Notification Regarding Start of New Construction on Hamamatsucho 2-Chome Type-1 Urban Redevelopment Project

Total Page:16

File Type:pdf, Size:1020Kb

Notification Regarding Start of New Construction on Hamamatsucho 2-Chome Type-1 Urban Redevelopment Project March 19, 2021 For immediate release WORLD TRADE CENTER BUILDING, INC. KAJIMA CORPORATION Mitsui Fudosan Residential Co., Ltd. MITSUBISHI ESTATE RESIDENCE CO., LTD., Notification Regarding Start of New Construction on Hamamatsucho 2-Chome Type-1 Urban Redevelopment Project Tokyo, Japan, March 19, 2021 – Construction has begun on the Hamamatsucho 2-Chome Type-1 Urban Redevelopment Project being advanced by the Hamamatsucho 2-Chome Urban Redevelopment Association. WORLD TRADE CENTER BUILDING, INC., KAJIMA CORPORATION, Mitsui Fudosan Residential Co., Ltd., and MITSUBISHI ESTATE RESIDENCE CO., LTD. are participating in the project as members of this association. The Hamamatsucho 2-Chome Type-1 Urban Redevelopment Project, which is progressing alongside neighboring districts and includes rebuilding the World Trade Center, has been designated as the Hamamatsucho Station West Exit District Project. The project is intended to introduce diverse functions that will bring comfort and activity to urban living, as well as create a neighborhood that is safe and comfortable and will serve as an intersection to link the station with the surrounding urban area. It will include areas such as residential buildings, offices, retail facilities, and the Minato-ku Culture & Arts Hall. A notification regarding the decision on urban planning was issued in January 2017. The association was then established in November 2018, and the rights conversion plan was approved in March 2020, after which demolition work was conducted, leading to the start of new construction at this time. The participating companies aim to complete construction on the high-rise section (including residential buildings and offices) by November 2024, and full completion (including the Minato-ku Culture & Arts Hall and retail facilities) by December 2026. 【Project Overview】 Main contractor: Hamamatsucho 2-Chome Urban Redevelopment Project Association Construction site: Located within Hamamatsucho 2-Chome, Minato-ku, Tokyo Purpose: Residential buildings, offices, retail facilities, Minato-ku Culture & Arts Hall, etc. Site area: Approx. 63,383.82 ft2 (5,888.55 m2) Facility scale: Approx. 805,934.12 ft2 (74,873.73 m2) Number of floors: 46 floors above ground, 2 floors below ground Max. height: Approx. 608.36 ft (185.43 m) To Nippon Cultural ◆ ◆Map Broadcasting Deck floor Image of the exterior view Floors above ground Daimon Station on the Toei Oedo and Asakusa Lines (Construction planned) Ticket gate To Shiodome Station on the Tokyo Monorail Monorail Tokyo the on Station and Takeshiba Main Monorail Nippon Life Building planned) (Renovation Ticket gate Hamamatsucho (Planned) Crea Tower Hamamatsucho Hamamatsucho JR Hamamatsucho Station (Renovation planned) Ticket gate Ticket Ticket gate DWorld World Trade Trade Mid-rise Center Building section Center Building Ticket gate Lobby (Planned) High-rise South section Building (Under Existing construction) overpass Project site (Construction planned) To Shibaura .
Recommended publications
  • (English Version of School Brochure) Japanese Preschool & Elementary
    Japanese Children’s Society, Inc. (English version of school brochure) Japanese Preschool & Elementary School Contents I. Preschool Curriculum -------------------------------------------------------------- 3 II. Elementary School Curriculum ----------------------------------------------------- 6 III. Campus and Classrooms ---------------------------------------------------------- 10 IV. Bus Service ----------------------------------------------------------------------- 10 V. Directions --------------------------------------------------------------------------10 School Song Written by Shinichiro Sako Composed by Shoichiro Sako Translated by Toshikatsu Konishi 1. A blue sky is broadening over the earth, The mighty Hudson River is flowing into the bay, Like a young tree growing up healthily and quickly, All of us extend our hands And grow strong and big, in our school 2. On the bright windows filled with light, Reflecting smiling faces with enjoyment, Like small birds singing amicably All of us live in harmony Encourage and train with each other, in our school 3. In the city where a large number of people gather together from all over the world In search of freedom and dreaming of a future Like the Stature of Liberty uplifting a torch All of us are afire with high hopes, And build the joy of peace, in our school, in our school 1 Japanese Children’s Society, Inc. Mission Statement 1. To give Japanese preschool and elementary aged children a broad, rich education. 2. To shape and nurture their social and intellectual development. 3. To provide support and education in first language acquisition to preschool and elementary aged students. 4. To provide a cosmopolitan educational experience to students. Our belief is that our students must have a comprehensive knowledge and understanding of the Japanese language and culture in order to survive in today’s world.
    [Show full text]
  • Bridge Architecture in Japan
    International Journal of the Physical Sciences Vol. 6(17), pp. 4302-4310, 2 September, 2011 Available online at http://www.academicjournals.org/IJPS DOI: 10.5897/IJPS11.072 ISSN 1992 - 1950 ©2011 Academic Journals Full Length Research Paper Bridge architecture in Japan Hamed Niroumand1*, M. F. M. Zain2 and Maslina Jamil1 1Department of Architecture, Faculty of Engineering, National University of Malaysia (UKM), Malaysia. 2Deputy Dean, Faculty of Engineering, National University of Malaysia (UKM), Malaysia. Accepted 27 June, 2011 A bridge is a structure built to span physical obstacle such as a body of water, city, or road, for the purpose of providing passage over the obstacle. Bridges are a unique offshoot of architecture and possess their own associated terms, components and styles. This paper presents the second part of Japanese bridges by investigating architectural aspects of its design. Limited usable land in heavily populated areas of Japan has often necessitated the design of unique bridge approaches. One of such design is the spiral viaduct bridge approach. When this design is used, care is taken to make the structures aesthetically appealing. An important reason for the bridge construction will lead into a critical study of bridge aesthetics and structural design. According to the configuration of frameworks, bridges may be described as arched, girdered and cable stayed or suspension. Refereeing to Japanese bridges, those most frequently provided cable stayed in the construction of bridges are important factor in architecture and bridges aesthetic. This paper presents a brief history of bridge design in Japan, and then discusses the influence of technical factors on Japan bridges design.
    [Show full text]
  • Table of Contents TOKYO
    To assist Australian citizens living in Japan the following includes information about general medical facilities in Japan. The information is organised by location. Table of Contents TOKYO.......................................................................................................................... 3 Medical facilities .................................................................................................................... 3 General and Emergency Hospitals ........................................................................................ 7 Dental Clinics ......................................................................................................................... 8 OSAKA ........................................................................................................................ 11 HYOGO ....................................................................................................................... 14 KYOTO........................................................................................................................ 16 HIROSHIMA ............................................................................................................... 17 EHIME ......................................................................................................................... 17 FUKUOKA .................................................................................................................. 17 NAGASAKI ................................................................................................................
    [Show full text]
  • 金融商品取引法令に基づく金融庁の登録・許認可を受けていない業者 ("Cold Calling" - Non-Registered And/Or Non-Authorized Entities)
    金融商品取引法令に基づく金融庁の登録・許認可を受けていない業者 ("Cold Calling" - Non-Registered and/or Non-Authorized Entities) 商号、名称又は氏名等 所在地又は住所 電話番号又はファックス番号 ウェブサイトURL 掲載時期 (Name) (Location) (Phone Number and/or Fax Number) (Website) (Publication) 28F Nakanoshima Festival Tower W. 2020年3月 Tokai Fuji Brokerage 3 Chome-2-4 Nakanoshima. (March 2020) Kita. Osaka. Japan Toshida Bldg 7F Miyamoto Asuka and 2020年3月 1-6-11 Ginza, Chuo- Tel:+81 (3) 45720321 Associates (March 2021) ku,Tokyo,Japan. 104-0061 Hibiya Kokusai Bldg, 7F 2-2-3 Uchisaiwaicho https://universalassetmgmt.c 2020年3月 Universal Asset Management Chiyoda-ku Tel:+81 3 4578 1998 om/ (March 2022) Tokyo 100-0011 Japan 9F Tokyu Yotsuya Building, 2020年3月 SHINBASHI VENTURES 6-6 Kojimachi, Chiyoda-ku (March 2023) Tokyo, Japan, 102-0083 9th Fl Onarimon Odakyu Building 3-23-11 Nishishinbashi 2019年12月 Rock Trading Inc Tel: +81-3-4579-0344 https://rocktradinginc.com/ Minato-ku (December 2019) Tokyo, 105-0003 Izumi Garden Tower, 1-6-1 https://thompsonmergers.co 2019年12月 Thompson Mergers Roppongi, Minato-ku, Tokyo, Tel: +81 (3) 4578 0657 m/ (December 2019) 106-6012 2019年12月 SBAV Group https://www.sbavgroup.com (December 2019) Sunshine60 Bldg. 42F 3-1-1, 2019年12月 Hikaro and Partners Higashi-ikebukuro Toshima-ku, (December 2019) Tokyo 170-6042, Japan 31F Osaka Kokusai Building, https://www.smhpartners.co 2019年12月 Sendai Mubuki Holdings 2-3-13 Azuchi-cho, Chuo-ku, Tel: +81-6-4560-4410 m/ (December 2019) Osaka, Japan. 16F Namba Parks Tower 2-10-70 YAMANASHI KYOTO 2019年12月 Nanbanaka, Naniwa-ku, Osaka, Tel: +81 (0) 6-4560-4440 https://www.ykmglobal.com/ MANAGEMENT (December 2019) Japan 8th Floor Shidome, 1.2.20 2019年12月 Tenshi Venture Capital Kaigan, Minatu-ku, Tokyo (December 2019) 6flr Nishi Bldg.
    [Show full text]
  • Survey of Large-Scale Office Building Supply in Tokyo's 23 Wards 2018
    Survey of Large-Scale Office Building Supply in Tokyo’s 23 Wards 2018 April 25, 2018 Mori Trust Co., Ltd., (Head Office: Minato-ku, Tokyo) has surveyed supply trends for large-scale office buildings with total office space of 10,000 square meters or more in Tokyo’s 23 wards since 1986 and for mid-size office buildings with total office space of 5,000 square meters to less than 10,000 square meters since 2013, based on various published materials, field surveys, and interviews. The results of the most recent survey are presented below. In calculating total office floor area, where the survey deals with multipurpose buildings—buildings that also contain retail space, residential space, or hotels—the calculation includes only the floor area set aside solely for office use. [Survey Date: December 2017] Supply to increase in 2018–2020 and decline subsequently —Supply in 2021–2022 to be half the past average or lower— Main Results of This Survey 1. Supply of large-scale office buildings Supply of large-scale office space in 2017 in Tokyo’s 23 wards was 0.76 million square meters, falling short of the past 20-year average of 1.05 million square meters. Supply is projected to be 1.47 million square meters in 2018, 1 million square meters in 2019, and 1.73 million square meters in 2020. The last would mark the third-highest level in the past 20 years. A subsequent downturn is anticipated for the two years from 2021, as supply dips significantly below the past average. 2.
    [Show full text]
  • Station Name of New Railway Station Between Tamachi and Shinagawa Stations Decided
    December 4, 2018 East Japan Railway Company Station name of new railway station between Tamachi and Shinagawa stations decided In spring 2020, a new railway station is to be established between Tamachi and Shinagawa stations. With the aim of thinking of a station name for the new railway station together with its many customers, JR East accepted suggestions for station names between June 5 (Tuesday) and 30 (Saturday), 2018. As a result of selection, a decision was reached as stated below. Further, the concept and designer of the lighting design of the railway station have also been decided. 1. Decision on the station name of the new railway station (1) Station name 「Takanawa Gateway」 <Reference> First place Takanawa Second place Shibaura Third place Shibahama A rendering of the outside of the completed railway station from the neighborhood side (2) Reason for selection * This perspective drawing is a rendering. The actual railway station may differ. This area has a long and distinguished history. Since ancient times, it has been a busy area, serving as a gateway on the road to and from Edo. In the Meiji Era, the area became connected by railway. JR East aims to form a new town into an international exchange hub where leading-edge companies and people from around the world come together. Inheriting and continuing the history of this area, the new railway station will enable the area to go on functioning as an exchange hub. The selection reflects the fact that the new railway station will contribute to the development of the whole town by being a hub that connects the past and the future, Japan and the world, and many people.
    [Show full text]
  • Minato Monthy No 395 January 2020
    Published by Minato City Published monthly by: Minato City Tokyo Edited by: Public Relations Subsection, Office of the Mayor, Minato City Hall, 1-5-25, Shibakoen, Minato-ku, Tokyo 105-8511 Tel: 03-3578-2111, weekdays, 9 a.m. to 5 p.m. E-mail: [email protected] Web: www.city.minato.tokyo.jp Circulation: 10,000 copies No 395 January 2020 Happy New Year Students from Nijinohashi Kindergarten, Odaiba Gakuen, and Mayor of Minato City. Odaiba Gakuen will be used as a sport service center for the British Olympic Association during the Tokyo 2020 Games. New Year’s Greetings from the Mayor As the Mayor of Minato City, I would like to wish Last December, the Minato City Ordinance for This year, the Olympic and Paralympic Games everyone a happy and prosperous New Year. the Promotion and Understanding of Sign Language Tokyo will be conducted. The Olympic and Last year, Japan achieved enormous success in and Various Communication Methods for People Paralympic torch will be passed through Minato sport. In the first Rugby World Cup held in Japan, with Disabilities was implemented. Through this City. During the Tokyo 2020 Games, Odaiba Japan’s national team became the first team from Asia ordinance, the city clarified the basic concept and Seaside Park will be used as a venue for triathlon to make it to the quarter-finals of the tournament. responsibility regarding the promotion of various competitions. By making Odaiba beach swimmable Also, Akira Yoshino was awarded the Nobel Prize in communication methods, in order to realize a society with the improvement of water quality, Minato City Chemistry, because of his achievement in inventing the which people with disabiities can lead energetic lives.
    [Show full text]
  • TGMM Shibaura Project (Tentative Name) Msb Tamachi(Musubu Tamachi)Announced As District Name
    May 16, 2017 Press Release Tokyo Gas Co., Ltd. Mitsui Fudosan Co., Ltd. Mitsubishi Estate Co., Ltd. TGMM Shibaura Project (tentative name) msb Tamachi(musubu Tamachi)Announced as District Name Tokyo, Japan, May 16, 2017— Tokyo Gas Co., Ltd. Mitsui Fudosan Co., Ltd. and Mitsubishi Estate Co., Ltd. announced today that they have decided on msb Tamachi(musubu Tamachi.“musubu”means“connecting”) for the district name of the joint TGMM Shibaura Project (tentative name; hereafter, “the project”) being developed in the Shibaura area at the east exit of JR Tamachi Station. The area at the east exit of JR Tamachi Station was historically a commercial district and is expected to see further development going forward due to the construction of tower condominiums and station-area redevelopment projects in recent years. The district name msb Tamachi reflects a desire for the project, which is aimed at the creation of a mixed-use urban district near the station, to play the role of organically connecting people, things and ideas—work time and leisure time, tradition and innovation, Mita and Shibaura—and to enhance the district’s communicative capacity. With the advanced environment and energy technologies of Tokyo Gas and the real estate development expertise cultivated in the Nihonbashi and Marunouchi areas respectively by Mitsui Fudosan and Mitsubishi Estate, the project will promote creating a neighborhood that is a progressive and appealing mixed-use urban district and which will fulfill the commitment expressed in the msb Tamachi name. [District
    [Show full text]
  • Weekend Scene Ad Rates
    Revised on Jan., 2010 The Japan Times special pullout supplement Weekend Scene ■ Distributed on every Fridays ■ Sharing the same content with a part of the Japan Times article ■ All the paid advertisement on Weekend Scene will be placed on The Japan Times of the same Friday edition for no extra change The Japan Times Advertising Dept. 4-5-4, Shibaura, Minato-ku, Tokyo, Japan 108-8071 Tel: (03)3453-5242 Fax: (03)3453-7085 E-mail: [email protected] The Japan Times 【Outline】 Distribution Date: Every Fridays (except for irregular holidays including year-end) Circulation: About 12,000 copies Distribution points: About 150 places in metropolitan area (see the attached paper for details) Format: 8-page pullout supplement Ad application Deadline: 10 days prior to the insertion date. (2 weeks prior for full-color ads) Transcript deadline: 1 week prior to the insertion date. (10 days prior for full-color ads) 【Contents (scheduled)】 Restaurants and shops / Movie and event information / Satellite broadcast listings / Information on places of interest to non-Japanese (such as antique and souvenir shops, hospitals, beauty parlors, etc.) / Community classified ads / Introduction to major tourist spots 【Target】 2.05 million non-Japanese residents in Japan / 8.30 million tourists / 3,300 foreign-affiliated companies / 20,680 Japanese companies with subsidiaries abroad / Embassies from 126 countries / Senior government officials in Japan and abroad / Opinion leaders in Japan and abroad *For special advertisement features The Japan Times offers special advertisement features combining the advertisement and the publicity article according to your budget. Feel free to consult our sales person.
    [Show full text]
  • Aomi Exhibition Halls Floor Guide AOMI
    Tokyo Big Sight Aomi Exhibition Halls Floor guide AOMI to Shibaura-futo Sta. (U-05) to Daiba Sta. 6 (U-07) minutes Yurikamome Line Odaiba-Kaihinkoen Sta. (U-06) Route 357 Teleport Bridge Shuto Express Way Bayshore Route Rinkai Line Route 357 Tokyo Teleport Sta. to Kokusai- tenjijo Sta. (R-04) (R-03) Exit B to Tennozu Isle Sta.(R-05) Exit A Tokyo 2 Entrance minutes Hall A Hall B Wangan Under Entrance Center Promenade 4 minutes Legend Station Bus Yurikamome Rinkai Line Line Venusfort Mega Web Tourist Information Information Yurikamome Line Aomi Sta.(U-10) Business Center Restroom Accessible Ostomate Facility to Telecom Center Sta. to Tokyo Big Sight Sta. (R-09) (U-11) Baby Chair Nursing Room Tokyo Big Site AOMI Exhibition Hall Facility Outline ●Structural Scale Steel Frame 1F Tokyo Big Sight Inc. Site Area / 37,306 ㎡ Building Area / 24,983 ㎡ 3-11-1 Ariake, Koto-ku, Tokyo 135-0063 Total floor Area / 25,032 ㎡ tel.+81‒ 3 - 5530‒ 1111 Display Area / 23,256 ㎡ http://www.bigsight.jp/english More on the web http://www.bigsight.jp/english Access Tokyo Big Sight⇔Aomi Exhibition Halls ■Free Shuttle Bus ■Tr a i n・B u s When events are being held at Tokyo Big Sight (West / South Halls) or Conference Tower and the Aomi Exhibition Halls at the same time, a free shuttle Yurikamome Line bus running between Tokyo Big Sight and the Aomi Exhibition Halls is available (normally between 10 AM and 6 PM, approximately 8-minute intervals). Approx. Approx. ※Delays in the running interval / ride length may occur depending on the traffic 4 minutes Approx.
    [Show full text]
  • Tokyo Gas, Mitsui Fudosan, and Mitsubishi Estate TGMM Shibaura
    October 3, 2014 Tokyo Gas Co., Ltd. Mitsui Fudosan Co. Ltd. Mitsubishi Estate Co., Ltd. Tokyo Gas, Mitsui Fudosan, and Mitsubishi Estate TGMM Shibaura Project (working name) Large-Scale Multi-purpose Development with Direct Connections to JR Tamachi Station is Underway Tokyo Gas Co., Ltd. (President: Michiaki Hirose; hereafter “Tokyo Gas”), Mitsui Fudosan Co., Ltd. (President & CEO: Masanobu Komoda; hereafter “Mitsui Fudosan”), and Mitsubishi Estate Co., Ltd. (President & CEO: Hirotaka Sugiyama; hereafter “Mitsubishi Estate”) have been moving forward with planning for the joint “TGMM Shibaura Project (working name; hereafter, “the project”)” in the Shibaura area on the east side of Tamachi Station on Tokyo’s JR Yamanote Line. Following on today’s announcement of a development plan for the Tamachi Station east exit north district establishing a redevelopment promotion district that will encompass the project site (hereafter, “the site”) we would like to provide an overview of this major urban development project. (Architectural perspective of completed project) The project will create a multi-purpose business center with total floor space of some 300,000 m2 containing office buildings, commercial facilities, a hotel and other services on an approximately 28,000 m2 site owned by Tokyo Gas adjacent to the JR Tamachi Station east exit. Together with JR Shinagawa Station and a proposed new JR station to be built before the 2020 Tokyo Olympic and Paralympic Games between Tamachi and Shinagawa, the site is expected to play a key role in enhancing Tokyo’s international competitiveness. A pedestrian deck throughout the site will provide barrier free access to Tamachi Station’s east exit as well as the neighboring area, where construction is currently underway on Minato City’s Minato Park Shibaura facility, the future home of the Minato City Shibaura-Konan Regional City Office and a city sports center, as well as the Aiiku Hospital.
    [Show full text]
  • BRANZ TOWER SHIBAURA 2-Chome Shibaura, Minato-Ku, Tokyo
    BRANZ TOWER SHIBAURA 2-chome Shibaura, Minato-ku, Tokyo Prime Minato-ku 8 mins walk to Redevelopments 8 mins train location JR Yamanote surrounded to Otemachi Line (CBD) Computer Generated Image, indicative only PROJECT DETAIL BRANZ TOWER Shibaura Developer: TOKYU LAND CORPORATION KINTETSU REAL ESTATE CO.,Ltd Keikyu Corporation HASEKO Corporation SOTETSU REALESTATE Co.,LTD. Local Authority: Minato-ku Access: 8 mins walk to JR Yamanote Line, Keihin Tohoku Line Tamachi station 9 mins walk to Metro Asakusa Line, Mita Line Mita station 8 mins walk to Yurikamome Line Shibaura-futo station Total Units: 482 Exclusive apartments,1 floor below ground, 32 floors above ground Room type(estimated): 1-3 bed room (430.88sqft ~ 1347.10sqft) Land Area: 4,456.49 sqm (47,969.26 sqft) Builder: HASEKO Corporation Tenure: Freehold Construction Permit: 第UHEC建確300359号 (10th Sep 2018) Building Warranty: 10-year building warranty from completion Est. Completion: Sep 2021 (Key Handover Jan 2022) Car Parking: 167 parking spaces available for rent per month subject to availability Lettings & Management: Guaranteed rent scheme available Computer Generated Image, indicative only What is SHIBAURA Shibaura is a mixed area of office, residential and educational. You will find office buildings, tower condominiums, university campus and supermarkets here Tamachi station and msb Tamachi Sports center and hospital msb Tamachi Tokyo Institute of Technology Computer Generated Image, indicative only Where is SHIBAURA Shibaura is a bayside area located at the south east part of Minato-ku, Tokyo. Regarded as the east part of JR Yamanote Line Tamachi station, the area is also the starting point of Rainbow Bridge.
    [Show full text]