Building One City for You Department of Environmental Protection Acting Commissioner Vincent Sapienza Annual Report Fiscal Year 2016

Bill de Blasio Dr. Feniosky Peña-Mora Mayor Commissioner Dear Acting Commissioner Sapienza,

Last year, for the first time, we provided you a customized annual report with detailed information about the projects we are completing for your agency. This valuable information lets you know how DDC is working within the Mayor’s vision of a growing, equitable, sustainable, resilient, and healthy City to meet the needs of your agency. Now, we follow up on that commitment to you with our second annual client report.

Inside you will find maps, project schedules, budget, and bid information for the variety of projects that we are managing for you. As the City’s design and construction experts, it is our responsibility to deliver projects with a sense of urgency, responsiveness, service, and collaboration. Our goal is to provide extraordinary value to you as a professional manager of infrastructure and public building projects.

During this time of exponential growth in New York, when our skyline is bursting with cranes and new buildings, we share your dedication to managing that growth toward a positive transformation for the City. In order to realize that vision, the capital projects in your agency must thrive, and every day we work toward that goal. Thank you for partnering with us and as always, our doors are open to you.

Sincerely,

Dr. Feniosky Peña-Mora Commissioner

2 New York City Department of Design and Construction Values Lenses

Our values guide the way we work. Our lenses provide perspective to what we do.

Urgency, responsiveness, service, collaboration, and mentorship—these values are at the Growth, sustainability, resiliency, equity, and healthy living—these are the lenses through core of how we approach our work at the Department of Design and Construction. As we which we look at our work. They help us bring to life the Mayor’s vision of a strong and deliver sustainable capital projects to every neighborhood in the city, our values ensure just city. From these perspectives, DDC projects and client agency programs provide the that our buildings and sites are efficient, effective, and safe. From design decisions to places that accommodate a growing population, the high efficiency systems and green client relations, our guiding values anchor our position as the leading municipal design roofs that protect our environment, the infrastructural innovation that safeguards our and construction agency in the United States. shores, the buildings and sites that welcome all, and the spaces that improve our health and mental well-being.

Urgency Growth DDC goes above and beyond to exceed client goals and community expectations, DDC’s projects meet demographic needs by building infrastructure that enables working for the City that never sleeps. Whether it is a planned capital project or an growth. We build to meet the demands of the world’s most dynamic urban economy unexpected emergency, we act quickly, efficiently, and urgently. with a focus on creating thriving communities.

Sustainability Responsiveness By 2050, NYC will reduce carbon emissions by 80% based on 2005 levels We respond quickly and thoroughly to the requests and concerns of all client and DDC is helping to make it happen. We use design elements, such as agencies and communities. Getting things done means staying ahead of the curve geothermal wells, green roofs, and solar technology to create sustainable projects and anticipating the needs of those who count on us. for future generations.

Service Resiliency At DDC, we tackle the problems and solve the changing needs that our clients and Superstorm Sandy demonstrated the vulnerability of New York City infrastructure communities face by providing specialized, individual attention to every neighborhood and neighborhoods, particularly along the shorelines. DDC’s design and construction and agency. We work together to produce the strongest capital projects for all of projects enable communities to overcome devastation and emerge stronger than ever. New York City. Healthy Living Collaboration The stairways, step streets, and bike lanes that DDC builds help New Yorkers to be DDC excellence is built on our working collaboration with our partner agencies, fit, active, and healthy. Our infrastructure and building projects use design to support healthy minds and healthy bodies. communities, elected officials, and design and construction professionals. We make it a priority to learn from each other, so that the expertise of one becomes Equity the expertise of all. More than just assuring the fair distribution of the many built assets that bring communities together, we make it our priority to ensure that all our projects are Mentorship welcoming to the growing and diverse population of New York City. At DDC, we value and promote new ideas and keep our processes open to the possibilities of change. We believe in the professional development of our staff and creating diverse opportunities for them to learn and grow.

3 New York City Department of Design and Construction 4 New York City Department of Design and Construction 1,419 1,300 $16 Billion DDC employees committed to consultants bringing expertise to value of work DDC has completed since 1996 creating a strong New York City DDC projects 254 4,144 $15 Billion awards won since 1996 total number of DDC projects completed current portfolio value since 1996 $654 Million total MWBE contracts FY14 to FY16 subject to local law 1 and local law129 660 641 active infrastructure projects active public buildings projects MWBE

In keeping with the spirit of our city and Mayor de Blasio’s vision, the New York City Department of Design and Construction (DDC) is committed to fostering an equitable and competitive business environment while ensuring our procurement reflects the diversity $74 of New York City. We understand the success of minority and women-owned businesses $233 (MWBE’s) contributes to the success of diverse communities around the City.

Through its Office of Diversity and Industry Relations, DDC has taken a holistic approach to increasing opportunities for MWBE’s with a comprehensive plan that strengthens Million Million and supports MWBE’s as they navigate the city procurement process. Our policies and programs are centered on the four core principles of accessibility, capacity building, total MWBE prime contracts subject total MWBE subcontracts subject to accountability, and sustainability. This approach creates a structure that allows MWBE’s to local law 1 & local law129 in FY16 local law 1 & local law 129 in FY16 to succeed, providing the city a larger pool of qualified contractors.

Accessibility To increase the number of MWBE’s who do business with us, it’s integral to communicate our interest in them as potential partners. During FY16 and FY17, DDC has engaged over 4,500 prospective contractors through events we’ve hosted as well as those we’ve attended.

Capacity-Building Sharing the message that we want to partner with MWBE’s is only the first step. Our 81% 190% job doesn’t end once we’ve hosted or attended an event. DDC understands its role in increase in MWBE prime contract increase in MWBE subcontract ensuring MWBE’s are equipped with the tools to do business with us. We’ve created a suite of programs that enables MWBE’s to increase their capacity by enhancing awards in FY16 compared to FY13 awards in FY16 compared to FY13 their technical and business capabilities. Our Ready to Build New York City business subject to local law 1 & local law 129 subject to local law 1 & local law 129 development program helps MWBE’s grow by becoming prequalified to work with DDC. The New York City Construction Mentorship program affords city-certified MWBE’s the opportunity to learn how to successfully grow their businesses.

Accountability We are committed to increasing the number of MWBE’s who work with us. We believe we have a duty to create an equitable and competitive business environment that facilitates procurement opportunities for the City’s MWBE community. As such, we are responsible for ensuring that those who do business with us meet their contractual obligations and $525 $129 take appropriate action when they don’t. Sustainability An important aspect of our MWBE strategy is to make sure MWBE’s who do business with us operate efficiently and grow their businesses. In partnership with the Mayor’s Million Million Office of MWBE and the NYC Department of Small Business Services, DDC provides a supportive framework to safeguard MWBE success and growth, such as our Opportunity total MWBE prime contract awards MWBE subcontract awards from Academy that trains community college students in our processes so they can provide from FY14 to FY16 subject to FY14 to FY16 subject to local law 1 back office support to MWBE’s. local law 1 & local law 129 & local law 129 8 New York City Department of Design and Construction Public Buildings Infrastructure Project Locations Project Locations Project Schedule for The Department of Environmental Protection Project Schedule for The Department of Environmental Protection Projects in Design and/or Construction Projects in Design and/or Construction (Data approximated by Quarter as of August, 2016)

Q3’15 ’15 Q1’16 Q2’16 Q3’16 Q4’16 Q1’17 Q2’17 Q3’17 Q3’15 Q4’15 Q1’16 Q2’16 Q3’16 Q4’16 Q1’17 Q2’17 Q3’17 HOLLIS-ROOF REPLACEMENT HOLLIS-ROOF REPLACEMENT

SUNNYSIDE LIBRARY ROOF SUNNYSIDE LIBRARY ROOF

ROOF REPLACEMENT-BAISLEY ROOF REPLACEMENT-BAISLEY

HVAC REPLACEMENT AT ROSEDALE HVAC REPLACEMENT AT ROSEDALE

ROOF REPLACEMENT AT LEFFERTS LIBRARY ROOF REPLACEMENT AT LEFFERTS LIBRARY

FOREST HILLS LIBRARY ROOF REPLACEMENT FOREST HILLS LIBRARY ROOF REPLACEMENT

ROOF REPLACEMENT-SOUTH JAMAICA ROOF REPLACEMENT-SOUTH JAMAICA

QUEENSBORO HILL ROOF QUEENSBORO HILL ROOF

RAVENSWOOD UNIVERSAL PRE-K RAVENSWOOD UNIVERSAL PRE-K

WHITESTONE-SELECTED MASONRY WHITESTONE-SELECTED MASONRY

EAST ELMHURST EXPANSION EAST ELMHURST EXPANSION

BRIARWOOD-ROOF REPLACEMENT BRIARWOOD-ROOF REPLACEMENT

WOODHAVEN-ROOF REPLACEMENT WOODHAVEN-ROOF REPLACEMENT

MCGOLDRICK-HVAC & CONTROLS MCGOLDRICK-HVAC & CONTROLS

QUEENS WEST HUNTERS POINT NEW BRANCH WEST HUNTERS POINT NEW BRANCH

ROCHDALE VILLAGE ROOF REPLACEMENT ROCHDALE VILLAGE ROOF REPLACEMENT

LONG ISLAND CITY LIBRARY-SECURITY LIGHTING LONG ISLAND CITY LIBRARY-SECURITY LIGHTING

LANGSTON HUGHES-MASONRY & WATERPROOFING LANGSTON HUGHES-MASONRY & WATERPROOFING

HVAC REPLACEMENT AT BAISLEY HVAC REPLACEMENT AT BAISLEY Jul’14 Jul’15 Jul’16 Jul’14 Jul’15 Jul’16 Oct’14 Oct’15 Oct’14 Oct’15 Apr’15 Apr’16 Apr’15 Apr’16 Jan’15 Jan’16 Jan’15 Jan’16

*On-hold projects *On-hold projects

Projected/Actual Projected/Actual

Design Design Procurement Procurement Construction Construction

11 New York City Department of Design and Construction 12 New York City Department of Design and Construction Project Schedule for The Department of Environmental Protection Project Schedule for The Department of Environmental Protection Projects in Design and/or Construction Projects in Design and/or Construction

Q3’15 Q4’15 Q1’16 Q2’16 Q3’16 Q4’16 Q1’17 Q2’17 Q3’17 Q3’15 Q4’15 Q1’16 Q2’16 Q3’16 Q4’16 Q1’17 Q2’17 Q3’17 HOLLIS-ROOF REPLACEMENT HOLLIS-ROOF REPLACEMENT

SUNNYSIDE LIBRARY ROOF SUNNYSIDE LIBRARY ROOF

ROOF REPLACEMENT-BAISLEY ROOF REPLACEMENT-BAISLEY

HVAC REPLACEMENT AT ROSEDALE HVAC REPLACEMENT AT ROSEDALE

ROOF REPLACEMENT AT LEFFERTS LIBRARY ROOF REPLACEMENT AT LEFFERTS LIBRARY

FOREST HILLS LIBRARY ROOF REPLACEMENT FOREST HILLS LIBRARY ROOF REPLACEMENT

ROOF REPLACEMENT-SOUTH JAMAICA ROOF REPLACEMENT-SOUTH JAMAICA

QUEENSBORO HILL ROOF QUEENSBORO HILL ROOF

RAVENSWOOD UNIVERSAL PRE-K RAVENSWOOD UNIVERSAL PRE-K

WHITESTONE-SELECTED MASONRY WHITESTONE-SELECTED MASONRY

EAST ELMHURST EXPANSION EAST ELMHURST EXPANSION

BRIARWOOD-ROOF REPLACEMENT BRIARWOOD-ROOF REPLACEMENT

WOODHAVEN-ROOF REPLACEMENT WOODHAVEN-ROOF REPLACEMENT

MCGOLDRICK-HVAC & CONTROLS MCGOLDRICK-HVAC & CONTROLS

QUEENS WEST HUNTERS POINT NEW BRANCH QUEENS WEST HUNTERS POINT NEW BRANCH

ROCHDALE VILLAGE ROOF REPLACEMENT ROCHDALE VILLAGE ROOF REPLACEMENT

LONG ISLAND CITY LIBRARY-SECURITY LIGHTING LONG ISLAND CITY LIBRARY-SECURITY LIGHTING

LANGSTON HUGHES-MASONRY & WATERPROOFING LANGSTON HUGHES-MASONRY & WATERPROOFING

HVAC REPLACEMENT AT BAISLEY HVAC REPLACEMENT AT BAISLEY Jul’14 Jul’15 Jul’16 Jul’14 Jul’15 Jul’16 Oct’14 Oct’15 Oct’14 Oct’15 Apr’15 Apr’16 Apr’15 Apr’16 Jan’15 Jan’16 Jan’15 Jan’16

*On-hold projects *On-hold projects

Projected/Actual Projected/Actual

Design Design Procurement Procurement Construction Construction

13 New York City Department of Design and Construction 14 New York City Department of Design and Construction Project Schedule for The Department of Environmental Protection Project Schedule for The Department of Environmental Protection Projects in Design and/or Construction Projects in Design and/or Construction

Q3’15 Q4’15 Q1’16 Q2’16 Q3’16 Q4’16 Q1’17 Q2’17 Q3’17 Q3’15 Q4’15 Q1’16 Q2’16 Q3’16 Q4’16 Q1’17 Q2’17 Q3’17 HOLLIS-ROOF REPLACEMENT HOLLIS-ROOF REPLACEMENT

SUNNYSIDE LIBRARY ROOF SUNNYSIDE LIBRARY ROOF

ROOF REPLACEMENT-BAISLEY ROOF REPLACEMENT-BAISLEY

HVAC REPLACEMENT AT ROSEDALE HVAC REPLACEMENT AT ROSEDALE

ROOF REPLACEMENT AT LEFFERTS LIBRARY ROOF REPLACEMENT AT LEFFERTS LIBRARY

FOREST HILLS LIBRARY ROOF REPLACEMENT FOREST HILLS LIBRARY ROOF REPLACEMENT

ROOF REPLACEMENT-SOUTH JAMAICA ROOF REPLACEMENT-SOUTH JAMAICA

QUEENSBORO HILL ROOF QUEENSBORO HILL ROOF

RAVENSWOOD UNIVERSAL PRE-K RAVENSWOOD UNIVERSAL PRE-K

WHITESTONE-SELECTED MASONRY WHITESTONE-SELECTED MASONRY

EAST ELMHURST EXPANSION EAST ELMHURST EXPANSION

BRIARWOOD-ROOF REPLACEMENT BRIARWOOD-ROOF REPLACEMENT

WOODHAVEN-ROOF REPLACEMENT WOODHAVEN-ROOF REPLACEMENT

MCGOLDRICK-HVAC & CONTROLS MCGOLDRICK-HVAC & CONTROLS

QUEENS WEST HUNTERS POINT NEW BRANCH QUEENS WEST HUNTERS POINT NEW BRANCH

ROCHDALE VILLAGE ROOF REPLACEMENT ROCHDALE VILLAGE ROOF REPLACEMENT

LONG ISLAND CITY LIBRARY-SECURITY LIGHTING LONG ISLAND CITY LIBRARY-SECURITY LIGHTING

LANGSTON HUGHES-MASONRY & WATERPROOFING LANGSTON HUGHES-MASONRY & WATERPROOFING

HVAC REPLACEMENT AT BAISLEY HVAC REPLACEMENT AT BAISLEY Jul’14 Jul’15 Jul’16 Jul’14 Jul’15 Jul’16 Oct’14 Oct’15 Oct’14 Oct’15 Apr’15 Apr’16 Apr’15 Apr’16 Jan’15 Jan’16 Jan’15 Jan’16

*On-hold projects *On-hold projects

Projected/Actual Projected/Actual

Design Design Procurement Procurement Construction Construction

15 New York City Department of Design and Construction 16 New York City Department of Design and Construction Project Schedule for The Department of Environmental Protection Project Schedule for The Department of Environmental Protection Projects in Design and/or Construction Projects in Design and/or Construction

Q3’15 Q4’15 Q1’16 Q2’16 Q3’16 Q4’16 Q1’17 Q2’17 Q3’17 Q3’15 Q4’15 Q1’16 Q2’16 Q3’16 Q4’16 Q1’17 Q2’17 Q3’17 HOLLIS-ROOF REPLACEMENT HOLLIS-ROOF REPLACEMENT

SUNNYSIDE LIBRARY ROOF SUNNYSIDE LIBRARY ROOF

ROOF REPLACEMENT-BAISLEY ROOF REPLACEMENT-BAISLEY

HVAC REPLACEMENT AT ROSEDALE HVAC REPLACEMENT AT ROSEDALE

ROOF REPLACEMENT AT LEFFERTS LIBRARY ROOF REPLACEMENT AT LEFFERTS LIBRARY

FOREST HILLS LIBRARY ROOF REPLACEMENT FOREST HILLS LIBRARY ROOF REPLACEMENT

ROOF REPLACEMENT-SOUTH JAMAICA ROOF REPLACEMENT-SOUTH JAMAICA

QUEENSBORO HILL ROOF QUEENSBORO HILL ROOF

RAVENSWOOD UNIVERSAL PRE-K RAVENSWOOD UNIVERSAL PRE-K

WHITESTONE-SELECTED MASONRY WHITESTONE-SELECTED MASONRY

EAST ELMHURST EXPANSION EAST ELMHURST EXPANSION

BRIARWOOD-ROOF REPLACEMENT BRIARWOOD-ROOF REPLACEMENT

WOODHAVEN-ROOF REPLACEMENT WOODHAVEN-ROOF REPLACEMENT

MCGOLDRICK-HVAC & CONTROLS MCGOLDRICK-HVAC & CONTROLS

QUEENS WEST HUNTERS POINT NEW BRANCH QUEENS WEST HUNTERS POINT NEW BRANCH

ROCHDALE VILLAGE ROOF REPLACEMENT ROCHDALE VILLAGE ROOF REPLACEMENT

LONG ISLAND CITY LIBRARY-SECURITY LIGHTING LONG ISLAND CITY LIBRARY-SECURITY LIGHTING

LANGSTON HUGHES-MASONRY & WATERPROOFING LANGSTON HUGHES-MASONRY & WATERPROOFING

HVAC REPLACEMENT AT BAISLEY HVAC REPLACEMENT AT BAISLEY Jul’14 Jul’15 Jul’16 Jul’14 Jul’15 Jul’16 Oct’14 Oct’15 Oct’14 Oct’15 Apr’15 Apr’16 Apr’15 Apr’16 Jan’15 Jan’16 Jan’15 Jan’16

*On-hold projects *On-hold projects

Projected/Actual Projected/Actual

Design Design Procurement Procurement Construction Construction

17 New York City Department of Design and Construction 18 New York City Department of Design and Construction Project Schedule for The Department of Environmental Protection Project Schedule for The Department of Environmental Protection Projects in Design and/or Construction Projects in Design and/or Construction

Q3’15 Q4’15 Q1’16 Q2’16 Q3’16 Q4’16 Q1’17 Q2’17 Q3’17 Q3’15 Q4’15 Q1’16 Q2’16 Q3’16 Q4’16 Q1’17 Q2’17 Q3’17 HOLLIS-ROOF REPLACEMENT HOLLIS-ROOF REPLACEMENT

SUNNYSIDE LIBRARY ROOF SUNNYSIDE LIBRARY ROOF

ROOF REPLACEMENT-BAISLEY ROOF REPLACEMENT-BAISLEY

HVAC REPLACEMENT AT ROSEDALE HVAC REPLACEMENT AT ROSEDALE

ROOF REPLACEMENT AT LEFFERTS LIBRARY ROOF REPLACEMENT AT LEFFERTS LIBRARY

FOREST HILLS LIBRARY ROOF REPLACEMENT FOREST HILLS LIBRARY ROOF REPLACEMENT

ROOF REPLACEMENT-SOUTH JAMAICA ROOF REPLACEMENT-SOUTH JAMAICA

QUEENSBORO HILL ROOF QUEENSBORO HILL ROOF

RAVENSWOOD UNIVERSAL PRE-K RAVENSWOOD UNIVERSAL PRE-K

WHITESTONE-SELECTED MASONRY WHITESTONE-SELECTED MASONRY

EAST ELMHURST EXPANSION EAST ELMHURST EXPANSION

BRIARWOOD-ROOF REPLACEMENT BRIARWOOD-ROOF REPLACEMENT

WOODHAVEN-ROOF REPLACEMENT WOODHAVEN-ROOF REPLACEMENT

MCGOLDRICK-HVAC & CONTROLS MCGOLDRICK-HVAC & CONTROLS

QUEENS WEST HUNTERS POINT NEW BRANCH QUEENS WEST HUNTERS POINT NEW BRANCH

ROCHDALE VILLAGE ROOF REPLACEMENT ROCHDALE VILLAGE ROOF REPLACEMENT

LONG ISLAND CITY LIBRARY-SECURITY LIGHTING LONG ISLAND CITY LIBRARY-SECURITY LIGHTING

LANGSTON HUGHES-MASONRY & WATERPROOFING LANGSTON HUGHES-MASONRY & WATERPROOFING

HVAC REPLACEMENT AT BAISLEY HVAC REPLACEMENT AT BAISLEY Jul’14 Jul’15 Jul’16 Jul’14 Jul’15 Jul’16 Oct’14 Oct’15 Oct’14 Oct’15 Apr’15 Apr’16 Apr’15 Apr’16 Jan’15 Jan’16 Jan’15 Jan’16

*On-hold projects *On-hold projects

Projected/Actual Projected/Actual

Design Design Procurement Procurement Construction Construction

19 New York City Department of Design and Construction 20 New York City Department of Design and Construction Project Schedule for The Department of Environmental Protection Project Schedule for The Department of Environmental Protection Projects in Design and/or Construction Projects in Design and/or Construction

Q3’15 Q4’15 Q1’16 Q2’16 Q3’16 Q4’16 Q1’17 Q2’17 Q3’17 Q3’15 Q4’15 Q1’16 Q2’16 Q3’16 Q4’16 Q1’17 Q2’17 Q3’17 HOLLIS-ROOF REPLACEMENT HOLLIS-ROOF REPLACEMENT

SUNNYSIDE LIBRARY ROOF SUNNYSIDE LIBRARY ROOF

ROOF REPLACEMENT-BAISLEY ROOF REPLACEMENT-BAISLEY

HVAC REPLACEMENT AT ROSEDALE HVAC REPLACEMENT AT ROSEDALE

ROOF REPLACEMENT AT LEFFERTS LIBRARY ROOF REPLACEMENT AT LEFFERTS LIBRARY

FOREST HILLS LIBRARY ROOF REPLACEMENT FOREST HILLS LIBRARY ROOF REPLACEMENT

ROOF REPLACEMENT-SOUTH JAMAICA ROOF REPLACEMENT-SOUTH JAMAICA

QUEENSBORO HILL ROOF QUEENSBORO HILL ROOF

RAVENSWOOD UNIVERSAL PRE-K RAVENSWOOD UNIVERSAL PRE-K

WHITESTONE-SELECTED MASONRY WHITESTONE-SELECTED MASONRY

EAST ELMHURST EXPANSION EAST ELMHURST EXPANSION

BRIARWOOD-ROOF REPLACEMENT BRIARWOOD-ROOF REPLACEMENT

WOODHAVEN-ROOF REPLACEMENT WOODHAVEN-ROOF REPLACEMENT

MCGOLDRICK-HVAC & CONTROLS MCGOLDRICK-HVAC & CONTROLS

QUEENS WEST HUNTERS POINT NEW BRANCH QUEENS WEST HUNTERS POINT NEW BRANCH

ROCHDALE VILLAGE ROOF REPLACEMENT ROCHDALE VILLAGE ROOF REPLACEMENT

LONG ISLAND CITY LIBRARY-SECURITY LIGHTING LONG ISLAND CITY LIBRARY-SECURITY LIGHTING

LANGSTON HUGHES-MASONRY & WATERPROOFING LANGSTON HUGHES-MASONRY & WATERPROOFING

HVAC REPLACEMENT AT BAISLEY HVAC REPLACEMENT AT BAISLEY Jul’14 Jul’15 Jul’16 Jul’14 Jul’15 Jul’16 Oct’14 Oct’15 Oct’14 Oct’15 Apr’15 Apr’16 Apr’15 Apr’16 Jan’15 Jan’16 Jan’15 Jan’16

*On-hold projects *On-hold projects

Projected/Actual Projected/Actual

Design Design Procurement Procurement Construction Construction

21 New York City Department of Design and Construction 22 New York City Department of Design and Construction Project Schedule for The Department of Environmental Protection Trending Data for the Department of Environmental Protection Projects in Design and/or Construction Target vs. Actual (values below include change order registrations for active projects, registered projects, and de-registered projects)

$100,000,000 50 Q3’15 Q4’15 Q1’16 Q2’16 Q3’16 Q4’16 Q1’17 Q2’17 Q3’17 HOLLIS-ROOF REPLACEMENT $100,000,000 50

SUNNYSIDE LIBRARY ROOF

ROOF REPLACEMENT-BAISLEY $100,000,000 40

$100,000,000 40 HVAC REPLACEMENT AT ROSEDALE

ROOF REPLACEMENT AT LEFFERTS LIBRARY Number of Projects $60,000,000 30

FOREST HILLS LIBRARY ROOF REPLACEMENT Number of Projects $60,000,000 30

ROOF REPLACEMENT-SOUTH JAMAICA

QUEENSBORO HILL ROOF $40,000,000 20 Number of Projects

$40,000,000 20 RAVENSWOOD UNIVERSAL PRE-K Number of Projects

WHITESTONE-SELECTED MASONRY

$20,000,000 $18,694,878 10 EAST ELMHURST EXPANSION $20,000,000 $18,694,878 $13,485,798 10 $11,524,858 $11,039,414 $10,204,262 $8,851,355 BRIARWOOD-ROOF REPLACEMENT $13,485,798 $11,524,858 $11,039,414 $10,204,262 $8,851,355118% 88% 88% 73% 82% 65% 49% 62% 15% 37% 12% 8% WOODHAVEN-ROOF REPLACEMENT $0 118% 88% 88% 73% 82% 65% 0 49% 62% 15% 37% 12% 8% $0 FY09 FY10 FY11 FY12 FY13 FY14 MCGOLDRICK-HVAC & CONTROLS 0

FY09 FY10 FY11 FY12 FY13 FY14 QUEENS WEST HUNTERS POINT NEW BRANCH

ROCHDALE VILLAGE ROOF REPLACEMENT

LONG ISLAND CITY LIBRARY-SECURITY LIGHTING

LANGSTON HUGHES-MASONRY & WATERPROOFING

HVAC REPLACEMENT AT BAISLEY Jul’14 Jul’15 Jul’16 Oct’14 Oct’15 Apr’15 Apr’16 Jan’15 Jan’16

*On-hold projects

Projected/Actual

Design Sept Plan No. of Projs for Sept Plan Actual vs. Target No. Projs Percent Procurement Target Plan No. of Projs for Target Actual vs. Target $ Percent Construction SeptActual Plan No. of Projs for SeptActual Plan ActualActual vs.vs. SeptTarget Plan $ Percent $ Percent Target Plan No. of Projs for Target CapitalActual vs.Money Target Spent No. Projs Percent Actual No. of Projs for Actual Capital Money Spent 23 New York City Department of Design and Construction 24 New York City Department of Design and Construction Cost Data for the Department of Environmental Protection Bid Data for the Department of Environmental Protection Last 5 Projects (Competitively Bid, Substantially Completed) Last 5 Sealed Competitive Bid Results (winning bid may not result in awarding of contract)

$100,000,000 $100,000,000

$100,000,000 $100,000,000

$60,000,000 $60,000,000

$40,000,000 $40,000,000

$20,000,000 $20,000,000

$0 $0

84% FY09100% 100% FY10 FY11 FY12 FY14 FY09 FY10 FY11 FY12 FY14

1 2 3 4 5 1 2 3 4 5

1 TV INSPECTION AND CLEANING - CITYWIDE 1 CONSTRUCTION OF SANITARY AND STORM SEWERS AND APPURTENANCES IN RAMBLE ROAD, ETC-BOROUGH 2 STRM SWR & WM IN 58 AVE & 185 ST, QNS OF STATEN ISLAND 3 DIST WM EXTEN & REPLACMTS, NEW BLGS Index2 CONSTRUCTIONContract Description OF STORM AND SANITARY SEWERS AND WATER MAINSCntract AND Type APPURTENANCESProject IN DescriptionMARKHAM PLACE BET. 4 EDGEMERE (PHASE C2), INCLUDING SEQ200421/SEQ002576 1 JEWETTREHABILITATION AVE & WARDWELL OF EXISTING AVE, TRUNK ETC.-BOROUGH WATER MAINS IN OF CRESCENT STATEN ISLANDConstruction/Regular/Water/N/ 3 REPLACEMENT OF WATERREHABILITATION MAIN IN 135TH OF ASTORIA STREET, 5 SAN/STM SEWERS IN SPRINGFIELD BLVD, 88 AV & 118 AV BOROUGHSTREET- BOROUGH OF QUEENS OF QUEENS A WATER TRUNK MAIN, QNS 32 REHABILITATIONCONSTRUCTION OF OF COMBINED EXISTING SEWERS TRUNK AND WATER APPURTENANCES MAINS IN CRESCENT IN Construction/Regular/Sewer/NSTREET- BOROUGH OF QUEENSPUGSLEY CREEK RELIEF PUGSLEY CREEK AREA - BOROUGH OF THE BRONX /A SEWER / REPAIR OF EXISTING 4 CONSTRUCTION OF COMBINED SEWERS AND APPURTENANCES IN PUGSLEY CREEK AREA - WMBOROUGH OF THE BRONX 5 CONSTRUCTION OF SANITARY AND STORM SEWERS AND APPURTENANCES IN BEACH 99TH STREET BETWEEN ROCKAWAY 3 CONSTRUCTION OF SANITARY AND STORM SEWERS AND Construction/Regular/Sewer/N STORM & SANITARY SEWER BEACHAPPURTENANCES AND ROCKAWAY IN BEACH FREEWAY-BOROUGH 99TH STREET BETWEEN OF ROCKAWAY QUEENS BEACH /A EXTENSION IN B 99 STREET AND ROCKAWAY FREEWAY-BOROUGH OF QUEENS 4 CONSTRUCTION OF STORM SEWER AND APPURTENANCES IN KATAN AVE- Construction/Regular/Sewer/N STORM SEWER IN KATAN AVE, BOROUGH OF STATEN ISLAND /A SI 5 CROTON WATER TREATMENT PLANT FACILITIES AND LANDSCAPE Construction/Regular/General CROTON FILTRATION PLANT CONSTRUCTION-BOROUGH OF THE BRONX Construction/N/A

DDC Estimated Bid Amount Orig. Bid Amount vs. DDC Est. Bid Amount DDC Estimated Bid Amount Orig. Bid Amount vs. DDC Est. Bid Amount Original Bid Amount Orig. Awd-NMSC vs. Orig. Bid Amount Original Bid Amount Orig. Awd-NMSC vs. Orig. Bid Amount Original Award-NMSC Final Award vs. Orig. Awd-NMSC Original Award-NMSC Final Award vs. Orig. Awd-NMSC Final Award Final Award

25 New York City Department of Design and Construction 26 New York City Department of Design and Construction Project List (sorted by completion date) Project List (Data approximated by Quarter as of August, 2016)

STRM SEWER EXTENSION IN 217 ST, 105 AV & HOLLIS AV STORM SEWER IN WATERBURY AVE LINING CONTRACT - CITYWIDE FLUSHING BAY LOW LYING DIVERSION SEWER MULTIPLE ADDRESSES MULTIPLE ADDRESSES MULTIPLE ADDRESSES MULTIPLE ADDRESSES Estimated Construction Cost: $2,169,048 Estimated Construction Cost: $11,153,809 Estimated Construction Cost: $2,280,172 Estimated Construction Cost: $4,164,139 Estimated Completion Date: Q3 2014 Estimated Completion Date: Q4 2015 Estimated Completion Date: Q2 2016 Estimated Completion Date: Q3 2016

GREEN INFRASTRUCTURE IN JAMAICA AREA COMBINED SEWER-121 ST-JAMAICA AV & DEAD END SANITARY SEWER IN 213 ST B/T 50 AV & 53 AVENUE GREEN INFRA IN NEWTOWN CREEK AREA MULTIPLE ADDRESSES MULTIPLE ADDRESSES MULTIPLE ADDRESSES TBD Estimated Construction Cost: TBD Estimated Construction Cost: $2,378,853 Estimated Construction Cost: $1,987,689 Estimated Construction Cost: $13,225,000 Estimated Completion Date: Q3 2015 Estimated Completion Date: Q1 2016 Estimated Completion Date: Q2 2016 Estimated Completion Date: Q3 2016

GREEN INFRA IN HUTCHINSON RIVER AREA, PH1 CULVERT BETWEEN 235 ST AND 232 ST GUNITING / REPAIR OF COMBINED SEWER REI SERVICES FOR GKRH34-02 MULTIPLE ADDRESSES 147 AV, QUEENS, NY 11422 102 RD, QUEENS, NY 11416 MULTIPLE ADDRESSES Estimated Construction Cost: TBD Estimated Construction Cost: $5,673,686 Estimated Construction Cost: $1,849,475 Estimated Construction Cost: $1,688,000 Estimated Completion Date: Q3 2015 Estimated Completion Date: Q1 2016 Estimated Completion Date: Q2 2016 Estimated Completion Date: Q3 2016

STORM & SANITARY SEWERS IN BEACH 29TH STREET GREEN INFRA IN HUTCHINSON RIVER AREA STRM SWR & WM IN 58 AVE & 185 ST, QNS TRUNK WATER MAINS IN WEST 30TH STREET MULTIPLE ADDRESSES BOSTON RD, THE BRONX, NY 10466 MULTIPLE ADDRESSES MULTIPLE ADDRESSES Estimated Construction Cost: $38,864,384 Estimated Construction Cost: $3,194,746 Estimated Construction Cost: $2,438,467 Estimated Construction Cost: $23,743,256 Estimated Completion Date: Q3 2015 Estimated Completion Date: Q2 2016 Estimated Completion Date: Q2 2016 Estimated Completion Date: Q3 2016

CATCH BASINS, QUEENS GREEN INFRA IN NEWTOWN CREEK AREA SANITARY SEWERS IN REON AVENUE REPAIRS & REHAB OF INTERCEPTING SEWERS, CW MULTIPLE ADDRESSES MOUNT OLIVET C, QUEENS, NY 11379 MULTIPLE ADDRESSES MULTIPLE ADDRESSES Estimated Construction Cost: $904,239 Estimated Construction Cost: $3,829,640 Estimated Construction Cost: $6,366,819 Estimated Construction Cost: $4,888,615 Estimated Completion Date: Q3 2015 Estimated Completion Date: Q2 2016 Estimated Completion Date: Q2 2016 Estimated Completion Date: Q3 2016

INSTAL OF NEW & RECONSTRUCTION OF CATCH BASIN DISTRIBUTION WM EXTENSION/REPLACEMENTS SANIT & STORM SEWERS-ROSSVILLE AVE+WOODROW RD WATER MAIN WORK IN VARIOUS LOCATIONS MULTIPLE ADDRESSES MULTIPLE ADDRESSES MULTIPLE ADDRESSES MULTIPLE ADDRESSES Estimated Construction Cost: $7,709,138 Estimated Construction Cost: $5,581,324 Estimated Construction Cost: $11,173,873 Estimated Construction Cost: $12,359,521 Estimated Completion Date: Q3 2015 Estimated Completion Date: Q2 2016 Estimated Completion Date: Q2 2016 Estimated Completion Date: Q3 2016

STORM SEWER IN ELKMONT AVENUE EDGEMERE (PHASE C2) NEW STORM SEWER IN JEWETT AVE & WILLARD AVE, ETC. ACCEL DIST. WM REPLACE & SEWER REHAB., QNS MULTIPLE ADDRESSES MULTIPLE ADDRESSES MULTIPLE ADDRESSES MULTIPLE ADDRESSES Estimated Construction Cost: $3,046,663 Estimated Construction Cost: $37,803,891 Estimated Construction Cost: $8,343,437 Estimated Construction Cost: $27,494,626 Estimated Completion Date: Q3 2015 Estimated Completion Date: Q2 2016 Estimated Completion Date: Q2 2016 Estimated Completion Date: Q3 2016

STORM SEWER EXT IN AMSTERDAM AVE DIST WM EXTEN & REPLACMTS, NEW BLGS SANITARY & STORM SEWERS IN SPRAGUE AVE ACCEL DIST. WM REPLACE & SEWER REHAB., SI AMSTERDAM AVE, STATEN ISLAND, NY 10314 MULTIPLE ADDRESSES MULTIPLE ADDRESSES MULTIPLE ADDRESSES Estimated Construction Cost: $4,775,155 Estimated Construction Cost: $5,840,039 Estimated Construction Cost: $9,375,333 Estimated Construction Cost: $14,159,112 Estimated Completion Date: Q3 2015 Estimated Completion Date: Q2 2016 Estimated Completion Date: Q2 2016 Estimated Completion Date: Q3 2016

STORM SEWER EXTENSIONS AT 61 AVE, QNS REPLACEMENT OF WM IN JAMAICA AREA TV INSPECTION AND CLEANING - CITYWIDE STORM & SAN SEWERS IN N.B WHITESTONE EXPWY MULTIPLE ADDRESSES MULTIPLE ADDRESSES MULTIPLE ADDRESSES MULTIPLE ADDRESSES Estimated Construction Cost: $2,778,577 Estimated Construction Cost: $5,217,273 Estimated Construction Cost: $2,029,352 Estimated Construction Cost: $64,133,966 Estimated Completion Date: Q4 2015 Estimated Completion Date: Q2 2016 Estimated Completion Date: Q2 2016 Estimated Completion Date: Q3 2016

CLOVE LAKE PARK, STATEN ISLAND CATCH BASIN PROJECT #13 AT VARIOUS LOCATIONS COMBINED SEWER IN THIERIOT AVE REPLACE OF COMBINED SEWER IN CALAMUS AVE MULTIPLE ADDRESSES ABBEY CT, BROOKLYN, NY 11229 MULTIPLE ADDRESSES MULTIPLE ADDRESSES Estimated Construction Cost: $1,871,000 Estimated Construction Cost: $849,795 Estimated Construction Cost: $2,364,724 Estimated Construction Cost: $24,472,948 Estimated Completion Date: Q4 2015 Estimated Completion Date: Q2 2016 Estimated Completion Date: Q2 2016 Estimated Completion Date: Q3 2016

27 New York City Department of Design and Construction 28 New York City Department of Design and Construction Project List

SAN/STM SEWERS IN SPRINGFIELD BLVD, 88 AV & 118 AV ACCL DISTRIBUTION WATER MAIN REPLACEMENT MULTIPLE ADDRESSES MULTIPLE ADDRESSES Estimated Construction Cost: $4,559,378 Estimated Construction Cost: $12,922,397 Estimated Completion Date: Q3 2016 Estimated Completion Date: Q4 2016

STORM SEWER EXTENSION IN 128 STREET TRUNK MAIN CONNECTION MULTIPLE ADDRESSES 54 ST, QUEENS, NY 11378 Estimated Construction Cost: $3,202,168 Estimated Construction Cost: $3,280,114 Estimated Completion Date: Q3 2016 Estimated Completion Date: Q4 2016

RECONSTRUCTION OF EXISTING SEWERS, QUEENS WATER MAIN WORK IN JEWEL AVE MULTIPLE ADDRESSES MULTIPLE ADDRESSES Estimated Construction Cost: $11,325,039 Estimated Construction Cost: $4,987,733 Estimated Completion Date: Q3 2016 Estimated Completion Date: Q4 2016

RECONSTRUCTION OF EXISTING SEWERS, QUEENS NEW WATER MAIN IN VARIOUS LOCATIONS MULTIPLE ADDRESSES MULTIPLE ADDRESSES Estimated Construction Cost: $12,642,530 Estimated Construction Cost: TBD Estimated Completion Date: Q3 2016 Estimated Completion Date: Q4 2016

ACCELERATED DIST. WM REPL. & SEWER REHAB., BK NEW TRUNK & DISTRIBUTION WM IN VERMONT PL MULTIPLE ADDRESSES MULTIPLE ADDRESSES Estimated Construction Cost: $11,585,000 Estimated Construction Cost: $16,999,958 Estimated Completion Date: Q4 2016 Estimated Completion Date: Q4 2016

GREEN INFRA IN NEWTOWN CREEK AREA - PH 1 SANITARY & STORM SEWERS IN CHANDLER ST MULTIPLE ADDRESSES MULTIPLE ADDRESSES Estimated Construction Cost: $3,458,045 Estimated Construction Cost: $22,507,021 Estimated Completion Date: Q4 2016 Estimated Completion Date: Q4 2016

WATER MAIN WORK IN VARIOUS LOCATIONS, BX 81ST STREET @ 19TH AVENUE MULTIPLE ADDRESSES MULTIPLE ADDRESSES Estimated Construction Cost: $5,519,023 Estimated Construction Cost: $3,632,662 Estimated Completion Date: Q4 2016 Estimated Completion Date: Q4 2016

NEW 20” SUB-AQUEOUS WM EXT. TO RANDALL’S ISLAND BEDELL ST, 115 RD/ 116 AVE ST ANN’S AVE, THE BRONX, NY 10454 MULTIPLE ADDRESSES Estimated Construction Cost: $19,770,252 Estimated Construction Cost: $4,615,170 Estimated Completion Date: Q4 2016 Estimated Completion Date: Q4 2016 “I’m proud to work at DDC because ACCEL DIST. WM REPLACEMENT & SEWER REHAB., BX STORM SEWER IN 115TH STREET, ETC. MULTIPLE ADDRESSES MULTIPLE ADDRESSES Estimated Construction Cost: $28,420,344 Estimated Construction Cost: $7,292,774 Estimated Completion Date: Q4 2016 Estimated Completion Date: Q4 2016 I know that we are helping city

TRUNK WATER MAINS 58TH ST. STRM SEWERS IN HARTLAND AVE, QNS MULTIPLE ADDRESSES HARTLAND AV, QUEENS, NY 11427 neighborhoods thrive. Even small Estimated Construction Cost: $19,912,800 Estimated Construction Cost: $3,249,951 Estimated Completion Date: Q4 2016 Estimated Completion Date: Q4 2016 jobs make a big difference.”

Sarah Shelley DDC Bid Document Review Manager

29 New York City Department of Design and Construction Project List Project List

STORM & SANITARY SEWERS IN WARDS POINT AVENUE DIST WM EXTEN & REPLACMTS, NEW BLGS STORM SEWER & WM WORK IN MERRILL STREET, QNS DIST WM EXTENSIONS /REPLACEMENT, QNS MULTIPLE ADDRESSES MULTIPLE ADDRESSES MULTIPLE ADDRESSES MULTIPLE ADDRESSES Estimated Construction Cost: $4,957,000 Estimated Construction Cost: $14,857,200 Estimated Construction Cost: $642,000 Estimated Construction Cost: $4,000,000 Estimated Completion Date: Q4 2016 Estimated Completion Date: Q2 2017 Estimated Completion Date: Q2 2017 Estimated Completion Date: Q3 2017

STM, SAN SEWERS & WM IN CONEY ISLAND AREA, BK NEW CREEK WEST BRANCH BLUEBELT, S.I. STORM SEWER AND WATER MAIN IN 183 STREET.QNS ACCELERATED DIST WM REPL. & SE REHAB. QNS MULTIPLE ADDRESSES MULTIPLE ADDRESSES MULTIPLE ADDRESSES KENILWORTH DRIVE, QUEENS, NY Estimated Construction Cost: $27,875,174 Estimated Construction Cost: $22,251,507 Estimated Construction Cost: $12,393,731 Estimated Construction Cost: $15,000,000 Estimated Completion Date: Q1 2017 Estimated Completion Date: Q2 2017 Estimated Completion Date: Q2 2017 Estimated Completion Date: Q3 2017

REPLACEMENT/REPAIR MANHOLE HARDWARE, BRONX REHAB OF INTERCEPTING SEWERS, BK & SI SEWER WHEN & WHERE CONTRACT IN SE QUEENS GUNITING OF SEWERS, CITYWIDE MULTIPLE ADDRESSES MULTIPLE ADDRESSES MULTIPLE ADDRESSES MULTIPLE ADDRESSES Estimated Construction Cost: $2,000,000 Estimated Construction Cost: $18,926,508 Estimated Construction Cost: $25,000,000 Estimated Construction Cost: $8,757,975 Estimated Completion Date: Q1 2017 Estimated Completion Date: Q2 2017 Estimated Completion Date: Q2 2017 Estimated Completion Date: Q3 2017

SAN SEWER IN RICHARD AVE WATER MAIN WORK IN VARIOUS LOCATIONS SANITARY SEWER EXTENSIONS IN TWOMBLY AVE STORM & SANITARY SEWERS IN NAMEOKE AVENUE MULTIPLE ADDRESSES MULTIPLE ADDRESSES MULTIPLE ADDRESSES MULTIPLE ADDRESSES Estimated Construction Cost: $11,365,654 Estimated Construction Cost: $14,508,247 Estimated Construction Cost: $3,017,480 Estimated Construction Cost: TBD Estimated Completion Date: Q1 2017 Estimated Completion Date: Q2 2017 Estimated Completion Date: Q2 2017 Estimated Completion Date: Q3 2017

INSTAL NEW CATCH BASINS/RECONSTRUCTION, CW REPLACE OF DISTRIBUTION WM 234TH STREET, ETC. STORM SEWER IN GRANTWOOD AVENUE INSTALLATION OF NEW CATCH BASIN & RECONSTR MULTIPLE ADDRESSES MULTIPLE ADDRESSES MULTIPLE ADDRESSES MULTIPLE ADDRESSES Estimated Construction Cost: $8,253,816 Estimated Construction Cost: $5,118,649 Estimated Construction Cost: $19,090,871 Estimated Construction Cost: $4,000,000 Estimated Completion Date: Q1 2017 Estimated Completion Date: Q2 2017 Estimated Completion Date: Q2 2017 Estimated Completion Date: Q3 2017

CATCH BASIN #34, QUEENS NEW TRUNK W/M IN ROCKAWAY B. BLVD STM & SAN SEWERS IN HARVEST AVENUE, SI CW LINING CONTRACT-ACCL WATER MAIN PROJECTS MULTIPLE ADDRESSES MULTIPLE ADDRESSES MULTIPLE ADDRESSES MULTIPLE ADDRESSES Estimated Construction Cost: $1,517,097 Estimated Construction Cost: $24,704,539 Estimated Construction Cost: $5,100,000 Estimated Construction Cost: $1,500,000 Estimated Completion Date: Q1 2017 Estimated Completion Date: Q2 2017 Estimated Completion Date: Q2 2017 Estimated Completion Date: Q3 2017

GUINITING & TRENCH REST IN SEYMORE & VARIOUS LOC DISTRIBUTION WM EXTENSIONS/REPLACEMENTS GI IN THE JAM-003/006 CSO PH 1 TRIBUTARY AREA, ST1 CITYWIDE LINING CONTRACT MULTIPLE ADDRESSES MULTIPLE ADDRESSES MULTIPLE ADDRESSES MULTIPLE ADDRESSES Estimated Construction Cost: $6,386,092 Estimated Construction Cost: $6,958,540 Estimated Construction Cost: $13,068,000 Estimated Construction Cost: $5,775,329 Estimated Completion Date: Q1 2017 Estimated Completion Date: Q2 2017 Estimated Completion Date: Q3 2017 Estimated Completion Date: Q3 2017

STM, SAN SEWERS & WM IN CONEY ISLAND AREA, BK SANITARY AND STORM SEWER IN SHELDON AVE GI IN THE BB-09 CSO TRIBUTARY AREA, STAGE 1 SEWERS-HOOK CREEK BLVD (TWIN PONDS) MULTIPLE ADDRESSES MULTIPLE ADDRESSES QUEENS MIDTOWN EXPRESSWAY, QUEENS, NY MULTIPLE ADDRESSES Estimated Construction Cost: $23,883,663 Estimated Construction Cost: $48,427,825 Estimated Construction Cost: $5,300,000 Estimated Construction Cost: $17,928,158 Estimated Completion Date: Q2 2017 Estimated Completion Date: Q2 2017 Estimated Completion Date: Q3 2017 Estimated Completion Date: Q3 2017

GREEN INFRASTRUCTURE IN FLUSHING CREEK RECON OF COMB SWR & WM IN YORK AV DIST WATER MAIN REPLACEMENT LONG ISLAND CITY STRM & SAN SWR-21 ST B/T NEW HAVEN AV & ELK MULTIPLE ADDRESSES MULTIPLE ADDRESSES MULTIPLE ADDRESSES MULTIPLE ADDRESSES Estimated Construction Cost: $7,253,239 Estimated Construction Cost: $7,423,423 Estimated Construction Cost: $30,735,300 Estimated Construction Cost: $21,206,369 Estimated Completion Date: Q2 2017 Estimated Completion Date: Q2 2017 Estimated Completion Date: Q3 2017 Estimated Completion Date: Q3 2017

DIST. WM EXTENSION/REPLACEMNTS; NEW BLDGS, ETC STRM SWR & WM IN 208 ST & 209 ST, QNS REPLACEMENT OF WATER MAIN IN ARCADE AVE, QNS SANIT SEWER EXTENSIONS IN CHICAGO AVE S.I. MULTIPLE ADDRESSES MULTIPLE ADDRESSES MULTIPLE ADDRESSES CHICAGO AVENUE, STATEN ISLAND, NY Estimated Construction Cost: $8,771,420 Estimated Construction Cost: $5,177,380 Estimated Construction Cost: $14,926,989 Estimated Construction Cost: $690,000 Estimated Completion Date: Q2 2017 Estimated Completion Date: Q2 2017 Estimated Completion Date: Q3 2017 Estimated Completion Date: Q3 2017

31 New York City Department of Design and Construction 32 New York City Department of Design and Construction Project List

STORM & SANITARY SEWERS IN XENIA STREET COMBINED SEWER IN PENELOPE AVENUE MULTIPLE ADDRESSES MULTIPLE ADDRESSES Estimated Construction Cost: $2,946,946 Estimated Construction Cost: $17,342,953 Estimated Completion Date: Q3 2017 Estimated Completion Date: Q4 2017

STM & SAN SEWERS IN DIXON AVE, SI STORM SEWERS IN GLEN OAKS AREA, 69TH AVE MULTIPLE ADDRESSES MULTIPLE ADDRESSES Estimated Construction Cost: $11,339,892 Estimated Construction Cost: $12,591,850 Estimated Completion Date: Q3 2017 Estimated Completion Date: Q4 2017

STORM SEWER EXTENSION AT FORRESTAL COURT, SI SAN & STRM SEWERS IN BERTRAM AVE MULTIPLE ADDRESSES MULTIPLE ADDRESSES Estimated Construction Cost: $1,585,000 Estimated Construction Cost: $6,526,000 Estimated Completion Date: Q3 2017 Estimated Completion Date: Q4 2017

ACCELERATED DIST WATER MAIN REPLACEMENT, BK STORM & SANITARY SEWERS IN BLOOMINGDALE RD MULTIPLE ADDRESSES MULTIPLE ADDRESSES Estimated Construction Cost: $18,000,000 Estimated Construction Cost: $18,215,900 Estimated Completion Date: Q4 2017 Estimated Completion Date: Q4 2017

DIST. MAIN EXTENSIONS (NEW BLDG), CW STORM SEWER IN MASON STREET, SI MULTIPLE ADDRESSES MULTIPLE ADDRESSES Estimated Construction Cost: $12,450,790 Estimated Construction Cost: $5,850,000 Estimated Completion Date: Q4 2017 Estimated Completion Date: Q4 2017

S/W RESTORATION - FIRE HYDRANTS/CATCH BASINS, CW DESIGN REHAB & UPGRADE DEP SHAFT MAINT BUILD MULTIPLE ADDRESSES 865 KENT AVENUE, BROOKLYN, NY 11205 Estimated Construction Cost: $1,891,000 Estimated Construction Cost: $31,944,970 Estimated Completion Date: Q4 2017 Estimated Completion Date: Q1 2018

CONNECT SHAFTS 24B, 25B, 27B, 30B TO SYSTEM. NEW 20” SUB-AQUEOUS WATER MAIN TO CITY ISLAND MULTIPLE ADDRESSES CITY ISLAND AV, , NY 10464 Estimated Construction Cost: $240,489,723 Estimated Construction Cost: $23,000,000 Estimated Completion Date: Q4 2017 Estimated Completion Date: Q1 2018

ACCELERATED DISTRIBUTION WATER MAIN REPLACEMENT DISTRIBUTION MAIN EXTENSIONS - MANHATTAN MULTIPLE ADDRESSES MULTIPLE ADDRESSES Estimated Construction Cost: $16,206,941 Estimated Construction Cost: $3,000,000 Estimated Completion Date: Q4 2017 Estimated Completion Date: Q1 2018

REPAIRS & REHAB OF INTERCEPTING SEWERS, QN COMBINED SEWER IN 45TH AVENUE, QUEENS MULTIPLE ADDRESSES MULTIPLE ADDRESSES Estimated Construction Cost: $20,002,620 Estimated Construction Cost: $1,395,093 Estimated Completion Date: Q4 2017 Estimated Completion Date: Q1 2018 “Our projects aim to provide all

ACCELERATED DISTRIBUTION WATER MAIN REPLACEMENT STORM SEWER IN 95TH STREET MULTIPLE ADDRESSES MULTIPLE ADDRESSES hard-working New Yorkers the Estimated Construction Cost: $18,881,468 Estimated Construction Cost: $3,169,600 Estimated Completion Date: Q4 2017 Estimated Completion Date: Q1 2018 essentials they deserve.”

Mario Garrovillas DDC Project Manager, A&E

33 New York City Department of Design and Construction Project List Project List

STORM & SANITARY SEWER EXTENSION IN B 99 STREET REPLMT OF COMB SEWER IN E. 26 ST B/T 1ST AV & FDR COMBINED SEWER IN HOLLAND AVE, BRONX STM & SAN SEWERS- 20 AVE B/T126 ST & US BULKHEAD BEACH 99 ST, QUEENS, NY 11694 MULTIPLE ADDRESSES MULTIPLE ADDRESSES MULTIPLE ADDRESSES Estimated Construction Cost: $986,000 Estimated Construction Cost: $11,792,322 Estimated Construction Cost: $4,072,000 Estimated Construction Cost: $108,810,695 Estimated Completion Date: Q1 2018 Estimated Completion Date: Q2 2018 Estimated Completion Date: Q2 2018 Estimated Completion Date: Q3 2018

STORM SEWERS IN 204 STREET STORM SEWER IN COLLEGE PLACE ACCELERATED DIST WATER MAIN REPLACEMENT, BK WILLOW AV MULTIPLE ADDRESSES MULTIPLE ADDRESSES MULTIPLE ADDRESSES WILLOW AV, STATEN ISLAND, NY 10305 Estimated Construction Cost: $2,860,461 Estimated Construction Cost: $19,627,918 Estimated Construction Cost: $15,000,000 Estimated Construction Cost: $1,745,000 Estimated Completion Date: Q1 2018 Estimated Completion Date: Q2 2018 Estimated Completion Date: Q3 2018 Estimated Completion Date: Q3 2018

STM SEWER IN RICHMOND AVE & AMBOY RD, SI 41 AVENUE, CORPORAL KENNEDY AND ETC INSTALL OF NEW TRUNK MAIN, VALVES & APPURT. @16A NEW STRM SWR & WM REPLACE IN ACACIA AVE, ETC. MULTIPLE ADDRESSES MULTIPLE ADDRESSES SCHERMERHORN ST, BROOKLYN, NY 11217 MULTIPLE ADDRESSES Estimated Construction Cost: $3,143,000 Estimated Construction Cost: $3,683,674 Estimated Construction Cost: $1,000,000 Estimated Construction Cost: $16,254,000 Estimated Completion Date: Q1 2018 Estimated Completion Date: Q2 2018 Estimated Completion Date: Q3 2018 Estimated Completion Date: Q3 2018

GREEN INFRA IN HUTCHINSON RIVER AREA STORM SEWER EXTENSION IN 239 STREET REPLACEMENT/REPAIR MANHOLE HARDWARE, BROOKLYN DSGN & CONST OF BIOSWALES & GREENSTREETS, QUE MULTIPLE ADDRESSES MULTIPLE ADDRESSES MULTIPLE ADDRESSES MULTIPLE ADDRESSES Estimated Construction Cost: $1,285,000 Estimated Construction Cost: TBD Estimated Construction Cost: $2,000,000 Estimated Construction Cost: $23,600,000 Estimated Completion Date: Q2 2018 Estimated Completion Date: Q2 2018 Estimated Completion Date: Q3 2018 Estimated Completion Date: Q4 2018

EMERGENCY RECONSTRUCTION OF WATER MAINS, CW STORM SEWER EXTENSION IN 91 ROAD, QUEENS REPLACEMENT/REPAIR MANHOLE HARDWARE, SI DSGN & CONST OF BIOSWALES & GREENSTREETS, QUE MULTIPLE ADDRESSES 221 PLACE, QUEENS, NY MULTIPLE ADDRESSES MULTIPLE ADDRESSES Estimated Construction Cost: $11,500,000 Estimated Construction Cost: $301,000 Estimated Construction Cost: $1,000,000 Estimated Construction Cost: $23,100,000 Estimated Completion Date: Q2 2018 Estimated Completion Date: Q2 2018 Estimated Completion Date: Q3 2018 Estimated Completion Date: Q4 2018

REPLACEMENT/REPAIR MANHOLE HARDWARE, MANHATTAN STORM & SAN SEWERS IN 119TH ROAD TRUNK WATER MAIN IN SOUTHERN BLVD (W/ SEX002245) DSGN & CONST OF BIOSWALES & GREENSTREETS, QUE MULTIPLE ADDRESSES MULTIPLE ADDRESSES MULTIPLE ADDRESSES MULTIPLE ADDRESSES Estimated Construction Cost: $2,000,000 Estimated Construction Cost: $8,583,124 Estimated Construction Cost: $62,906,081 Estimated Construction Cost: $23,400,000 Estimated Completion Date: Q2 2018 Estimated Completion Date: Q2 2018 Estimated Completion Date: Q3 2018 Estimated Completion Date: Q4 2018

WATER MAIN CONNECTION AT WASHINGTON SQUARE PARK SEWER WHEN & WHERE CONTRACT IN SE QUEENS ACCELERATED DISTRIBUTION WATER MAIN REPLACEMENT INSTALL OF TRUNK MAIN IN BAINBRIDGE AVE., ETC. MULTIPLE ADDRESSES MULTIPLE ADDRESSES MULTIPLE ADDRESSES MULTIPLE ADDRESSES Estimated Construction Cost: $8,939,669 Estimated Construction Cost: TBD Estimated Construction Cost: $20,000,000 Estimated Construction Cost: $16,815,000 Estimated Completion Date: Q2 2018 Estimated Completion Date: Q2 2018 Estimated Completion Date: Q3 2018 Estimated Completion Date: Q4 2018

REPAIRS & REHAB OF INTERCEPTING SEWERS, MN & BX STORM & SANIT SEWERS-ALVERSON AVENUE, SI REPLACEMENT OF WATER MAIN IN FARMERS BLVD, QNS REPLACEMENT OF WATER MAINS IN WALDO AVE, BX MULTIPLE ADDRESSES MULTIPLE ADDRESSES MULTIPLE ADDRESSES MULTIPLE ADDRESSES Estimated Construction Cost: $17,502,592 Estimated Construction Cost: $6,587,000 Estimated Construction Cost: $4,188,000 Estimated Construction Cost: $4,328,700 Estimated Completion Date: Q2 2018 Estimated Completion Date: Q2 2018 Estimated Completion Date: Q3 2018 Estimated Completion Date: Q4 2018

COMBINED SEWER AND CHAMBERS IN 7TH STREET, BK STORM SWR-PARK HILL CT & VANDERBILT AVE, SI ACCELERATED DIST WM REPL. & SE REHAB. QNS ACCELERATED DIST. WM REPL. & SE REHAB. BX MULTIPLE ADDRESSES MULTIPLE ADDRESSES MULTIPLE ADDRESSES MULTIPLE ADDRESSES Estimated Construction Cost: $2,679,000 Estimated Construction Cost: $1,219,000 Estimated Construction Cost: TBD Estimated Construction Cost: $20,000,000 Estimated Completion Date: Q2 2018 Estimated Completion Date: Q2 2018 Estimated Completion Date: Q3 2018 Estimated Completion Date: Q4 2018

HIGH LEVEL STM SEWERS IN GOWANUS CANAL AREA STORM SEWER IN KATAN AVE, SI REPLACEMENT OF WATER MAIN IN CLOVE ROAD, STATEN IS REHAB OF ASTORIA WATER TRUNK MAIN, QNS MULTIPLE ADDRESSES MULTIPLE ADDRESSES MULTIPLE ADDRESSES MULTIPLE ADDRESSES Estimated Construction Cost: $26,842,000 Estimated Construction Cost: $4,382,600 Estimated Construction Cost: $8,103,668 Estimated Construction Cost: $22,190,000 Estimated Completion Date: Q2 2018 Estimated Completion Date: Q2 2018 Estimated Completion Date: Q3 2018 Estimated Completion Date: Q4 2018

35 New York City Department of Design and Construction 36 New York City Department of Design and Construction Project List

ACCELERATED DIST WM REPL. & SE REHAB. SI STORM & COMBINED SEWERS IN 229 STREET MULTIPLE ADDRESSES MULTIPLE ADDRESSES Estimated Construction Cost: $17,000,000 Estimated Construction Cost: $19,793,000 Estimated Completion Date: Q4 2018 Estimated Completion Date: Q1 2019

STORM & SANITARY SEWERS IN ROBINSON AVENUE CONSTR OF STM & SAN SEWERS IN 119 AVE, QNS MULTIPLE ADDRESSES MULTIPLE ADDRESSES Estimated Construction Cost: $39,825,909 Estimated Construction Cost: $12,348,000 Estimated Completion Date: Q4 2018 Estimated Completion Date: Q1 2019

TV INSPECTION AND CLEANING - CITYWIDE STORM & SANIT SEWERS IN WARDWELL AVENUE, SI MULTIPLE ADDRESSES MULTIPLE ADDRESSES Estimated Construction Cost: $1,928,848 Estimated Construction Cost: $14,669,487 Estimated Completion Date: Q4 2018 Estimated Completion Date: Q1 2019

GREEN INFRASTRUCTURE IN TI-11 AND TI-22, QNS REPLACE OF TRUNK WATER MAINS-ATLANTIC AVE MULTIPLE ADDRESSES ATLANTIC AV, BROOKLYN, NY 11217 Estimated Construction Cost: $12,942,000 Estimated Construction Cost: $4,775,000 Estimated Completion Date: Q1 2019 Estimated Completion Date: Q2 2019

TRUNK WATER MAINS IN WEST 30TH STREET, PHASE II STM, SAN SEWERS & WM IN CONEY ISLAND AREA MULTIPLE ADDRESSES MULTIPLE ADDRESSES Estimated Construction Cost: $37,683,676 Estimated Construction Cost: $44,443,446 Estimated Completion Date: Q1 2019 Estimated Completion Date: Q2 2019

WATER MAIN REPLACEMENT AT W 170 STREET, MN TRUNK WATER MAIN IN 2ND AVE. MULTIPLE ADDRESSES MULTIPLE ADDRESSES Estimated Construction Cost: $7,197,000 Estimated Construction Cost: $36,714,925 Estimated Completion Date: Q1 2019 Estimated Completion Date: Q2 2019

FRANCIS LEWIS BLVD - 90TH AVE TO BRADDOCK AVE NEWTON CREEK NATURE WALK PHASE II - PIER MULTIPLE ADDRESSES BROOKLYN, NY Estimated Construction Cost: $55,331,596 Estimated Construction Cost: $6,277,430 Estimated Completion Date: Q1 2019 Estimated Completion Date: Q2 2019

REPLACEMENT OF WM IN VARIOUS LOCATIONS (JWS), QNS REPLACEMENT OF WATER MAIN IN 135TH ST, QNS MULTIPLE ADDRESSES MULTIPLE ADDRESSES Estimated Construction Cost: $24,725,000 Estimated Construction Cost: $35,893,040 Estimated Completion Date: Q1 2019 Estimated Completion Date: Q2 2019 “It’s a beautiful experience to be REPLACEMENT OF WATER MAIN, ONDERDONK AVE, QNS SAN & STM SEWERS IN PAGE AVENUE MULTIPLE ADDRESSES MULTIPLE ADDRESSES Estimated Construction Cost: $18,320,610 Estimated Construction Cost: $40,615,174 Estimated Completion Date: Q1 2019 Estimated Completion Date: Q2 2019 able to build projects that enhance

SANITARY & STRM SEWER IN RAMBLE ROAD HLSS - FRESH CREEK, PHASE 1A MULTIPLE ADDRESSES MULTIPLE ADDRESSES communities and better the Estimated Construction Cost: $35,292,777 Estimated Construction Cost: $56,556,556 Estimated Completion Date: Q1 2019 Estimated Completion Date: Q2 2019 lives of our fellow neighbors.”

HowCharlie Sheen Jimenez-Hernandez Pau DDC ProjectConstruction Executive, Project East Manager Side Coastal Resiliency Project Ocean Breeze Riding Arena

37 New York City Department of Design and Construction Project List Project List

COMB / HL STORM SEWER & WM WORK IN LEFFER BLVD STRM & SAN SEWERS, WM WORK IN BAISLEY BLVD STORM SEWER IN KING STREET, SI COMBINED SEWER IN 70TH STREET, QUEENS MULTIPLE ADDRESSES MULTIPLE ADDRESSES MULTIPLE ADDRESSES MULTIPLE ADDRESSES Estimated Construction Cost: $4,105,000 Estimated Construction Cost: $28,489,200 Estimated Construction Cost: $3,406,000 Estimated Construction Cost: $32,854,000 Estimated Completion Date: Q2 2019 Estimated Completion Date: Q3 2019 Estimated Completion Date: Q3 2019 Estimated Completion Date: Q2 2020

NEW STORM SEWER EXTENSION IN EAGAN AVENUE, SI HLSS - FRESH CREEK STORM & SANITARY SEWERS IN FOREST AVE, SI WM REPLMT EAST NEW YORK AVE MULTIPLE ADDRESSES MULTIPLE ADDRESSES MULTIPLE ADDRESSES MULTIPLE ADDRESSES Estimated Construction Cost: $4,266,000 Estimated Construction Cost: $16,354,000 Estimated Construction Cost: $3,174,750 Estimated Construction Cost: $18,872,000 Estimated Completion Date: Q2 2019 Estimated Completion Date: Q3 2019 Estimated Completion Date: Q3 2019 Estimated Completion Date: Q3 2020

TRUNK & DIST. WM REPLMT IN LEONARD STREET HLSS - FRESH CREEK BASIN, PHASE 2B STORM SEWER & WM WORK IN ORCHARD LANE SOUTH, SI REPLACEMENT OF 72” TRUNK WM IN FLATBUSH AVE MULTIPLE ADDRESSES MULTIPLE ADDRESSES MULTIPLE ADDRESSES MULTIPLE ADDRESSES Estimated Construction Cost: $35,747,023 Estimated Construction Cost: $34,513,000 Estimated Construction Cost: $704,000 Estimated Construction Cost: $31,772,300 Estimated Completion Date: Q3 2019 Estimated Completion Date: Q3 2019 Estimated Completion Date: Q3 2019 Estimated Completion Date: Q3 2020

CROTON FILTRATION PLANT NEW STORM & COMBINED SEWERS IN 9TH STREET NEW WATER MAIN IN 33 AVE, QNS RECONSTRUCTION OF WATER MAIN IN AVENUE S 3545 JEROME AVENUE, THE BRONX, NY 10467 MULTIPLE ADDRESSES MULTIPLE ADDRESSES MULTIPLE ADDRESSES Estimated Construction Cost: $55,392,962 Estimated Construction Cost: $9,610,000 Estimated Construction Cost: $71,268,761 Estimated Construction Cost: $14,444,100 Estimated Completion Date: Q3 2019 Estimated Completion Date: Q3 2019 Estimated Completion Date: Q4 2019 Estimated Completion Date: Q3 2020

NEW 48” TRUNK WATER MAIN IN E 233 STREET SAN. & STM. SEWERS IN HOLLIS AVE STM & SAN SWR, WILLET PT BLVD WHITESTONE AREA, PH2 CONSTRUCTION OF SANIT, STORM SEWERS E 233 ST, THE BRONX, NY 10466 MULTIPLE ADDRESSES MULTIPLE ADDRESSES MULTIPLE ADDRESSES Estimated Construction Cost: $8,233,500 Estimated Construction Cost: TBD Estimated Construction Cost: $13,279,000 Estimated Construction Cost: $29,452,000 Estimated Completion Date: Q3 2019 Estimated Completion Date: Q3 2019 Estimated Completion Date: Q4 2019 Estimated Completion Date: Q3 2020

STM & SAN SEWER, BMP AND WM WORK IN HUSSON ST STM & COMB SEWERS IN 130TH ROAD GUNITING & REPAIR OF 25 AVE SEWER-GRAVESEND BAY REPL. OF TRUNK & DIST. WM IN CYPRESS AVE, QNS MULTIPLE ADDRESSES MULTIPLE ADDRESSES 25 AV, BROOKLYN, NY 11214 MULTIPLE ADDRESSES Estimated Construction Cost: $35,564,000 Estimated Construction Cost: $4,033,000 Estimated Construction Cost: $2,359,800 Estimated Construction Cost: $25,150,000 Estimated Completion Date: Q3 2019 Estimated Completion Date: Q3 2019 Estimated Completion Date: Q4 2019 Estimated Completion Date: Q3 2020

NEWTOWN CREEK NATURE WALK PHASE III - GARDEN STORM & SANITARY SEWERS IN FOCH BLVD STORM & SANITARY SEWERS IN AMBOY ROAD & SOUTH RA SEWERS AND WATER MAINS IN ROCKLAND AVE, SI 1 KINGSLAND AVENUE, BROOKLYN, NY 11211 MULTIPLE ADDRESSES MULTIPLE ADDRESSES MULTIPLE ADDRESSES Estimated Construction Cost: $7,358,802 Estimated Construction Cost: $5,533,500 Estimated Construction Cost: $5,654,000 Estimated Construction Cost: $19,909,000 Estimated Completion Date: Q3 2019 Estimated Completion Date: Q3 2019 Estimated Completion Date: Q4 2019 Estimated Completion Date: Q3 2020

REPLACEMENT OF WATER MAIN IN JAMAICA AVE, QNS SAN SEWER IN NAUGHTON AVE ETC + MAIN EXTN TRUNK WATER MAIN IN ROCKAWAY BEACH BLVD, QNS STORM SEWER OUTLET IN 225TH STREET, QNS MULTIPLE ADDRESSES MULTIPLE ADDRESSES MULTIPLE ADDRESSES 225 STREET, QUEENS, NY Estimated Construction Cost: $13,875,000 Estimated Construction Cost: $4,736,000 Estimated Construction Cost: $3,831,000 Estimated Construction Cost: $42,484,000 Estimated Completion Date: Q3 2019 Estimated Completion Date: Q3 2019 Estimated Completion Date: Q1 2020 Estimated Completion Date: Q3 2020

WATER MAIN REPLACEMENT IN SOUTH CONDUIT AVE, QNS SAN & STRM SEWERS IN WALKER STREET, SI STM, SAN SEWERS & WM IN CONEY ISLAND AREA STORM & SANIT SEWERS IN LIVERPOOL ST, QUEEN MULTIPLE ADDRESSES MULTIPLE ADDRESSES MULTIPLE ADDRESSES MULTIPLE ADDRESSES Estimated Construction Cost: $5,395,000 Estimated Construction Cost: $2,711,000 Estimated Construction Cost: $32,000,000 Estimated Construction Cost: $43,315,938 Estimated Completion Date: Q3 2019 Estimated Completion Date: Q3 2019 Estimated Completion Date: Q2 2020 Estimated Completion Date: Q3 2020

CHESTER AVENUE, STATEN ISLAND (W/SE-761) STORM & SANITARY SEWERS IN TRAVIS AREA TRUNK & DIST WM IN W 124TH STREET, MNS HIGH LEVEL STM SEWERS-GOWANUS CANAL AREA MULTIPLE ADDRESSES MULTIPLE ADDRESSES MULTIPLE ADDRESSES MULTIPLE ADDRESSES Estimated Construction Cost: $12,951,000 Estimated Construction Cost: $9,067,000 Estimated Construction Cost: $23,605,000 Estimated Construction Cost: $9,600,000 Estimated Completion Date: Q3 2019 Estimated Completion Date: Q3 2019 Estimated Completion Date: Q2 2020 Estimated Completion Date: Q3 2020

39 New York City Department of Design and Construction 40 New York City Department of Design and Construction Project List Project List

SANITARY & STORM SEWERS IN HALPIN AVE, STATEN IS. REPLACE OF COMBINED SEWER IN BURR AVE, BX CONSTRUCTION OF GREEN INFRA IN BROOKLYN VIT CLAY PIPE SEWERS - STATEN ISLAND MULTIPLE ADDRESSES MULTIPLE ADDRESSES MULTIPLE ADDRESSES MULTIPLE ADDRESSES Estimated Construction Cost: $11,969,000 Estimated Construction Cost: $11,149,000 Estimated Construction Cost: $3,240,890 Estimated Construction Cost: $5,200,000 Estimated Completion Date: Q3 2020 Estimated Completion Date: Q1 2022 Estimated Completion Date: N/A* Estimated Completion Date: N/A*

PUGSLEY CREEK RELIEF SEWER/REPAIR OF EXISTING WM STM & SAN SWR, WHITESTONE EXPWY SERV RD DSGN & CONST OF BIOSWALES & GREENSTREETS QUEENS MULTIPLE ADDRESSES MULTIPLE ADDRESSES MULTIPLE ADDRESSES Estimated Construction Cost: $81,479,546 Estimated Construction Cost: $11,333,000 Estimated Construction Cost: $21,000,000 Estimated Completion Date: Q4 2020 Estimated Completion Date: Q1 2023 Estimated Completion Date: N/A*

REPLACEMENT OF WATER MAIN IN E 46TH & E 47TH ST HLSS, STM, SAN & COMB SEWERS-135TH AVE, QNS WATER MAIM REPLACEMENT IN QUEENS BLVD, QUEENS MULTIPLE ADDRESSES MULTIPLE ADDRESSES MULTIPLE ADDRESSES Estimated Construction Cost: $12,200,000 Estimated Construction Cost: $39,261,850 Estimated Construction Cost: $6,894,000 Estimated Completion Date: Q4 2020 Estimated Completion Date: Q1 2024 Estimated Completion Date: N/A*

NEW 36” TRUNK MAIN IN BROADWAY, MN STM & SAN SEWERS IN MINNIEFORD AVENUE AREA EMERGENCY LINING CONTRACT - CITYWIDE MULTIPLE ADDRESSES MULTIPLE ADDRESSES MULTIPLE ADDRESSES Estimated Construction Cost: $7,750,000 Estimated Construction Cost: $2,252,100 Estimated Construction Cost: $6,100,319 Estimated Completion Date: Q4 2020 Estimated Completion Date: Q1 2024 Estimated Completion Date: N/A*

REPLACEMENT OF WATER MAIN IN HOWARD BCH AREA STORM & SANITARY SEWERS IN 224 STREET, QNS CITYWIDE RECONSTRUCTION OF EXISTING SEWERS, CW MULTIPLE ADDRESSES MULTIPLE ADDRESSES MULTIPLE ADDRESSES Estimated Construction Cost: TBD Estimated Construction Cost: $35,068,000 Estimated Construction Cost: $25,000,000 Estimated Completion Date: Q1 2021 Estimated Completion Date: Q3 2024 Estimated Completion Date: N/A*

MEADOWMERE/ WARNERVILLE AREA STORM, SANITARY & COMBINED SEWERS IN 138TH VIT CLAY PIPE SEWERS - BROOKLYN MULTIPLE ADDRESSES MULTIPLE ADDRESSES MULTIPLE ADDRESSES Estimated Construction Cost: TBD Estimated Construction Cost: $73,282,900 Estimated Construction Cost: $6,000,000 Estimated Completion Date: Q2 2021 Estimated Completion Date: Q2 2025 Estimated Completion Date: N/A*

CONSTRUCTION OF BMP NC 6 AND 15, SI WATERMAIN REPLACE IN ORIENTAL BLVD, BKLYN VIT CLAY PIPE SEWERS - BROOKLYN MULTIPLE ADDRESSES MULTIPLE ADDRESSES MULTIPLE ADDRESSES Estimated Construction Cost: $31,527,500 Estimated Construction Cost: $17,200,000 Estimated Construction Cost: $6,000,000 Estimated Completion Date: Q3 2021 Estimated Completion Date: N/A* Estimated Completion Date: N/A*

WATER MAIN WORK IN VARIOUS LOCATIONS NEWTOWN CREEK CLUSTER, QNS/BK VIT CLAY PIPE SEWERS - QUEENS MULTIPLE ADDRESSES MULTIPLE ADDRESSES MULTIPLE ADDRESSES Estimated Construction Cost: $19,764,390 Estimated Construction Cost: $10,595,000 Estimated Construction Cost: $325,000 Estimated Completion Date: Q3 2021 Estimated Completion Date: N/A* Estimated Completion Date: N/A*

STORM & SANITARY SEWERS IN BRUNSWICK AVENUE CONSTRUCTION OF GREEN INFRA IN BROOKLYN VIT CLAY PIPE SEWERS - QUEENS MULTIPLE ADDRESSES MULTIPLE ADDRESSES MULTIPLE ADDRESSES Estimated Construction Cost: TBD Estimated Construction Cost: $3,240,890 Estimated Construction Cost: $7,500,000 Estimated Completion Date: Q3 2021 Estimated Completion Date: N/A* Estimated Completion Date: N/A*

(CS-FC-SEW) PHASE 3B: H.L.S.S., STM & COMBINED SWR CONSTRUCTION OF GREEN INFRA IN BROOKLYN RECONSTRUCTION OF EXISTING SEWERS, STATEN ISLAND MULTIPLE ADDRESSES MULTIPLE ADDRESSES MULTIPLE ADDRESSES Estimated Construction Cost: $42,967,000 Estimated Construction Cost: $3,240,890 Estimated Construction Cost: $6,261,403 Estimated Completion Date: Q3 2021 Estimated Completion Date: N/A* Estimated Completion Date: N/A*

*Design only project. *Design only project.

41 New York City Department of Design and Construction 42 New York City Department of Design and Construction New York City Department of Design and Construction 30-30 Thomson Avenue Long Island City, NY 11101 nyc.gov/ddc