AT VILLAGE- JATWAR, TEHSIL-IGLAS, DISTRICT- ALIGARH, STATE- UTTAR PRADESH (AREA- 3.099Ha)
Total Page:16
File Type:pdf, Size:1020Kb
FORM- 1 “BRICK EARTH MINING” AT VILLAGE- JATWAR, TEHSIL-IGLAS, DISTRICT- ALIGARH, STATE- UTTAR PRADESH (AREA- 3.099Ha) Submitted by: M/S GOLO DEVI ENT UDHYOG PROP-SHRI BANI SINGH S/O SHRI DASHRAT SINGH R/O-JATWAR, TEHSIL IGLAS, DISTRICT-ALIGARH (U.P) Prepared by COGNIZANCE RESEARCH INDIA PRIVATE LIMITED GT-20, Sector-117, Noida-201301. (U.P) Contact: +91-9910047760, +91-9415102339 Certificate No. NABET/EIA/1619/IA006, Valid Till: Aug 18, 2019 Project:Brick Earth Mine Proponent : M/s Golo Devi Ent Udhyog Area: 3.099 Ha Village: Jatwar, Tehsil: Iglas District: Aligarh, State: Uttar Pradesh FORM - 1 FORM- 1 Basic Information S. No. Item Details 1. Name of the project/s Brick Earth Mining Project at Gata No. 289, 309, 312, 313, 434, 433, 305 2. S. No. in the schedule 1(a) i 3. Proposed capacity/area/length/tonnage to be/ Area: 3.099 Ha handled / command and area/lease Yearly proposed production in cum is area/number of wells to be drilled. mentioned below: S.No. Year Production (cum) 1. 1st 4880.9 2. 2nd 4880.9 3. 3rd 4880.9 4. 4th 4880.9 Total 19523.6 Proposed Production: 4880.9 Cum/year (from 1st Year to 4th Year) Total Proposed production: 19523.6 Cum in 4 year 4. New / Expansion / Modernization New Mine This is fresh grant case of mining lease. Land owner has given their consent to mining for 4 years. 5. Existing Capacity / Area etc. Nil 6. Category of Project i.e. `A’ or `B’ Category B(2) 7. Does it attract the general condition? If yes, No, It does not attract general condition please specify 8. Does it attract the specific condition? If yes, No, it does not attract specific condition please specify 9. Location GPS Co-rodinates of the Project Site: Khasra Latitude (N) Longitude (E) no. 289 27°43'20.82"N 77°52'29.22"E 309 27°43'26.78"N 77°52'14.19"E 312 27°43'26.49"N 77°52'17.60"E 313 27°43'26.97"N 77°52'17.00"E 434 27°43'26.18"N 77°52'12.66"E 433 27°43'25.95"N 77°52'12.11"E 305 27°43'23.97"N 77°52'15.70"E Plot / Survey / Khasra No. 289, 309, 312, 313, 434, 433, 305 Village Jatwar 2 Project:Brick Earth Mine Proponent : M/s Golo Devi Ent Udhyog Area: 3.099 Ha Village: Jatwar, Tehsil: Iglas District: Aligarh, State: Uttar Pradesh FORM - 1 S. No. Item Details Tehsil Iglas District Aligarh State Uttar Pradesh 10. Nearest railway station / airport along with Sonai Railway Station-35.5 Km S distance in km. Airport: Agra Airport-124 Km, S 11. Nearest Town, city, District Headquarters along Nearest District Headquarter& Town with distance in km. Aligarh-56.7 km, NE 12. Village Panchayats, ZillaParishad, Municipal GramPanchayat- Jatwar Corporation, Local body (complete postal ZilaPanchayat–Aligarh addresses with telephone nos. to be given) 13. Name of the applicant M/s Golo Devi Ent Udhyog 14. Registered Address Shri Bani Singh S/O Shri Dasjrat Singh R/O-Village Jatwar, Tehsil-Iglas District-Aligarh (U.P) 15. Address for correspondence : Name M/s Golo Devi Ent Udhyog Designation (Owner / Partner / CEO) Own firm Address Shri Bani Singh S/O Shri Dasjrat Singh R/O-Village Jatwar, Tehsil-Iglas District-Aligarh (U.P) Pin Code 202145 E-mail [email protected] Telephone No. - Fax No. None 16. Details of alternative sites examined, if any. Not Applicable Location of these sites should be shown on a toposheet 17. Interlinked Projects No 18. Whether separate application of interlinked No project has been submitted? 19. If yes, date of submission Not Applicable 20. If no, reason No 21. Whether the proposal involves approval/ No clearance under: if yes, details of the same and their status to be given. (a) The Forest (Conservation) Act, 1980? Not Applicable No (b) The Wildlife (Protection) Act, 1972? Not Applicable No (c) The C.R.Z Notification, 1991? Not Applicable No 22. Whether there is any Government Order / Not applicable 3 Project:Brick Earth Mine Proponent : M/s Golo Devi Ent Udhyog Area: 3.099 Ha Village: Jatwar, Tehsil: Iglas District: Aligarh, State: Uttar Pradesh FORM - 1 S. No. Item Details Policy relevant / relating to the site? 23. Forest land involved (hectares) The Project site is free from Forest Land 24. Whether there is any litigation pending against No the project and / or land in which the project is propose to be set up? (a) Name of the Court (b) Case No. (c) Orders/directions of the Court, if any and its relevance with the proposed project. Activity 1.0 Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) Details thereof (with approximate S. No. Information/Checklist Confirmation Yes/No quantities /rates, wherever possible) with source of information data. 1.1 Permanent or temporary change in land Yes No major change anticipated. The use, land cover or topography including present land-use of the applied area is increase in intensity of land use (with agricultural land. The land-use of the respect to local land use plan). applied lease area will changed temporarily during mining. After completion land-use will remain agricultural land. Mining will be restricted to the allotted area only keeping the berm un affected, thus does not involve any change in existing topography or land use. 1.2 Clearance of existing land, vegetation and No Not Applicable buildings? 1.3 Creation of new land uses? No As this is Brick clay mining project. No pre-construction activity has been done or proposed.The lease area will continue to be agriculture land. However, part of the area will be used for plantation. 1.4 Pre-construction investigations e.g. bore No None holes, soil testing? 1.5 Construction works? No None 1.6 Demolition works? No None 1.7 Temporary sites used for construction No None works or housing of construction workers 1.8 Above ground buildings, structures or Yes Mining/excavation of soil will be done earthworks including linear structures, cut according to approved mine plan. The and fill or excavations. works mainly involve excavation of soil for Brick making. 4 Project:Brick Earth Mine Proponent : M/s Golo Devi Ent Udhyog Area: 3.099 Ha Village: Jatwar, Tehsil: Iglas District: Aligarh, State: Uttar Pradesh FORM - 1 Details thereof (with approximate S. No. Information/Checklist Confirmation Yes/No quantities /rates, wherever possible) with source of information data. 1.9 Underground works including mining or No None tunneling? 1.10 Reclamation works? No None 1.11 Dredging? No Not applicable 1.12 Offshore structures? No Not applicable 1.13 Production and manufacturing processes? No Total production of 4880.9 Cum/annum soil is proposed for mining. The project does not involve any manufacturing process 1.14 Facilities for storage of goods or materials? No Extracted Material moulds to raw brick in lease area and transported to Klin 1.15 Facilities for treatment or disposal of solid No The entire brick clay will be used for waste or liquid effluents? casting of bricks and no mineral rejects, solid waste will be produced by this activity. 1.16 Facilities for long term housing of No Laborers from nearby areas will be hired operational workers? hence no need of housing. Temporary site office and rest shelters will be made. 1.17 New road, rail or sea traffic during No No new rail, road is expected during construction or operation? construction & operation, the existing roads & infrastructure is sufficient for the process. 1.18 New road, rail, air waterborne or other No The existing road facility is adequate for transport infrastructure including new or meeting additional traffic intensity during altered routes and stations, ports, airports operational phase of mine. etc? 1.19 Closure or diversion of existing transport No No closure or diversion of existing routes or infrastructure leading to changes transport routes or infrastructure will in traffic movements? take place. 1.20 New or diverted transmission lines or No As there will be no large scale electricity pipelines? or water requirement for the project, therefore no transmission lines or pipelines are involved. 1.21 Impoundment, damming, culverting, No As such there will be no impounding or realignment or other changes to the damming throughout the year excepting hydrology of watercourses or aquifers? monsoon when rain water will be collected in the excavated pits. Water so accumulated water will contribute to base flow. 5 Project:Brick Earth Mine Proponent : M/s Golo Devi Ent Udhyog Area: 3.099 Ha Village: Jatwar, Tehsil: Iglas District: Aligarh, State: Uttar Pradesh FORM - 1 Details thereof (with approximate S. No. Information/Checklist Confirmation Yes/No quantities /rates, wherever possible) with source of information data. 1.22 Stream crossings? No No stream crossing through the site. Neither any surface drain nor any water course (minor) passes through the mine area. 1.23 Abstraction or transfers of water form No No abstraction of natural flow of water in ground or surface waters? the form of ground or surface water in the lease area. Working will be done above water table. The mining operations do not require water, except watering the planted areas and for the workforce employed at the mine site. For these purpose approximately 3 KL water/ day will be consumed at the area. Water requirement of 3 KLD will be met from tanker supply. Potable tankers will be the source of the water.