Oslo Airport 오슬로 공항

Total Page:16

File Type:pdf, Size:1020Kb

Oslo Airport 오슬로 공항 Oslo Airport 오슬로 공항 코 드 : OSL / ENGM 도 시 : Oslo / 오슬로 국 가 : Norway / 노르웨이 기준일: 2008.12.31 ◎ 개요 ▶ 주소 : PO Box 100 N-2061 Gardermoen Norway ▶ 전화 : +47 64 81 20 00 ▶ 팩스 : +47 64 81 20 01 ▶ 홈페이지 : http://www.osl.no/ ▶ 이메일 : [email protected] ◎ 공항운영자 공항운영주체 Oslo Lufthavn AS, PO Box 100, N-2061 Gardermoen. 전화 +47 64 81 20 00 팩스 +47 64 81 20 01 Managing Director: Nic Nilsen Director, Personnel and Organisational Development: Geir Svegaarden Director, Air Traffic Services: Einar Tajford Director, Airport Services: Erik Gill 주요인사 Director, Technical Division: Bjørn Vinge Director, Terminal and Business Development: Espen Ettre Director, Environment and Quality Management: Ms Anna Margrethe Snekkerbakken Director, Organisation and Finance: Mait Ehtvedt Kjar Information Manager: Jo Kobro ◎ 시설현황 활주로 Rwy 01L/19R, 11,811' 3,600 m, width 148' 45 m, asphalt, PCN 75 F/A/W/T. 추가활주로 Rwy 01R/19L, 9,678' 2,950 m, width 148' 45 m, asphalt, PCN 75 F/A/W/T. 최대활주로길이 11,811' 3,600m Rwy 01L: HIRL, CL, centre row, PAPI. Rwy 01R: HIRL, CL, TDZL, centre row, PAPI. 활주로 등화 Rwy 19L: HIRL, CL, centre row, PAPI. Rwy 19R: HIRL, CL, TDZL, centre row, PAPI. ILS (LLZ and GP, refer to Terminal FLIP for details); ASR (131.35 MHz); DVOR/DME (Gardermoen, ID GRM, 115.95 MHz, Ch 106Y, at field); NDB (Solberg, ID SLB, 414 kHz, 019º, 11.5 nm; Oppaker, ID OPA, 334 kHz, 267º, 12.6 nm; Morskogen, ID MSK, 347 kHz, 198º, 16.5 nm; Bergerud, ID BGU, 316 kHz, 346º, 21.3 nm; Soknen, ID SOK, 387 kHz, 094º, 35.5 nm). 항행시설 Frequencies: Twr 118.3, 123.325 and 299.4 (W Sector Ops), 120.1, 128.875 and 257.8 (E Sector Ops) MHz; Gnd 121.925, 121.675X, 121.725X, 337.975 MHz; App 119.975 (E Sector), 120.45 (W Sector) MHz; Clnc Del 121.6 MHz; Director 131.35 MHz; Arr Info 126.125 MHz; Dep Info 127.15 MHz; Handling/Briefing 134.175 MHz; Wing Ops 293.8 kHz; De-icing 131.975 MHz. 주파수 See Navaids. 인근도시 Oslo (50 km). 항공기주기 Taxi-in, push-back. 게이트/스탠드 40 gates and 17 remote, including 4 cargo. 최대 계류장 All types. 행거 Limited hangarage available, O/R through handling agent. 표준시간대 Summer (Mar-Oct) UTC+2, Winter UTC+1. 운영시간 H24. Operations with jet aircraft not complying with ICAO Annex 16, Chapter 3 are only allowed between 0800-1600LT. Between 2400-0600LT the 소음경감 maximum noise level shall not exceed 78 dBA outside Aircraft Zone II. In the same period operations with aircraft noise certification exceeding 88 EPNdB at departure are not allowed. 장애물 Unlighted obstructions surround airport. ◎ 역사 ○ 군용공항, 그리고 보조공항 덴마크와 노르웨이 군은 Fredericksfeldt라 불리던 Gardermoen공항을 1740년 초부터 야영지로 사 용하기 시작했다. 첫 비행은 1912년 시작했으며, 1920까지는 비행장의 복합격납고로 사용됐다. 독일군은 노르웨이를 제2차 세계대전 기간 동안 점령했다. 그들은 공항에 폭탄을 투하했지만 2000m에 달하는 두 개의 활주로를 계속해서 재건축했다. 종전 후 Gardermoen공항은 전세비행과 국제비행에 모두 사용되었다. 그리고 군 훈련 또한 이 곳에 서 수행하였다. 전세비행은 Fornebu공항의 슬롯 부족으로 인해 Fornebu공항 대신에 Gardermoen공 항이 1972년 부터 운영되었다. 게다가 Fornebu공항의 활주로가 너무 짧아 국제비행도 Gardermoen공항에서 운영되었다. 뉴욕으로 가는 Scandinavian Airlines System(sas)의 항공편이 Fornebu공항으로 이동되었던 것은 1990년대 였다. 이동 후 새 터미널과 다른 시설들이 1998년에 이용되기 시작했고, Fornebu공항은 상업적인 비행으로 사용 되지 않았지만 군비행으로는 사용이 되었다. ○ 새로운 공항 발견 Gressholmen(해상)와 Kjeller공항(육지)이 있는 Oslo지역에 공항을 건설하기에 적합했다. Oslo지역 에 새 공항인 Fornebu공항이 1939년에 개항했다. 그러나 1980년대 이 공항에 몇 가지 기능상 문제 가 발생했다. 이 공항은 하나의 활주로만 있었고, 그로 인해 오전과 오후의 첨두 시간대에 공항의 이 용 가능한 슬롯이 없었다. 이 같은 문제는 항공시장 업무에서의 새로운 규제완화를 무용지물로 만들 었고, 잠재력 있는 새로운 항공사들은 Fornebu공항의 슬롯을 이용할 수가 없었다. 새로운 활주로는 부지문제로 인해 만들어지지 못했다. 구 공항은 공항으로 가는 지하철 또는 기차도 없어서, 대중교통의 부족 또한 발생했다. 이 공항은 도시중심과 주거지역 주변의 꽤 가까운 곳에 위치해있어 소음공해도 일으켰다. Oslo에는 새로운 공항을 위한 많은 후보지가 있었는데 특히, Hobøl, Hurum, Kroer, As 과 Gardermoen들이 있었다. 새로운 공항을 선정하기 위한 공항 주변지역의 행정적 선정과정은 1950년 대에 시작했지만, 첫 번째 결정은 1988년에 입법부가 Hurum에 공항을 건설하기로 한 것이었다. 그 러나 기상조사에서 Hurum지역에 안개가 너무 자주 발생한다는 것이 밝혀져, 결국 그 곳의 선정과정 은 취소되었다. 이후 1992년 10월8일, 국회는 Gardermoen에 공항을 건설하기로 최종결정 했다. ○ OSL Gardermoen 새 운영회사인 Oslo Lufthavn AS는 Gardermoen공항과 Fornebu공항의 운영을 이어받았다. 국회의 결정은 신 공항은 이 회사의 자산으로 건설되어져야 하며, 하나의 독립된 주식회사로써 신 공항의 재정을 확립시켜야 한다는 것을 의미했다.NOK의 공항 총 건설비용인 114억은 이 회사로부터 모두 빌렸으며, 공항운영으로 인한 수익은 그 빚을 갚는데 사용되었다. 이 회사는 1997년 1월1일부터 Fornebu공항을 운영했다. Oslo Lufthavn AS는 노르웨이의 민간공항운영을 하는 Avinor AS의 자회사였다. Gardermobanen의 신 고속철도는 공항과 동시에 완공되었다. 열차는 공항에서 Oslo 중앙역으로 한 시간에 6회 출발했다. 이 열차는 노르웨이의 첫 번째 고속철도였고, 지금은 Flytoget으로써 210km/h속도를 낸다. Gardermoen공항은 1998년 10월8일, Fornebu공항의 해상항공시설을 제외한 나머지 시설이 폐쇄되었을 때 Oslo의 주 공항으로써의 역할을 대신했다. 신 공항 이전의 주요 작업은 야간에 이루어졌다. 신 공항에서는 연간 1천7백만 명의 수용력과 시간 당 80대의 항공기 이착륙이 가능했다. Gardermoen공항의 개항 이후 공항으로의 슬롯접근과 Color Air(노르웨이의 첫 번째 저가항공사)의 취항은 항공사들간의 가격경쟁에 영향을 주었다. 결국, 1999 년에 Color Air가 운항을 중단했다. 이 기간 동안 일일50대에 달하는 항공기가 Gardermoen에서 Bergen, Stavanger 그리고 Trondheim로 각각 운항을 했었다. 1999년, Northwest Airlines은 적은 탑승률에 의해 운항이 취소되기 전까지는 일시적으로 Oslo와 Minneapolis사이를 몇 달 동안 DC-10-30기종으로 운항하였다. 2001년 10월, 대륙간을 잇는 비행 으로 유일하게 남아있던 SAS 767-300항공기에 의해 뉴욕으로 가는 노선이 중단되었다. 2004년, Continental Airlines이 이 노선에 대한 운항을 다시 시작하였다. 또한, 파키스탄으로의 정 기 노선과 태국으로의 전세기운항, 그리고 다른 대륙의 몇몇 국가들과의 노선에 취항하였다. 2002 년, Norwegian Air Shuttle(노르웨이 국적 항공사)은 Gardermoen공항을 허브공항으로 이용하면서 운항을 시작하였다. 이 항공사는 46개의 국제노선과 8개의 국내노선에 취항하였다. 2006년1월18일, Liv Signe Navarsete, Minister of Transport 와 Communications은 유럽의 첫 번째 적외선을 이 용한 제빙격납고를 Oslo 공항에서 완공했다. 그 격납고는 겨울기간 동안 일반적인 제빙서비스를 제공할 것이다. ◎ 터미널 터미널 1 passenger, 1 cargo, 1 general aviation. 서비스 Air terminals Braathens ASA SAS 지상조업 Serviceair Widerge Fuel: 100LL, Jet A-1, JP4 기타사항 Customs.
Recommended publications
  • OFFERING CIRCULAR Avinor AS
    OFFERING CIRCULAR Avinor AS (incorporated with limited liability in Norway) €3,000,000,000 Euro Medium Term Note Programme Under this €3,000,000,000 Euro Medium Term Note Programme (the Programme), Avinor AS (the Issuer or Avinor) may from time to time issue notes (the Notes) denominated in any currency agreed between the Issuer and the relevant Dealer (as defined below). The Notes may be issued in bearer form or uncertificated book entry form (the VPS Notes) cleared through the Norwegian Central Securities Depositary, the Verdipapirsentralen ASA (the VPS). The maximum aggregate nominal amount of all Notes from time to time outstanding under the Programme will not exceed €3,000,000,000 (or its equivalent in other currencies calculated as described in the Programme Agreement described herein), subject to increase as described herein. The Notes may be issued on a continuing basis to one or more of the Dealers specified under “Overview of the Programme” and any additional Dealer appointed under the Programme from time to time by the Issuer (each a Dealer and together the Dealers), which appointment may be for a specific issue or on an ongoing basis. References in this Offering Circular to the relevant Dealer shall, in the case of an issue of Notes being (or intended to be) subscribed by more than one Dealer, be to all Dealers agreeing to subscribe such Notes. An investment in Notes issued under the Programme involves certain risks. For a discussion of these risks see “Risk Factors”. Application has been made to the Commission de Surveillance du Secteur Financier (the CSSF) in its capacity as competent authority under the Luxembourg Act dated 10 July 2005 on prospectuses for securities (the Prospectus Act 2005) to approve this document as a base prospectus.
    [Show full text]
  • NORWAY LOCAL SINGLE SKY IMPLEMENTATION Level2020 1 - Implementation Overview
    LSSIP 2020 - NORWAY LOCAL SINGLE SKY IMPLEMENTATION Level2020 1 - Implementation Overview Document Title LSSIP Year 2020 for Norway Info Centre Reference 20/12/22/79 Date of Edition 07/04/2021 LSSIP Focal Point Peder BJORNESET - [email protected] Luftfartstilsynet (CAA-Norway) LSSIP Contact Person Luca DELL’ORTO – [email protected] EUROCONTROL/NMD/INF/PAS LSSIP Support Team [email protected] Status Released Intended for EUROCONTROL Stakeholders Available in https://www.eurocontrol.int/service/local-single-sky-implementation- monitoring Reference Documents LSSIP Documents https://www.eurocontrol.int/service/local-single-sky-implementation- monitoring Master Plan Level 3 – Plan https://www.eurocontrol.int/publication/european-atm-master-plan- Edition 2020 implementation-plan-level-3 Master Plan Level 3 – Report https://www.eurocontrol.int/publication/european-atm-master-plan- Year 2020 implementation-report-level-3 European ATM Portal https://www.atmmasterplan.eu/ STATFOR Forecasts https://www.eurocontrol.int/statfor National AIP https://avinor.no/en/ais/aipnorway/ FAB Performance Plan https://www.nefab.eu/docs# LSSIP Year 2020 Norway Released Issue APPROVAL SHEET The following authorities have approved all parts of the LSSIP Year 2020 document and the signatures confirm the correctness of the reported information and reflect the commitment to implement the actions laid down in the European ATM Master Plan Level 3 (Implementation View) – Edition 2020. Stakeholder / Name Position Signature and date Organisation
    [Show full text]
  • Aviation in Norway Sustainability and Social Benefit
    AVIATION IN NORWAY SUSTAINABILITY AND SOCIAL BENEFIT PROJECT REPORT Summary 1 Oslo, 30 January 2008 1. INTRODUCTION The main task of Norwegian aviation is to contribute beneficially to social A project was started in spring 2007 to promote initiatives that contribute and economic development in Norway by providing safe, efficient and to sustainable and socially beneficial aviation. The major goals for the eco-adapted air transportation within all regions of the country and to project have been threefold: make arrangements that enable the nation to participate actively in global economic and social development. 1) To investigate initiatives to reduce the negative environmental impact of the industry. The work has concentrated in the areas for which the The Intergovernmental Panel on Climate Change (IPCC) concluded in industry itself has responsibility and over which it can have an influence, its fourth major report published in 2007 that it is highly probable that but the project has also been looking at initiatives within associated human emissions of greenhouse gases have been the main cause of the areas, such as ground transport access to the airports. increase in global temperature since the mid-20th century. If emissions are not reduced, the global mean temperature will continue to rise. Resol- 2) To give a comprehensive presentation of the environmental impact of ving the climate problem is a major social and societal challenge. Aviation the industry. industry operations involve the emission of greenhouse gases and the sector therefore has a responsibility to find solutions for the environmen- 3) To contribute to a comprehensive presentation of the social and tal challenges.
    [Show full text]
  • AIBN Accident Boeing 787-9 Dreamliner, Oslo Airport, 18
    Issued June 2020 REPORT SL 2020/14 REPORT ON THE AIR ACCIDENT AT OSLO AIRPORT GARDERMOEN, NORWAY ON 18 DECEMBER 2018 WITH BOEING 787-9 DREAMLINER, ET-AUP OPERATED BY ETHIOPIAN AIRLINES The Accident Investigation Board has compiled this report for the sole purpose of improving flight safety. The object of any investigation is to identify faults or discrepancies which may endanger flight safety, whether or not these are causal factors in the accident, and to make safety recommendations. It is not the Board's task to apportion blame or liability. Use of this report for any other purpose than for flight safety shall be avoided. Accident Investigation Board Norway • P.O. Box 213, N-2001 Lillestrøm, Norway • Phone: + 47 63 89 63 00 • Fax: + 47 63 89 63 01 www.aibn.no • [email protected] This report has been translated into English and published by the AIBN to facilitate access by international readers. As accurate as the translation might be, the original Norwegian text takes precedence as the report of reference. Photos: AIBN and Trond Isaksen/OSL The Accident Investigation Board Norway Page 2 INDEX ACCIDENT NOTIFICATION ............................................................................................................ 3 SUMMARY ......................................................................................................................................... 3 1. FACTUAL INFORMATION .............................................................................................. 4 1.1 History of the flight .............................................................................................................
    [Show full text]
  • Challenges and Solutions for Transport in Norway
    09.06.2017 Challenges and solutions for transport in Norway Therese Ustvedt, adviser Director General’s Staff Norwegian Public Roads Administration National Transport Plan 2018-2029 Transport Network Public roads, total 94 600 km - National roads 10 700 km - County roads 44 500 km - Municipal roads 39 400 km Road tunnels 1 100 tunnels Road bridges 18 200 bridges Rail network 4 200 km Rail tunnels 736 tunnels Rail bridges 2 577 bridges State owned airports 45 airports National ports 32 ports National Transport Plan 2018-2029 1 09.06.2017 The Norwegian Parliament (Stortinget) The Norwegian Government (Regjeringen) Ministry of Transport and Communication Norwegian Norwegian Public Roads Norwegian Railway Norwegian Coastal air traffic authority Administration Directorate Administration Avinor AS (Statens vegvesen) (Jernbanedirektoratet) (Kystverket) National Transport Plan 2018-2029 Background • In 1998, the Government directed the four transport agencies to prepare a joint proposal for the first long-term national transport plan (for the period 2002-2011). • The fifth joint input from the transport agencies was presented in February 2016. • The Government presented the white paper on transport to the Storting in April 2017. • The white paper presents a plan that will apply for the period 2018-2029. • The Storting will adopt the white paper in June 2017. National Transport Plan 2018-2029 2 09.06.2017 Official Steering Documents National Transport Plan (12 Year Period) Action Programme (Focus on first 4 Years) Annual National Budget Appropriation Projects National Transport Plan 2018-2029 Overall goal A transport system that is safe, promotes economic growth and contributes to the transition into a low- emission society.
    [Show full text]
  • Bane NOR Eiendom AS – Company Presentation Norway's Leading Hub Developer Important Information (1/2)
    Bane NOR Eiendom AS – Company Presentation Norway's leading hub developer Important information (1/2) This presentation and its appendices (collectively the "Presentation") has been produced by Bane NOR Eiendom AS (the "Company") with assistance from Danske Bank, Norwegian Branch and Skandinaviska Enskilda Banken AB (publ) (together the "Managers") in connection with the offering of bonds by the Company (the "Offering"). This Presentation is strictly confidential and may not be reproduced or redistributed, in whole or in part, to any other person. This Presentation has not been reviewed by or registered with any public authority or stock exchange and does not constitute a prospectus. To the best of the knowledge of the Company and its board of directors, the information contained in this Presentation is in all material respects in accordance with the facts as of the date hereof, and contains no omissions likely to affect its import. This Presentation contains information obtained from third parties. As far as the Company is aware and able to ascertain from the information published by that third party, such information has been accurately reproduced and no facts have been omitted that would render the reproduced information to be inaccurate or misleading. Only the Company and the Managers are entitled to provide information in respect of matters described in this Presentation. Information obtained from other sources is not relevant to the content of this Presentation and should not be relied upon. This Presentation does not constitute an offer to sell or a solicitation of an offer to buy any securities in any jurisdiction to any person to whom it is unlawful to make such an offer or solicitation in such jurisdiction.
    [Show full text]
  • Bane NOR Eiendom AS – Company Presentation Norway's Leading Hub Developer Important Information (1/2)
    Bane NOR Eiendom AS – Company Presentation Norway's leading hub developer Important information (1/2) This presentation and its appendices (collectively the "Presentation") has been produced by Bane NOR Eiendom AS (the "Company") with assistance from Danske Bank, Norwegian Branch and and Nordea Bank AB (publ), filial i Norge (together the "Managers") in connection with the offering of bonds by the Company (the "Offering"). This Presentation is strictly confidential and may not be reproduced or redistributed, in whole or in part, to any other person. This Presentation has not been reviewed by or registered with any public authority or stock exchange and does not constitute a prospectus. To the best of the knowledge of the Company and its board of directors, the information contained in this Presentation is in all material respects in accordance with the facts as of the date hereof, and contains no omissions likely to affect its import. This Presentation contains information obtained from third parties. As far as the Company is aware and able to ascertain from the information published by that third party, such information has been accurately reproduced and no facts have been omitted that would render the reproduced information to be inaccurate or misleading. Only the Company and the Managers are entitled to provide information in respect of matters described in this Presentation. Information obtained from other sources is not relevant to the content of this Presentation and should not be relied upon. This Presentation does not constitute an offer to sell or a solicitation of an offer to buy any securities in any jurisdiction to any person to whom it is unlawful to make such an offer or solicitation in such jurisdiction.
    [Show full text]
  • The State Ownership Report 2019
    The State Ownership Report 2019 Contents The Minister’s introduction 7 Category Goal of the highest possible Scope and key figures 8 return over time and where Key issues for the State as owner 16 the State no longer has a How the State exercises its ownership 22 A sustainable portfolio for 1 rationale for its ownership long-term value creation 34 Ambita AS 42 Baneservice AS 43 Entra ASA 44 Flytoget AS 45 Giek kredittforsikring AS 46 Mesta AS 47 Category Goal of the highest possible return over time and where the State has a special 2 rationale for its ownership Aker Kværner Holding AS 50 Argentum Fondsinvesteringer AS 51 DNB ASA 52 Eksportfinans Norway ASA 53 Electronic chart centre AS 54 Equinor ASA 55 Investinor AS 56 Kommunalbanken AS 57 Kongsberg Gruppen ASA 58 Mantena AS 59 Nammo AS 60 Norsk Hydro ASA 61 Nysnø Klimainvesteringer AS 62 Posten Norge AS 63 Statkraft SF 64 Telenor ASA 65 Vygruppen AS 66 Yara International ASA 67 Category Goal of the most efficient possible attainment of 3 public policy goals Andøya Space Center AS 70 Simula Research Laboratory AS 104 Avinor AS 71 Siva – Selskapet for Industrivekst SF 105 Bane Nor SF 72 Space Norway AS 106 Bjørnøen AS 73 Statnett SF 107 Carte Blanche AS 74 Statskog SF 108 Den Nationale Scene 75 Staur gård AS 109 Andøya Space Center AS 76 Store Norske Spitsbergen Kulkompani AS 110 Den Norske Opera & Ballett AS 76 Talent Norge AS 111 Avinor AS 77 Trøndelag Teater AS 112 Eksportkreditt Norge AS 77 Universitetssenteret på Svalbard AS 113 Enova 78 Vinmonopolet AS 114 Entur AS 79 Fiskeri- og
    [Show full text]
  • Regulatory Reform in Norway
    Regulatory Reform in Norway MARKETISATION OF GOVERNMENT SERVICES – STATE-OWNED ENTERPRISES © OECD (2003). All rights reserved. 1 ORGANISATION FOR ECONOMIC CO-OPERATION AND DEVELOPMENT Pursuant to Article 1 of the Convention signed in Paris on 14th December 1960, and which came into force on 30th September 1961, the Organisation for Economic Co-operation and Development (OECD) shall promote policies designed: • to achieve the highest sustainable economic growth and employment and a rising standard of living in Member countries, while maintaining financial stability, and thus to contribute to the development of the world economy; • to contribute to sound economic expansion in Member as well as non-member countries in the process of economic development; and • to contribute to the expansion of world trade on a multilateral, non-discriminatory basis in accordance with international obligations. The original Member countries of the OECD are Austria, Belgium, Canada, Denmark, France, Germany, Greece, Iceland, Ireland, Italy, Luxembourg, the Netherlands, Norway, Portugal, Spain, Sweden, Switzerland, Turkey, the United Kingdom and the United States. The following countries became Members subsequently through accession at the dates indicated hereafter: Japan (28th April 1964), Finland (28th January 1969), Australia (7th June 1971), New Zealand (29th May 1973), Mexico (18th May 1994), the Czech Republic (21st December 1995), Hungary (7th May 1996), Poland (22nd November 1996), Korea (12th December 1996) and the Slovak Republic (14th December 2000). The Commission of the European Communities takes part in the work of the OECD (Article 13 of the OECD Convention). © OECD 2003 Permission to reproduce a portion of this work for non-commercial purposes or classroom use should be obtained through the Centre français d’exploitation du droit de copie (CFC), 20, rue des Grands-Augustins, 75006 Paris, France, tel.
    [Show full text]
  • 1St Quarter 2017
    INTERIM FINANCIAL REPORT 1st quarter 2017 2 AVINOR AS Content Group main figures 3 Board of directors report 4 Income statement 8 Statement of comprehensive income 9 Balance sheet 10 Statement of changes in equity 12 Statement of cash flows 13 Notes 14 About Avinor Avinor has two primary business areas, operation of a nationwide The Ministry of Transport and Communications manages the Norwegian network of airports, and the national air navigation services for civil and state’s ownership of Avinor, and stipulates e.g. the tasks imposed on military aviation. In total, this includes 46 airports as well as control the Group to safeguard the general interests of Norwegian society, towers, control centres and other technical infrastructure for safe air the required rate of return and dividends. In addition, the Ministry of navigation. In addition to the aviation-operative activities, commercial Transport and Communications regulates the aviation fees. The Ministry earnings are facilitated through airport hotels, parking facilities, tax-free of Transport and Communications is the highest authority for Norwegian stores, restaurants and other services for air passengers. aviation and also stipulates the Civil Aviation Authority’s regulations, which have consequences for Avinor’s operations. Avinor is a group where the operational activities are partly organised in divisions and in partly in legal entities (subsidiaries). Financially, the Avinor has issued bonds that are listed on the Oslo and Luxembourg overall operations are run as a single aviation system. The air navigation Stock Exchange. The Group’s corporate governance must adhere to the services finance themselves by pricing the services in accordance with Oslo Stock Exchange’s recommendations for corporate governance to international provisions.
    [Show full text]
  • The Norwegian State's Direct Ownership Of
    The Norwegian State’s Direct Ownership of Companies Climate Related Risks June 2017 The Norwegian State’s Direct Ownership of Companies – Climate Related Risks June 2017 CREDITS Researched and written by: Christina Weimann,Senior Research Analyst Gautier Desme, Senior Research Analyst Research team led by: Lauren Smart, Head of Financial Institutions Report edited and designed by: James Richens, Editor Rebecca Edwards, Marketing ABOUT TRUCOST Trucost is part of the S&P Global family, operated by S&P Dow Jones Indices. Our shared commitment to the environment will allow us to bring essential ESG investment opportunities to the global marketplace, enabling the combined entity to satisfy growing market demand through new products and enhancements of Trucost’s existing capabilities. Trucost assesses and prices risks relating to climate change, natural resource constraints and broader ESG factors. Companies and financial institutions use Trucost intelligence to understand exposure to ESG factors, inform resilience and identify the transformative solutions of tomorrow. Trucost data also underpins ESG indices, including the S&P 500 Carbon Efficient Index® and S&P/IFIC Carbon Efficient Index®. For more information, visit www.trucost.com. ABOUT S&P DOW JONES INDICES S&P Dow Jones Indices is the largest global resource for essential index-based concepts, data and research, and home to iconic financial market indicators, such as the S&P 500® and the Dow Jones Industrial Average®. More assets are invested in products based on our indices than based on any other provider in the world. With over 1,000,000 indices and more than 120 years of experience constructing innovative and transparent solutions, S&P Dow Jones Indices defines the way investors measure and trade the markets.
    [Show full text]
  • A Sectoral Innovation System Analysis of the Transport Sector in Norway and Canada in Light of the Paris Agreement
    sustainability Review Many Miles to Paris: A Sectoral Innovation System Analysis of the Transport Sector in Norway and Canada in Light of the Paris Agreement Konstantinos Koasidis 1 , Anastasios Karamaneas 1, Alexandros Nikas 1,* , Hera Neofytou 1 , Erlend A. T. Hermansen 2, Kathleen Vaillancourt 3 and Haris Doukas 1 1 Decision Support Systems Laboratory, School of Electrical and Computer Engineering, National Technical University of Athens, Iroon Politechniou 9, 157 80 Athens, Greece; [email protected] (K.K.); [email protected] (A.K.); [email protected] (H.N.); [email protected] (H.D.) 2 CICERO Center for International Climate and Environmental Research, P.O. Box 1129, Blindern, NO-0318 Oslo, Norway; [email protected] 3 ESMIA Consultants, Blainville, QC J7B 6B4, Canada; [email protected] * Correspondence: [email protected]; Tel.: +30-210-772-3612 Received: 16 June 2020; Accepted: 17 July 2020; Published: 20 July 2020 Abstract: Transport is associated with high amounts of energy consumed and greenhouse gases emitted. Most transport means operate using fossil fuels, creating the urgent need for a rapid transformation of the sector. In this research, we examine the transport systems of Norway and Canada, two countries with similar shares of greenhouse gas emissions from transport and powerful oil industries operating within their boundaries. Our socio-technical analysis, based on the Sectoral Innovation Systems approach, attempts to identify the elements enabling Norway to become one of the leaders in the diffusion of electric vehicles, as well as the differences pacing down progress in Canada. By utilising the System Failure framework to compare the two systems, bottlenecks hindering the decarbonisation of the two transport systems are identified.
    [Show full text]