Construction of Second Tunnel of Airoli-Katai Elevated Project Begins
Total Page:16
File Type:pdf, Size:1020Kb
The Dynamic Daily Newspaper of Navi Mumbai Saturday, 26 December 2020 www.newsband.in Pages 8 • Price 2 VOL. 14 • ISSUE 169 RNI No. MAHEN/2007/21778 POSTAL REGN. No. NMB/154/2020-22/VASHI MDG POST OFFICE Amnesty Scheme evokes Construction of second good response AHAR welcomes NMMC collects more than Rs 24 50% waiver in tunnel of Airoli-Katai crore within a week of its launch license fee and rollback of the By Abhitash D.Singh around 30 percent of the proposed 15% elevated project begins ealising the finan- property tax i.e. Rs. 187 annual hike The work of this important project was started at the Rcial difficulties that crores from the estimat- The Indian Hotel the citizens had to face ed Rs 630 crores for the during the lockdown im- and Restaurant As- hands of Urban Development Minister on December 24th financial year 2020-21. posed in the backdrop of NMMC Commis- sociation (AHAR), Covid 19 pandemic, the sioner Abhijit Bangar the apex body of the Navi Mumbai Municipal said, “The collection of industry has wel- Corporation (NMMC) property tax had been comed the State Gov- launched the Amnesty severely affected due to ernment’s decision of Scheme (Abhay Yoja- the ongoing pandemic. 50% waiver in license na) from December 15, Further, many citizens fee and rollback of the 2020. The civic body, of the satellite city are proposed 15% annual through the scheme, has going through financial hike. Mr. Shivanand Shetty, President, AHAR said, “This is a very positive step to- wards supporting the industry which has By Chandrashekhar Hendve 24th December at the Mumbai and Kalyan- been badly hit due to he construction work hands of Urban Devel- Dombivali. The new the pandemic related Tof the second tunnel opment Minister, Eknath route will avoid traffic of Airoli-Katai elevated lockdown..” Shinde. The project will project was started on connect Mumbai, Navi CONTINUED ON page...2 (More on page 6) Officials ordered Local train services on Trans-harbour to resolve the pending issues of Mathadi workers line hit due to pantograph malfunction offered 75% rebate on difficulties. Abhay Yoja- the penalty for delayed na was launched by the M a h a r a s h t r a The pantograph of the suburban train got entangled with the overhead payment of property tax civic body with an aim Labour Minister, wire at Koparkhairane station around 10 am on 25th December till 15th February, 2020. to give relief to all those Dilip Walse-Patil and The scheme has evoked property tax payers who Home Minister, Anil By Vikram Gaikwad a good response from had not paid the tax. The Deshmukh have in- he movement of the tax payers and within citizens are requested to structed the Labour Tlocal trains on the a week of its launch, the pay their pending prop- and Home Depart- Thane-Vashi Trans- civic body succeeded erty tax between 15th ment officials to re- Harbour suburban rail- in collecting Rs. 24.18 December till 15th Feb- solve the pending way line was disrupted crores. ruary, 2020, after which issues of Mathadi on Friday after a local's The civic body, workers within a pantograph got entan- till date, has collected CONTINUED ON page...2 month. The Minis- gled with the overhead ter also promised to wire at Koperkhairane allow the Mathadi station at around 10 am, workers to travel by an official said. PHOTO By SUMIT RENOSE train from January 1 About 1 km of over- as they are engaged head wire between Turb- with the overhead wire. the local services on this he and Koparkhairane in loading and un- As a result, the move- route started smoothly at was broken when a pan- loading of essential ment of trains from Vashi around 3.30 pm. tograph on the Vashi- to Thane and Nerul to According to an of- commodities… Thane local on the Trans (More on page 2) Thane were disrupted for ficial, at around 10 a.m. Harbor railway line about 5 hours. After the broke and got entangled repair work was done, CONTINUED ON page... 3 2 Saturday, 26 December 2020 AMNESTy SCHEME NMMC Chief Ab- Officials ordered to resolve the EVOkES GOOD.... hijit Bangar instructed CONTINUED FROM page...1 the civic body officials NMMC will not only to effectively implement pending issues of Mathadi workers offer any rebate but will the online system so that State Labour Minister and Home Minister have instructed the also take legal action the citizens do not have against the defaulters." to come to the municipal Labour and Home Department to do the needful within a month Bangar further added, office for paying their " The civic body, even property taxes. By Chandrashekhar Hendve Transport and General Workers The meeting was attended during the pandemic, aharashtra Labour Minis- Union had called a strike on De- by Maharashtra State Mathadi, succeeded in collecting Mter, Dilip Walse-Patil and cember 14 to draw the attention Transport and General Workers Rs. 187 crores property Home Minister, Anil Deshmukh Union leaders, former MLA Na- tax from April 2020 till have instructed the Labour and rendra Patil, former Minister and 21st December, 2020. Home Department officials to MLA Shashikant Shinde, Labor And now through Am- resolve the pending issues of Department Principal Secre- nesty Scheme from Mathadi workers within a month. tary Vanita Singhal, Joint Labor 15th December till 15th The Minister also promised to Commissioner Raviraj Ilve, La- February, 2020 the civic allow the Mathadi workers to bour and Home Department of- body hopes to collect travel by train from January 1 as ficials, Mathadi Board Chairman good amount which will they are engaged in loading and and other officials. be used for many devel- unloading of essential commodi- towards the pending issues and Home Minister Anil opmental works in the ties. demanded their speedy resolu- satellite city." Maharashtra State Mathadi, tion. CONTINUED ON page... 3 Residents demand action against Illegal sewage connection By Chandrashekhar Hendve have been constructed on the open concretization work that had been he residents living in Sai spaces adjacent to Sai Sadanand carried out by the Navi Mumbai TSadanand Nagar chawl in Nagar Chawl and have illegally Municipal Corporation (NMMC) Ghansoli have alleged that ille- connected their sewage line with a year and a half ago, has not been gal constructions that that have the Sai Sadanand Nagar sewage done properly. The road is at a cropped up in the vicin- higher plane, than that of ity are illegally connect- the chawls due to which ing their sewage line with the sewage water enters their sewage lines. This into the houses. CHANGE OF NAME is causing a great deal of Thus, to solve the issue I have changed my name from BABURAO CHANGU inconvenience to the resi- the residents of Sai Sadan- PATIL to BABURAO CHANGO PATIL as per docu- dents. They have demand- and Nagar resident, met the ments. ed immediate action from officials of Ghansoli ward the authorities. and submitted a letter. DOCUMENT MISSING The residents allege Speaking about the Notice is hereby given, that the original Share Certificate Reg. that due to illegal sewage line due to which the sewerage issue Madan Waghchaure, Engi- No. 14, No. of Shares - 5 distinctive No. 066 to 070 issued by connections, the sewage water is line has started overflowing”, said neer Ghansoli Ward said, “I have Datta Krupa Co-operative Housing Society Ltd., located at Kurla, overflowing and entering into the a resident. personally inspected the area and Mumbai to its member Mr. Prakash Vinayak Bhogate, Owner of room no. C-2 has been lost while travelling from Vashi Bus Depot houses on the ground floor. To add on to the problem, the have instructed the engineers to to Sector - 20, Nerul Bus Depot on 22nd December 2020 at 5.30 “Three unauthorized buildings residents point out that the road do the needful”. pm. A complaint to the efffect has been lodged by Mrs. Sandhya Prakash Bhogate, aged 65 years residing Plot No. 101, Vikram CONSTRUCTION OF will begin soon. half years, after which have three sidewalks Society, Sector - 20, Nerul, Navi Mumbai - 400 706 with Nerul police station who have recorded the same vide their document SECOND TUNNEL... The Thane-Belapur the distance between each. The tunnel will missing register No. 2587/2020 dated 23rd December 2020. CONTINUED FROM page...1 Elevated Freeway will Airoli and Katai will be also have a refuge lane In case no information about the lost Share Certificate is received jams and will cover the be similar to the East- reduced and the traffic in for repair work on both within 15 days from the date of publication hereof, it shall be ern Freeway connecting this area will be faster. sides, CCTV system and deemed that the Share Certificate has been lost for good and the distance from Airoli to society shall then initiate the process of issuing a duplicate share Dombivali in 15 min- Mumbai to Thane. The second phase will a high-quality fire extin- certificate to its affected member, Mrs. Sandhya Prakash Bho- utes. “Considering the see a flyover near Dom- guishing system to keep gate. The relevant contact Tel. No. 8652657505 is Mrs. Sandhya Currently, work on growing population of bivli, as well as an over- the traffic safe. Prakash Bhogate. Date : 26-12-2020. Sd/- the tunnel is in full swing this area in future and bridge and underpass at “This road is very Place : Navi Mumbai. Mrs. Sandhya Prakash Bhogate from both Airoli and the need for good roads, Sheelphata, which will important for both the Mumbra.