NYC.Gov Web Site At

Total Page:16

File Type:pdf, Size:1020Kb

NYC.Gov Web Site At This page is located on the NYC.gov Web site at http://www.nyc.gov/html/dot/html/bridges/bxbrgs.shtml Bridges Movable Bridges in the Bronx Eastern Boulevard Bridge, Bronx River Hutchinson River Parkway Bridge, Eastchester Creek Pelham Bridge, Eastchester Creek Unionport Bridge, Westchester Creek Hutchinson River Parkway Bridge The Hutchinson River Parkway Bridge carries the Hutchinson River Parkway over the Hutchinson River in the Bronx. The bridge is located between the interchanges with the New England Thruway (I-95) to the north and Pelham Parkway to the south. The bridge is a seven-span, 205-meter (673- foot) structure with six approach spans and a 48.9 meter (160′ 6″) bascule span. The bascule span consists of a four-leaf deck with steel median barriers between the northbound and southbound lanes. The bridge carries six lanes of traffic on two roadways each 11 meters (36 feet) wide, divided by a concrete barrier. There is a 2.4- meter (8-foot) wide sidewalk on the west side of the bridge. Hutchinson River Parkway Bridge Facts BIN 2-07585-9 Borough Bronx Type Bascule Telephone (718) 885-1851 Location Bartow Avenue & New England Thwy. Waterway Harlem River Miles from Mouth 0.9 Channels 1 Used by Hwy Length 670′ Max. Span 160 Roadways 2 - 36′ 0″ Sidewalks 1 - 8′ 0″ Construction Cost $1,275,700.00 Land Cost Free Total Cost $1,275,700.00 Date Opened Oct. 11, 1941 Unionport Bridge The Unionport Bridge is presently a double leaf trunnion bascule supporting Bruckner Boulevard over Westchester Creek in the Bronx, New York City. Each leaf is about 70 feet wide and the span of the bridge is 75 feet center to center of trunnions. The total bridge length including approaches is 526 feet. The bridge carries two westbound and three eastbound lanes of traffic on a 58 feet wide roadway and pedestrian traffic on a 7.5 feet wide south sidewalk. The current bridge provides a channel with a horizontal clearance of 60 feet and a vertical clearance of 21 feet at lower water and 14 feet at higher water. The Unionport Bridge was opened to traffic in 1953. The bridge is an important link between the Unionport section and Schyerville sections of the Bronx. The bridge is located in the midst of the Bruckner interchange that is also comprised of the Cross Bronx Expressway and the Hutchinson River Parkway. The average daily traffic on the bridge was recorded in October 1998 as approximately 50,000 vehicles per day. Unionport Bridge Facts BIN 1-06651-0 Type Bascule Location Zerega Avenue & Brush Avenue Waterway Westchester Creek Miles from Mouth 1.6 Channels 1 Used by Hwy Total Cost $5,404,361.03 Date Opened Oct. 27, 1953 Pelham Bridge The Pelham Bay Bridge is a double leaf bascule type bridge. It carries four lanes of traffic, two in each direction. It also has one pedestrian sidewalk on the east side of the span. By far this is the busiest of all the City owned drawbridges. Pelham Bridge Facts BIN 2-24020-0 Type Bascule Location Bruckner Expwy. & Shore Rd. Waterway Hutchinson River Miles from Mouth 0.4 Channels 1 Used by Hwy Total Cost $605,274.06 Date Opened Oct. 15, 1908 Eastern Boulevard Bridge The Eastern Boulevard Bridge carries the Bruckner Expressway (I-278) over the Bronx River. It links the Hunts Point and Soundview sections of the Bronx. The Bruckner Expressway essentially runs northeast-southwest, beginning at the Triborough Bridge and ending at the New England Thruway, near Co-op City. The bridge consists of two parallel structures orientated east-west. The Eastern Boulevard Bridge is a dual double-leaf trunnion bascule bridge with a span of 36.2 meters (118 feet, 6 inches) center to center of trunnions. Just west of the bridge is a fixed bridge that carries I-278 over Amtrak's Northeast Corridor line. Each of the two bridges carries three expressway lanes on a 10- meter (34-foot) roadway, two service road lanes on a 6.7-meter (22- foot) roadway and a 2.3-meter (7'-6") sidewalk on the outside of each service road. Eastern Boulevard Bridge Facts BIN 2-06667-1 Type Bascule Location Edgewater Road & Bronx River Avenue Waterway Bronx River Miles from Mouth 1.1 Channels 1 Used by Hwy Length 634′ Max. Span 0 Roadways 2 - 34′ 0″ and 2 - 22′ 0″ Sidewalks 2 - 7′ 6″ Total Cost $2,761,150.49 Date Opened Oct. 27, 1953 Copyright 2011 The City of New DOT Home | Contact Us York.
Recommended publications
  • Recognizing Environmental Justice in History: Resistance And
    Connecticut College Digital Commons @ Connecticut College History Honors Papers History Department 2011 Recognizing Environmental Justice in History: Resistance and Agency in the Cross Bronx Expressway and the Memphis Sanitation Workers’ Strike Sarah Berkley Connecticut College, [email protected] Follow this and additional works at: http://digitalcommons.conncoll.edu/histhp Part of the Environmental Health and Protection Commons, Social History Commons, and the United States History Commons Recommended Citation Berkley, Sarah, "Recognizing Environmental Justice in History: Resistance and Agency in the Cross Bronx Expressway and the Memphis Sanitation Workers’ Strike" (2011). History Honors Papers. 7. http://digitalcommons.conncoll.edu/histhp/7 This Honors Paper is brought to you for free and open access by the History Department at Digital Commons @ Connecticut College. It has been accepted for inclusion in History Honors Papers by an authorized administrator of Digital Commons @ Connecticut College. For more information, please contact [email protected]. The views expressed in this paper are solely those of the author. Recognizing Environmental Justice in History: Resistance and Agency in the Cross Bronx Expressway and the Memphis Sanitation Workers’ Strike An Honors Thesis presented by Sarah Berkley to The Department of History in partial fulfillment of the requirements for Honors in the Major Field and for completion of the certificate program of The Goodwin Niering Center for the Environment Connecticut College New London, Connecticut May 5, 2011 2 Abstract The term environmental justice did not become a part of academic discourse until the 1970s; however, the facts of environmental injustice predate the concept. Minority and low-income communities have historically born a disproportionate burden of the environmental harm associated with economic progress while reaping few of the benefits.
    [Show full text]
  • Appendix G Historic, Archaeological, and Cultural Resources Part1
    Historic, Archaeological, and Cultural Resources APPENDIX G G.1 Section 106 Effects Assessment and Relevant Correspondence G.2 Phase IA Studies and Relevant Correspondence G.3 Draft Programmatic Agreement G.4 Historic Architectural Resources Background Study (HARBS) and Relevant Correspondence G.5 Project Initiation Letter (PIL) Relevant Correspondence G.6 Miscellaneous Correspondence PENN STATION ACCESS PROJECT: Environmental Assessment and Section 4(f) Evaluation May 2021 Penn Station Access Project: Environmental Assessment and Section 4(f)Evaluation Appendix G. Historic, Archaeological, and Cultural Resources G.1 SECTION 106 EFFECTS ASSESSMENT AND RELEVANT CORRESPONDENCE MTA Metro-North Railroad Penn Station Access Project Preliminary Environmental Assessment Section 106 Effects Assessment Prepared for: Prepared by: Lynn Drobbin & Associates, Historical Perspectives, Inc., and July 2019 Penn Station Access Project: Preliminary Environmental Assessment Section 106 Effects Assessment Contents 1. Introduction ...............................................................................................................................1 2. Project Description ................................................................................................................... 5 2.1 PROJECT NEED ......................................................................................................................................................................... 5 2.2 PROPOSED SERVICE ..............................................................................................................................................................
    [Show full text]
  • 33 CFR Ch. I (7–1–10 Edition)
    § 117.791 33 CFR Ch. I (7–1–10 Edition) from 6 a.m. to 9 a.m. and 5 p.m. to 7 (d) The draw of the state highway p.m., Monday through Friday, except bridge, mile 150.2 between Troy and federal holidays. The draw of the Menands, need not be opened for the Broadway Bridge need not open for the passage of vessels. passage of vessel traffic from 7 a.m. to (e) The draw of the highway bridge, 10 a.m. and 4 p.m. to 7 p.m., Monday mile 152.7 between Troy and Green Is- through Friday, except federal holi- land, operates as follows: days. (1) From April 1 through December (2) The draws of the Willis Avenue 15, the draw shall open on signal from Bridge, mile 1.5, Third Avenue Bridge, 9 a.m. to 4 p.m.; except that, the draw mile 1.9, and the Madison Avenue need not be opened from 6 p.m. to 7 Bridge, mile 2.3, need not open for the a.m., unless notice is given before 4:30 passage of vessel traffic at various p.m. of the time the vessel is expected times between 8 a.m. and 5 p.m. on the to pass, and need not open from 7 a.m. first Sunday in May and November. to 9 a.m. and 4 p.m. to 6 p.m. The exact time and date of each bridge (2) From December 16 through March closure will be published in the Local 31, the draw need not be opened.
    [Show full text]
  • Copy of Copy of Exceptional Communication and Networking Skillssuccessful Working in a Team Environment, As Well As Independentl
    F I N A N C E C O M M I S S I O N E R The high school houses the Museum of Arts and Culture, the only Regents-chartered museum in a New Rochelle, NY school in the State of New York. Three prestigious colleges add vibrancy to the City: the College of New Population 79,637 Rochelle, Iona College, and Monroe College. Located nineteen miles from midtown Manhattan, thirty Commissioner of Finance minutes from Grand Central Terminal, direct links to I-95, the Hutchinson River Parkway, and Amtrak, easy access The City of New Rochelle is seeking an experienced to three major New York airports, miles of shoreline on municipal finance professional to be the Commissioner Long Island Sound, a quick trip to other centers in the of Finance. The Commissioner shall have supervision region – there is no suburban community in metropolitan and control of the administration of the financial affairs New York that offers a better combination of transit and of the City. travel options, or which boast better infrastructure to support business growth. The duties will include compiling the current income and expense estimates for the budget (including capital In New Rochelle, the intimacy and charm of a small town estimates), supervising the collection and disbursement is combined with the amenities, choices and culture of a of all moneys, supervising the accounting records, sophisticated city. The New Rochelle Transit Center payrolls, preauditing, payment of invoices, financial serves thousands of commuters via Amtrak, Metro North, planning and budgeting, preparing reports for the City and the Westchester Bee Line, and the downtown Manager and Council, prescribing systems of accounts and records for all administrative departments and Business Improvement District helps 800 business and officials, auditing all claims for payment.
    [Show full text]
  • Phase 1 Remedial Investigation Work Plan Addendum: Reference Area Memorandum No
    305 West Grand Avenue, Suite 300 Montvale, New Jersey 07645 Phone 201.930.9890 Fax 201.930.9805 www.anchorqea.com MEMORANDUM To: Caroline Kwan and Nica Klaber Date: October 1, 2012 U.S. Environmental Protection Agency – Region 2 From: David Haury and Matt Cavas Anchor QEA, LLC Project: 120782-01.01 Re: Phase 1 Remedial Investigation Work Plan Addendum: Reference Area Memorandum No. 2 This memorandum presents the final decision regarding the candidate reference area sampling originally proposed in Section 3 of the Phase 1 Remedial Investigation Work Plan Addendum (WPA; Anchor QEA 2012a) and the subsequent Phase 1Remedial Investigation Work Plan Addendum: Reference Area Memorandum (Reference Area Memorandum; Anchor QEA 2012b). CANDIDATE REFERENCE AREAS SELECTED FOR RECONNAISSANCE SAMPLING The areas to be sampled, shown on Figure 1, are generally located throughout Jamaica Bay and along portions of Lower and Upper East River. The 14 candidate reference areas shown were selected by the U.S. Environmental Protection Agency (USEPA) on September 27, 2012 (Kwan 2012) after review of proposed candidate reference areas. These 14 areas were selected to provide multiple candidate areas within four general categories—industrial with combined sewer overflows (CSOs), industrial with no or minimal CSO input, non-industrial with CSOs, and non-industrial with no or minimal CSO input. Table 1 lists the 14 candidate reference areas and the general category they were placed in. The target locations within each candidate reference area are shown on Figures 2 through 15 and are listed in Table 2 of this memorandum. The sampling activities to be completed, which are summarized in this memorandum, will be performed in a manner consistent with the methods outlined in the Remedial Investigation/Feasibility Study Work Plan (RI/FS Work Plan; AECOM 2011) and described in greater detail in the Field Sampling and Analysis Plan (FSAP; Anchor QEA 2011a).
    [Show full text]
  • Westchester Creek Long Term Control Plan II
    New York City Department of Combined Sewer Overfl ow Environmental Protection Long Term Control Plan for Capital Project No. WP-169 Westchester Creek Long Term Control Plan II June 2014 CSO Long Term Control Plan II Long Term Control Plan Westchester Creek TABLE OF CONTENTS EXECUTIVE SUMMARY ........................................................................................................................ ES-1 1.0 INTRODUCTION ..........................................................................................................1-1 1.1 Goal Statement ................................................................................................................ 1-1 1.2 Regulatory Requirements (Federal, State, Local) ........................................................... 1-2 1.3 LTCP Planning Approach ................................................................................................ 1-4 2.0 WATERSHED/WATERBODY CHARACTERISTICS ...................................................2-1 2.1 Watershed Characteristics ............................................................................................... 2-1 2.2 Waterbody Characteristics ............................................................................................. 2-22 3.0 CSO BEST MANAGEMENT PRACTICES ...................................................................3-1 3.1 Collection System Maintenance and Inspection Program ............................................... 3-2 3.2 Maximizing Use of Collection System for Storage ..........................................................
    [Show full text]
  • Potential Options Table
    POTENTIAL OPTIONS CODE WORKING GROUPS TOS TRAFFIC OPERATIONS AND SAFETY GM GOODS MOVEMENT TS TRANSIT SERVICES BP BIKE/PEDESTRIAN ENV ENVIRONMENTAL ISSUES/ECONOMIC DEVELOPMENT # CODE NO. DESCRIPTION (**) 1 TOS-1 Encourage employers to offer flexible schedules so traffic is not always congested at the same times. 2 TOS-2 Improve signage along Cross Bronx Expressway. 3 TOS-3 Establish breakdown lane and shoulders on major roadways. 4 TOS-4 Examine local and mainline bridges to facilitate traffic flow. 5 TOS-5 Eliminate TDM measures to divert traffic to alternate routes-this hurts local communities. 6 TOS-6 Create an exit on Cross Bronx Expressway near the Sheridan Expressway (near Boston Road) in the area of the former industrial park (174 – 176th Streets) which will become a 136,00 square ft. retail center. 7 TOS-7 Improve road conditions in the Bronx. 8 TOS-8 The intersection of Devoe Avenue and 177th Street should be examined so that its congestion problem can be improved. 9 TOS-9 Improve operational/geometric conditions along parallel major arterials in Major Deegan Expressway corridor (e.g., University Avenue and Grand Concourse). 10 TOS-10 Construct service roads/c-d roads on Major Deegan Expressway. Options are continuous, partial and directional (nb/sb) service/c-d roads. 11 TOS-11 Improve mainline horizontal geometry on Major Deegan Expressway, south of 145th Street. 12 TOS-12 Examine option to divert Cross Bronx Expressway-Henry Hudson Parkway traffic to Washington Bridge as alternative route to the Alexander Hamilton Bridge. Option to increase outer lane usage and to reduce congestion on inner lanes on Trans- Manhattan Expressway.
    [Show full text]
  • Hutchinson River CSO Long Term Control Plan (LTCP)
    Hutchinson River CSO Long Term Control Plan (LTCP) The Hutchinson River is an area of significant natural resources that provides communities in the Bronx with nature access at Pelham Bay Park as well as other areas along the river. DEP will complete a Long Term Control Plan to better understand how combined sewer overflows (CSOs) affect water quality and related recreational uses in the Hutchinson River waterbody. The goal for the combined sewer overflow Long Term Control Plan is to identify the appropriate controls necessary to achieve waterbody-specific water quality standards, consistent with EPA’s 1994 CSO Policy and subsequent guidance. The Hutchinson River begins in Westchester County, flows through the Bronx into Eastchester Bay Tributary to East River. The Hutchinson River is classified for primary and secondary recreation contact and fishing. The portion of the river within New York City can be affected by pollutant loads originating in the upstream portions of the river located in Westchester County. In anticipation of developing and finalizing the Hutchinson River LTCP, DEP will continue to study and evaluate load reduction alternatives in the Hutchinson River as well as collaborate with DEC to approach multi-jurisdictional issues. In addition, DEP is investing approximately $18 million dollars in Green Infrastructure in the combined sewer areas over the next few years. DEP is investing approximately $18 million dollars in three large projects New York City Housing Authority Retrofit – Edenwald Houses • Impervious area managed:
    [Show full text]
  • Recognizing Environmental Justice in History: Resistance and Agency In
    View metadata, citation and similar papers at core.ac.uk brought to you by CORE provided by DigitalCommons@Connecticut College Connecticut College Digital Commons @ Connecticut College History Honors Papers History Department 1-1-2011 Recognizing Environmental Justice in History: Resistance and Agency in the Cross Bronx Expressway and the Memphis Sanitation Workers’ Strike Sarah Berkley Connecticut College, [email protected] Follow this and additional works at: http://digitalcommons.conncoll.edu/histhp Recommended Citation Berkley, Sarah, "Recognizing Environmental Justice in History: Resistance and Agency in the Cross Bronx Expressway and the Memphis Sanitation Workers’ Strike" (2011). History Honors Papers. Paper 7. http://digitalcommons.conncoll.edu/histhp/7 This Honors Paper is brought to you for free and open access by the History Department at Digital Commons @ Connecticut College. It has been accepted for inclusion in History Honors Papers by an authorized administrator of Digital Commons @ Connecticut College. For more information, please contact [email protected]. The views expressed in this paper are solely those of the author. Recognizing Environmental Justice in History: Resistance and Agency in the Cross Bronx Expressway and the Memphis Sanitation Workers’ Strike An Honors Thesis presented by Sarah Berkley to The Department of History in partial fulfillment of the requirements for Honors in the Major Field and for completion of the certificate program of The Goodwin Niering Center for the Environment Connecticut College New London, Connecticut May 5, 2011 2 Abstract The term environmental justice did not become a part of academic discourse until the 1970s; however, the facts of environmental injustice predate the concept. Minority and low-income communities have historically born a disproportionate burden of the environmental harm associated with economic progress while reaping few of the benefits.
    [Show full text]
  • NEC One-Year Implementation Plan: FY17 Contents
    Northeast Corridor One-Year Implementation Plan Fiscal Year 2017 September 2016 Congress established the Northeast Corridor Commission to develop coordinated strategies for improving the Northeast’s core rail network in recognition of the inherent challenges of planning, financing, and implementing major infrastructure improvements that cross multiple jurisdictions. The expectation is that by coming together to take collective responsibility for the NEC, these disparate stakeholders will achieve a level of success that far exceeds the potential reach of any individual organization. The Commission is governed by a board comprised of one member from each of the NEC states (Massachusetts, Rhode Island, Connecticut, New York, New Jersey, Pennsylvania, Delaware, and Maryland) and the District of Columbia; four members from Amtrak; and five members from the U.S. Department of Transportation (DOT). The Commission also includes non-voting representatives from four freight railroads, states with connecting corridors and several commuter operators in the Region. 2| NEC One-Year Implementation Plan: FY17 Contents Introduction 6 Funding Summary 8 Baseline Capital Charge Program 10 1 - Boston South Station 12 16 - Shore to Girard 42 2 - Boston to Providence 14 17 - Girard to Philadelphia 30th Street 44 3 - Providence to Wickford Junction 16 18 - Philadelphia 30th Street - Arsenal 46 4 - Wickford Junction to New London 18 19 - Arsenal to Marcus Hook 48 5 - New London to New Haven 20 20 - Marcus Hook to Bacon 50 6 - New Haven to State Line 22 21 - Bacon to Perryville 52 7 - State Line to New Rochelle 24 22 - Perryville to WAS 54 8 - New Rochelle to Harold Interlocking 26 23 - Washington Union Terminal 56 9 - Harold Interlocking to F Interlocking 28 24 - WAS to CP Virginia 58 10 - F Interlocking to PSNY 30 25 - Springfield to New Haven 60 11 - Penn Terminal 32 27 - Spuyten Duyvil to PSNY* 62 12 - PSNY to Trenton 34 28 - 30th St.
    [Show full text]
  • To Download Three Wonder Walks
    Three Wonder Walks (After the High Line) Featuring Walking Routes, Collections and Notes by Matthew Jensen Three Wonder Walks (After the High Line) The High Line has proven that you can create a des- tination around the act of walking. The park provides a museum-like setting where plants and flowers are intensely celebrated. Walking on the High Line is part of a memorable adventure for so many visitors to New York City. It is not, however, a place where you can wander: you can go forward and back, enter and exit, sit and stand (off to the side). Almost everything within view is carefully planned and immaculately cultivated. The only exception to that rule is in the Western Rail Yards section, or “W.R.Y.” for short, where two stretch- es of “original” green remain steadfast holdouts. It is here—along rusty tracks running over rotting wooden railroad ties, braced by white marble riprap—where a persistent growth of naturally occurring flora can be found. Wild cherry, various types of apple, tiny junipers, bittersweet, Queen Anne’s lace, goldenrod, mullein, Indian hemp, and dozens of wildflowers, grasses, and mosses have all made a home for them- selves. I believe they have squatters’ rights and should be allowed to stay. Their persistence created a green corridor out of an abandoned railway in the first place. I find the terrain intensely familiar and repre- sentative of the kinds of landscapes that can be found when wandering down footpaths that start where streets and sidewalks end. This guide presents three similarly wild landscapes at the beautiful fringes of New York City: places with big skies, ocean views, abun- dant nature, many footpaths, and colorful histories.
    [Show full text]
  • Board of Commissioners of the NYC Dept of Public Parks
    • DO()UMENT No. 23. BOARD OF THE DEP ARTlIENT OF PUBLIC PARKS. MAY 2, 1871. The President presented a .certined .copy of an act entitled "An act relative to the improvement of certain portions of the counties of vVestchester and New York, including provisions for .communication between said counties, and for improving the navigation of Harlem river and Spuyten Duyvil creek." Ordered, That said act be laid on the table and printed in document form. GEO. M. V AN NORT, Olerk. • Chap. 534. AN ACT relative to the impt'ovement of certain portions of the counties of Westchester and New York, including provisions for communication between said counties, and for improving the navigation of Harlem river and Spny~en Dnyvil creek. Passed April 15, 1871; three fifths being present. The People of the State of New Ym'/c, represented in Senate and A8sembly, do enact as follow8 : SECTION 1. It shall be the duty of the board of commissioners of the department of public parks of the city of New York, to cause a proper survey to be made of all that part of the county of "Vestchester lying south of the southerly line' of the village of Y OIIkers, and a line in continuation thereof eastwardly to Hutchinson river or creek, and including that part of said county lying south of said line and west of said river or creek, or the westerly boundary line of the town of Pelham to Long Island sound, and to devise and prepare maps, plans and pro­ files embracing and showing such changes in the location, 'width, courses, windings, and grades of the streets, avenues, and
    [Show full text]