The 43Rd Annual Engineering and Survey Report on Water Conditions of the Santa Ynez River Water

Total Page:16

File Type:pdf, Size:1020Kb

The 43Rd Annual Engineering and Survey Report on Water Conditions of the Santa Ynez River Water FORTY-THIRD ANNUAL ENGINEERING AND SURVEY REPORT ON WATER SUPPLY CONDITIONS OF THE SANTA YNEZ RIVER WATER CONSERVATION DISTRICT 2020-2021 April 21, 2021 Northern California Southern California Arizona Colorado Oregon FORTY-THIRD ANNUAL ENGINEERING AND SURVEY REPORT ON WATER SUPPLY CONDITIONS OF THE SANTA YNEZ RIVER WATER CONSERVATION DISTRICT 2020-2021 April 21, 2021 CARLSBAD, COVINA, AND SAN RAFAEL, CALIFORNIA APACHE JUNCTION, ARIZONA CENTENNIAL, COLORADO MEDFORD, OREGON INTENTIONALLY LEFT BLANK 1126-13 April 21, 2021 San Rafael Board of Directors Santa Ynez River Water Conservation District P.O. Box 719 Santa Ynez, California 93460 Re: Forty-Third Annual Engineering Survey and Report on Water Supply Conditions of the Santa Ynez River Water Conservation District, 2020-2021 Dear Board Members: Transmitted herewith is our Engineering Survey and Report on Water Supply Conditions of the Santa Ynez River Water Conservation District for 2020-2021. This, the Forty-Third Annual Report, presents the required and pertinent information for the Board of Directors to make necessary determinations for levying groundwater charges upon the production of groundwater from water-producing facilities (water wells) within the District. As such, it provides information on the status of the groundwater and surface water supplies, as well as the annual production of groundwater from within the District. Sincerely, Oliver S. Page OSP:rrk Enclosures INTENTIONALLY LEFT BLANK TABLES OF CONTENTS Page Number 1.0 Executive Summary 1 1.1. Historical Background 1 1.2. Description of the District 2 1.3. Report Summary 3 1.4. Findings 9 1.5. Sources of Information 10 2.0 GroundWater Charges 11 2.1. Revenues 12 2.2. Groundwater Production 12 2.3. Well Registration 16 2.4. Major Producers 16 3.0 Precipitation 25 4.0 Surface Water Conditions 29 4.1. Basin Surface Water Use 29 4.2. State Water Project Water Use 32 4.3. River System Flow Conditions 33 4.4. Water Rights Releases 33 4.5. State Water Code Requirements 40 5.0 Groundwater Conditions 41 5.1. Sources of Groundwater 41 5.2. Groundwater Level Changes 42 5.3. Storage Changes 49 5.4. Change in Storage Trends 57 5.5. Safe Yield 57 5.6. Historical Pumpage 57 5.7. Overdraft 57 5.8. Groundwater Quality 64 APPENDICES A Summary of Provisions in the California Water Code Pertaining to the Implementation of a Groundwater Charge B Historical Groundwater Charge Rates C Additional Streamflow Records, Santa Ynez River Basin D Water Rights Releases E General Description of the Hydrogeology of the Sources of Groundwater within the District F Water-Level Hydrographs of Selected Wells G Well Inventory i LIST OF TABLES Page Number Table 1a Annual Reported Groundwater Production Within the District, All District Zones .................................................................................................. 18 Table 1b Annual Reported Groundwater Production Within the District Agricultutal Water ................................................................................................ 19 Table 1c Annual Reported Groundwater Production Within the District Other Water ........................................................................................................... 20 Table 1d Annual Reported Groundwater Production Within the District Special Irrigation Water ........................................................................................ 21 Table 2 Monthly Precipitation and Departure From Normal at Bradbury Dam and Lompoc January 2020 through March 2021 ......................................................... 26 Table 3 Summary of Cachuma Project Operations 1953 Through 2020 ........................... 30 Table 4 Flow of the Santa Ynez River at the Lompoc Narrows ........................................ 34 Table 5 Flow of Salsipuedes Creek Near Lompoc ............................................................ 37 Table 6 Historical Water Rights Releases.......................................................................... 39 Table 7 Water-Level Changes Lompoc Plain Subarea 2020 to 2021 ................................ 45 Table 8 Water-Level Changes Lompoc Upland and Lompoc Terrace Subareas 2020 to 2021 ......................................................................................................... 46 Table 9 Water-Level Changes Santa Rita and Buellton Upland Subareas 2020 to 2021 ......................................................................................................... 46 Table 10 Water-Level Changes Santa Ynez Upland Subarea 2020 to 2021 ....................... 48 Table 11 Estimated Annual Change of Groundwater in Storage in the Santa Ynez River Alluvium for the Past Ten Years and Current Year (2020-21) ............................. 50 Table 12 Estimated Annual Change of Groundwater in Storage in the Lompoc Plain Subarea for the Past Ten Years and Current Year (2020-21) ............................... 51 Table 13 Estimated Annual Change of Groundwater in Storage in the Lompoc Upland and Lompoc Terrace Subareas for the Past Ten Years and Current Year (2020-21)............................................................................................................... 53 Table 14 Estimated Annual Change of Groundwater in Storage in the Santa Rita Upland Subarea For the Past Ten Years and Current Year (2020-21) .............................. 54 Table 15 Estimated Annual Change of Groundwater in Storage in the Eastern Portion of the Buellton Upland Subarea For the Past Ten Years and Current Year (2020-21)............................................................................................................... 55 Table 16 Estimated Annual Change of Groundwater in Storage in the District Portion of the Santa Ynez Upland Subarea For the Past Ten Years and Current Year (2020-21)............................................................................................................... 56 Table 17 Summary of Change in Quantity of Groundwater in Storage Within the District................................................................................................................... 58 ii Page Number Table 18 Estimated Average Safe Yield of Principal Sources of Groundwater Within the District ............................................................................................................. 61 Table 19 Estimated Average Annual Historical Reported Groundwater Pumpage from the Principal Sources of Groundwater Within the District .......................... 62 Table 20 Average Annual Overdraft of Principal Sources of Groundwater Within the District................................................................................................................... 63 Table 21 Estimated Accumulated Overdraft of Principal Sources of Groundwater Within the District................................................................................................. 65 LIST OF FIGURES 1 Santa Ynez River Water Conservation District 5 2 Groundwater Charge Zones, Santa Ynez River Water Conservation District 13 3 Annual Groundwater Production Within the District, 5-Year Moving Average 23 4 Annual Precipitation and Cumulative Departure from Mean for Lompoc, Santa Barbara, Bradbury Dam, and Gibraltar Dam 27 5 Monthly Surface Flow, Santa Ynez River Near Lompoc 35 6 Major Groundwater Sources, Santa Ynez River Basin 43 7 Accumulated Dewatered Storage 59 8 Graphs Showing Total Dissolved Solids, Chloride and Sodium Concentrations in Groundwater from Selected Wells Located in the Lompoc Plain Subarea 67 LIST OF TERMS Accumulated Overdraft ..........The amount of water necessary to be replaced in the intake areas of the groundwater basins within the District or any zone or zones thereof to prevent the landward movement of salt water into the fresh groundwater body, or to prevent subsidence of the land within the District or any zone or zones thereof, as determined by the board from time to time. Defined in Water Code Section 75505. See also Dewatered Storage Acre-Foot ...............................Volume of water to flood one acre to a depth of one foot (325,851 gallons). Ad Valorem property tax .......Property tax assessed according to value of property. AF, AC-FT .............................Acre-Foot. iii Agricultural water ..................Produced water first used on lands in the production of plant crops or livestock for market. Defined in Water Code Section 75508. Alluvium ................................Sediments deposited through stream or river action. In Santa Ynez these sediments are generally much younger, less consolidated, with greater hydraulic conductivity, than the surrounding marine and non-marine sediments. ANA .......................................Above Narrows Account. Water rights release from Bradbury Dam (Lake Cachuma) made to replenish the groundwater basin upstream of the Lompoc Narrows area. Annual Overdraft ...................The amount, determined by the board, by which the production of water from groundwater supplies within the District or any zone or zones thereof during the water year exceeds the natural replenishment of such groundwater supplies in such water year. Defined in Water Code Section 75506. BNA .......................................Below Narrows Account. Water rights release from Bradbury Dam (Lake Cachuma) made to replenish the groundwater basin downstream of the Lompoc Narrows area, i.e. for the Lompoc Plain subarea. Board .....................................Refers to the five Directors of the Santa Ynez River Water
Recommended publications
  • 5.1 Hydrology, Water Supply, and Water Quality
    5.1 HYDROLOGY, WATER SUPPLY, AND WATER QUALITY 5.1.1 OVERVIEW AND SUMMARY The proposed Master Plan Update will provide for additional water infrastructure facilities for the City of Solvang (City). The analysis of the proposed Master Plan Update was divided into potential construction and operational impacts to the surface and groundwater hydrology, the water supply, and water quality of the Santa Ynez River. The Master Plan Update proposes that the Santa Ynez River be the primary source of water for the City. The City will be required to obtain and implement a Storm Water Pollution Prevention Plan (SWPPP) as required by the State Water Resources Control Board (SWRCB). Therefore, the proposed Master Plan Update impacts to water quality during construction would be less than significant (Class III). The proposed Master Plan Update impacts to surface water hydrology, groundwater hydrology, water rights, and water supplies during construction would be less than significant (Class III). Operation of the proposed wells identified in the Master Plan Update would result in minimal reductions in flows along the Santa Ynez River at the Alisal Bridge compared to baseline conditions. Surface water quantity and quality along the Santa Ynez River would be consistent with historic measurements at the Lompoc Narrows under baseline conditions and under the proposed Master Plan Update. Water right users along the Santa Ynez River downstream of Bradbury Dam to the Highway 101 Bridge in Buellton would receive their entire water right entitlement from the riparian groundwater basins and the Cachuma Project. Therefore, potential cumulative water right impacts would be less than significant (Class III).
    [Show full text]
  • Historic P U B Lic W Ork S P Roje Cts on the Ce N Tra L
    SHTOIRICHISTORIC SHTOIRIC P U B LIC W ORK S P ROJE TSCP ROJE CTS P ROJE TSC ON THE CE N TRA L OCA STCOA ST OCA ST Compiled by Douglas Pike, P.E. Printing Contributed by: Table of Contents Significant Transportation P rojects......2 El Camino Real................................................... 2 US Route 101...................................................... 3 California State Route 1...................................... 6 The Stone Arch Bridge ..................................... 11 Cold Spring Canyon Arch Bridge..................... 12 Significant W ater P rojects...................14 First Dams and Reservoirs................................ 14 First Water Company........................................ 14 Cold Spring Tunnel........................................... 15 Mission Tunnel ................................................. 16 Gibraltar Dam ................................................... 16 Central Coast Conduit....................................... 18 Water Reclamation In Santa Maria Valley....... 23 Twitchell Dam & Reservoir.............................. 24 Santa Maria Levee ............................................ 26 Nacimiento Water Project................................. 28 M iscellaneous P rojects of Interest.......30 Avila Pier .......................................................... 30 Stearns Wharf.................................................... 32 San Luis Obispo (Port Harford) Lighthouse..... 34 Point Conception Lighthouse............................ 35 Piedras Blancas Light ......................................
    [Show full text]
  • Santa Ynez Annual Report
    FORTY-SECOND ANNUAL ENGINEERING AND SURVEY REPORT ON WATER SUPPLY CONDITIONS OF THE SANTA YNEZ RIVER WATER CONSERVATION DISTRICT 2019-2020 April 24, 2020 Northern California Southern California Arizona Colorado Oregon FORTY-SECOND ANNUAL ENGINEERING AND SURVEY REPORT ON WATER SUPPLY CONDITIONS OF THE SANTA YNEZ RIVER WATER CONSERVATION DISTRICT 2019-2020 April 24, 2020 CARLSBAD, COVINA, AND SAN RAFAEL, CALIFORNIA APACHE JUNCTION, ARIZONA CENTENNIAL, COLORADO MEDFORD, OREGON 1126-13 April 24, 2020 San Rafael Board of Directors Santa Ynez River Water Conservation District P.O. Box 719 Santa Ynez, California 93460 Re: Forty-Second Annual Engineering Survey and Report on Water Supply Conditions of the Santa Ynez River Water Conservation District, 2019-2020 Dear Board Members: Transmitted herewith is our Engineering Survey and Report on Water Supply Conditions of the Santa Ynez River Water Conservation District for 2019-2020. This, the Forty-Second Annual Report, presents the required and pertinent information for the Board of Directors to make necessary determinations for levying groundwater charges upon the production of groundwater from water-producing facilities (water wells) within the District. As such, it provides information on the status of the groundwater and surface water supplies, as well as the annual production of groundwater from within the District. Sincerely, Oliver S. Page OSP:rrk Enclosures TABLES OF CONTENTS Page Number 1.0 Introduction 1 1.1. Historical Background 1 1.2. Description of the District 2 1.3. Report Summary 3 1.4. Findings and Determinations 7 1.5. Sources of Information 8 2.0 Groundwater Charges 9 2.1. Revenues 10 2.2.
    [Show full text]
  • Locations Contact Information
    LOCATIONS CONTACT INFORMATION Aerial Services Aeronautic Pictures Craig Schmitman 805-985-2320 http://aeronauticpictures.com/ P.O. Box 1748, Ojai, CA 93024 Film, video and still photography aerial and location services. Stock footage and photos too. We work air-to-anywhere. Demo reel on our website. Aspen Helicopters 805-985-5416 Fax: 805-985-7327 [email protected] http://www.aspenhelo.com/ Crop spraying and aerial tours. Credits: Richmond Prods. FAA Federal Aviation Administration Terri Rector FAA Federal Aviation Administration 10 Burns Place Goleta, CA 93117 805-681-0534, x3102 [email protected] Regional Flight Standards: (Van Nuys) 818-904-6291 Platinum Helicopters, Inc Skybound Charter, LLC Phone: 805-484-6900 Fax: 805-484-6939 Camarillo, Ca. 93010 [email protected] www.platinumhelicopters.com Movie/Television Camera Flight Operations, Aerial Film Productions, Business/VIP Transportation throughout Southern California, Arizona, Nevada. Aerial Photography, Aerial Survey, Private Tours/Sightseeing, Geological Survey. Remote-i Rhandal Sayat - Director of Photography 805-681-7314 [email protected] http://www.remotei.com/ 81 David Love Place, Goleta, CA 93117 Remote Aerial Photography, videography & cinematography services, and camera mount systems. Santa Barbara Biplane Tours Jay Farbman - Marketing Director 805-453-8320 [email protected] http://www.sbbiplane.com/ 406 A Moffett, Santa Barbara, CA 93117 Signature Flight Support Devin Madgett 805-967-5608 Fax: 805-967-5781 515 Marxmiller Rd, Goleta, CA 93117 [email protected] http://www.signatureflight.com/ Helicopter and fixed wing. Hangar storage 6am-10pm. After hours service available. Spitfire Aviation Flight School 805-967-4373 [email protected] 300 Moffett Place, Goleta, CA, 93117 Flights for still photography or filming purposes.
    [Show full text]
  • Ground-Water Quality in the Santa Rita, Buellton, and Los Olivos Hydrologic Subareas of the Santa
    GROUND-WATER QUALITY IN THE SANTA RITA, BUELLTON, AND LOS OLIVOS HYDROLOGIC SUBAREAS OF THE SANTA YNEZ RIVER BASIN, SANTA BARBARA COUNTY, CALIFORNIA By Scott N. Hamlin U.S. GEOLOGICAL SURVEY Water-Resources Investigations Report 84-4131 Prepared in cooperation with the CALIFORNIA REGIONAL WATER QUALITY CONTROL BOARD, CENTRAL COAST REGION o C\J I C\J Sacramento, California 1985 UNITED STATES DEPARTMENT OF THE INTERIOR DONALD PAUL HODEL, SECRETARY GEOLOGICAL SURVEY Dallas L. Peck, Director For additional information Copies of this report write to: can be purchased from: Open-File Services Section District Chief Western Distribution Branch U.S. Geological Survey U.S. Geological Survey Federal Building, Room W-2234 Box 25425, Federal Center 2800 Cottage Way Denver, CO 80225 Sacramento, CA 95825 Telephone: (303) 236-7476 CONTENTS Page Abstract ------------------------------------------------------------- i Introduction -------------- - ______________ ______________________ 2 Location and general features -------------------- --- ----- - 2 Problem - - - - - -- 2 Purpose and scope ----------------------------------------------- 4 Approach -------------------------------------------------------- 4 Previous work ------------- _-_-_-----_ ____ _________________ 5 Acknowledgments ------------------------------------------------- 5 Well-numbering system ------------------------ --- ______--_--_ 5 Ground-water geology ------------------------------------------------- 7 Main water-bearing units -------- __________ _____ _______ __ 7 Geologic structure
    [Show full text]
  • 53048 Federal Register / Vol. 47, No. 227 1 Wednesday, November 24, 1982 / Proposed Rules
    53048 Federal Register / Vol. 47, No. 227 1 Wednesday, November 24, 1982 / Proposed Rules prescribed by the Secretary, the terms the Department reviews the executed DATE: Written comments must be and conditions upon which the mortgage loan documents in accordance with the received by January 10, 1983. will be insured. procedure set forth in § 200.163, if the ADDRESS: Send written comments to: (b) Except as set forth in § 200.164(f), documents are acceptable the loan is Chief, Regulations and Procedures commitments are not issued by HUD endorsed. Division, Bureau of Alcohol, Tobacco under the single family Program of and Firearms, P.O. Box 385, Washington, PART 237-AMENDED] Direct Endorsement. Under this Program DC 20044-0385, Attention: Notice No. the Department reviews the executed 14. Part 237 is amended by revising 435. loan documents in accordance with the § 237.5 to read as follows: procedure set forth in § 200.163, and if Copies of the petition, the proposed the documents are acceptable the loan is § 237.5 Cross-reference. regulations, the appropriate maps, and written comments will be available for endorsed.. 11. Part To be eligible for insurance under this 203 would be amended by public inspection during normal subpart, a mortgage shall meet all of the business hours at: ATF Reading Room, revising § 203.255 to redd as follows: eligibility requirements for insurance Room 4405, Federal Building, 12th and § 203.255 Insurance of mortgage. under § § 203.1 et seq. (Part 203, Subpart Pennsylvania Avenue NW., Washington, A) of this chapter; § § 220.1 et seq. (Part (a) Upon compliance with a D.C.
    [Show full text]
  • Storage and Conveyance of the City of Santa Barbara's Gibraltar
    Draft FINDING OF NO SIGNIFICANT IMPACT Storage and Conveyance of the City of Santa Barbara’s Gibraltar Reservoir Pass Through Water in and Through Cachuma Project Facilities FONSI-12-086 U.S. Department of the Interior Bureau of Reclamation January 2016 Mission Statements The mission of the Department of the Interior is to protect and manage the Nation’s natural resources and cultural heritage; provide scientific and other information about those resources; and honor its trust responsibilities or special commitments to American Indians, Alaska Natives, and affiliated island communities. The mission of the Bureau of Reclamation is to manage, develop, and protect water and related resources in an environmentally and economically sound manner in the interest of the American public. BUREAU OF RECLAMATION South-Central California Area Office, Fresno, California Draft FONSI-12-086 Storage and Conveyance of the City of Santa Barbara’s Gibraltar Reservoir Pass Through Water in and Through Cachuma Project Facilities _____________ Prepared by: Stacy L. Holt Date Natural Resources Specialist _____________ Concurred by: Ned M. Gruenhagen Date Wildlife Biologist or Biology Technician _____________ Concurred by: Rain L. Emerson Date Supervisory Natural Resources Specialist _____________ Approved by: Michael P. Jackson, P.E. Date Area Manager Draft FONSI-12-086 Introduction In accordance with section 102(2)(c) of the National Environmental Policy Act of 1969, as amended, the South-Central California Area Office of the Bureau of Reclamation (Reclamation), has determined that executing 5- and 40- year Warren Act contracts with the City of Santa Barbara (City) is not a major federal action that will significantly affect the quality of the human environment and an environmental impact statement is not required.
    [Show full text]
  • USBR / SBCWA Master Contract
    This is a true certified copy of the original doc·-'"!lent c:1 C: c~ c ~ r:,~:);j L1 my office. It bears the seal ~.:-.-... c ~- ~, i:::;_::i...•:ed in purple ink. of the Oe:rk c :· ~-- ! ___ .:-2. ctSupervisors ~'~~~ c£~ ...... ..-.kb?- Rev. S.C.C. 10/26-1995 01 Rev. R.O. 02/08-1996 !Jare:: ' By~~~~~~~~- UNTIED STATES Irrigation (with M&I) DEPARTMENT OF THE INTERIOR Contract No. BUREAU OF RECLAMATION I75r-1802R Cachuma Projec+~ California CONTRACT BETWEEN TIIE UNITED STATES AND SANTA BARBARA COUNTY WATER AGENCY PROVIDING FOR WATER SERVICE FROM THE PROJECT Table of Contents Article No. Page No. Defined Terms 1-2 Preamble 3 Explanatory Recitals 3-8 1 Definitions 8-11 2 Term of Contract-Right to Use of Water 12-13 3 Water to be Made Available and Delivered to the Cachuma Member Units 13-17 4 Point of Diversion and Responsibility for Distribution of Water 17-18 5 Measurement of Water Within Contractor's Area of Service 18 6 Calculation of Rates and Method of .Payment for Water 18-28 7 Recognition of Downstream Water Rights and Studies 28-29 8 Transfers or Exchanges of Water 29 9 Project Operations/Temporary Reductions 30-32 10 Compliance With Federal Law 32 11 Water and Air Pollution Control 32 12 Quality of Water 32-33 13 Water Acquired by the Cachuma Member Units Other Than From the United States 33 14 Charges for Delinquent Payments 33-34 15 Equal Opportunity 34-35 16 General Obligation--Benefits Conditioned upon Payment 35-36 Article No.
    [Show full text]
  • Notice of Determination
    NOTICE OF DETERMINATION Office of Planning and Research Clerk of the Board 1400 Tenth Street, Room 113 County of Santa Barbara Sacramento, CA 95814 105 E. Anapamu Street, Room 407 Santa Barbara, CA 93101 SUBJECT: Filing of Notice of Determination in compliance with Section 21108 or 22152 of the Public Resources Code. State Clearinghouse Number: 2021020258 Project Title: Floradale Crossing Sewer Line Directional Drill Project Project Applicant: City of Lompoc City Project Files: ER20-19 Project Location: Upstream of Floradale Bridge, City of Lompoc, and County of Santa Barbara Project Description: The project proposes to install approximately 700 feet of inverted siphon interceptor sewer line using two 12-inch diameter High Density Polyethylene (HDPE) pipes and Horizontal Directional Drilling (HDD) trenchless technology boring under the Santa Ynez River. The second 12-inch pipe is intended to provide redundancy, stability and to allow for maintenance or repair. The sewer lines will be placed east (upstream) of the existing Floradale Bridge, extending from the southeast side of the existing Floradale Bridge, under the Santa Ynez River to the northeast side existing Floradale Bridge, within the existing 20-foot easement. The City Council of the City of Lompoc approved the above described project on April 6, 2021, and made the following determinations: 1. The project [ will, will not] have a significant effect on the environment. 2. An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA. A Negative Declaration was prepared for this project pursuant to the provisions of CEQA. 3. Mitigation measures [ were, were not] made a condition of approval for this project.
    [Show full text]
  • Goleta Train Depot Project
    Goleta Train Depot Project Draft Environmental Impact Report prepared by City of Goleta Neighborhood Services and Public Safety Department 130 Cremona Drive, Suite B Goleta, California 93117 Contact: Jaime A. Valdez, Principal Project Manager prepared with the assistance of Rincon Consultants, Inc. 209 East Victoria Street Santa Barbara, California 93101 June 2021 Goleta Train Depot Project Draft Environmental Impact Report prepared by City of Goleta Neighborhood Services and Public Safety Department 130 Cremona Drive, Suite B Goleta, California 93117 Contact: Jaime A. Valdez, Principal Project Manager prepared with the assistance of Rincon Consultants, Inc. 209 East Victoria Street Santa Barbara, California 93101 June 2021 This report prepared on 50 percent recycled paper with 50 percent post-consumer content Table of Contents Table of Contents Executive Summary ........................................................................................................................... ES-1 Project Synopsis ......................................................................................................................... ES-1 Project Objectives ...................................................................................................................... ES-3 Alternatives ................................................................................................................................ ES-3 Areas of Known Controversy ....................................................................................................
    [Show full text]
  • SILTING of RESE] ^Fieak ^ Novi of 0193Í
    Issued JULY 1936 TECHNICAL BULLETIN NO. 524 Revised August 1939 SILTING OF RESE] ^fiEAk ^ NOVi OF 0193Í By HENRY M. EAKIN Head, Sedimentation Studies Division of Research Soil Ck>nseryation Service Revised by CARL B. BROWN Project Supervisor Reservoir Investigations Soil Ck>n8ervation Service UNITED STATES DEPARTMENT OF AGRICULTURE, WASHINGTON, D. C. For sale by the Superintendent of Documents, Washington, DéCi -• -------••-•-- Price ?1.00 JULY 1936 TECHNICAL BULLETIN NO. 524 REVISED AUGUST 1939 UNITED STATES DEPARTMENT OF AGRICULTURE WASHINGTON, D. C. SILTING OF RESERVOIRS ' By HENEY M. EAKIN^ Head, Sedimentation Studies, Division of Research, Soil Conservation Service Revised by CABL B. BROWN Project Supervisor, Reservoir Investigations CONTENTS Page Page Introduction 2 Reservoir surveys—Continued. The project.- _ — 2 Upper Crystal Springs Reservoir 114 Economic aspects of the problem . 3 Upper San Leandro Reservón: 116 Physical aspects of the problem 4 Original capacity survey of Lake Mead... 117 Processes of reeervoir silting 6 General summary of results of the 1934-38 Previous investigations— 8 surveys 119 Basin reservoirs -.- 9 Reservoir reconnaissance investigations, 1934- Basin reservoirs resurveyed in 1935-36- 37 126 White Rock Reservoir Sediment measurements in other south- Elephant Butte Reservoir eastern reservoirs 126 Roosevelt Reservoir Emporia Reservoir, Emporia, Va 125 Lake Michie__ Wateree Reservoir, near Cam den, S. C. 127 Gibraltar Reservoir ._ Lake Murray, Saluda River, above Basin reservoirs with earlier records Columbia, S. C 128 only Appalachie Reservoir, Greer, S. C 128 Lake Worth Stevens Creek Reservoir, Augusta, Ga_ 130 Lake McMillan Warwick Reservoir, near Cordele, Ga_ 131 Zuni Reservoir Flint River and Muckafoone Reser- Sweet water Reservoir _ voirs, Albany, Ga 135 Lake Chabot Lake Martin, Dadeville, Ala 136 Guernsey Reservoir Completely filled Piedmont reservoirs 139 Cheoah Reservoir._.
    [Show full text]
  • Gibraltar Dam Background
    6-c CITY OF SANTA BARBARA COUNCIL AGENDA REPORT Draft AGENDA DATE: April 10, 2018 TO: Mayor and Councilmembers FROM: Engineering Division, Public Works Department SUBJECT: Contract For the Gibraltar Spillway Condition Assessment RECOMMENDATION: That Council authorize the Public Works Director to execute a City Professional Services contract with GEI Consultants, Inc. in the amount of $86,281 for professional services to prepare the Gibraltar Spillway Condition Assessment Report, and authorize the Public Works Director to approve additional expenditures of up to $8,628 for extra services of GEI Consultants Inc. that may result from necessary changes in the scope of work. DISCUSSION: Background The City owns and operates Gibraltar Dam (Dam), which was constructed in 1920 and is located on the Santa Ynez River, upstream of Lake Cachuma, and approximately nine miles from the City of Santa Barbara. The Dam has a maximum height of 178 feet, a 600-foot long crest, and is equipped with five spillways having a combined total capacity to pass water at a rate of 90,000 cubic feet per second. In last year’s rainy season in Northern California, Oroville Lake filled and spilled, resulting in extensive damage to the spillway. This created a crisis situation, complete with the need for mass evacuations downstream, below the dam. As a result of this experience, the California Division of Safety of Dams (DSOD) established a mandate for dam owners to assess the condition of the spillways at every facility under its jurisdiction. The deadline for the Gibraltar facility is July 31, 2019. The proposed contract will satisfy that mandate and will provide the City with an update on the condition of the Dam.
    [Show full text]