THE 8 PRINCIPLES of SIDEWALKS Building More Active Cities
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
Module 6. Hov Treatments
Manual TABLE OF CONTENTS Module 6. TABLE OF CONTENTS MODULE 6. HOV TREATMENTS TABLE OF CONTENTS 6.1 INTRODUCTION ............................................ 6-5 TREATMENTS ..................................................... 6-6 MODULE OBJECTIVES ............................................. 6-6 MODULE SCOPE ................................................... 6-7 6.2 DESIGN PROCESS .......................................... 6-7 IDENTIFY PROBLEMS/NEEDS ....................................... 6-7 IDENTIFICATION OF PARTNERS .................................... 6-8 CONSENSUS BUILDING ........................................... 6-10 ESTABLISH GOALS AND OBJECTIVES ............................... 6-10 ESTABLISH PERFORMANCE CRITERIA / MOES ....................... 6-10 DEFINE FUNCTIONAL REQUIREMENTS ............................. 6-11 IDENTIFY AND SCREEN TECHNOLOGY ............................. 6-11 System Planning ................................................. 6-13 IMPLEMENTATION ............................................... 6-15 EVALUATION .................................................... 6-16 6.3 TECHNIQUES AND TECHNOLOGIES .................. 6-18 HOV FACILITIES ................................................. 6-18 Operational Considerations ......................................... 6-18 HOV Roadway Operations ...................................... 6-20 Operating Efficiency .......................................... 6-20 Considerations for 2+ Versus 3+ Occupancy Requirement ............. 6-20 Hours of Operations .......................................... -
Pedestrian and Light Traffic Applications Introduction Brick Pavers Are Arranged Cost Savings That Upon the Bedding Sand in Supplement the Savings the Desired Pattern
Flexible Brick Industry Brick Paving Association Pedestrian and Light Traffic Applications Traffic Light and Pedestrian Introduction brick pavers are arranged cost savings that upon the bedding sand in supplement the savings the desired pattern. Sand afforded by the brick is then spread into the itself. In addition, spaces between the pavers replacement of pavers as jointing material. after repair of utilities beneath a flexible brick As the whole paving pavement is easily system compacts with time achieved. and use, the bricks interact with the jointing sand and base materials to achieve the unique quality of “interlock.” Interlock holds the pavers in place Brick paving has been used for thousands and distributes the load of years. The Romans laid brick in roads through the layers down crisscrossing their vast empire, some of to the subgrade, enabling which still exist. Americans have employed the surface to contribute the material since the earliest Colonial days, to the strength of the and brick pathways and sidewalks thread whole system. When through the landmark sites and properly installed, brick As an architect’s medium, historic areas across the country. interlocking pavements are brick is equally flexible. highly stable and durable. Its basic aesthetic appeal is legendary as a material Today, as many property the flexible nature of its This basic advantage begets that exudes warmth and owners and architects foundation and the action others. Because flexible elegance through the attest, brick paving is of the pavers themselves. brick paving provides permanent color of fired timeless, especially for In such flexible pavements, interlock, no rigid concrete clay or shale. -
Pavements and Surface Materials
N O N P O I N T E D U C A T I O N F O R M U N I C I P A L O F F I C I A L S TECHNICAL PAPER NUMBER 8 Pavements and Surface Materials By Jim Gibbons, UConn Extension Land Use Educator, 1999 Introduction Traffic Class Type of Road Pavements are composite materials that bear the weight of 1 Parking Lots, Driveways, Rural pedestrian and vehicular loads. Pavement thickness, width and Roads type should vary based on the intended function of the paved area. 2 Residential Streets 3 Collector Roads Pavement Thickness 4 Arterial roads 5 Freeways, Expressways, Interstates Pavement thickness is determined by four factors: environment, traffic, base characteristics and the pavement material used. Based on the above classes, pavement thickness ranges from 3" for a Class 1 parking lot, to 10" or more for Class 5 freeways. Environmental factors such as moisture and temperature significantly affect pavement. For example, as soil moisture Sub grade strength has the greatest effect in determining increases the load bearing capacity of the soil decreases and the pavement thickness. As a general rule, weaker sub grades require soil can heave and swell. Temperature also effects the load thicker asphalt layers to adequately bear different loads associated bearing capacity of pavements. When the moisture in pavement with different uses. The bearing capacity and permeability of the freezes and thaws, it creates stress leading to pavement heaving. sub grade influences total pavement thickness. There are actually The detrimental effects of moisture can be reduced or eliminated two or three separate layers or courses below the paved wearing by: keeping it from entering the pavement base, removing it before surface including: the sub grade, sub base and base. -
Brick Streets Plan
BRICK STREETS PLAN City of Rock Island Community & Economic Development Department Planning & Redevelopment Division Rock Island Preservation Commission Adopted 1988 by Rock Island City Council Amended: January 23, 2012 August 22, 2011 March 28, 2005 April 10, 2000 May 12, 1997 September 14, 1992 Rock Solid. Rock Island. 1899 - The first brick pavement was laid in the Tri-Cities on the corner of Twentieth Street and Second Avenue, Rock Island. The first brick was placed by Mayor William McConochie. Civil Engineer for the project was H.G. Paddock. -- From Historical Souvenir of Moline and Vicinity, 1909 TABLE of CONTENTS Executive Summary ..................................................................................... 3 Prioritization List ........................................................................................... 5 Map of Brick Streets ..................................................................................... 6 Methodology ................................................................................................ 9 History of Brick Street Construction in Rock Island ...................................... 10 Condition of Brick Streets ............................................................................. 13 Utilities and Brick Streets ............................................................................. 17 Street Standards .......................................................................................... 18 Owner-Occupancy Along Brick Streets ....................................................... -
"2. Sidewalks". "Boston Complete Streets Design Guide."
Sidewalk Zone Widths The width of the sidewalk contributes to the degree of When making decisions for how to allocate sidewalk space, comfort and enjoyment of walking along a street. Narrow the following principles should be used: sidewalks do not support lively pedestrian activity, and may create dangerous conditions where people walk in the Frontage Zone street. Typically, a five foot wide Pedestrian Zone supports > The Frontage Zone should be maximized to provide space two people walking side by side or two wheel chairs passing for cafés, plazas, and greenscape elements along build- each other. An eight foot wide Pedestrian Zone allows two ing facades wherever possible, but not at the expense of pairs of people to comfortably pass each other, and a ten reducing the Pedestrian Zone beyond the recommended foot or wider Pedestrian Zone can support high volumes of minimum widths. pedestrians. Pedestrian Zone Vibrant sidewalks bustling with pedestrian activity are not > The Pedestrian Zone should be clear of any obstructions only used for transportation, but for social walking, lingering, including utilities, traffic control devices, trees, and furniture. and people watching. Sidewalks, especially along Downtown When reconstructing sidewalks and relocating utilities, all Commercial, Downtown Mixed-Use, and Neighborhood Main utility access points and obstructions should be relocated Streets, should encourage social uses of the sidewalk realm outside of the Pedestrian Zone. by providing adequate widths. > While sidewalks do not need to be perfectly straight, the SIDEWALKS Pedestrian Zone should not weave back and forth in the When determining sidewalk zone widths, factors to consider right-of-way for no other reason than to introduce curves. -
PASER Manual Asphalt Roads
Pavement Surface Evaluation and Rating PASER ManualAsphalt Roads RATING 10 RATING 7 RATING 4 RATING PASERAsphalt Roads 1 Contents Transportation Pavement Surface Evaluation and Rating (PASER) Manuals Asphalt PASER Manual, 2002, 28 pp. Introduction 2 Information Center Brick and Block PASER Manual, 2001, 8 pp. Asphalt pavement distress 3 Concrete PASER Manual, 2002, 28 pp. Publications Evaluation 4 Gravel PASER Manual, 2002, 20 pp. Surface defects 4 Sealcoat PASER Manual, 2000, 16 pp. Surface deformation 5 Unimproved Roads PASER Manual, 2001, 12 pp. Cracking 7 Drainage Manual Patches and potholes 12 Local Road Assessment and Improvement, 2000, 16 pp. Rating pavement surface condition 14 SAFER Manual Rating system 15 Safety Evaluation for Roadways, 1996, 40 pp. Rating 10 & 9 – Excellent 16 Flagger’s Handbook (pocket-sized guide), 1998, 22 pp. Rating 8 – Very Good 17 Work Zone Safety, Guidelines for Construction, Maintenance, Rating 7 – Good 18 and Utility Operations, (pocket-sized guide), 1999, 55 pp. Rating 6 – Good 19 Wisconsin Transportation Bulletins Rating 5 – Fair 20 #1 Understanding and Using Asphalt Rating 4 – Fair 21 #2 How Vehicle Loads Affect Pavement Performance Rating 3 – Poor 22 #3 LCC—Life Cycle Cost Analysis Rating 2 – Very Poor 23 #4 Road Drainage Rating 1 – Failed 25 #5 Gravel Roads Practical advice on rating roads 26 #6 Using Salt and Sand for Winter Road Maintenance #7 Signing for Local Roads #8 Using Weight Limits to Protect Local Roads #9 Pavement Markings #10 Seal Coating and Other Asphalt Surface Treatments #11 Compaction Improves Pavement Performance #12 Roadway Safety and Guardrail #13 Dust Control on Unpaved Roads #14 Mailbox Safety #15 Culverts-Proper Use and Installation This manual is intended to assist local officials in understanding and #16 Geotextiles in Road Construction/Maintenance and Erosion Control rating the surface condition of asphalt pavement. -
Modeling the Copacabana Sidewalk Pavement
Modeling the Copacabana Sidewalk Pavement Tatiana Waintraub Waldemar Celes Computer Science Department, PUC-Rio Tecgraf, Computer Science Department, PUC-Rio Rio de Janeiro, Brazil Rio de Janeiro, Brazil Email: [email protected] Email: [email protected] Fig. 1. An image of the Copacabana sidewalk modeled with the proposed technique Abstract—In this paper, we propose a method to model the kind of Opus Palladium mosaic, where tiles of irregular shapes Copacabana beach sidewalk pavement, and Portuguese pave- are used to convey images in an expressive manner. There ments in general. Given a black and white source image, the are several proposals in the literature for computing digital proposed method outputs the geometry of all individual stones that compose the pavement. Different from previous mosaic mosaics using different strategies [1]. However, observing the techniques, we focus on capturing the particularities of such Copacabana sidewalk pavement, one can note a few distinct pavements: the stones (tiles) must completely follow the edges, features that have to be considered for our purpose: being mostly represented by irregular quadrilaterals with no particular orientation. A set of experiments demonstrates the effectiveness and stability of our proposal. • The stones present mostly irregular quadrilateral shapes Keywords-mosaic; procedural modeling; Voronoi diagram; • The region bounds (edge features) are perfectly honored • The stones (tiles) are placed with arbitrary orientations except near the bounds I. INTRODUCTION The Copacabana beach sidewalk, in Rio de Janeiro, repre- This paper presents a method capable of modeling Por- sents a famous use of a traditional pavement style known as tuguese pavement in an effective way. -
PLANNING and DESIGNING for PEDESTRIANS Table of Contents
PLANNING AND DESIGNING FOR PEDESTRIANS Table of Contents 1. Executive Summary ................................................................1 1.1 Scope of Guidelines.............................................................................. 2 1.2 How the Pedestrian-Oriented Design Guidelines Can be Used........ 5 1.3 How to Use the Chapters and Who Should Use Them ...................... 6 2. Pedestrian Primer ...................................................................9 2.1 What is Pedestrian-Oriented Design? ................................................. 9 2.2 Link Between Land Use and Transportation Decisions .................. 10 2.3 Elements of a Walkable Environment ............................................... 11 2.4 What Kind of Street Do You Have and What Kind Do You Want?... 12 2.4.1 "Linear" and "Nodal" Structures .......................................................................... 12 2.4.2 Interconnected or Isolated Streets ....................................................................... 14 2.4.3 Street Rhythm......................................................................................................... 15 2.4.4 "Seams" and "Dividers" ........................................................................................ 16 3. Community Structure and Transportation Planning.........17 3.1 Introduction ......................................................................................... 17 3.2 Land Use Types and Organization..................................................... 18 -
Pavement Mgmt Plan Street Listing
Town of Ashburnham Pavement Management Data 1/7/2021 Key REMINDER Town Accepted - Inspected It's important to keep the following in mind when reviewing this plan. State Roads Each fiscal year is subject to changes for any or all of the following reasons. Town Accepted - Gravel • Budget increases or decreases Town Accepted - Scenic Roads • Not receiving applied for grant monies Private • Changes to material costs RSR = Road Surface Rating • Unexpected changes to the condition of a particular road TIP = MA Transportation Improvement Program • Subject to funding allocation (Capital Plan) TOWN ACCEPTED INSPECTED Street Name Street Segment From Street RSR Repair Method Est. Cost Func. Class Estimated Action ACADEMY STREET ACADEMY ST-01 CENTRAL ST 99.23 No Maintenance Required $0.00 Local Completed ACADEMY STREET ACADEMY ST-02 PLEASANT ST N 99.23 No Maintenance Required $0.00 Local Completed AMES AVENUE AMES AVE CENTRAL ST 11.13 Major Rehabilitation $30,394.54 Local Cul De Sac/Dead End ASHBY ROAD ASHBY RD-01 CHAPEL ST 87.73 Routine Maintenance $6,852.38 Major Collector ASHBY ROAD ASHBY RD-02 STOWELL RD 89.73 Routine Maintenance $8,518.91 Major Collector ASHBY ROAD ASHBY RD-03 HOLT RD 91.73 Routine Maintenance $6,049.28 Major Collector ASHBY ROAD ASHBY RD-04 OLD ASHBY RD 96.73 No Maintenance Required $0.00 Major Collector Completed ASHBY ROAD ASHBY RD-05 OLD STEELE RD 96.73 No Maintenance Required $0.00 Major Collector Completed ASHBY ROAD ASHBY RD-06 RINGE TPKE 96.73 No Maintenance Required $0.00 Major Collector Completed BIRCHWOOD TERRACE -
Sidewalk Construction Standards
OSHTEMO TOWNSHIP SIDEWALK/SHARED-USE PATH CONSTRUCTION STANDARDS Approved August 28, 2018 CONCRETE SIDEWALK CONSTRUCTION The construction of Sidewalks and Shared-Use Paths within Oshtemo is managed through the Township’s issuance of a Sidewalk/Non-Motorized Path Permit. The permitting process includes both a pre-pour inspection of the base and concrete forms, and a final project inspection for acceptance of the work. Concrete sidewalk shall conform to MDOT 2012 (or current edition) Standard Specifications for Construction Section 803, "Concrete Sidewalks, Sidewalk Ramps and Steps" and shall be a minimum of five (5) feet wide unless a different width is required by other Township ordinances or regulations. Driveway Sidewalk Crossings Where public sidewalks (AKA pedestrian route) cross residential driveways, the sidewalk shall be constructed of concrete through the driveway. Where a curb-line concrete gutter pan begins the driveway, the driveway apron between the curb and sidewalk shall also be constructed of concrete. Hot-Mix Asphalt (HMA) commercial driveways that lack a concrete roadway gutter, and which have greater than two lanes or heavy traffic may seek administrative approval to establish a pedestrian route over the driveway in lieu of placing a concrete walkway through the HMA material. When new sidewalks are extended through existing driveways, it shall be administratively determined by the Township to what extent the existing driveway pavements will need to be reconstructed in lieu of providing a pedestrian route over the pavement. Grade The sidewalk shall be constructed to match the existing grade, or as noted on the construction drawings. The sidewalk will have a transverse slope either toward or away from the road to maintain existing drainage patterns. -
Neighborhood Road Design Guidebook a Massachusetts Guide to Sustainable Design for Neighborhood Roads
NEIGHBORHOOD ROAD DESIGN GUIDEBOOK A MASSACHUSETTS GUIDE TO SUSTAINABLE DESIGN FOR NEIGHBORHOOD ROADS A joint project of the Massachusetts Chapter of the American Planning Association Home Builders Association of Massachusetts Prepared for the Citizen Planner’s Training Collaborative March 14, 2012 Overview 2 1. Why a new Guidebook now? 2. Who will use this? 3. What is the general approach 4. Examples of recommended design standards 5. Cross Sections 6. Implementation Why Now? 3 1. Road design for whom? 2. Change in vehicle types 3. What is a win-win approach? 4. Length of time to change rules and regulations Why a new Guide now? 4 Massachusetts guide for Neighborhood Roads to create model guidelines and match local settings. This is called “context sensitive” design. Other road design manuals don’t get at local streets very well Who might use the Guidebook? 5 There are many “actors” in Transportation Design Engineers and designers (private and public sectors) Applicants who are building new infrastructure as part of their projects; Planning Directors/Planners; Planning Boards, Board of Selectmen, Fire and Emergency Service providers; Regional Planning Associations – link to state funding and state projects; Abutters; Land use and environmental advocates; and Finally –build roads that benefit the USERS What kind of Guidebook? 6 Project Goals Reduce environmental impacts of roadway development, operation and maintenance; Encourage Context Sensitive Solutions (CSS) in residential roadway design; Provide specific guidelines and references for municipal application; Promote innovative techniques for stormwater management; and Reduce maintenance costs of roadways and stormwater systems. What kind of Guidebook? 7 Project Goals (contin.) Encourage consistency in approach and rationale in residential roadway design across Massachusetts; Promote inter-connectivity of roads; Promote pedestrian and non- motorized access; Promote universal accessibility; and Provide guidance for the design of neighborhood scale residential roads. -
Road Surface Quality: What Road Users Want from Highways England November 2017 Road Surface Quality: What Road Users Want from Highways England
Road surface quality: what road users want from Highways England November 2017 Road surface quality: what road users want from Highways England Anthony Smith Jim O’Sullivan Chief Executive Chief Executive Transport Focus Highways England Foreword ransport Focus research in 2015 showed that not something separate. They prefer asphalt roads T surface quality was road users’ top priority for to concrete ones, partly because they are quieter improvement to England’s motorways and major to drive on. ‘A’ roads1, by some margin. But what wasn’t clear Highways England believes a connected was exactly which aspects of the surface users country is better for everyone. The company works wanted to be improved and why. hard to deliver the safest, smoothest, most Transport Focus and Highways England have reliable connections possible. In 2015/2016 therefore worked together to research just that. 1471 lane miles of resurfacing was carried out Our purpose being to ensure that the views of – 23 per cent higher than the original target. those using the roads shape decision-making in But Highways England is not complacent. this area. That’s why Transport Focus and Highways England The research shows that what road users want are both using this research to help inform the is not complicated. They want a surface without Government’s second Road Investment Strategy dips, bumps, potholes, undulations or deep ruts (RIS 2), covering 2020-25. Separately, Highways – in other words continuously smooth. They also England is considering the recommendations want clearer white lines and ‘cats eyes’, which Transport Focus has made in light of this users regard as part of the surface and research.