Beerenberg New Production Facility Stage 2 & 3
Total Page:16
File Type:pdf, Size:1020Kb
COMMERCIAL ELECTRICAL 41 Barnes Rd. Glynde SA 5070 [email protected] (08) 8165 0267 Beerenberg New Production Facility Stage 2 & 3 Client: McMahon Services & Beerenberg Farm Location: Hahndorf, South Australia Duration: July 2017 to Aug 2018 Value: $914k Project Referee: Jordan Singh 0438 955 353 PROJECT OVERVIEW Beerenberg is a family owned business that has been operational in the Adelaide Hills since 1839 which today produces premium quality jam, sauce and condiments. There are three main operational areas of the business. First is the farm, which produces strawberries, supporting stock and other agricultural activities. Second is the retail shopfront where the public can directly source product for their enjoyment and also pay to access Beerenberg’s ‘pick your own strawberry’ fields. Third is the food production facility where the processing, preparation, packaging and shipping of the jams, sauces and condiments takes place. The facilities are operational all year round, with some seasonal variation in activity. The production facility in particular, often operates extended hours and shifts to meet the ever-increasing demand by consumers. ElectraSol was contracted to deliver this Project Through a competitive Tender Process. The electrical installation included installation of a new, cable tray support systems, switchboards, general and feature lighting, lighting control, power, communications, access control, CCTV, MATV, Cabling to Supply Processing Machinery and Liaison with Specialist Contractors to Commission processing facility in record time. ElectraSol was able to deliver this project on budget and on time, a showcase of quality and workmanship www.electrasolsa.com.au .