-Road

Sponsor: WSDOT MTP Status: Approved Project ID: 4477 Estimated Cost: $8,000,000 Title: I-5/Mounts Road to Center Drive Auxiliary Lane Extension

Description: This project will extend the NB auxiliary lane south for approximately 1.5 miles between the Mounts Rd and Center Dr. Interchanges. This auxiliary lane will be an interim configuration until the full corridor improvements are completed.

Location / Facility: From: To: I-5 Mounts Rd Interchange Center Dr Interchange County: Completion Year: Type: Pierce County 2017 New Facility-Road

Sponsor: WSDOT MTP Status: Unprogrammed Project ID: 4424 Estimated Cost: $26,821,526 Title: I-5/Thorne Lane to Gravelly Lake Drive - Auxiliary Lanes Description: Construct SB and NB auxiliary lanes

Location / Facility: From: To: I-5 Thorne Lane Gravelly Lake Drive County: Completion Year: Type: Pierce County 2025 New Facility-Road Sponsor: WSDOT MTP Status: Candidate Project ID: 1624 Estimated Cost: $8,755,675 Title: I-5: 220th St. SW to 44th Ave W Description: Construct a northbound auxiliary lane.

Location / Facility: From: To: I-5 220th St SW 44th Ave W County: Completion Year: Type: Snohomish County 2025 New Facility-Road

Sponsor: WSDOT MTP Status: Candidate Project ID: 1803 Estimated Cost: $181,500,809 Title: I-5: Mounts-Old Nisqually Road to 41st Division Drive, JBLM Description: Add one lane each direction (GP or HOV/HOT) - Mounts-Old Nisqually Road to 41st Division Drive

Location / Facility: From: To: I-5 Mounts-Old Nisqually Road 41st Division Drive, JBLM County: Completion Year: Type: Pierce County 2023 New Facility-Road

Sponsor: WSDOT MTP Status: Candidate Project ID: 5336 Estimated Cost: $24,381,780 Title: I-5: NB Express Lanes Northgate Vic - Merge Revision Description: Separate the northbound HOV and GP merge from the express lanes to the mainline by moving the GP merge south to the 92nd Street vicinity.

Location / Facility: From: To: I-5 Express lanes I-5 @ Northgate Way I-5 @ 92nd St. vicinity County: Completion Year: Type: King County 2020 New Facility-Road Sponsor: WSDOT MTP Status: Completed Project ID: 5343 Estimated Cost: $433,831,572 Title: I-5: Port of Tacoma Rd Interchange to Pierce/King County Line Description: Core HOV lanes, interchange improvements, ITS, enhanced transit.

Location / Facility: From: To: I-5 Port of Tacoma Rd Interchange Pierce/King County Line County: Completion Year: Type: Pierce County 2012 New Facility-Road

Sponsor: WSDOT MTP Status: Approved Project ID: 4189 Estimated Cost: $351,930,073 Title: I-5: S. 96th to SR 16 - Widening (HOV/HOT) Description: Extends HOV lanes south in both directions between the SR 512 interchange and the SR 16 interchange. Reconstructs the 72nd Street and 84th Street interchanges to accommodate the widening and improve traffic movements on and off the interstate, replace the S 48th St. Bridge.

Location / Facility: From: To: I-5 SR 512 SR 16 County: Completion Year: Type: Pierce County 2025 New Facility-Road Sponsor: WSDOT MTP Status: Candidate Project ID: 5508 Estimated Cost: $12,190,890 Title: I-5: Seneca to Mercer St - Additional lane Description: The project will provide an additional NB lane to relieve congestion in the Downtown Seattle area of I 5. Requires narrowing traveled lanes to 11 feet and widening a structure

Location / Facility: From: To: I-5 Seneca Mercer County: Completion Year: Type: King County 2020 New Facility-Road

Sponsor: WSDOT MTP Status: Candidate Project ID: 4199 Estimated Cost: $19,103,290 Title: I-5: SR 104 to NE 175th

Description: Construct a southbound auxiliary lane on I-5 from SR 104 down to NE 175th Street.

Location / Facility: From: To: I-5 SR 104 I/C NE 175th St. County: Completion Year: Type: King County 2025 New Facility-Road Sponsor: WSDOT MTP Status: Approved Project ID: 1644 Estimated Cost: $948,449,717 Title: I-5: SR 16 to Port of Tacoma Rd Interchange Description: Core HOV lanes, interchange improvements, ITS, enhanced transit. Actual restriping and opening of HOV lanes south of the Port of Tacoma Interchange is likely to occur during or after POT Bridge replacement work (2017) since existing POT Interchange does not have enough existing span width to accommodate HOV lane widening underneath bridge.

Location / Facility: From: To: I-5 SR 16 Port of Tacoma Rd Interchange County: Completion Year: Type: Pierce County 2017 New Facility-Road

Sponsor: WSDOT MTP Status: Unprogrammed Project ID: 1708 Estimated Cost: $660,151,709 Title: I-5: SR 2 to SR 528 Description: Construct HOV/HOT Lanes in each direction and reconstruct the SR 528 I/C

Location / Facility: From: To: I-5 SR 2 SR 528 County: Completion Year: Type: Snohomish County 2040 New Facility-Road

Sponsor: WSDOT MTP Status: Unprogrammed Project ID: 4204 Estimated Cost: $143,542,273 Title: I-5: SR 528 to SR 531 Description: Add one lane in each direction (from 3-4 lanes)

Location / Facility: From: To: I-5 SR 528 SR 531 County: Completion Year: Type: Snohomish County 2040 New Facility-Road Sponsor: WSDOT MTP Status: Unprogrammed Project ID: 1720 Estimated Cost: $164,585,142 Title: I-5: Thorne Lane to SR 512. Description: Add HOV/HOT Lanes in both directions.

Location / Facility: From: To: I-5 Thorne Lane I/C Gravelly Lake Dr. County: Completion Year: Type: Pierce County 2030 New Facility-Road

Sponsor: WSDOT MTP Status: Candidate Project ID: 4423 Estimated Cost: $30,000,000 Title: I-5:Thorne Lane to Gravelly Lake Dr.-Frontage Road Description: This project improves traffic flow on I-5 by completing a missing local connection.

Location / Facility: From: To: I-5 Thorne Lane Gravelly Lake Dr. County: Completion Year: Type: Pierce County 2018 New Facility-Road

Sponsor: WSDOT MTP Status: Unprogrammed Project ID: 5437 Estimated Cost: $2,472,030 Title: I-90 Description: On West Lake Sammamish Parkway, convert single lane roundabout to a dual lane roundabout

Location / Facility: From: To: I-90 West Lake Sammamish Parkway West Lake Sammamish Parkway County: Completion Year: Type: King County 2040 New Facility-Road Sponsor: WSDOT MTP Status: Candidate Project ID: 5438 Estimated Cost: $54,005,642 Title: I-90 Description: Construct a westbound auxiliary lane between West Lake Sammamish Parkway and Sunset Way.

Location / Facility: From: To: I-90 West Lake Sammamish Parkway Sunset Way County: Completion Year: Type: King County 2020 New Facility-Road

Sponsor: WSDOT MTP Status: Unprogrammed Project ID: 5439 Estimated Cost: $111,241,350 Title: I-90 Description: Reconstruct the Front Street I/C

Location / Facility: From: To: I-90 Front St. I/C Front St. I/C County: Completion Year: Type: King County 2040 New Facility-Road

Sponsor: WSDOT MTP Status: Unprogrammed Project ID: 4223 Estimated Cost: $268,199,578 Title: I-90 @ SR 18 Description: Construct freeway to freeway interchange at SR 18, widen to four lanes in each direction, maintain truck lanes, and reconstruct interchange ramps.

Location / Facility: From: To: I-90 @ SR 18 I-90 @ SR 18 County: Completion Year: Type: King County 2040 New Facility-Road Sponsor: WSDOT MTP Status: Candidate Project ID: 4414 Estimated Cost: $219,436,019 Title: I-90 @ SR 18 Description: Construct a westbound I-90 to WB SR 18 flyover ramp and widen SR 18 to four lanes between Deep Creek to I-90.

Location / Facility: From: To: I-90 @ SR 18 I-90 @ SR 18 County: Completion Year: Type: King County 2020 New Facility-Road

Sponsor: WSDOT MTP Status: Completed Project ID: 2882 Estimated Cost: $5,751,889 Title: I-90 Highpoint to Preston Trail Description: Shared use bike path

Location / Facility: From: To: Highpoint Trail Terminus of existing Highpoint Trail near Western terminus of existing Preston- Issaquah eastern city limits Snoqualmie Trail County: Completion Year: Type: King County 2012 New Facility-Road

Sponsor: WSDOT MTP Status: Candidate Project ID: 5435 Estimated Cost: $42,000,000 Title: I-90 HOV to HOT Description: Convert HOV lanes to HOT lanes

Location / Facility: From: To: I-90 I-5 SR 900 County: Completion Year: Type: King County 2020 New Facility-Road Sponsor: WSDOT MTP Status: Candidate Project ID: 5436 Estimated Cost: $61,800,750 Title: I-90: Eastgate to W. Lake Sammamish Pkwy (Lakemont) - Added Aux. Lane Description: Construct an eastbound auxiliary lane or Hard Should Running between Eastgate and West Lake Sammamish Parkway (Lakemont).

Location / Facility: From: To: I-90 Eastgate West Lake Sammamish Parkway (Lakemont) County: Completion Year: Type: King County 2020 New Facility-Road

Sponsor: WSDOT MTP Status: Unprogrammed Project ID: 3528 Estimated Cost: $22,795,172 Title: Interurban Ave Capacity Expansion Description: Expand capacity on North-South arterials

Location / Facility: From: To: SR 181 144th St Southcenter Blvd County: Completion Year: Type: King County 2030 New Facility-Road

Sponsor: WSDOT MTP Status: Candidate Project ID: 3536 Estimated Cost: $6,667,975 Title: NE Park Drive Ped/Bike Description: Add sidewalk / paved shoulder crossing I-405 from SR 900 / Sunset Blvd to Lake Washington Blvd

Location / Facility: From: To: NE Park Drive SR 900 / Sunset Blvd Lake Washington Blvd County: Completion Year: Type: King County 2030 New Facility-Road Sponsor: WSDOT MTP Status: Unprogrammed Project ID: 1682 Estimated Cost: $10,721,726 Title: SR 104 Description: Add one lane each direction on SR 104 from 178th to SR 522 with intersection channelization improvements at 178th, 175th and SR 522.

Location / Facility: From: To: SR 104 SR 522 178th County: Completion Year: Type: King County 2040 New Facility-Road

Sponsor: WSDOT MTP Status: Unprogrammed Project ID: 1711 Estimated Cost: $13,545,963 Title: SR 104

Description: NFS - New connection from existing SR 104 alignment to proposed multimodal terminal location.

Location / Facility: From: To: SR 104 Pine St. I/S Proposed ferry terminal County: Completion Year: Type: Snohomish County 2040 New Facility-Road Sponsor: WSDOT MTP Status: Completed Project ID: 1650 Estimated Cost: $12,171,381 Title: SR 16 Description: Approved in 24, 2003. Core HOV lanes, new interchange, TSM/TDM, ITS, enhanced transit. Cost unknown for expanding North Gig Harbor Park and Ride lot (Kimball), therefore not in estimate. SR 16/36th St to Olympic Dr NW - Add HOV Lanes is programmed for completion in 2010.

Location / Facility: From: To: 0 Tacoma Narrows Bridge (36th St E) Olympic Drive County: Completion Year: Type: Pierce County 2010 New Facility-Road

Sponsor: WSDOT MTP Status: Unprogrammed Project ID: 1651 Estimated Cost: $151,064,172 Title: SR 16 Description: Construct Core HOV lanes, interchange improvements, frontage road, Intelligent Transportation Systems. This project has several Conditions approved by EB on September 29th, 2000: a) No additional freeway capacity expansion NW of SR-16/Wollochet Drive NW/Pioneer Way interchange until a complete grade-separated exchange is developed on SR-16 in the vicinity of the intersection with SE Burley-Olalla Road. This condition does not preclude development of interim measures to address safety and access controls at SE Burley/Olalla Road. b) Future HOV capacity expansion entire SR 16 corridor from I-5 to SR3 should include full implementation of surveillance control and driver information (SC&DI) system improvements to include conventional electronic flow monitoring and on- ramp metering for preferential HOV access.

Location / Facility: From: To: SR 16 Olympic Drive SR 302 Vicinity County: Completion Year: Type: Pierce County 2020 New Facility-Road Sponsor: WSDOT MTP Status: Unprogrammed Project ID: 1727 Estimated Cost: $94,142,508 Title: SR 16 Description: Widen from 4 lanes to 6 lanes creating HOV lanes, I/C improvements, TDM, ITS, enhanced transit. Cost not included for Park and Ride Lots at Armory and Landfill.

Location / Facility: From: To: SR 16 SR 160 (Sedgwick Rd) Vicinity SR 166 County: Completion Year: Type: Kitsap County 2040 New Facility-Road

Sponsor: WSDOT MTP Status: Unprogrammed Project ID: 1811 Estimated Cost: $78,294,437 Title: SR 16

Description: Widen from 4 lanes to 6 lanes creating HOV lanes, interchange improvements, TSM/TDM, ITS, enhanced transit

Location / Facility: From: To: SR 16 SR 302 Vicinity Pierce/Kitsap County Line County: Completion Year: Type: Pierce County 2030 New Facility-Road

Sponsor: WSDOT MTP Status: Unprogrammed Project ID: 1833 Estimated Cost: $108,191,777 Title: SR 16 Description: Widen from 4 lanes to 6 lanes creating HOV lanes, I/C improvements, TDM, ITS, enhanced transit. Cost unknown for expansion of Park and Ride Lot at Mullenix, therefore not in estimate

Location / Facility: From: To: SR 16 Pierce/Kitsap County Line SR 160 (Sedgwick Rd) Vicinity County: Completion Year: Type: Kitsap County 2040 New Facility-Road Sponsor: WSDOT MTP Status: Completed Project ID: 4099 Estimated Cost: $168,138,427 Title: SR 16 Description: Approved in April 24, 2003. Core HOV lanes, interchange improvements, TSM/TDM, ITS, enhanced transit.

Location / Facility: From: To: SR 16 I-5 Tacoma Narrows Bridge County: Completion Year: Type: Pierce County 2014 New Facility-Road

Sponsor: WSDOT MTP Status: Unprogrammed Project ID: 4213 Estimated Cost: $7,193,933 Title: SR 16 Description: Construct EB and WB auxiliary lanes

Location / Facility: From: To: SR 16 Burnham Drive I/C SR 302 Bridges County: Completion Year: Type: Pierce County 2017 New Facility-Road

Sponsor: WSDOT MTP Status: Candidate Project ID: 4426 Estimated Cost: $9,143,167 Title: SR 16 @ Wollochet Interchange Description: The current interchange in Gig Harbor is more than 40 years old and has marginal onramps that make it difficult for vehicles entering the freeway to merge into traffic creating potential conflicts. This project will add a new onramp and modernize the rest of the interchange to improve capacity, relieve congestion and reduce the potential for collisions.

Location / Facility: From: To: SR 16 SR 16 Gig Harbor I/C County: Completion Year: Type: Pierce County 2020 New Facility-Road Sponsor: WSDOT MTP Status: Completed Project ID: 1658 Estimated Cost: $42,024,510 Title: SR 161 Description: SR 161/24th St E to Jovita - Add Lanes is programmed for completion in 2011, but majority of work likely to be done by 2010.

Location / Facility: From: To: SR 161 24th St. E Jovita Blvd. County: Completion Year: Type: Pierce County 2014 New Facility-Road

Sponsor: WSDOT MTP Status: Approved Project ID: 5344 Estimated Cost: $38,316,465 Title: SR 161 Description: SR 161/36th to Vicinity 24th St E -Widen to 5 lanes (creating 5 lane roadway with center two-way left turn).

Location / Facility: From: To: SR 161 36th St. E 24th St. E County: Completion Year: Type: Pierce County 2022 New Facility-Road

Sponsor: WSDOT MTP Status: Candidate Project ID: 497 Estimated Cost: $131,609,190 Title: SR 162: SR 410 - 96th St E Description: Widen to 4 lanes with restricted median. Make operational improvements at the SR 410/SR 167 Interchange.

Location / Facility: From: To: SR 162 SR 410 96th St. E County: Completion Year: Type: Pierce County 2030 New Facility-Road Sponsor: WSDOT MTP Status: Candidate Project ID: 4229 Estimated Cost: $165,879,260 Title: SR 167 Description: Construct auxiliary lanes between interchanges.

Location / Facility: From: To: SR 167 S 277th St. SR 516 County: Completion Year: Type: King County 2025 New Facility-Road

Sponsor: WSDOT MTP Status: Unprogrammed Project ID: 5325 Estimated Cost: $1,588,279,281 Title: SR 167 Description: Add 1 GP lane each direction from 15th St. NW to S. 180th St.

Location / Facility: From: To: SR 167 15th St. NW S 180th (SW 43rd) County: Completion Year: Type: King County 2030 New Facility-Road Sponsor: WSDOT MTP Status: ROW Conditionally Ap Project ID: 1659 Estimated Cost: $850,598,385 Title: SR 167 Corridor Completion Phase 1 Description: Phase I includes one lane in each direction from the existing SR167 terminus at the Meridian interchange in Puyallup to I-5. There will be two lanes in each direction from the I-5/SR 167 Extension to the SR 167 / 54th Avenue interchange in Fife, where two lanes would drop and a single lane in each direction would continue to a connection at SR 509 in Tacoma. The SR 167 Extension – Phase I includes full interchanges at Meridian Avenue and Valley Avenue in Puyallup as well as a freeway-to-freeway interchange connections with I-5. A partial interchange (NB on/SB off) would be included at 54th Avenue in Fife. All necessary right-of-way for the SR 167 extension full- build would be purchased.

Location / Facility: From: To: SR 167 SR 509 I-5 County: Completion Year: Type: Pierce County 2015 New Facility-Road

Sponsor: WSDOT MTP Status: Candidate Project ID: 1722 Estimated Cost: $425,299,192 Title: SR 167 Corridor Completion Phases 2 and 3. Description: Phase 2 will widen the SR 167 to 2 general purpose lanes in each direction from SR 509 (Port of Tacoma) to the Meridian Interchange (SR 161) in Puyallup. Phase 3 will add HOV lanes each direction between I-5 and the Meridian Interchange.

Location / Facility: From: To: SR 167 SR 509 Puyallup/ Sumner vicinity (SR 161) County: Completion Year: Type: Pierce County 2040 New Facility-Road Sponsor: WSDOT MTP Status: Approved Project ID: 1652 Estimated Cost: $395,643,958 Title: SR 167 HOV lane completion Description: Extend HOV/HOT Lanes from current termini to SR 410 in Sumner.

Location / Facility: From: To: SR 167 SR 410 (Sumner) 15th St. SW/ NW County: Completion Year: Type: Pierce County 2017 New Facility-Road

Sponsor: WSDOT MTP Status: Unprogrammed Project ID: 4231 Estimated Cost: $13,718,874 Title: SR 169 Description: Construct a southbound truck climbing lane.

Location / Facility: From: To: SR 169 SE 383rd St. Green River County: Completion Year: Type: King County 2040 New Facility-Road

Sponsor: WSDOT MTP Status: Unprogrammed Project ID: 4232 Estimated Cost: $24,720,300 Title: SR 169 Description: Replace the existing northbound truck climbing shoulder with a truck climbing lane and extend it to the north.

Location / Facility: From: To: SR 169 Green River Crest of Hill (ARMP 6.32) County: Completion Year: Type: King County 2040 New Facility-Road Sponsor: WSDOT MTP Status: Unprogrammed Project ID: 4233 Estimated Cost: $12,360,150 Title: SR 169 Description: Construct a southbound truck climbing lane.

Location / Facility: From: To: SR 169 Near Cedar River (ARM 16.02 to 17.02 County: Completion Year: Type: King County 2040 New Facility-Road

Sponsor: WSDOT MTP Status: Unprogrammed Project ID: 3644 Estimated Cost: $149,615,914 Title: SR 169 Widening SR 516 to 231st Description: Widen to 4 lanes with turn lanes where warranted.

Location / Facility: From: To: SR 169 SR 516 SE 231st St. County: Completion Year: Type: King County 2040 New Facility-Road

Sponsor: WSDOT MTP Status: Unprogrammed Project ID: 5327 Estimated Cost: $113,713,380 Title: SR 169 Widening: I-405 to 152nd Ave. SE Description: Widen SR 169 from 4 to 6 lanes between I-405 and 152nd Ave. SE

Location / Facility: From: To: SR 169 I-405 152nd Ave. SE County: Completion Year: Type: King County 2040 New Facility-Road Sponsor: WSDOT MTP Status: Unprogrammed Project ID: 4214 Estimated Cost: $43,173,239 Title: SR 18 Description: Add an Auxiliary lane each direction on SR 18 from C Street to SR 164.

Location / Facility: From: To: SR 18 C Street SR 164 I/C County: Completion Year: Type: King County 2040 New Facility-Road

Sponsor: WSDOT MTP Status: Approved Project ID: 4216 Estimated Cost: $89,957,076 Title: SR 18 Description: Widen to four lanes, interchange improvements

Location / Facility: From: To: SR 18 Issaquah-Hobart Road Tigergate County: Completion Year: Type: King County 2040 New Facility-Road

Sponsor: WSDOT MTP Status: Unprogrammed Project ID: 4217 Estimated Cost: $107,534,251 Title: SR 18 Description: Widen to four lanes, interchange improvements. The first phase (Tier 2 investment) is to make improvements to the existing truck climbing lane in the 'raging river' vicinity.

Location / Facility: From: To: SR 18 Tigergate I-90 County: Completion Year: Type: King County 2040 New Facility-Road Sponsor: WSDOT MTP Status: Unprogrammed Project ID: 1712 Estimated Cost: $6,485,371 Title: SR 204 Description: Relocate Frontier Village access out of intersection with SR 9 and look at removing signal at 91st. Add storage for traffic from eastbound SR 204 to northbound SR 9.

Location / Facility: From: To: SR 204 US 2 SR 9 County: Completion Year: Type: Snohomish County 2040 New Facility-Road

Sponsor: WSDOT MTP Status: Candidate Project ID: 4185 Estimated Cost: $22,704,034 Title: SR 3 @ SR 16 Interchange (Gorst)

Description: Eliminate lane drop on SR 16 to northbound SR 3 by extending the lane north of the railroad bridge and extending the northbound SR 3 on-ramp.

Location / Facility: From: To: SR 3 SR 3/ SR 16 Vicinity (Gorst) SR 3/ SR 16 Vicinity (Gorst) County: Completion Year: Type: Kitsap County 2017 New Facility-Road

Sponsor: WSDOT MTP Status: Unprogrammed Project ID: 4183 Estimated Cost: $59,328,720 Title: SR 3 @ SR 304 I/C - Interchange Reconstruction Description: Reconstruct Interchange.

Location / Facility: From: To: SR 3 SR 3/SR 304 Interchange Vicinity SR 3/SR 304 Interchange Vicinity County: Completion Year: Type: Kitsap County 2035 New Facility-Road Sponsor: WSDOT MTP Status: Candidate Project ID: 4182 Estimated Cost: $12,407,791 Title: SR 3 @ SR 304 I/C - Ramp Modification Description: Extend SB SR 3 two-lanes though SR 304 Interchanges and adjust SR 304 SB ramp to merge instead of add lane.

Location / Facility: From: To: SR 3 SR 3/SR 304 Interchange Vicinity SR 3/SR 304 Interchange Vicinity County: Completion Year: Type: Kitsap County 2017 New Facility-Road

Sponsor: WSDOT MTP Status: Candidate Project ID: 1832 Estimated Cost: $33,695,747 Title: SR 3: Kinman-Big Valley Rd to SR 104 Description: Add northbound (NB) truck/climbing holding lane

Location / Facility: From: To: SR 3 Kinman/Big Valley Road SR 104 County: Completion Year: Type: Kitsap County 2030 New Facility-Road

Sponsor: WSDOT MTP Status: Unprogrammed Project ID: 4181 Estimated Cost: $16,453,143 Title: SR 3: Pioneer Way to Kinman-Big Valley Rd Description: Southbound truck/climbing lane between Pioneer Way and Kinman-Big Valley Road.

Location / Facility: From: To: SR 3 Pioneer Way Kinman-Big Valley Road County: Completion Year: Type: Kitsap County 2016 New Facility-Road Sponsor: WSDOT MTP Status: Unprogrammed Project ID: 4184 Estimated Cost: $317,359,025 Title: SR 3: SR 16 to SR 304 - HOV Widening Description: Widen from four to six-lane divided facility (creating one HOV lane in each direction) between the SR 3/SR 16 Interchange and the SR 3/SR 304 Interchange.

Location / Facility: From: To: SR 3 SR 16 SR 304 County: Completion Year: Type: Kitsap County 2040 New Facility-Road

Sponsor: WSDOT MTP Status: Unprogrammed Project ID: 1828 Estimated Cost: $18,395,865 Title: SR 3: SR 304 to Loxie Eagens Blvd - HOV Widening

Description: Widen to 6 lanes (creating one HOV lane in each direction) from SR 304 to Loxie Eagans Boulevard; and maintain the northbound auxiliary lane.

Location / Facility: From: To: SR 3 SR 3/SR 304 Interchange Vicinity Loxie Eagens Blvd. County: Completion Year: Type: Kitsap County 2040 New Facility-Road

Sponsor: WSDOT MTP Status: Unprogrammed Project ID: 4180 Estimated Cost: $70,114,203 Title: SR 3: SR 305 to SR 104 Description: Widen to a 4-lane, median divided facility

Location / Facility: From: To: SR 3 SR 305 SR 104 County: Completion Year: Type: Kitsap County 2040 New Facility-Road Sponsor: WSDOT MTP Status: Unprogrammed Project ID: 5440 Estimated Cost: $325,260,949 Title: SR 302 Description: Construct a new corridor from the vicinity of 144th Street NW to a new interchange on SR 16 in the vicinity of SE Pine Road.

Location / Facility: From: To: SR 302 144th Street SR 16 County: Completion Year: Type: Pierce County 2020 New Facility-Road

Sponsor: WSDOT MTP Status: Unprogrammed Project ID: 3618 Estimated Cost: $25,591,485 Title: SR 302 Capacity Improvements--Elgin-Clifton Road to SR 16 Description: Widen SR 302 to 4 lanes from Elgin-Clifton Road to 144th St NW to tie in with planned new alignment from 144th St NW to SR 16.

Location / Facility: From: To: SR 302 Elgin Clifton Rd. SR 16 County: Completion Year: Type: Pierce County 2017 New Facility-Road

Sponsor: WSDOT MTP Status: Unprogrammed Project ID: 4095 Estimated Cost: $200,867,894 Title: SR 303 Description: Construct Business Access and Transit Lanes.

Location / Facility: From: To: SR 303 11th Street (Bremerton) Fairgrounds Road County: Completion Year: Type: Kitsap County 2018 New Facility-Road Sponsor: WSDOT MTP Status: Candidate Project ID: 4237 Estimated Cost: $7,246,359 Title: SR 305: Bainbridge Ferry Terminal to Suquamish Way - Mobility Description: Intersection improvements with transit queue jump lanes.

Location / Facility: From: To: SR 305 Bainbridge Ferry Terminal Suquamish Way County: Completion Year: Type: Kitsap County 2016 New Facility-Road

Sponsor: WSDOT MTP Status: Completed Project ID: 1661 Estimated Cost: $33,943,096 Title: SR 410: 214th Ave E - 234th add lanes Description: Widen from 2 lanes to 4 lanes, realign 234th Ave E to create a "split intersection" and add a signal --per Route Development Plan/Design. SR 410/214th Ave E to 234th - Add Lanes is programmed for completion in 2011, but it appears majority of CN will be done by 2010

Location / Facility: From: To: SR 410 214th Ave E Vicinity 234th Ave E Vicinity County: Completion Year: Type: Pierce County 2011 New Facility-Road Sponsor: WSDOT MTP Status: ROW Conditionally Ap Project ID: 1613 Estimated Cost: $740,020,595 Title: SR 509 Extension (with I-5), Phase 1 Description: SR 509 Connection and I-5 Freight Mobility Project Phase 1 includes one lane in each direction between S 188th Street and S 24th/26th Ave, and two lanes in each direction between S 24th/26th Ave and I-5 with both GP &HOV/express toll lane connections to I-5, a full diamond interchange at SR509/S 188th Street, a half diamond interchange at SR 509/S 24th Ave to provide access to the airport via S 24/26th Ave and an improved air cargo road from S 188th Street to the airport, and a direct access to I-5 from the Kent Valley via S 228th Street and reconstruction of the SR 516 interchange. On I-5, Phase 1 also includes adding SB auxiliary lane from the extension to S 272nd St and NB auxilary lane from the SR 516 Interchange to the extension, converting the existing I-5 HOV lanes to ETL and the upgrading inside shoulders as ETL during peak periods from the SR 509 Connection to Federal Way.

Location / Facility: From: To: SR 509 I-5 Existing SR 509 County: Completion Year: Type: King County 2019 New Facility-Road

Sponsor: WSDOT MTP Status: Candidate Project ID: 4429 Estimated Cost: $148,854,717 Title: SR 509 Extension (with I-5), Phase 2 Description: SR 509 Connection and I-5 Freight Mobility Project Phase 2 includes widening the extension to two lanes each direction between S 188th Street and S 24th/26th Ave, construct partial interchange at 200th St. to link with the Airport South Access Road.

Location / Facility: From: To: SR 509 I-5 Existing SR 509 County: Completion Year: Type: King County 2040 New Facility-Road Sponsor: WSDOT MTP Status: Candidate Project ID: 4243 Estimated Cost: $38,137,343 Title: SR 512 Description: Construct eastbound and westbound auxiliary lanes from Meridian to Pioneer with two lane off-ramps at each Interchange.

Location / Facility: From: To: SR 512 Meridian/ SR 161 Pioneer County: Completion Year: Type: Pierce County 2025 New Facility-Road

Sponsor: WSDOT MTP Status: Candidate Project ID: 5442 Estimated Cost: $67,812,355 Title: SR 512 Description: Covert shoulders for use as additional lane during peak periods in the peak direction of travel

Location / Facility: From: To: SR 512 I-5 Meridian Street County: Completion Year: Type: Pierce County 2030 New Facility-Road

Sponsor: WSDOT MTP Status: Candidate Project ID: 1821 Estimated Cost: $15,595,486 Title: SR 512/94th Ave WB Ramps to SR 161 - Widening Description: Widen the westbound off ramp to SR 161 to two lanes, widen the eastbound on ramp from SR 161 to two lanes, widen the SR 512/SR 161 under-crossing from two to six lanes and extend the westbound climbing lane through interchange to tie in with the westbound on-ramp from 94th Ave. SE to SR 512.

Location / Facility: From: To: SR 512 @ Meridian/ SR 161 I/C SR 512 @ Meridian/ SR 161 I/C SR 512/SR 161 I/C County: Completion Year: Type: Pierce County 2025 New Facility-Road Sponsor: WSDOT MTP Status: Candidate Project ID: 4242 Estimated Cost: $9,038,000 Title: SR 512/Canyon Rd Interchange EB & WB - Mobility Description: Construct a two lane eastbound and westbound off-ramps to Canyon Road.

Location / Facility: From: To: SR 512 @ Canyon Road I/C SR 512 @ Canyon Road I/C SR 512Canyon Road I/C County: Completion Year: Type: Pierce County 2015 New Facility-Road

Sponsor: WSDOT MTP Status: Candidate Project ID: 4241 Estimated Cost: $8,000,000 Title: SR 512/SR 7 Interchange - Mobility Description: Construct a two lane eastbound off-ramp to SR 7.

Location / Facility: From: To: SR 512 @ SR 7 SR 512 @ SR 7 SR 512/SR 7 I/C County: Completion Year: Type: Pierce County 2015 New Facility-Road

Sponsor: WSDOT MTP Status: Unprogrammed Project ID: 4245 Estimated Cost: $90,229,095 Title: SR 518 Description: Add a second eastbound lane from the I-5 southbound drop lane to the I-5 northbound add lane at the Tukwila I/C.

Location / Facility: From: To: SR 518 @ I-5 Interchange SR 518 @ I-5 Interchange SR 518/I-5 Interchange County: Completion Year: Type: King County 2020 New Facility-Road Sponsor: WSDOT MTP Status: Unprogrammed Project ID: 4246 Estimated Cost: $79,769,032 Title: SR 518 Description: Relocate the I-5 northbound ramp to the right side and combine I-5 northbound, I-5 southbound and the 51st Ave. S ramps at the Tukwila I/C.

Location / Facility: From: To: SR 518 @ I-5 Interchange SR 518 @ I-5 Interchange SR 518/I-5 Interchange County: Completion Year: Type: King County 2020 New Facility-Road

Sponsor: WSDOT MTP Status: Unprogrammed Project ID: 5390 Estimated Cost: $111,404,504 Title: SR 518

Description: Construct a new interchange at SR 99

Location / Facility: From: To: SR 518 @ SR 99 SR 518 @ SR 99 I-5 County: Completion Year: Type: King County 2020 New Facility-Road Sponsor: WSDOT MTP Status: Approved Project ID: 4416 Estimated Cost: $14,057,986 Title: SR 518 at Des Moines Memorial Drive Interchange Phase I - Eastbound Off Ramp Description: The project is located within the city limits of Burien and incorporates an area within Section 20 Township 23N and Range 4E. The project will construct a new eastbound off-ramp from SR 518 to Des Moines Memorial Drive including a new ramp bridge over 8th Avenue South. The new off-ramp will be located primarily within the existing WSDOT right-of-way. This project will also include storm drain conveyance, stormwater treatment, retaining walls, illumination, and sidewalks on both sides of 8th Avenue South from S 148th Street to south of the new bridge over 8th Avenue South. Stormwater detention will be accomplished off-site utilizing an equivalent area swap approved by the Department of Ecology.

Location / Facility: From: To: SR 518 SR 509 Des Moines Memorial Drive County: Completion Year: Type: King County 2020 New Facility-Road

Sponsor: WSDOT MTP Status: Candidate Project ID: 4476 Estimated Cost: $67,316,204 Title: SR 518 at Des Moines Memorial Drive Interchange Phase II - Westbound Ramps Description: Reconstruct the existing half diamond interchange at Des Moines Memorial Drive. Phase 2 includes adding a westbound off- ramp from SR 518 to northbound SR 509 that diverges from SR 518 prior to the Des Moines Memorial Drive Interchange and an on-ramp from Des Moines Memorial Drive to westbound SR 518.

Location / Facility: From: To: SR 518 SR 509 Des Moines Memorial Drive County: Completion Year: Type: King County 2020 New Facility-Road Sponsor: WSDOT MTP Status: Completed Project ID: 1866 Estimated Cost: $92,923,924 Title: SR 519 Intermodal Access Project - Phase 2: South Atlantic Corridor Description: I-90 Off-Ramp to South Atlantic Street. A new two-lane elevated ramp connection would be built from westbound I 90 to terminate at a signalized T-intersection at South Atlantic Street. The new South Atlantic Street connection would serve westbound freeway traffic from I 90 and I-5. The new ramp would be entirely elevated, passing over Fourth Avenue South and Third Avenue South and connecting to the South Atlantic Street overpass southeast of Safeco Field. Exiting northbound I-5 traffic would be routed to South Atlantic Street, while exiting southbound I-5 traffic would have the option of taking either the new off-ramp to South Atlantic Street or the existing I-90 off-ramp to Fourth Avenue South. South Royal Brougham Way Railroad Overpass. The South Royal Brougham Way at- grade railroad crossing would be closed and a new two-lane elevated structure would be constructed, connecting Occidental Avenue South to Third Avenue South. The new overpass would transport vehicular, pedestrian, and bicycle traffic over the BNSF Railway tracks and provide a new connection from South Royal Brougham Way into the second level of Qwest Field Event Center parking garage. The new ramp would accommodate local two-way traffic.

Location / Facility: From: To: 0 I-90 Seattle Waterfront County: Completion Year: Type: King County 2010 New Facility-Road

Sponsor: WSDOT MTP Status: Completed Project ID: 4101 Estimated Cost: $96,210,542 Title: SR 520 Description: Widen SR 520 to 8 lanes including HOV Lanes and auxiliary lanes. Construct a new SR 520/SR 202 interchange.

Location / Facility: From: To: 0 W Lake Sammamish Parkway SR 202 County: Completion Year: Type: King County 2010 New Facility-Road Sponsor: WSDOT MTP Status: ROW Conditionally Ap Project ID: 4250 Estimated Cost: $1,249,673,569 Title: SR 520 Description: Construct new six lane connection between I-5 and Montlake Blvd. This includes reconstruction of the Portage Bay Bridge. Construct a westbound to southbound freeway-to-freeway Core HOV Connection at the I-5/SR520 interchange.

Location / Facility: From: To: SR 520 I-5 Foster Island Vicinity County: Completion Year: Type: King County 2022 New Facility-Road

Sponsor: WSDOT MTP Status: Candidate Project ID: 4418 Estimated Cost: $62,173,539 Title: SR 520 @ 148th Ave NE I/C Vicinity - I/C Improvments

Description: Provide 2nd eastbound grade separated off ramp access to the east of 148th Ave NE. Improve interchange ped and bike facilities along 148th Ave NE.

Location / Facility: From: To: SR 520 148th Ave NE County: Completion Year: Type: King County 2020 New Facility-Road

Sponsor: WSDOT MTP Status: Candidate Project ID: 4462 Estimated Cost: $14,207,649 Title: SR 520 Eastbound Auxiluary Lane: NE 148th Ave to NE 40th St. Description: Construct a auxilary lane eastbound between NE 148th Ave to NE 40th St.

Location / Facility: From: To: SR 520 NE 148th Ave. NE 40th St. County: Completion Year: Type: 2022 New Facility-Road Sponsor: WSDOT MTP Status: Candidate Project ID: 5443 Estimated Cost: $20,000,000 Title: SR 520 HOV to HOT Description: Convert HOV lanes to HOT lanes

Location / Facility: From: To: SR 520 I-405 SR 202 County: Completion Year: Type: King County 2020 New Facility-Road

Sponsor: WSDOT MTP Status: Candidate Project ID: 2906 Estimated Cost: $976,936 Title: SR 520 Trail Description: Shared use bike path pending outcome of Trans-Lake Corridor study

Location / Facility: From: To: SR 520 Trail Montlake east to Seattle city limits at water's edge County: Completion Year: Type: King County 2017 New Facility-Road

Sponsor: WSDOT MTP Status: Completed Project ID: 2907 Estimated Cost: $713,318 Title: SR 520 Trail Description: Shared use bike path Pending outcome of Trans-Lake Corridor study

Location / Facility: From: To: SR 520 Trail Medina western city limits Medina eastern city limits County: Completion Year: Type: King County 2015 New Facility-Road Sponsor: WSDOT MTP Status: ROW Conditionally Ap Project ID: 2910 Estimated Cost: $2,496,614 Title: SR 520 Trail over 520 Bridge Description: Shared use bike path Pending outcome of Trans-Lake Corridor study

Location / Facility: From: To: SR 520 Trail over 520 Bridge Eastern Seattle city limits Western Medina city limits County: Completion Year: Type: King County 2016 New Facility-Road

Sponsor: WSDOT MTP Status: Approved Project ID: 4252 Estimated Cost: $590,276,795 Title: SR 520: Eastside Transit and HOV Description: Add HOV lanes eastbound between Evergreen Point Road and 108th Ave. Move existing HOV lanes and upgrade to full standard lanes to the inside and add a direct HOV access at 108th Avenue. Cost for this project includes the HOV restriping between I-405 (108th Ave) and SR 202 (MTP 4284).

Location / Facility: From: To: SR 520 Evergreen Point Road 108th Ave County: Completion Year: Type: King County 2015 New Facility-Road Sponsor: WSDOT MTP Status: Approved Project ID: 4251 Estimated Cost: $1,136,779,255 Title: SR 520: I-5 to Medina - Evergreen Point Floating Bridge and Landings Description: The Floating Bridge and Landings Project is one of four projects in the SR 520 Bridge Replacement and HOV Program. The proposed project would replace the SR 520 floating bridge and landings, including the connections to the existing structure east of Foster Island, and to the existing roadway in Medina. The new bridges will meet current design standards for windstorms and earthquakes. The road will have six lanes including two HOV lanes, bicycle/pedestrian facilities, and the ability to accommodate future light rail.

Location / Facility: From: To: SR 520 West end of floating bridge Evergreen Point Road County: Completion Year: Type: King County 2016 New Facility-Road

Sponsor: WSDOT MTP Status: Approved Project ID: 4159 Estimated Cost: $150,000,000 Title: SR 522 (Nickel) Description: This project will widen SR 522 from the existing two lanes to four lanes with median separation from the Cathcart Road vicinity (Snohomish River Bridge) to US 2. The proposed action evaluated in this EA includes a new bridge across the Snohomish River, a wildlife crossing near milepost 22, improvements to the 164th St. SE (W Main St) interchange, and a new ramp connection and improvements to the US 2 interchange.

Location / Facility: From: To: SR 522 Snohomish River Bridge US 2 County: Completion Year: Type: Snohomish County 2015 New Facility-Road Sponsor: WSDOT MTP Status: Unprogrammed Project ID: 2380 Estimated Cost: $46,182,070 Title: SR 522 @ 195th Description: Construct second half of the existing half-diamond interchange making a full diamond interchange.

Location / Facility: From: To: SR 522 NE 195th Street NE 195th Street County: Completion Year: Type: King County 2040 New Facility-Road

Sponsor: WSDOT MTP Status: Candidate Project ID: 4257 Estimated Cost: $106,060,742 Title: SR 522 @ Paradise Lake Road Interchange Description: Construct a new grade separated diamond interchange.

Location / Facility: From: To: SR 522 Paradise Lake Road Paradise Lake Road County: Completion Year: Type: Snohomish County 2020 New Facility-Road Sponsor: WSDOT MTP Status: Completed Project ID: 3621 Estimated Cost: $39,454,870 Title: SR 522 UW Bothell Campus South Access Description: Construct a new interchange on SR 522 providing direct access to/from the UW-Bothell/Cascadia Community College joint campus in Bothell. Provide a new signalized intersection approx. one half mile west of the I-405 interchange where a new public street will be constructed from the campus to meet the existing "T" intersection of Woodinville Drive and Brackett's landing. A new bridge over this intersection will allow traffic exiting I-405 to merge onto WB SR 522 unimpeded by turns at the new intersection. The SB I-405 off- ramp to WB SR 522 will be widened to give motorists the option of entering the campus or using the new overpass to SB SR 522.

Location / Facility: From: To: 0 UW Bothell/Cascadia Community College one half mile west of I-405 County: Completion Year: Type: King County 2007 New Facility-Road

Sponsor: WSDOT MTP Status: Candidate Project ID: 1698 Estimated Cost: $69,488,073 Title: SR 522: Paradise Lk Rd to Snohomish River - Widening Description: Add two lanes converting a two lane highway to a four lane divided highway. Complete construction of the Fales/Echo Lake Interchange.

Location / Facility: From: To: SR 522 Paradise Lake Rd. Snohomish River County: Completion Year: Type: Snohomish County 2020 New Facility-Road Sponsor: WSDOT MTP Status: Approved Project ID: 1714 Estimated Cost: $111,000,000 Title: SR 524 Description: Widen to five lanes adding two general purpose lanes and a two-way-left-turn-lane.

Location / Facility: From: To: SR 524 24th Ave. SR 527 County: Completion Year: Type: Snohomish County 2025 New Facility-Road

Sponsor: WSDOT MTP Status: Unprogrammed Project ID: 4259 Estimated Cost: $95,512,919 Title: SR 524 Description: Widen to five lanes adding two general purpose lanes and a two-way-left-turn-lane.

Location / Facility: From: To: SR 524 SR 527 35th/39th Street County: Completion Year: Type: Snohomish County 2040 New Facility-Road

Sponsor: WSDOT MTP Status: Unprogrammed Project ID: 4260 Estimated Cost: $72,771,748 Title: SR 524 Description: Widen to five lanes adding two general purpose lanes and a two-way-left-turn-lane.

Location / Facility: From: To: SR 524 35th/39th Street SR 522 County: Completion Year: Type: Snohomish County 2040 New Facility-Road Sponsor: WSDOT MTP Status: Unprogrammed Project ID: 1715 Estimated Cost: $207,617,394 Title: SR 525 Description: NFS - Connect to proposed ferry terminal location. Costs are develop a new three-lane roadway on new alignment that would access the relocated Mukilteo Ferry Terminal down an environmentally sensitive drainage known as Japanese Gulch

Location / Facility: From: To: SR 525 SR 526 Proposed Mukilteo Multimodal Terminal. County: Completion Year: Type: Snohomish County 2027 New Facility-Road

Sponsor: WSDOT MTP Status: Candidate Project ID: 3539 Estimated Cost: $5,272,353 Title: SR 527 Ped/Bike I-405 Overcrossing

Description: Add ped / bike facility crossing I-405 from 220th St SE to 228th St SE

Location / Facility: From: To: SR 527 220th St SE 228th St SE County: Completion Year: Type: Snohomish County 2030 New Facility-Road Sponsor: WSDOT MTP Status: Completed Project ID: 5543 Estimated Cost: $53,686,904 Title: SR 529 - Ebey Slough Bridge 529/25 Replacement Description: This project will replace the existing Ebey Slough Bridge, 529/25, with a new fixed span structure and remove the existing bridge structure. The bridge will be widened from two to four lanes to match the four-lane roadway sections immediately before and after the bridge.

Location / Facility: From: To: SR 529 MP 6.21 MP 6.35 County: Completion Year: Type: Snohomish County 2010 New Facility-Road

Sponsor: WSDOT MTP Status: Candidate Project ID: 1639 Estimated Cost: $52,958,220 Title: SR 531 Description: Four-lane widening with intersection improvements

Location / Facility: From: To: SR 531 43rd Ave. SR 9 County: Completion Year: Type: Snohomish County 2030 New Facility-Road Sponsor: WSDOT MTP Status: Unprogrammed Project ID: 112 Estimated Cost: $503,240,693 Title: SR 704 - Cross Base Highway, I-5 to Spanaway Loop Rd Description: Construct new four-lane, limited access facility between Fort Lewis and McCord Air Base. Includes reconstructed interchange at I-5. Includes Gravelly Thorne Connector: Construct one mile single lane SB roadway connecting Gravelly Lake Drive to Thorne Lane west of the Sound Transit/Burlington Northern Railroad tracks. Also includes bike/ ped separated path.

Location / Facility: From: To: SR 704 - new alignment located approx. I-5 SR 7 along the common boundary of Ft. Lewis and McChord AFB County: Completion Year: Type: Pierce County 2035 New Facility-Road

Sponsor: WSDOT MTP Status: Candidate Project ID: 4206 Estimated Cost: $74,364,429 Title: SR 9 Description: Widen to four/ five lanes.

Location / Facility: From: To: SR 9 176th St SE SR 96 County: Completion Year: Type: Snohomish County 2020 New Facility-Road Sponsor: WSDOT MTP Status: Candidate Project ID: 4207 Estimated Cost: $12,051,057 Title: SR 9 Description: Widen to 4 lanes and intersection improvements at Marsh Road

Location / Facility: From: To: SR 9 Marsh Rd Snohomish River Bridge County: Completion Year: Type: Snohomish County 2030 New Facility-Road

Sponsor: WSDOT MTP Status: Candidate Project ID: 4208 Estimated Cost: $82,666,490 Title: SR 9 Description: Widen to 4/5 lanes from US-2 to Lake Stevens Road

Location / Facility: From: To: SR 9 US 2 Market Place County: Completion Year: Type: Snohomish County 2035 New Facility-Road

Sponsor: WSDOT MTP Status: Candidate Project ID: 4209 Estimated Cost: $16,000,000 Title: SR 9 Description: Add third NB and third SB through lanes

Location / Facility: From: To: SR 9 Market Place Lundeen Parkway County: Completion Year: Type: Snohomish County 2025 New Facility-Road Sponsor: WSDOT MTP Status: Candidate Project ID: 5432 Estimated Cost: $63,799,716 Title: SR 9 Description: Widen to 4 lanes and intersection improvements

Location / Facility: From: To: SR 9 Snohomish River Bridge US 2 County: Completion Year: Type: Snohomish County 2030 New Facility-Road

Sponsor: WSDOT MTP Status: Unprogrammed Project ID: 5434 Estimated Cost: $6,427,278 Title: SR 9 Description: Intersection improvements at Division Street and 84th Street

Location / Facility: From: To: SR 9 SR 92 SR 530 County: Completion Year: Type: Snohomish County 2040 New Facility-Road

Sponsor: WSDOT MTP Status: Candidate Project ID: 5433 Estimated Cost: $24,811,000 Title: SR 9 / US2 Interchange Description: Reconstruct the SR 9/US 2 I/C

Location / Facility: From: To: SR 9 @ US 2 SR 9 @ US 2 County: Completion Year: Type: Snohomish County 2030 New Facility-Road Sponsor: WSDOT MTP Status: Candidate Project ID: 4413 Estimated Cost: $54,842,362 Title: SR 9 @ SR 204 Intersection Improvement Description: Widen SR 9 for both northbound and southbound to provide one additional through lane at the SR 9/SR 204 intersection. A grade separated option is also being evaluated.

Location / Facility: From: To: SR 9 SR 9 / SR 204 Intersection SR 9 / SR 204 Intersection County: Completion Year: Type: Snohomish County 2020 New Facility-Road

Sponsor: WSDOT MTP Status: Completed Project ID: 1627 Estimated Cost: $81,069,418 Title: SR 9 Widening: 212th St. SE to 176th St. SE

Description: Widen SR 9 to 4/5 lanes

Location / Facility: From: To: SR 9 212th St SE 176th St SE County: Completion Year: Type: Snohomish County 2015 New Facility-Road

Sponsor: WSDOT MTP Status: Completed Project ID: 4428 Estimated Cost: $0 Title: SR 9 Widening: SR 522 to 212th St SE Description: Widen SR 9 to 4/5 lanes

Location / Facility: From: To: SR 9 SR 522 212th County: Completion Year: Type: Snohomish County 2011 New Facility-Road Sponsor: WSDOT MTP Status: Candidate Project ID: 5431 Estimated Cost: $108,459,516 Title: SR 9: Snohomish River Bridge Description: Replace bridge with new 4-lane bridge across river. Also, new 4-lane overflow bridge south of Snohomish River with ramp and interchange improvements.

Location / Facility: From: To: SR 9 Snohomish River Bridge Snohomish River Bridge County: Completion Year: Type: Snohomish County 2030 New Facility-Road

Sponsor: WSDOT MTP Status: Completed Project ID: 4267 Estimated Cost: $48,155,868 Title: SR 9: Lundeen Pkwy to SR 92

Description: This project adds new northbound and southbound SR-9 through lanes, improves or adds the left and right turn lanes on northbound and southbound SR-9 as needed, adds a left turn lane and extends the right turn lane on SR 92, and upgrades illumination and signal systems at Lundeen Parkway, Soper Hill Rd and SR 92 intersections. The project will treat and detain new impervious stormwater runoff.

Location / Facility: From: To: SR 9 Lundeen Parkway SR 92 County: Completion Year: Type: Snohomish County 2013 New Facility-Road Sponsor: WSDOT MTP Status: Completed Project ID: 4265 Estimated Cost: $42,437,544 Title: SR 9: SR 96 to Marsh Road Description: This project will widen SR 9 to two lanes in each direction and add left and right turn lanes at SR 96 and Marsh Rd. Other improvements include upgrading the existing lighting and traffic signals and modifying the drainage system at each intersection.

Location / Facility: From: To: 0 SR 96 Marsh Road County: Completion Year: Type: Snohomish County 2011 New Facility-Road

Sponsor: WSDOT MTP Status: Completed Project ID: 1617 Estimated Cost: $51,154,226 Title: SR 900

Description: Widen to 4 lanes w/ TWLTL.

Location / Facility: From: To: 0 Issaquah WCL I-90 County: Completion Year: Type: King County 2010 New Facility-Road

Sponsor: WSDOT MTP Status: Unprogrammed Project ID: 1812 Estimated Cost: $5,582,031 Title: SR 99 Description: Add a southbound thru lane on Hwy 99 from 54th to NB On Ramp to I-5. Improve intersection of HWY 99 and 54th Avenue.

Location / Facility: From: To: SR 99 I-5 Pacific Highway East/54th Ave County: Completion Year: Type: Pierce County 2017 New Facility-Road Sponsor: WSDOT MTP Status: Candidate Project ID: 4415 Estimated Cost: $36,572,670 Title: SR 99/ Evergreen Way: 148tth St SW to Airport Rd Description: Construct BAT lanes on Evergreen Way / Highway 99 from 148th Street SW to airport Road.

Location / Facility: From: To: Evergreen Way Transit HOV Treatments 148th Street SW Airport Road County: Completion Year: Type: Snohomish County 2020 New Facility-Road

Sponsor: WSDOT MTP Status: ROW Conditionally Ap Project ID: 4282 Estimated Cost: $253,254,054 Title: SR 99/Viaduct Surface Restoration & Construction Transit Center Description: Restoration and improvements of Surface Street Alaskan Way following the demolition of the Alaskan Way Viaduct Structure. The project includes an allowance for construction mitigation to replace the loss of parking stalls from under the existing structure.

Location / Facility: From: To: SR 99 S King Street Roy Street County: Completion Year: Type: King County 2018 New Facility-Road

Sponsor: WSDOT MTP Status: Completed Project ID: 1630 Estimated Cost: $78,021,696 Title: SR 99: 244TH ST. SW to 240th St. SW - BAT Lanes Description: Add one lane each direction to connect with Business Access and Transit (BAT) lanes that cities have built or are planning to build on each side of the HWY 99 and SR 104 Interchange.

Location / Facility: From: To: 0 244th Ave SW 240th St. SW County: Completion Year: Type: Snohomish County 2010 New Facility-Road Sponsor: WSDOT MTP Status: Completed Project ID: 4280 Estimated Cost: $445,326,900 Title: SR 99: S Holgate St to S King St - Viaduct Replacement Description: Remove and replace the seismically vulnerable viaduct by adding new SR 99 on and off ramps, constructing a new undercrossing at S. Atlantic St, constructing new bicycle/pedestrian paths, signing, illumination, utilities, and drainage.

Location / Facility: From: To: SR 99 S Holgate St. S King St County: Completion Year: Type: King County 2013 New Facility-Road

Sponsor: WSDOT MTP Status: Approved Project ID: 4281 Estimated Cost: $2,546,661,831 Title: SR 99: S. King Street to Roy Street – Central Waterfront Viaduct Replacement

Description: The proposed bored tunnel would be constructed under downtown Seattle between the vicinity of S. King Street and Roy Street to replace the seismically vulnerable Alaskan Way Viaduct along the central waterfront. The proposed bored tunnel would move SR 99 to a below-ground alignment under downtown Seattle and would bypass the existing Battery Street Tunnel. The project includes removal of the existing viaduct structure and decommissioning of Battery Street Tunnel.

Location / Facility: From: To: SR 99 S King St Roy St County: Completion Year: Type: King County 2016 New Facility-Road Sponsor: WSDOT MTP Status: Approved Project ID: 3527 Estimated Cost: $29,873,559 Title: Tukwila Urban Access Improvement Project Description: The project will widen Southcenter Parkway to the east from south of Strander Boulevard to the 1-5 northbound off-ramp to provide added storage length for the back-to-back dual left turn lanes between Strander Boulevard and Klickitat Drive. The southbound lanes of Southcenter Parkway will be re-profiled to provide a grade separation at the Klickitat Drive intersection. A new bridge structure maintains the connection between the existing surface grades of Klickitat Drive and northbound and southbound Southcenter Parkway. A new signal on Southcenter Parkway south of Strander Boulevard provides for access management to adjacent businesses and collision reduction. Traffic signal interconnections, pedestrian facilities on the east side of Southcenter parkway will be included.

Location / Facility: From: To: Southcenter Pkwy Tukwila Pkwy Strander Blvd County: Completion Year: Type: King County 2012 New Facility-Road

Sponsor: WSDOT MTP Status: Completed Project ID: 5323 Estimated Cost: $356,807 Title: US 2 "Trestle" ATM Description: Restripe the east bound carriageway to allow hard shoulder running (3 lanes) during the PM peak and install other companion ATM devices.

Location / Facility: From: To: 0 I-5 SR 204 County: Completion Year: Type: Snohomish County 2010 New Facility-Road Sponsor: WSDOT MTP Status: Unprogrammed Project ID: 4176 Estimated Cost: $420,245,102 Title: US 2: Bickford to Monroe Description: Widen to four lanes. The alignment may be on the existing highway or it may be on R/W purchased for a bypass in the 1960s. The final decision should be resolved in an EIS.

Location / Facility: From: To: US 2 Bickford Ave. City of Monroe (SR 522) County: Completion Year: Type: Snohomish County 2040 New Facility-Road

Sponsor: WSDOT MTP Status: Candidate Project ID: 5444 Estimated Cost: $45,106,293 Title: US 2: Monroe Bypass - phase 1

Description: Construct a two lane SR 522 extension to the north and terminate at Chain Lake Road that connects to the local street system.

Location / Facility: From: To: SR 522 Extension North of the SR 522 I/C North of the SR 522 I/C County: Completion Year: Type: Snohomish County 2020 New Facility-Road

Sponsor: WSDOT MTP Status: Unprogrammed Project ID: 1620 Estimated Cost: $177,986,161 Title: US 2: Monroe Bypass phases 2 & 3 Description: Construct a four- lane, limited access bypass around Monroe on new alignment to the north of the city. This project could be constructed in two stages.

Location / Facility: From: To: US 2 (on new alignment) (west of) SR 522 Monroe east City limits County: Completion Year: Type: Snohomish County 2020 New Facility-Road Sponsor: WSDOT MTP Status: Unprogrammed Project ID: 4177 Estimated Cost: $304,772,248 Title: US 2: Monroe to City of Sultan Description: Widen the corridor to four lanes.

Location / Facility: From: To: US 2 Monroe east city limits Sultan west city limits County: Completion Year: Type: Snohomish County 2040 New Facility-Road

Sponsor: WSDOT MTP Status: Candidate Project ID: 4175 Estimated Cost: $82,813,005 Title: US 2: SR 204 to Bickford Description: Widen to 4 lanes.

Location / Facility: From: To: US 2 SR 204 Bickford Ave. County: Completion Year: Type: Snohomish County 2040 New Facility-Road

Sponsor: WSDOT MTP Status: Unprogrammed Project ID: 1704 Estimated Cost: $93,937,140 Title: US 2: Sultan to Goldbar Description: In between Sultan and Gold Bar would be a four lane section (two lanes in each direction) separated by a four foot median with rumble strips to improve safety.

Location / Facility: From: To: US 2 City of Sultan east city limits Goldbar West City Limits County: Completion Year: Type: Snohomish County 2040 New Facility-Road Sponsor: WSDOT MTP Status: Candidate Project ID: 4412 Estimated Cost: $195,054,239 Title: US 2: Trestle Widening - Stage 1 Description: Build a new westbound US-2 structure over Ebey Slough for the future configuration of 2 general purpose lanes and 1 HOV lane. Realign the westbound SR 204 to westbound US-2 on-ramp utilizing the new westbound structure, improving the weaving conditions for the interchange.

Location / Facility: From: To: US 2 I-5 SR 204 County: Completion Year: Type: Snohomish County 2020 New Facility-Road

Sponsor: WSDOT MTP Status: Unprogrammed Project ID: 5324 Estimated Cost: $731,453,396 Title: US 2: Trestle Widening - Stage 2 Description: Widen the trestle to 3 lanes each direction (with HOV lane) with standard lane and shoulder widths and improve the US 2/I-5 interchange.

Location / Facility: From: To: US 2 I-5 SR 204 County: Completion Year: Type: Snohomish County 2040 New Facility-Road Sponsor: WSDOT MTP Status: Unprogrammed Project ID: 5420 Estimated Cost: $53,148,645 Title: US 2: within Baring Description: Widen to four lanes (safety related widening)

Location / Facility: From: To: US 2 Enter Baring Leave Baring County: Completion Year: Type: Snohomish County 2040 New Facility-Road

Sponsor: WSDOT MTP Status: Unprogrammed Project ID: 5419 Estimated Cost: $56,856,690 Title: US 2: within Goldbar Description: Within the city of Goldbar, this will be a four-lane section (two lanes in each direction with bike lanes, sidewalks and a center median). The existing signalized intersections would be replaced with roundabouts.

Location / Facility: From: To: US 2 Gold Bar WCL Gold Bar ECL County: Completion Year: Type: Snohomish County 2040 New Facility-Road

Sponsor: WSDOT MTP Status: Unprogrammed Project ID: 4178 Estimated Cost: $173,440,397 Title: US 2: within Sultan Description: The long term vision through Sultan is a four-lane section (two lanes in each direction with bike lanes, sidewalks and a center median). The existing signalized intersections would be replaced with roundabouts.

Location / Facility: From: To: US 2 City of Sultan west city limits City of Sultan east city limits County: Completion Year: Type: Snohomish County 2040 New Facility-Road Sponsor: WSDOT MTP Status: Unprogrammed Project ID: 5422 Estimated Cost: $134,725,636 Title: US 3 Description: Widen from Imperial Way to SR 16 to four lanes

Location / Facility: From: To: SR 3 Imperial Way Gorst (SR 16) County: Completion Year: Type: Kitsap County 2040 New Facility-Road

Sponsor: WSDOT MARINE DIV. (PSRC REGION ONLY) MTP Status: Candidate Project ID: 5135 Estimated Cost: $301,141,372 Title: Colman Dock Description: WSF facility improvements

Location / Facility: From: To: Alaskan Way S Marion St County: Completion Year: Type: King County 2040 New Facility-Road

Sponsor: WSDOT MARINE DIV. (PSRC REGION ONLY) MTP Status: Candidate Project ID: 2486 Estimated Cost: $129,000,000 Title: Mukilteo Terminal Relocation/Expansion Description: Terminal relocation/expansion

Location / Facility: From: To: Mukilteo Terminal Loveland Cornelia St. County: Completion Year: Type: Snohomish County 2019 New Facility-Road