Anglogold Ashanti Geita Gold Mine Expression of Interest

Total Page:16

File Type:pdf, Size:1020Kb

Anglogold Ashanti Geita Gold Mine Expression of Interest ANGLOGOLD ASHANTI GEITA GOLD MINE EXPRESSION OF INTEREST/REQUEST FOR INFORMATION SURFACE EXPLORATION AND GRADE CONTROL DRILLING SERVICES FOR ANGLOGOLD ASHATI GEITA GOLD MINING LIMITED INTRODUCTION Geita Gold Mining Limited and AngloGlod Ashati Ltd is subsidiary is located in north western Tanzania in Lake Victoria goldfields of geita about 120 KM from Mwanza and 44 KM West of the town of geita Anglogold ashant limited has globally diverse world class portfolio of operation projects. AGA is rd the 3 ​ largest mining gold company in the world measured by production, it has 14 gold mine in ​ 9 counties, our exploration programme is aimed at establishing an organic growth pipeline to enable us to generate significant value over time, Greenfields and Brownfield’s exploration is conducted in both establishment and new gold producing regions through managed and non-managed joint venture strategic alliance and wholly owned ground holdings The purpose of EO is to explore the drilling market for competent services provider with the requisite technical skills and financial capacity to undertake exploration and grade conduction control drilling services at our Geita Gold Mine in accordance with the RFI Documents The response of this EOI will be used to shortlist capable service provider that will be invited to respond to the main tender for provision of various works/service for Geita Gold mining Ltd. The details and date for the issues of the main tender will be communicated to shortlisted companies only. It is necessary to respond to EOI/RFI in order to be pre-qualified be considered for the main tender Scope of work The surface exploration and grade control drilling services 1. Exploration – Diamond Drilling (DD) 2. Exploration Reverse Circulation (RC) 3. GRADE CONTROL – OPEN Pit RC Drilling for the purpose of the obtaining accurate and complete drilling samples properly related to the depth of the drilling Drilling services (hereinafter refer as to the services) are to be performed at GGML underground operations is in safe productive and efficiency manner TABLE 1 ESTIMATED INDICATIVE DRILL BY TYPE FROM 2021 END OF 2023 Drilling Type 2021 2022 2023 Total RC GRADE CONTROL 14,757 45,000 40,000 99,757 RC EXPLORATION 21,200 18,600 16,000 55,800 DD EXPLORATION 31,800 27,900 24,000 83,700 TOTAL 67,757 91,500 80,000 239,257 The service will be performed at AAA Wholly owned GGML lease located in Geita DC , Geita Region approximately 910 KM From Dar es Salaam and 120 KM west of Mwanza city respectively within the lake zone northern western Tanzania, The GGML lease area falls within the Achaean Sukumaland greenstone belt of the lake Victoria goldfields and the mine is one of the largest open to pit operations in Africa underground activities have recently commenced at the star and comet deposit and are planned at the Nyakanga Geita Hill Deposit The lease is at a mean altitude of +/-1200 KM above sea leave with a mean montly temperature 22C total annual rainfalls is in the region of 1000 mm with a dry season between June and September. The landscape comprises steep hilly areas along the southern and eastern areas with several river systems flowing from the hills across low lying mbuga plains towards lake Victoria in the northwest Mining Geita is currently undertaken by conventional truck and shoved open pit ming method on one active pi at nyakanga to be complete in Q4 2020 with nyamulilima CUT 1 (Roberts) anticipated commence mid-started in early 2016 using the services of an underground mining contractor. Underground mining at Nyakanga commenced in 2016 and Geita Hill from 2021. GGM ore processing conventional process with the CIL Plant having a throughput capacity of 5.2 mpta Request for information electronic document Interested companies/respondents are required to obtain electronic copies of the EOI/FRI th documents by emailing [email protected] by 14 ​ August 2020 ​ The closing date for the submission of EOI/RFI documents from interested companies is 31 August 2020 .
Recommended publications
  • Anglogold Ashanti Geita Gold Mine Expression of Interest/Request for Information Provision of Underground Mechanized Contract Mi
    ANGLOGOLD ASHANTI GEITA GOLD MINE EXPRESSION OF INTEREST/REQUEST FOR INFORMATION PROVISION OF UNDERGROUND MECHANIZED CONTRACT MINING SERVICES AT GEITA GOLD MINE TANZANIA INTRODUCTION Geita Gold Mining Limited and Anglo Gold Ashati Ltd is subsidiary is located in north western Tanzania in Lake Victoria goldfields of geita about 120 KM from Mwanza and 44 KM West of the town of geita Town The purpose of EO is to explore the supply market for competent providers with the requisite technical skills and knowledge and financial capacity to undertake the Supply and Delivery of Capital projects Goods and Service to Geita Gold Mine in accordance with the tender document The response of this EOI will be used to shortlist capable service provider that will be invited to respond to the main tender for provision of various works/service for Geita Gold mining Ltd. The details and date for the issues of the main tender will be communicated to shortlisted companies only. It is necessary to respond to EOI/RFI in order to be pre-qualified be considered for the main tender SCOPE OF WORK Provision of Services as detailed below S/N Reference Projects Description No 1 GGME0955 Provision of Underground Mechanized contract mining services for Geita Gold Mining Ltd SCOPE The EOI for the supply of underground mechanized contract mining services is for two UG mines in the GGM complex Nyakanga Ug Geita Hill UG the Nyakanga and Geita Hill orebodies will be mined using mechanized mining method development will ultilized standard Jumbo drilling and bolting for ground support, while any production activity will be based around a variation of long hole one stopping.
    [Show full text]
  • Social, Environmental and Health Legacy Issues
    MATERIAL ISSUE 4: The Nykabale village nursery is a project sponsored by AngloGold Ashanti to supply trees to the community and Geita Gold Mine, Tanzania. © 2014 ANGLOGOLD ASHANTI | ANNUAL REPORTS 2013 | Disclaimer MATERIAL ISSUE 4: Lung function testing at the occupational health clinic at Obuasi, Ghana. Context Occupational health and safety Occupational lung disease (OLD) is a risk inherent in many underground gold mines where silica dust is present. The most significant forms of OLD seen within the company are silicosis and pulmonary tuberculosis (TB). OLD in Brazil has virtually been eradicated, as a consequence of mechanisation of mining, improved ventilation, dust suppression, personal preventative measures and statutory limitations on the length of service of underground employees. If inhaled, silica dust may cause inflammation and scarring in the lungs, resulting in impaired lung functioning. Silicosis typically has a long latency period of more than 15 years and is sometimes only detected years after exposure. Silicosis in South Africa is a legacy issue on which AngloGold Ashanti and the gold mining industry as a whole, as well as government, unions and health care professionals place an enormous effort in addressing. Our occupational health strategy encompasses both minimising current risks, primarily by reducing occupational exposure within the industry. In 2008, we committed to eliminating new cases of silicosis among previously unexposed employees at our South African operations. Pulmonary TB, particularly where it is associated with silica dust exposure, is a key area of concern. Our immediate commitment is to reduce occupational TB incidence to below 2.25% among our South African employees and to successfully cure 85% of new cases – a target set by World Health Organization (WHO).
    [Show full text]
  • Modelling the Optimum Interface Between Open Pit and Underground Mining for Gold Mines
    MODELLING THE OPTIMUM INTERFACE BETWEEN OPEN PIT AND UNDERGROUND MINING FOR GOLD MINES Seth Opoku A thesis submitted to the Faculty of Engineering and the Built Environment, University of the Witwatersrand, Johannesburg, in fulfilment of the requirements for the degree of Doctor of Philosophy. Johannesburg 2013 DECLARATION I declare that this thesis is my own unaided work. Where use was made of the work of others, it was duly acknowledged. It is being submitted for the Degree of Doctor of Philosophy in the University of the Witwatersrand, Johannesburg. It has not been submitted before in any form for any degree or examination at any other university. Signed …………………………….. (Seth Opoku) This……………….day of……………..………2013 i ABSTRACT The open pit to underground transition problem involves the decision of when, how and at what depth to transition from open pit (OP) to underground (UG). However, the current criteria guiding the process of the OP – UG transition are not well defined and documented as most mines rely on their project feasibility teams’ experiences. In addition, the methodologies used to address this problem have been based on deterministic approaches. The deterministic approaches cannot address the practicalities that mining companies face during decision-making, such as uncertainties in the geological models and optimisation parameters, thus rendering deterministic solutions inadequate. In order to address these shortcomings, this research reviewed the OP – UG transition problem from a stochastic or probabilistic perspective. To address the uncertainties in the geological models, simulated models were generated and used. In this study, transition indicators used for the OP - UG transition were Net Present Value (NPV), ratio of price to cost per ounce of gold, stripping ratio, processed ounces and average grade at the run of mine pad.
    [Show full text]
  • Auditor Credentials Form 2016
    Auditor Credentials Form Facility Audited: AngloGold Ashanti Geita Gold Mine, Tanzania Date: - 25th– 30th January 2016 Lead Auditor Credentials Lead Auditor: Arend Hoogervorst Eagle Environmental Tel: - +27 31 7670244 Private Bag X06 Fax: - +27 31 7670295 KLOOF 3640, South Africa Email: - [email protected] Certifying Organization: Name: Exemplar Global Auditor Certification Number: 12529 Telephone Number: - +61 2 4728 4600 Address: P O Box 347, Penrith BC, NSW 2751, Australia Web Site Address: - http://www.exemplarglobal.org/ Minimum experience: 3 audits in past 7 years as Lead Auditor Year Type of Facility, Type of Audit Led Country & State/Province 1991 to 2007 – 111 Chemicals, manufacturing, oil and gas, South Africa, Botswana, audits (Audit logs mining (gold, coal, chrome), foods, and Mozambique, Mali, Namibia, Ghana held by Exemplar heavy industry sectors. EMS, Global & ICMI) Compliance, Environmental Due Diligence, HSEC, SHE audits. Lead Auditor in 81 audits. 2006 ICMI Cyanide Code Compliance Audits: Lead Auditor *Sasol Polymers Cyanide Plants 1 & 2 South Africa and Storage Areas (Production) *Sasol SiLog (Transportation) South Africa 2007 ICMI Cyanide Code Compliance Audits: Lead Auditor *AngloGold Ashanti West Gold Plant South Africa *AngloGold Ashanti East Gold Acid South Africa Float Plant *AngloGold Ashanti Noligwa Gold South Africa Plant *AngloGold Ashanti Kopanang Gold South Africa Plant *AngloGold Ashanti Savuka Gold Plant South Africa *AngloGold Ashanti Mponeng Gold South Africa Plant 2007 ICMI Cyanide Code Gap Analyses:
    [Show full text]
  • The Geita Gold Mine in Tanzania
    Applied Geography 54 (2014) 243e249 Contents lists available at ScienceDirect Applied Geography journal homepage: www.elsevier.com/locate/apgeog Monitoring geomorphic and hydrologic change at mine sites using satellite imagery: The Geita Gold Mine in Tanzania * Jody Emel , Joshua Plisinski, John Rogan Clark Graduate School of Geography, Clark University, Worcester, MA 01610, United States abstract Keywords: Large surface mining operations typically involve not only multiple pits but also the creation of new Mining “mountains” of tailings. These operations dramatically change the local watershed topography and Stream flow expose downslope agricultural fields and forest to tailings runoff. Given that most mine tailings expose DEM large quantities of surface area to oxidation and transport by water, any heavy metals associated with the Tanzania Geita Gold Mine deposit are mobilized to move along with the runoff. In Tanzania, the Geita Gold Mine (GGM) area is such a site and the Government of Tanzania has yet to develop a water monitoring network to protect villages adjacent to the mines. As a result, mining company data are the only data available to monitor water supply and quality. Typically in mining and oil sand extraction, geospatial data are used to report and monitor land reclamation at the mining site, and while these efforts are useful, they do not consider hydrologic changes and risks. In this paper we evaluate the use of Digital Elevation Model (DEM) data from the Space shuttle Radar Topography Mission (SRTM) and the Advanced Spaceborne Thermal Emission and Reflection Radiometer (ASTER) in an effort to identify the changes in local topography and surface hydrology around the GGM and assess the implications these changes have for the potential increased mobility of tailings and their effects upon farmers, village water supplies, and community forests using a hydrologic flow model.
    [Show full text]
  • 5 the Sukuma and the Ideology of a Free Market
    5 The Sukuma and the ideology of a free market By the beginning of the eighties the disillusionment with the socialist ideology and the growing difference between rhetoric and reality provided a fertile basis for change, away from ideology towards more pragmatism. People were fed up with the national government and its central planning. In 1985 the ‘Father of the Nation’ step down as president, giving way to an agreement with the International Monetary Fund which he had always prohibited as being against the ideology of ‘self-reliance’. It was followed by a rapid liberalization process, promoting a free market economy and reducing the role of the state. In 1992 this change was followed by a multi-party system and the democratization of political struc- tures. How did these liberalization and democratization processes affect the Sukuma’s under- standing of themselves? Undoubtedly they experienced these changes as a victory over the ‘internal expatriates’, bureaucrats from Dar es Salaam. But with the open economy and a free market new outsiders came, private companies dominated by non-Sukuma and even non-Africans, new political parties, imported goods and new religions, aid workers and officials of the United Nations High Commission for the Refugees, who are based in Mwanza and who run an airline from Mwanza Airport to the camps for refugees from Ruanda, Burundi and recently from the Democratic Republic of Congo. How did these world-wide ‘others’ affect Sukumaness? How do the Sukuma deal with this? In the previous chapters we dealt with various topics, in a more or less systematic way: social structures, political institutions, means of living, cultural and religious ways of problem-solving, law and medicine.
    [Show full text]
  • Mining in Africa
    Mining in Africa Mining in Africa Are Local Communities Better Off? Punam Chuhan-Pole, Andrew L. Dabalen, and Bryan Christopher Land in collaboration with Michael Lewin, Aly Sanoh, Gregory Smith, and Anja Tolonen A copublication of the Agence Française de Développement and the World Bank © 2017 International Bank for Reconstruction and Development / The World Bank 1818 H Street NW, Washington, DC 20433 Telephone: 202-473-1000; Internet: www.worldbank.org Some rights reserved 1 2 3 4 20 19 18 17 This work is a product of the staff of The World Bank with external contributions. The findings, interpretations, and conclusions expressed in this work do not necessarily reflect the views of The World Bank, its Board of Executive Directors, or the governments they represent, or the Agence Française de Développement. The World Bank does not guarantee the accuracy of the data included in this work. The boundaries, colors, denominations, and other information shown on any map in this work do not imply any judgment on the part of The World Bank concerning the legal status of any territory or the endorsement or acceptance of such boundaries. Nothing herein shall constitute or be considered to be a limitation upon or waiver of the privileges and immunities of The World Bank, all of which are specifically reserved. Rights and Permissions This work is available under the Creative Commons Attribution 3.0 IGO license (CC BY 3.0 IGO), http:// creativecommons.org/licenses/by/3.0/igo. Under the Creative Commons Attribution license, you are free to copy, distribute, transmit, and adapt this work, including for commercial purposes, under the following conditions: Attribution—Please cite the work as follows: Chuhan-Pole, Punam, Andrew L.
    [Show full text]
  • Ard Management at Geita Gold Mine1
    ARD MANAGEMENT AT GEITA GOLD MINE1 Ulrich Sibilski,2 and Rebecca Stephen3 Abstract: The Geita Gold Mine (GGM) is located approximately 4km west of Geita in the Mwanza Region of northern Tanzania. The mine is situated at the headwaters of the Mtakuja River that drains into Lake Victoria approximately 20km north west of plant site. GGM is owned and managed by AngloGold Ashanti Limited which is one of the major gold producer companies in the world. GGM alone produces up to 610,000 oz of gold per year moving towards 880,000 oz in 2007. GGM has sound environmental practices and Acid Rock Drainage (ARD) is one of the main issues of concern. This paper describes the management of ARD at GGM which is mostly done through proper identification and handling of potentially acid forming waste material from all operating five pits. The procedure for ARD management involves: producing a waste model for the life of mine for each pit; validating of waste models using in-pit geological mapping; selective handling and placement of waste in designated areas of the waste rock dump and the tailings dam embankments; validating placement of waste within the waste rock dump and tailings dam embankment; monitoring the placement using piezometers within the waste rock dump, tailings embankment and downstream of these facilities; regular technical reviews and implementing the mentioned procedures for the life of mine. Our rehabilitation programme further enhances the combat of ARD and has been recognised in the Tanzanian mining industry as being the benchmark. ______________________ 1 Poster paper presented at the 7th International Conference on Acid Rock Drainage (ICARD), March 26-30, 2006, St.
    [Show full text]
  • Research Report 17/1, Dar Es Salaam, REPOA
    THE IMPACT OF LARGE-SCALE MINING ON THE LIVELIHOODS OF ADJACENT COMMUNITIES: THE CASE OF GEITA GOLD MINE, TANZANIA WILLY MALIGANYA AND RENATUS PAUL OCTOBER 2016 Research Report i 17/1 Publisher for: REPOA P.O. Box 33223, Dar es Salaam, Tanzania 157 Migombani Street, Regent Estate Tel: +255 (0) 22 2700083/2772556 Fax:+255 (0) 22 2775738 Email: [email protected] Design: Formatted by GJM Key Words: Mining, Large-Scale Mining, Livelihoods and Communities Research Report 17/1, Dar es Salaam, REPOA @REPOA, 2017 All rights reserved. No Part of this publication may be reproduced or transmitted in any form or by any means without the written permission of the copyright holder or the publisher. ii TABLE OF CONTENTS TABLE OF CONTENTS .................................................................................................. iii LIST OF TABLES ............................................................................................................. i LIST OF FIGURE ............................................................................................................. i ABBREVIATIONS AND ACRONYMS ............................................................................. ii ACKNOWLEDGEMENTS ............................................................................................... iii ABSTRACT .................................................................................................................... iv 1.0 INTRODUCTION AND BACKGROUND .......................................................... 1 1.1 Statement and Significance
    [Show full text]
  • Jobs at Geita Gold Mining Ltd According to the National Social Security Fund Anglogold Ashanti - Geita Gold Mine Is the Most Compliant Employer in the Mining Sector
    FAQJobs at Geita Gold Mining Ltd According to the National Social Security Fund AngloGold Ashanti - Geita Gold Mine is the most compliant employer in the mining sector. AngloGold Ashanti - Geita Gold Mine currently employs about 4,567 people, with 96% Tanzanian workforce. How do I apply for a job at GGML? GGML accommodates about 300 students a year on Field Attachments from various colleges/Universities. Apply directly Vacancies are advertised periodically on our website, Graduate internship programme where job seekers can apply directly. GGML also GGML also welcomes successful graduates, both male advertises vacancies in national newspapers including and female ensuring that there is an even split, to apply the Daily News and The Guardian. Sometimes vacancies for a place on the internship program (previously named are advertised internally on staff notice boards, internal GRP) for a 12-month internship working in different areas emails and also communicated to certain contractors of the mine which will be determined by the course we know that are available. Some job vacancies are only completed. advertised in the Geita town and the surrounding local community. GGML welcomes all successful graduates, with internship positions throughout the organisation Apply to do a field attachment including Engineering, HR, Finance, Mining, Metallurgy, GGML welcomes students for a 3-month field attachment etc. throughout the year. Applications for conducting Field Attachment at GGML must be sent via College/ Overseas applicants University Administration.
    [Show full text]
  • Auditor Credentials Form
    Auditor Credentials Form Facility Audited: Harmony No 1 Gold Plant, South Africa. th th Date: - 14 – 18 September 2020 Lead Auditor and Technical Auditor Credentials Lead Auditor: Arend Hoogervorst Eagle Environmental Tel: - +27 31 7670244 Private Bag X06 KLOOF 3640, South Africa Email: - [email protected] Certifying Organization: Name: Exemplar Global Auditor Certification Number: 12529 Telephone Number: - +61 2 4728 4600 Address: P O Box 347, Penrith BC, NSW 2751, Australia Web Site Address: - http://www.exemplarglobal.org/ Minimum experience: 3 audits in past 7 years as Lead Auditor Year Type of Facility, Type of Audit Led Country & State/Province 1991 to 2007 – 111 Chemicals, manufacturing, oil and gas, South Africa, Botswana, audits (Audit logs mining (gold, coal, chrome), foods, and Mozambique, Mali, Namibia, Ghana held by Exemplar heavy industry sectors. EMS, Global & ICMI) Compliance, Environmental Due Diligence, HSEC, SHE audits. Lead Auditor in 81 audits. 2006 ICMI Cyanide Code Compliance Audits: Lead Auditor *Sasol Polymers Cyanide Plants 1 & 2 South Africa and Storage Areas (Production) *Sasol SiLog (Transportation) South Africa 2007 ICMI Cyanide Code Compliance Audits: Lead Auditor *AngloGold Ashanti West Gold Plant South Africa *AngloGold Ashanti East Gold Acid South Africa Float Plant *AngloGold Ashanti Noligwa Gold South Africa Plant *AngloGold Ashanti Kopanang Gold South Africa Plant *AngloGold Ashanti Savuka Gold Plant South Africa *AngloGold Ashanti Mponeng Gold South Africa Plant 2007 ICMI Cyanide Code Gap Analyses:
    [Show full text]
  • The Extractive Resource Industry in Tanzania
    The Extractive Resource Industry in Tanzania: Resource The Extractive The Extractive Resource Industry in Tanzania: Status and challenges of the mining sector The existing mineral wealth in a country should be a blessing. However the experience in some countries shows that this can prove to be very problematic instead. This publication is inspired by the increasing discovery of minerals in East Africa and the concern about their impact on the future of the region. It argues that if timely investments are made in promoting and implementing good practices in this sector, the problems that have plagued other resource-rich countries can be avoided in Status and challenges of the mining sector East Africa. This report, a product of a process that has engaged various industry stakeholders focuses on Tanzania, which is a relatively late arrival to large-scale mining. It maps out the performance of the mining sector as one component of Tanzania’s extractive resource industry (ERI) and analyses the interactions of the different stakeholders over time. It argues that although there are a number of challenges faced by the ERI sector, Tanzania could yet become one of the best performers in her class. However this will require hard work and investments by all stakeholders. By providing information on the challenges and implications of the current state of the ERI in Tanzania, this report wishes to contribute to the on going discourse and efforts to improve the performance of the ERI in Tanzania in a way that incorporates public accountability and transparency as well as increased participation and benefit to the Tanzanian population.
    [Show full text]