Gonzalo Rada, PE, Phd Principal Pavement Engineer

Total Page:16

File Type:pdf, Size:1020Kb

Gonzalo Rada, PE, Phd Principal Pavement Engineer Gonzalo Rada, PE, PhD Principal Pavement Engineer Professional Summary Dr. Rada has devoted his entire career to the field of pavement Years of Experience engineering and is an expert in the areas of pavement design, 35 (29 with Wood) evaluation, maintenance, materials, rehabilitation, and Office of Employment management systems. He has published more than 100 technical East US - Beltsville papers and reports and has made numerous presentations throughout the U.S. and internationally in Argentina, Brazil, Languages Canada, Mexico, New Zealand, Norway, Peru, South Africa, Taiwan English - Fluent and Venezuela. The topics of his publications and presentations Spanish - Fluent are broad ranging and have included: the Strategic Highway Research Project (SHRP) Long-Term Pavement Performance (LTPP) Professional Associations program; pavement management systems and GIS applications; Member, American Society for traffic mix analysis and traffic control devices; pavement structural Testing and Materials and rehabilitation design; pavement materials, construction, and Member, American Society of maintenance; and quality assurance and control programs. Dr. Rada's international work experience has included Australia, Brazil, Civil Engineers Canada, The Bahamas, Bahrain, El Salvador, England, France, Member, Transportation Cayman Islands and Saudi Arabia. Research Board As a specialist pavement engineer and project manager, Dr. Rada Areas of Expertise has been involved in a variety of airport, highway, port and bridge Civil Engineer - Expert pavement design, pavement management, and research projects. Pavement Engineer - Expert He has been involved in numerous highway and airfield pavement analyses, special topic research, quality control reviews, and development of operational procedures. He has effectively performed project management of multi-million dollar projects for the federal government in matters dealing with pavement studies across the United States and Canada, as well as a number of other pavement research studies. In addition, he has developed pavement design and analysis methodologies and developed pavement design and analysis software for a number of public agencies and national trade organizations. Dr. Rada has also developed and implemented over 100 highway and airfield pavement management systems in the U.S. and throughout the world. His project responsibilities have included the evaluation and development of rehabilitation recommendations for thousands of miles of roads, airfield and port pavements. Dr. Rada has also served as an expert consultant and expert witness on a number of projects both in the US and abroad. Dr. Rada has worked for Wood for nearly 30 years and for FUGRO Consultants, Inc. for 3 years in various roles including senior principal engineer, senior project manager, © 2018 Wood Page 1 Continued... senior consultant and assistant vice president. Prior to that he served for 5 years as faculty research associate at the University of Maryland, where he taught classes in pavements and materials and performed research. Among his major research projects at the university are the overview and integration planning for the Strategic Highway Research (SHRP), development of a project level pavement management system life cycle cost model for the Maryland State Highway Administration, and dynamic characterization of typical Maryland base and subbase materials. He also served as training coordinator for the University of Maryland’s Transportation Studies Center and performed consulting services for DAMA, Inc. and the American Railroad Association. Dr. Rada' work experience is best divided into the following four general pavement areas: Pavement Research; Pavement Management Systems; Pavement Evaluation, Design and Rehabilitation; Expert Consultant and Witness; and Teaching and Training. The following is a summary of his experience in each of the four areas. Pavement Research Dr. Rada's most visible accomplishment in the pavement research field has been that of Principal Investigator on the Long-Term Pavement Performance (LTPP) Technical Support Services Contract, a role he held from 1992 to 2008. The LTPP program began under the National Academy of Science, Strategic Highway Research Program (SHRP) in 1987. At the end of the 5-year SHRP effort, the administration of this 20-year research program was continued under the Federal Highway Administration. In his role as Principal Investigator, he was responsible for overview of the technical assistance provided in the areas of pavement engineering, traffic engineering and information/database management. In addition, he was tasked with special assignments such as leading the assessment of the LTPP program to produce priority products from its research, development of position papers on key program issues, and coordination with highway agency officials, and other LTPP contractors, including numerous technical presentations on all aspects of the LTPP program at national LTPP meetings, TRB committees, National Academy of Sciences Expert Task Groups, LTPP Advisory Committee, and at industry conferences. Dr. Rada's experience with the LTPP study dates back to before the start of the program. From 1985 to 1986, he served as Project Manager for the Overview and Integration Planning of the SHRP Pre- Implementation activities under NCHRP Project Number 20-20(2). He was responsible for providing a general overview of the all-inclusive SHRP research plan and the study culminated with the preparation of the SHRP Overview and Integration Report, included in the final "Strategic Highway Research Program: Research Plans," published in May 1986. From 1987 to 1990, he served as Materials and Pavement Engineer on the SHRP LTPP P-001 Technical Assistance Contract. His efforts during this time period focused on deflection testing, materials field sampling and testing and laboratory testing, and assistance with management of the LTPP pavement performance monitoring activities. From 1990 to 1992, he served as Co-Principal Investigator for the SHRP LTPP P-001B Technical Assistance Contract. In this role, he provided technical and management services in support of SHRP in the development and conduct of the LTPP program, with particular emphasis on pavement performance monitoring, which included all those activities related to distress, profile, deflection, seasonal monitoring and climatic data collection. From 1992 to 2008, he served as Principal Investigator for the FHWA LTPP Technical Assistance (1992 to 1997) and Technical Support Services (1997 to 2008) Contracts, which provided technical and management support services to the FHWA LTPP Team staff for management of the LTPP program. In that role, he was involved on all phases of the program including pavement monitoring and instrumentation, materials testing, information managements system, LTPP experiments, regional operations, and coordination activities. From 2003 to 2008, he also served as Technical Advisor to the FHWA LTPP Specific Pavement Sites (SPS) Weigh-in-Motion Sites Assessment and Performance Evaluations Contract. In this role, he was Environment & Infrastructure Solutions www.woodplc.com Page 2 of 17 Continued... responsible for providing technical expertise and program support to ensure that the assessment, calibration and performance evaluation of the LTPP SPS weigh-in-motion sites adheres to guidelines and methods developed as part of the LTPP program. From 2008 to 2011, he served as Senior Engineer for the LTPP Southern Regional Support Contract (SRSC), where he has been involved in coordination and data analysis activities as well as the preparation of various draft chapters of the LTPP 20-year report. Finally, from 2011 to date, Dr. Rada has served as Senior Engineer for the LTPP TSSC contract, where he has been involved in the preparation of strategic plans and other higher-order activities. In summary, Dr. Rada’s involvement with the LTPP program covers more than 20 years, in excess of $40 million in fees, and the following nine contracts: U.S. Federal Highway Administration Technical Support Services Contract for the Long-Term Pavement Performance (LTPP) Program. 2011 to date. U.S. Federal Highway Administration Long-Term Pavement Performance (LTPP) Southern Regional Support (RSC) Contract. 2008 to 2011. U.S. Federal Highway Administration Long-Term Pavement Performance (LTPP) Specific Pavement Sites (SPS) Weigh-in-Motion Sites Assessment and Performance Evaluations Contract. 2003 to 2008. U.S. Federal Highway Administration Long-Term Pavement Performance (LTPP) Program Pavement and Traffic Engineering Technical Support Services Contract. 2002 to 2009. U.S. Federal Highway Administration Nationwide Long-Term Pavement Performance (LTPP) Studies and Traffic Engineering Services Contract. 1997 to 2002. U.S. Federal Highway Administration Long-Term Pavement Performance (LTPP) Program Technical Assistance Contract. 1992 to 1997. SHRP P-001B Technical Assistance to Long-Term Pavement Performance (LTPP) Program Contract. 1990 to 1992. SHRP P-001 Technical Assistance to Long-Term Pavement Performance (LTPP) Program. 1987 to 1990. NCHRP 20-20 (2) Overview and Integration Planning - National Strategic Highway Research (SHRP) Plan. 1985 to 1986. Dr. Rada has also dedicated significant time to a number of other important state and national research projects. He is presently serving as Principal Investigator and/or Project Manager for the following projects: FHWA’s “Guidance for Quality Management of Pavement
Recommended publications
  • KCEW Procedures
    CRESTVIEW, FLORIDA AL-5261 (FAA) 20086 Rwy Idg LOC I-CEW APP CRS 8006 TDZE 213 ILS or LOC RWY 17 111.9 175° Apt Elev 214 BOB SIKES(CEW) ADF required. MISSED APPROACH: Climb T Circling NA for Cat D West of Rwy 17-35. Autopilot coupled approach NA. When local to 1000 then climbing right altimeter setting not received, use Eglin AFB altimeter setting and increase S-ILS 17 DA to turn to 2000 direct KOBRA A NA 1 472 and all MDA 60 feet, increase S-LOC 17 Cat C/D and Circling Cat D visibility 4 SM. LOM and hold. ASOS EGLIN APP CON UNICOM 119.275 124.05 284.65 122.95(CTAF)L ROMEK CE 25 N CEW 21.5 SA M M 355 2300 ° 1249 ° 220 ° 090° 270° 2000 040 165° (21.1) 1800 175 LOM / IAF ° KOBRA 201 CE SE-3, 07 OCT 2021 to 04 NOV C E 355 ° CRESTVIEW 2000 115.9 CEW C ° E 082 367 W 111.9 Chan 106 (7.5) I I-CEW C 395 WE 673 514 R-2914A SE-3, 07 OCT 2021 to 04 NOV R-2918 ELEV 214 TDZE 213 R-2915A 175° 3.8 NM 17 from FAF Duke Field 1 . 2 (Eglin AF Aux NR3) V % DO W CE 1000 2000 CE N Remain LOM within 10 NM 8006 ° 355 1498 X 2000 150 175° 0 . 3 1600 % GS 3.00° U TCH 50 P 3.8 NM V CATEGORY A B C D 3 3 35 S-ILS 17 413- 4 200 (200- 4 ) HIRL Rwy 17-35 L 1 1 S-LOC 17 407 (500-1) 620-1 407 (500-1 8 ) 620-1 8 FAF to MAP 3.8 NM 3 820-1 4 840-2 Knots 60 90 120 150 180 C CIRCLING 700-1 486 (500-1) 3 606 (700-1 4 ) 626 (700-2) Min:Sec 3:48 2:32 1:54 1:31 1:16 CRESTVIEW, FLORIDA 30°47'N-86°31'W BOB SIKES(CEW) Amdt 1 28FEB19 ILS or LOC RWY 17 CRESTVIEW, FLORIDA AL-5261 (FAA) 20086 WAAS Rwy Idg APP CRS 8006 CH 56206 TDZE 213 RNAV (GPS) RWY 17 175° W17A Apt Elev 214 BOB SIKES(CEW) RNP APCH.
    [Show full text]
  • COVID-19: Summary of Cases and Monitoring Data Through May 6, 2021 Verified As of May 7, 2021 at 09:25 AM Data in This Report Are Provisional and Subject to Change
    COVID-19: summary of cases and monitoring Data through May 6, 2021 verified as of May 7, 2021 at 09:25 AM Data in this report are provisional and subject to change. Cases: people with positive PCR or antigen test result Cases: people with positive PCR or antigen test result Total cases 2,262,598 Risk factors for Florida residents 2,220,240 Florida residents 2,220,240 Traveled 17,829 Non-Florida residents 42,358 Contact with a known case 887,914 Type of testing Traveled and contact with a known case 24,179 Florida residents 2,220,240 Neither 1,290,318 Positive by BPHL/CDC 81,254 No travel and no contact 268,784 Positive by commercial/hospital lab 2,138,986 Travel is unknown 725,442 PCR positive 1,770,667 Contact is unknown 493,047 Antigen positive 449,573 Contact is pending 459,315 Non-Florida residents 42,358 Travel can be unknown and contact can be unknown or pending for Positive by BPHL/CDC 1,007 the same case, these numbers will sum to more than the "neither" total. Positive by commercial/hospital lab 41,351 PCR positive 28,817 Antigen positive 13,541 Characteristics Florida residents hospitalized 91,848 Florida resident deaths 35,635 Non-Florida resident deaths 711 Hospitalized counts include anyone who was hospitalized at some point during their illness. It does not reflect the number of people currently hospitalized. More information on deaths identified through death certificate data is available on the National Center for Health Statistics website at www.cdc.gov/nchs/nvss/vsrr/COVID19/index.htm.
    [Show full text]
  • COVID-19: Summary of Cases and Monitoring Data Through Mar 15, 2021 Verified As of Mar 16, 2021 at 09:25 AM Data in This Report Are Provisional and Subject to Change
    COVID-19: summary of cases and monitoring Data through Mar 15, 2021 verified as of Mar 16, 2021 at 09:25 AM Data in this report are provisional and subject to change. Cases: people with positive PCR or antigen test result Cases: people with positive PCR or antigen test result Total cases 1,984,425 Risk factors for Florida residents 1,947,834 Florida residents 1,947,834 Traveled 15,454 Non-Florida residents 36,591 Contact with a known case 760,850 Type of testing Traveled and contact with a known case 21,017 Florida residents 1,947,834 Neither 1,150,513 Positive by BPHL/CDC 71,673 No travel and no contact 228,782 Positive by commercial/hospital lab 1,876,161 Travel is unknown 664,322 PCR positive 1,575,872 Contact is unknown 429,735 Antigen positive 371,962 Contact is pending 427,186 Non-Florida residents 36,591 Travel can be unknown and contact can be unknown or pending for Positive by BPHL/CDC 881 the same case, these numbers will sum to more than the "neither" total. Positive by commercial/hospital lab 35,710 PCR positive 25,196 Antigen positive 11,395 Characteristics Florida residents hospitalized 82,584 Florida resident deaths 32,449 Non-Florida resident deaths 612 Hospitalized counts include anyone who was hospitalized at some point during their illness. It does not reflect the number of people currently hospitalized. More information on deaths identified through death certificate data is available on the National Center for Health Statistics website at www.cdc.gov/nchs/nvss/vsrr/COVID19/index.htm.
    [Show full text]
  • COVID-19: Summary of Cases and Monitoring Data Through Apr 2, 2021 Verified As of Apr 3, 2021 at 09:25 AM Data in This Report Are Provisional and Subject to Change
    COVID-19: summary of cases and monitoring Data through Apr 2, 2021 verified as of Apr 3, 2021 at 09:25 AM Data in this report are provisional and subject to change. Cases: people with positive PCR or antigen test result Cases: people with positive PCR or antigen test result Total cases 2,077,032 Risk factors for Florida residents 2,038,204 Florida residents 2,038,204 Traveled 16,333 Non-Florida residents 38,828 Contact with a known case 803,756 Type of testing Traveled and contact with a known case 22,283 Florida residents 2,038,204 Neither 1,195,832 Positive by BPHL/CDC 74,488 No travel and no contact 242,143 Positive by commercial/hospital lab 1,963,716 Travel is unknown 683,248 PCR positive 1,641,045 Contact is unknown 451,386 Antigen positive 397,159 Contact is pending 435,780 Non-Florida residents 38,828 Travel can be unknown and contact can be unknown or pending for Positive by BPHL/CDC 915 the same case, these numbers will sum to more than the "neither" total. Positive by commercial/hospital lab 37,913 PCR positive 26,539 Antigen positive 12,289 Characteristics Florida residents hospitalized 85,678 Florida resident deaths 33,652 Non-Florida resident deaths 654 Hospitalized counts include anyone who was hospitalized at some point during their illness. It does not reflect the number of people currently hospitalized. More information on deaths identified through death certificate data is available on the National Center for Health Statistics website at www.cdc.gov/nchs/nvss/vsrr/COVID19/index.htm.
    [Show full text]
  • TBDA BOD 24 Apr 19
    Board of Directors Meeting Minutes Date: Wednesday, 24 April 2019 Location: Tampa Port Authority / Port Tampa Bay Boardroom Time: 6:00 PM Attendees: • Board Members: MG (Ret) Mike Jones, Maj Gen (Ret) Larry Martin, Maj Gen (Ret) Richard Haddad, Dr. Walter McCracken, • Senior Advisors: Gen (Ret) Art Lichte, Brig Gen (Ret) Chip Diehl, Col (Ret) Rich McClain, Jeff Gareau, • Members/Guests: Steve Sanders, Jenny Clark, Kevin Glenn, Valerie Pianta, Lt Col Kevin Daugherty, Mike Kasarda, Eric Polins, CAPT (Ret) Jeff Cathey, Lt Col (Ret) Buck MacLaughlin, Marchalle Lamaster, Karl Strauch, Sean Coniglio, and Karen McClain • Board Members Absent: John Schueler, CAPT (Ret) Jim Philpitt, Ed Springer Tim Jones, President: Call to Order and Pledge of Allegiance Introductions Previous Board Meeting Minutes were discussed and approved, 3 for, 0 against. Committees/Grants: • Ed Springer was not in attendance and the President asked if anyone had any questions on outstanding expenses. The Florida Department of Economic Opportunity (DEO) grant was approved in the amount of $56,000. • Regarding the 2016 tax status, the President stated that TBDA wrote a letter to the IRS in December. In March, 60 days was requested and a fine was levied. TBDA asked for an abatement, with a probable favorable outcome expected. • The President discussed website support and Steve Sanders stated the website is now updated with accurate photos and biographies. Steve asked that any requests be submitted to him; Eric Polins said he had updates to submit. 1 | P a g e PO Box 172925 ▪ Tampa, Florida 33672 ▪ www.tampabaydefensealliance.com Events: The President stated that the Influencer Events have been very successful.
    [Show full text]
  • Vol. 81 Thursday, No. 42 March 3, 2016 Pages 11091–11406
    Vol. 81 Thursday, No. 42 March 3, 2016 Pages 11091–11406 OFFICE OF THE FEDERAL REGISTER VerDate Sep 11 2014 21:09 Mar 02, 2016 Jkt 238001 PO 00000 Frm 00001 Fmt 4710 Sfmt 4710 E:\FR\FM\03MRWS.LOC 03MRWS mstockstill on DSK4VPTVN1PROD with FEDWS II Federal Register / Vol. 81, No. 42 / Thursday, March 3, 2016 The FEDERAL REGISTER (ISSN 0097–6326) is published daily, SUBSCRIPTIONS AND COPIES Monday through Friday, except official holidays, by the Office PUBLIC of the Federal Register, National Archives and Records Administration, Washington, DC 20408, under the Federal Register Subscriptions: Act (44 U.S.C. Ch. 15) and the regulations of the Administrative Paper or fiche 202–512–1800 Committee of the Federal Register (1 CFR Ch. I). The Assistance with public subscriptions 202–512–1806 Superintendent of Documents, U.S. Government Publishing Office, Washington, DC 20402 is the exclusive distributor of the official General online information 202–512–1530; 1–888–293–6498 edition. Periodicals postage is paid at Washington, DC. Single copies/back copies: The FEDERAL REGISTER provides a uniform system for making Paper or fiche 202–512–1800 available to the public regulations and legal notices issued by Assistance with public single copies 1–866–512–1800 Federal agencies. These include Presidential proclamations and (Toll-Free) Executive Orders, Federal agency documents having general FEDERAL AGENCIES applicability and legal effect, documents required to be published Subscriptions: by act of Congress, and other Federal agency documents of public interest. Assistance with Federal agency subscriptions: Documents are on file for public inspection in the Office of the Email [email protected] Federal Register the day before they are published, unless the Phone 202–741–6000 issuing agency requests earlier filing.
    [Show full text]
  • VI: Military Aviation
    VI: Military aviation Eglin Air Force B ase • Hurlburt Field • Duke Field • Fort Ruc ker • Camp Shelby National Gua rd Com bat Readiness Training Center • Tynda llll Air Force Base Coast Gu ar d Avia tion Training Center Mobile • Keesler A irir Force Base NAS Whitinitin g Field • NAS Pensacola • NAS JRB Ne w Orleans U.S. Air Force photo by Samuel King Jr. Gulf Coast Aerospace Corridor 2014-2015 – 78 Chapter VI: Military aviation A bastion of military aviation Military aviation is deeply Chapter at a glance embedded in the fabric of • F-35 center has churned out more than the Gulf Coast, and it’s just 1,200 maintainers and 100 pilots • Replacement value for 45 military sites the most high-profile part of in the region about $20 billion • Bases in the region involved in a wide the region’s activities... range of training, operational missions hrill cries for program and budget cuts • Region companies awarded $76.7 billion have been drowned out by the sound of in contracts between 2000-2013 freedom in aviation happy Northwest • Florida budgeted $22.2 million in 2014 Florida, where the expensive, contro- to protect its bases versial,S but exciting and capable F-35 Lightning II Joint Strike Fighter has established itself as an everyday sight and an economic engine. cess of the Lockheed Martin Joint Strike “The future is bright. Every day you see Fighter. Funded jointly by the United States and planes flying over Eglin and the same thing is allies, the F-35 is envisioned as the aircraft that happening at bases around the country,” said will dominate the skies in future battlefields.
    [Show full text]
  • 2020 Legislative Summary Brochure
    DSI Committee Members DSI Priority Topics Defense Support Initiatives Tri-County Military Affairs Committees Retired Military Personnel Military Mission Line Defense Contractors The Economic Development Council of Okaloosa Sustainment of Moratorium Protection Tri-County Commissioners County (EDC) originated the Defense Support Eglin Complex Ex Officio Initiatives (DSI) committee in 1996 to support Eglin Gulf Test & Training Range Okaloosa EDC Management Defense Support Initiatives local military installations and missions, and their Gulf Range Enhancement Plan resultant economic impact. The DSI leverages Electronic Warfare Infrastructure Assets community leadership and expertise from across a Hypersonic Development 2020 three-county region of Northwest Florida; Okaloosa Test Facilities and Range Infrastructure — Santa Rosa — Walton Counties housing Eglin Air Force Base. Eglin Test & Training Complex NexGen Facility Repair by Replacement Legislative Weapons Technology Integration Center Major Range & Test Facility Base BOEM Gulf of Mexico OCS Region Blocks and The Major Range and Test Facility Base (MRTFB) is Active Leases by Planning Area Summary a designated set of Department of Defense (DoD) January 3 2017 facilities, ranges, and their associated workforce Sponsored by that provide the foundation, or base, for the The complexity of future warfare drives The Economic Development Council Nation’s Test and Evaluation (T&E) capabilities of Okaloosa County, Florida the need for more advanced weapon deemed critical to maintaining our Nation’s military systems that can operate at the speed superiority. Concurrently, the MRTFB supports Post Office Box 4097 the development of rapid response solutions Fort Walton Beach, FL 32549 necessary; adapt to situations in a to technology related issues experienced by USA complex, multi‑domain environment; warfighters engaged in conflict.
    [Show full text]
  • COVID-19: Summary of Cases and Monitoring Data Through Nov 30, 2020 Verified As of Dec 1, 2020 at 09:25 AM Data in This Report Are Provisional and Subject to Change
    COVID-19: summary of cases and monitoring Data through Nov 30, 2020 verified as of Dec 1, 2020 at 09:25 AM Data in this report are provisional and subject to change. Cases: people with positive PCR or antigen test result Cases: people with positive PCR or antigen test result Total cases 1,008,166 Risk factors for Florida residents 991,910 Florida residents 991,910 Traveled 9,084 Non-Florida residents 16,256 Contact with a known case 379,375 Type of testing Traveled and contact with a known case 10,730 Florida residents 991,910 Neither 592,721 Positive by BPHL/CDC 37,531 No travel and no contact 128,565 Positive by commercial/hospital lab 954,379 Travel is unknown 324,220 PCR positive 904,354 Contact is unknown 244,048 Antigen positive 87,556 Contact is pending 190,980 Non-Florida residents 16,256 Travel can be unknown and contact can be unknown or pending for Positive by BPHL/CDC 461 the same case, these numbers will sum to more than the "neither" total. Positive by commercial/hospital lab 15,795 PCR positive 13,346 Antigen positive 2,910 Characteristics Florida residents hospitalized 55,197 Florida resident deaths 18,679 Non-Florida resident deaths 237 Hospitalized counts include anyone who was hospitalized at some point during their illness. It does not reflect the number of people currently hospitalized. More information on deaths identified through death certificate data is available on the National Center for Health Statistics website at www.cdc.gov/nchs/nvss/vsrr/COVID19/index.htm.
    [Show full text]
  • 919 Special Operations Wing
    919 SPECIAL OPERATIONS WING MISSION LINEAGE 919 Troop Carrier Group, Assault established and activated, 15 Jan 1963 Organized in the Reserve, 11 Feb 1963 Discontinued, and inactivated, 15 Dec 1965 Redesignated 919 Tactical Airlift Group, 17 Jun 1971 Activated in the Reserve, 30 Jul 1971 Redesignated 919 Special Operations Group, 1 Jul 1975 Redesignated 919 Special Operations Wing, 1 Aug 1992 STATIONS Memphis Muni Aprt, TN, 11 Feb 1963-15 Dec 1965 Eglin AF Aux Field #3 (Duke Field), FL, 30 Jul 1971 ASSIGNMENTS 445 Troop Carrier (later, 445 Air Transport) Wing, 11 Feb 1963-15 Dec 1965 459 Tactical Airlift Wing, 30 Jul 1971 Eastern Air Force Reserve Region, 1 Dec 1974 Tenth Air Force, 8 Oct 1976 Fourth Air Force, 1 Mar 1983 Tenth Air Force, 1 Jul 1994 WEAPON SYSTEMS C-123, 1963-1965 C-130, 1971 AC-130, 1975-1995 HH-3, 1990-1993 HC-130N/P (later, MC-130P), 1995 MC-130E, 1995 COMMANDERS Col Arthur T. Ousley, Feb 1963-15 Dec 1965 Col Donald E. Haugen, 30 Jul 1971 Maj Roy E. Ayers Jr. (acting), 2 Apr 1974 Col Amos R. Dreessen, 17 Jun 1974 Col Billie H. Parker, 23 Oct 1978 Col Terry G. Whitnell, 13 Oct 1985 LTC Lee T. Weiland Jr., 14 Nov 1987 Col Warren D. Snyder, 17 Jan 1988 Col Ernest R. Webster, 28 Apr 1991 Col Jack W. Blair Jr., 2 Mar 1994 Col Thomas M. Stogsdill, 5 Jun 1998 Col Steve Chapman, #2009 HONORS Service Streamers Campaign Streamers Southwest Asia Defense of Saudi Arabia Liberation and Defense of Kuwait Armed Forces Expeditionary Streamers Decorations Air Force Outstanding Unit Awards 30 Jul 1971-31 Mar 1973 1 Jul 1975-31 Jan 1977 1 Oct 1983-1 Jun 1985 1 Jun 1987-31 May 1989 8 Dec 1989-7 Jan 1990 1 Jun 1990-31 May 1992 1 Jun 1992-31 May 1994 1 Jun 1994-31 May 1996 1 Jun 1996-31 May 1998 EMBLEM Approved, 21 Aug 1980 MOTTO NICKNAME OPERATIONS Trained for troop carrier duties, 1963-1965.
    [Show full text]
  • COVID-19: Summary of Cases and Monitoring Data Through Jun 2, 2021 Verified As of Jun 3, 2021 at 09:25 AM Data in This Report Are Provisional and Subject to Change
    COVID-19: summary of cases and monitoring Data through Jun 2, 2021 verified as of Jun 3, 2021 at 09:25 AM Data in this report are provisional and subject to change. Cases: people with positive PCR or antigen test result Cases: people with positive PCR or antigen test result Total cases 2,329,867 Risk factors for Florida residents 2,286,332 Florida residents 2,286,332 Traveled 18,931 Non-Florida residents 43,535 Contact with a known case 920,896 Type of testing Traveled and contact with a known case 24,985 Florida residents 2,286,332 Neither 1,321,520 Positive by BPHL/CDC 83,364 No travel and no contact 280,411 Positive by commercial/hospital lab 2,202,968 Travel is unknown 733,532 PCR positive 1,819,119 Contact is unknown 511,267 Antigen positive 467,213 Contact is pending 459,732 Non-Florida residents 43,535 Travel can be unknown and contact can be unknown or pending for Positive by BPHL/CDC 1,037 the same case, these numbers will sum to more than the "neither" total. Positive by commercial/hospital lab 42,498 PCR positive 29,688 Antigen positive 13,847 Characteristics Florida residents hospitalized 95,607 Florida resident deaths 36,973 Non-Florida resident deaths 744 Hospitalized counts include anyone who was hospitalized at some point during their illness. It does not reflect the number of people currently hospitalized. More information on deaths identified through death certificate data is available on the National Center for Health Statistics website at www.cdc.gov/nchs/nvss/vsrr/COVID19/index.htm.
    [Show full text]
  • 19. Project B3, USAR, AFRC, Orlando. USAR Needs Have Changed and Wish This Project to Be Removed
    19. Project B3, USAR, AFRC, Orlando. USAR needs have changed and wish this project to be removed. No exceptions and the board recommendation are to remove project. 20. New Project B4, USAR, AFRC/AMSA, Miramar. USAR stated approximately 17 AC, to build a 600 man AFRC. Project will include training, unheated storage building, and parking. FLARNG is open for discussion on property in Miramar. This project was briefed to the ACSIM-AR's Construction Requirement Review Board (CRRC) in 2009/2010. No exceptions and the board recommends unilateral. 21. Project B5, USAR, AMSAlECSlWarehouse, Orlando. USAR, to construct an ECS/AMSAlOMS warehouse ARC in central Florida. T~lis project will replace existing AMSA 50G (FL125) and the McCoy Center (FL021), both located in Orlando. No exceptions and the board recommendation are to leave unilateral. 22. New Project B6 and B7, Construct an Aviation Support Facility, Phase I & II, Clearwater, FL. Project will include both construction of new facilities and renovation of existing facilities. This project is on FYOP for FY2014 and existing facilities cannot meet requirements for new mission. Clearwater site is slated to receive new squadron of 23 MEOEVAC helicopters. These projects have been briefed to the ACSIM-AR's Construction Requirement Review Board (CRRC). 23. Project 01, FANG, Replace Fire Station Facility, #1 priority. Construct 17,000 SF Fire station to replace existing undersized temporary facility located inside the base. Continue to use inadequate space for crash, fire and rescue operations. Open to joint effort. No exceptions and board recommended unilateral. Required by ANG Base Master Plan to correct space deficiencies.
    [Show full text]