HOPE AFTER STEP ONE Dear Subscribers and Readers

Total Page:16

File Type:pdf, Size:1020Kb

HOPE AFTER STEP ONE Dear Subscribers and Readers Greater Milwaukee Central Office “Welcoming Newcomers and Aiding AA Groups In Our Community.” Vol. 28 Issue 1 January 2020 Dear Subscribers and Readers, HOPE AFTER STEP ONE We truly appreciated your support, these past years. The Big Book tells us that alcoholics drink because they are Our hope is that you have enjoyed and found the Be- “restless, irritable and discontented." (xxvi) Well, that was- tween-Us Newsletter informative and entertaining. n’t me! I even drank when everything was hunky dory. I recall a time, back in the 1950s, arriving home from a joy- As time and technology have moved forward, it is ous visit with my lovely girlfriend at a nearby college and now time for us to do the same. Due to the high cost not having drank a drop. I was as exuberantly happy that a young man might be! However, I became “boiled as an owl” of printing and postage and the low number of sub- that night before the bars closed. Happy or otherwise, there scriptions (184), changes should be made. was a mental obsession that decided when or if I would drink—the Big Book tells us: “Alcoholics have lost choice Effective January 2020, we will in the matter of drink.” (p. 24). So long as that no longer be offering mail ser- demon (I refer to is as a drunken monkey) re- mains active in my noggin, I am sure to drink vice for our Between-Us deliv- again. ery. We will be emailing a copy This episode took place during the 1950s each month to whomever would when I still had sufficient willpower to choose like to receive it, at no charge. to go home directly after ‘motel-time’ was an- nounced at the bar. However, that was not to You will be free to print a “hard be the case as years passed. The Big Book tells copy” for distribution at your us that real alcoholics have a progressive phys- group. Also, you can “forward” ical condition (allergy) which destroys their ability to control how much they drink after the email to all of your interested they once start. During the 1960s, I became an friends and group members. This eco-friendly mode avid attender of Los Angeles theater where they offer cock- of distribution will help save money and the envi- tails during intermission. Yet, I had learned, through tor- turous experience, that if I drank just one of those tempting ronment. devils, I was doomed to think of little else till I got to the nearest bar. My expensive evening at the theater would be Those of you who do not have email can pick up a ruined! Positive proof e that the good doctor Silkworth printed copy at the Central Office, for 25¢ a copy. rightly described the physical allergy. (p. xxviii) If you are interested in having the Between-Us So, I was powerless over alcohol both before and after my first drink, and though I have been sober for a fairly long emailed to you, please send contact information to time, if I imbibe just one shot of whisky this evening, I may Dan at: [email protected]. not be able to stop drinking for several days. My physical allergy landed my in several drunk tanks, through twenty- For anyone or group that has already paid for the eight years of inebriated living and lost more jobs for not year 2020, please contact Dan at 414-771-9119 or showing up than I can remember. However, that doesn’t email: [email protected] for more infor- amount to a hill of beans so long as I don’t take that first drink—and this won’t be necessary so long as I remain in a mation. “fit spiritual condition.” (p. 85) I trust God will keep me safe from that drunken monkey so long as I live in accord- Sincerely, ance with the Twelve Steps. Milwaukee Central Office Bob S, Richmond, Indiana Board of Directors and Staff Reprinted with permission, Robert Stonebraker December 2019, Richmond Indiana 25¢ Published monthly by Greater Milwaukee Central Office, Inc., 7429 W. Greenfield Ave., West Allis, WI 53214, (414) 771-9119 Visit our website at: www.aamilwaukee.com 1 Secretary Meeting December 10, 2019 Groups represented: Gp 22, Gp 48, Gp 100, Another Chance Tue Night, Big Book Readers, Early Bird Rogers, Gratitude Gp, Mayfair Ladies Mon/Fri Gp., New Begin- nings Oconomowoc, Pow Wow Gp, Restore U to Sanity, Serenity In the Woods, Sun Night Grapevine, Thinking Outside the Bottle, Trust Through Fellowship, Tuesday a.m. Big Book/12x12 Study, Wanderer’s, and Way of Life Gp. Only 17 groups were represented. I’m sorry if I have missed anyone that was in attendance. Nancy S. opened the meeting at 7:00 p.m. with a moment of silence followed by the Serenity Prayer. Bank Balances on left of this page. New secretaries introduced themselves, and made announcements. ALL MEETINGS listed in our meeting directo- ries should routinely contribute to the AA Service Entities; Milwaukee Central Office 50%, GSO in New York 30% and Area 75 Committee 10% and to your Districts 10%. Between-Us monthly Newsletter is free for all through Email. New subscribers should send an email to: [email protected]. BIRTHDAY CLUB! We celebrate birthdays, and we’d like to help you celebrate yours! Send us a donation of $1 for each year - or more if you’d like - and we’ll print your birthday in the Between-Us Newsletter. Include your Home Group, and we’ll print that too! Just fill in the form found on page 6 of this newsletter. Volunteers are needed for the helpline, some overnight and some Saturdays (9-1 or 1-5). Some in-office hours available now. You need to have at least 1 year of sobriety, a Home Group and Spon- sor. Call Nancy or Dan. Gratitude Boxes: All groups should have re- ceived the boxes, to pass at the Nov/Dec meet- ings. Please return the boxes or the contents to Central Office in January. You may, if you wish, open the box and send a check for the amount in the box. Please include the group Name and ID number, on the check. The Deaf Access Commit- Deaf Access Committee (DAC) The meeting closed with the Lord’s Prayer at tee needs to rotate it’s November 2019 7:30 p.m.. Next meeting is January 14th, 2019, at 7 Balance: $8,651.19 p.m. members. We are Contributions: $1,300.76 searching for two AA mem- Interpreter : $1,120.00 Meeting Space Available bers to act as Co-Chairs, a Awareness Event treasure, and a liaison per- Expenses: N/A St Martin Mission Church, 29th and Lincoln Ave, Milwaukee. Contact: [email protected] or son to work with Members Donations: N/A Annual Cost of interpreters call 262-510-7400 (Fr. Steven) for more information. of AA Deaf community. for 3 meetings a week @$160 They can email DAC at: Christ United Methodist Church, 5200 S 48th St. per meeting is $24,960 Greenfield WI 53221. Wheelchair accessible space milwareadeafaccess@ Leslie P. with questions: available. Contact: Jo, 414-421-0202 or email: gmail.com [email protected] [email protected] 2 Bucks In The Basket... Make it a Reality, not just a dream! “Every AA group ought to be fully self-supporting, declining outside contributions.” Tradition Seven, Twelve Steps and Twelve Traditions, Reprinted with permission AA World Services, Inc. Seventh Tradition Checklist 2 DISTRICT INFO ON THE WEB: TAYCHEEDAH CORRECTIONAL, Meetings are held 1st, 2nd & 4th Tues- https://www.area75.org/page/districtmeetings day and on the 3rd Thursday at 5:45 -7:30 p.m., Gloria K. (920) 921-2395 1. JACKSON, LaCROSSE, MONROE, VERNON, & TREMPEALEAU; FEDERAL CORRECTIONAL INSTITUTION, P.O. Box 1085 Oxford, No 2 & 18 GREEN LAKE & MARQUETTE CNTY'S & PART OF Meeting! WAUSHARA; 8 & 30 ROCK ; 9. CRAWFORD, GRANT, IOWA and LAFAYETTE; 19 FEDERAL CORRECTIONAL Satellite Camp, New Path Group, P. O. & 37. RICHLAND & SAUK; Box 1085 Oxford, WI. Meetings Wed. at 1:30 p.m. 20, 21 & 26 DANE; 31. COLUMBIA CNTY; 35. GREEN; 37. JUNEAU OAK HILL AA GROUP, OAK HILL WCI 5212 Hwy M, P.O. Box 140 Oregon, WI 53575 Meetings Wednesday at 7:00 p.m. and Sunday at CNTY’S 6:30 p.m. Contact: Rick B. (608) 235-5154 (Check the web address above for meeting info.) THOMPSON FARM, RT. 2 DEERFIELD, WI., Closed meeting Tuesday 3. MANITOWOC & SHEBOYGAN CNTY'S 3rd Wed. of month, 6:30 at 8:00 p.m. Contact: Tom Dickert, (608)764-5755 p., Even numbered months at 1907 Club, 2908 N. 21st St., ROBERT ELLSWORTH CORRECTIONAL, 21425A Spring St., Union Sheboygan. Odd numbered months: Alano Club, 404 S 29 St Grove, 53182 Call for AA Meeting times: Contact Jennifer H. 262) Manitowoc 237-1294 or Cheryl P. (262) 914-3970. 6. WALWORTH CNTY 2nd Tue. 7:30 p. Feb. Apr. June. Aug. Oct. and KETTLE MORAINE CORR., Box 31, W9071 Forrest Dr., Plymouth, AA Dec. only, Walworth Alano Club, 611 E. Walworth St., Delavan Thr. at 6:00 p.m. Contact Mike L (920) 898-4782. 7. KENOSHA CNTY 3rd Sun. of month, 4:00 p., Kenosha Alano Club, WAUPUN CORRECTIONAL INSTITUTION AA Meeting Sat. , 8:00a.m.- 630 56th St. 9:30 a.m. Dale C. 920-387-4229 after 5 p. clearance. 10.Spanish District. Contact: Salvador G. at 414-446-0158. Meets MILWAUKEE COUNTY HOUSE OF CORRECTION, 8885 S. 68th St. every 2nd & 4th Sunday 9 a.m.
Recommended publications
  • Chapter Ii Mine Tailings Facilities
    14 TOWARDS ZERO HARM – A COMPENDIUM OF PAPERS PREPARED FOR THE GLOBAL TAILINGS REVIEW TOWARDS ZERO HARM – A COMPENDIUM OF PAPERS PREPARED FOR THE GLOBAL TAILINGS REVIEW 15 SETTING THE SCENE CHAPTER II Upstream MINE TAILINGS 4 3 FACILITIES: OVERVIEW 2 1 AND INDUSTRY TRENDS Starter dyke: 1 Downstream The embankment design terms, upstream, Elaine Baker*, Professor, The University of Sydney, Australia and GRID Arendal, Arendal, Norway downstream and centreline, indicate the 4 Michael Davies*, Senior Advisor – Tailings & Mine Waste, Teck Resources Limited, Vancouver, Canada direction in which the embankment crest 3 moves in relation to the starter dyke at the Andy Fourie, Professor, University of Western Australia, Australia 2 base of the embankment wall. Gavin Mudd, Associate Professor, RMIT University, Australia 1 Kristina Thygesen, Programme Group Leader, Geological Resources and Ocean Governance, GRID Arendal, Norway Centreline Dyke: 2 to 4 or more 4 Dykes are added to raise the embankment. This continues throughout the operation 3 of the mine. 1. INTRODUCTION The tailings are most commonly stored on site 2 in a tailings storage facility. Storage methods for 1 This chapter provides an overview of mine tailings conventional tailings include cross-valley and paddock and mine tailings facilities. It illustrates why and (ring-dyke) impoundments, where the tailings are how mine tailings are produced, and the complexity behind a raised embankment(s) that then, by many Source: Vick, 1983, 1990 involved in the long-term storage and management definitions, become a dam, or multiple dams. of this waste product. The call for a global standard However, a tailings facility can have an embankment Figure 1.
    [Show full text]
  • Dam Effects on Low-Tide Channel Pools and Fish Use of Estuarine Habitat
    Beaver in Tidal Marshes: Dam Effects on Low-Tide Channel Pools and Fish Use of Estuarine Habitat W. Gregory Hood Wetlands Official Scholarly Journal of the Society of Wetland Scientists ISSN 0277-5212 Wetlands DOI 10.1007/s13157-012-0294-8 1 23 Your article is protected by copyright and all rights are held exclusively by Society of Wetland Scientists. This e-offprint is for personal use only and shall not be self- archived in electronic repositories. If you wish to self-archive your work, please use the accepted author’s version for posting to your own website or your institution’s repository. You may further deposit the accepted author’s version on a funder’s repository at a funder’s request, provided it is not made publicly available until 12 months after publication. 1 23 Author's personal copy Wetlands DOI 10.1007/s13157-012-0294-8 ARTICLE Beaver in Tidal Marshes: Dam Effects on Low-Tide Channel Pools and Fish Use of Estuarine Habitat W. Gregory Hood Received: 31 August 2011 /Accepted: 16 February 2012 # Society of Wetland Scientists 2012 Abstract Beaver (Castor spp.) are considered a riverine or can have multi-decadal or longer effects on river channel form, lacustrine animal, but surveys of tidal channels in the Skagit riverine and floodplain wetlands, riparian vegetation, nutrient Delta (Washington, USA) found beaver dams and lodges in the spiraling, benthic community structure, and the abundance and tidal shrub zone at densities equal or greater than in non-tidal productivity of fish and wildlife (Jenkins and Busher 1979; rivers. Dams were typically flooded by a meter or more during Naiman et al.
    [Show full text]
  • Inventory of Tidepool and Estuarine Fishes in Acadia National Park
    INVENTORY OF TIDEPOOL AND ESTUARINE FISHES IN ACADIA NATIONAL PARK Edited by Linda J. Kling and Adrian Jordaan School of Marines Sciences University of Maine Orono, Maine 04469 Report to the National Park Service Acadia National Park February 2008 EXECUTIVE SUMMARY Acadia National Park (ANP) is part of the Northeast Temperate Network (NETN) of the National Park Service’s Inventory and Monitoring Program. Inventory and monitoring activities supported by the NETN are becoming increasingly important for setting and meeting long-term management goals. Detailed inventories of fishes of estuaries and intertidal areas of ANP are very limited, necessitating the collection of information within these habitats. The objectives of this project were to inventory fish species found in (1) tidepools and (2) estuaries at locations adjacent to park lands on Mount Desert Island and the Schoodic Peninsula over different seasons. The inventories were not intended to be part of a long-term monitoring effort. Rather, the objective was to sample as many diverse habitats as possible in the intertidal and estuarine zones to maximize the resultant species list. Beyond these original objectives, we evaluated the data for spatial and temporal patterns and trends as well as relationships with other biological and physical characteristics of the tidepools and estuaries. For the tidepool survey, eighteen intertidal sections with multiple pools were inventoried. The majority of the tidepool sampling took place in 2001 but a few tidepools were revisited during the spring/summer period of 2002 and 2003. Each tidepool was visited once during late spring (Period 1: June 6 – June 26), twice during the summer (Period 2: July 3 – August 2 and Period 3: August 3 – September 18) and once during early fall (Period 4: September 29 – October 21).
    [Show full text]
  • Beaver Dam Mine Project Environmental Impact Statement
    Plain Language Summary BEAVER DAM MINE PROJECT ENVIRONMENTAL IMPACT STATEMENT 1 Table Of Contents 3 About 4 Project Overview 5 Sustainable Development at Beaver Dam Mine Project 6 Current Condition of the Project Site 8 Project Description 10 The Life of the Mine 12 The Environmental Assessment Process 14 Engaging Communities of Nova Scotia • Meeting with the Mi’kmaq of Nova Scotia • Meeting with the General Public 16 Traditional Use by Mi’kmaq People • Nearest Mi’kmaq Communities 18 The Natural & Human Environment Today • Fish & Wildlife • Water • Current Use by Mi’kmaq Communities • Mi’kmaq Ecological Knowledge Study • Traditional Land and Resource Use Study (Millbrook First Nation) • Cultural and Heritage Resources • Recreational and Commercial Activities 22 Effects on the Natural & Human Environment • Air • Light • Noise • Groundwater • Surface Water • Land • Animals • Fish • Birds • Cultural and Heritage Resources • Effects to the Mi’kmaq People 34 Environmental Monitoring 36 Reclamation 38 Environmental Management Programs ꢀ 40ꢀ BenefitsꢀofꢀtheꢀProject 2 41 Conclusions 1 Increase font size for all body copy? About The purpose of this booklet is to describe, in plain language, theꢀproposed development of a gold mine at Beaver Dam (Marinette), inꢀHalifax County, Nova Scotia. Atlantic Mining NS Corp. (Atlantic Gold) isꢀtheꢀcompany that wants to develop this mine. This is a plain language summary of the Environmental Impact Statement that Atlantic Gold first gave to the federal government in 2017. It is important to Atlantic Gold that you understand how they will build the mine. Atlantic Gold wants you to know how they will protect the environment during building, operating and closure of the mine.
    [Show full text]
  • Louvicourt Mine Tailings Storage Facility and Polishing Pond 2019 Dam Safety Inspection
    REPORT Louvicourt Mine Tailings Storage Facility and Polishing Pond 2019 Dam Safety Inspection Submitted to: Morgan Lypka, P.Eng. Teck Resources Ltd. 601 Knighton Road, Kimberley, BC V1A 3E1 Submitted by: Golder Associates Ltd. 7250, rue du Mile End, 3e étage Montréal (Québec) H2R 3A4 Canada +1 514 383 0990 001-19118317-5000-RA-Rev0 25 March 2020 25 March 2020 001-19118317-5000-RA-Rev0 Distribution List 1 e-copy: Teck Resources Ltd., Kimberley, BC 1 e-copy: Golder Associates Ltd., Saskatoon, SK 1 e-copy: Golder Associates Ltd., Montreal, QC 1 e-copy: MELCC, Rouyn-Noranda, QC 1 copy: MELCC, Rouyn-Noranda, QC i 25 March 2020 001-19118317-5000-RA-Rev0 Executive Summary This report presents the 2019 annual dam safety inspection (DSI) for the tailings storage facility (TSF) and polishing pond at the closed Louvicourt mine site located near Val-d’Or, Quebec. This report was prepared based on a site visit carried out on September 24, 2019 by Laurent Gareau and Simon Chapuis of Golder Associates Ltd (Golder), Morgan Lypka and Jason McBain of Teck Resources Limited (Teck, Owner), Jonathan Charland of Glencore Canada (Glencore, Owner) and Rene Fontaine of WSP (who conducts routine inspections with Glencore personnel), as well as on a review of available data representative of conditions over the period since the previous annual DSI. Golder Associates are the original designer of the facility and have been the provider of the Engineer of Record (EOR) since 2017. Golder performed an inspection in 2009, and then has performed annual inspections of the facilities since 2014.
    [Show full text]
  • Beavers Are Cleaning Stormwater, Cooling Streams, and Increasing Complexity in Gresham
    Beavers are Cleaning Stormwater, Cooling Streams, and Increasing Complexity in Gresham Katie Holzer Watershed Scientist City of Gresham, Oregon 1 Overview 1) Stormwater facility study 2) Stream temperature study 3) Stream complexity observations 2 Gresham 3 Dozens of Beaver Dams in Gresham Streams • Seem to be increasing drastically in past 10 years • Most strongly associated with public land 4 Variety of Dams https://www.facebook.com/JohnsonCreekWC/videos/382315012475862/ 5 1) Stormwater Facility Study 6 Columbia Slough Regional Water Quality Facility • Constructed in 2007-08 • 13-acre site • Treats 965 acres of industrial and commercial land • Cost = $2.4M • Goals: clean stormwater, provide habitat, foster education 7 Columbia Slough Regional Water Quality Facility 8 Columbia Slough Regional Water Quality Facility + Beavers 9 Question: Do the beaver dams help or hinder the water quality treatment in this facility? 10 Methods – Dam Removal 11 Methods – Water Quality Sampling • Collected water quality samples during storms • Inlets and outlets of facility • Before and after dam removal and rebuilding • 7 storms without dams, 7 storms with dams • Metals, nutrients, sediment, pesticides 12 Results 100 No beaver dams 80 60 40 20 % Pollutant Removal Pollutant % 0 -20 -40 13 Results 100 No beaver dams With beaver dams 80 60 40 20 % Pollutant Removal Pollutant % 0 -20 -40 14 Beaver dams slow and filter stormwater 15 New Question: What if the beavers leave?! 16 Continually Remove One Dam 17 Suggestions for Designing Stormwater Facilities with
    [Show full text]
  • Beaver Dam Lake Report 2012
    Beaver Dam Lake Aquatic Macrophytic Survey Report 580 Rockport Rd. Hackettstown, NJ 07840 Phone: 908-850-8690 Fax: 908-850-4994 www.alliedbiological.com Table of Contents Introduction .................................................................................................................................................. 3 Procedures: ............................................................................................................................................... 3 Macrophyte Summary: ................................................................................................................................. 4 Macrophyte Abundance and Distribution Discussion .................................................................................. 9 Summary of Findings: ................................................................................................................................. 12 2 11/30/2012 Beaver Dam Lake Protection and Rehabilitation District 557 Shore Drive New Windsor, NY 12553 2012 Aquatic Macrophytic Survey Report Beaver Dam Lake Orange County, New York Introduction On September 7, 2012 Allied Biological, Inc. conducted a detailed aquatic macrophyte survey at Beaver Dam Lake located in Orange County, NY. During the survey, 102 GPS-referenced locations were sampled for the presence of aquatic macrophytes in the main basin of the lake. The primary goal of the survey was to map the diverse vegetation present in the lake for scientific determination of best management strategies. In the Appendix
    [Show full text]
  • W234 N8676 Woodside Rd. Lisbon, WI 53089
    TOWN OF LISBON W234 N8676 Woodside Rd. Lisbon, WI 53089 Join Zoom Meeting Online: https://zoom.us/j/97986382979?pwd=T3V0cURMY3dIRnU4eHhHNXgxOHBsQT09 Join Zoom by Phone: Dial 1-312-626-6799 Meeting ID: 979 8638 2979 Passcode: 060914 TOWN BOARD MEETING AGENDA Lisbon Town Hall Board Room Monday, June 14, 2021 6:30 P.M. 1. Roll Call. 2. Pledge of Allegiance. 3. Comments from citizens present. Citizens are invited to share their questions, comments, or concerns with the Town Board. When speaking, citizens should state their name and address for the record and limit their presentation to three minutes. Where possible, the Board will answer factual questions immediately. If a response would involve discussion of Board policy or decisions, which might be of interest to citizens, not present at the meeting, the Board may place the item on a future meeting agenda. 4. Meeting Minutes. • Discussion and necessary action regarding approval of May 24, 2021, Town Board minutes. 5. Accounts Payable. • Authorize the payment of bills in the amount of $242,407.54 • Monthly report of ACH & Autopays – May 2021 6. Announcements/Correspondence. • Sanitary Sewer District #1 Commission – Wednesday, 6/16/21 at 6:30p.m., Town Hall • Lisbon Community Festival – Saturday, 6/19/21, 11:00a.m. – 4:00p.m., Community Park • Parks Committee – Monday, 6/21/21 at 6:30p.m., Richard Jung Fire Station • Town Board Meeting – Monday, 6/28/21 at 6:30 p.m. Town Hall • Plan Commission – Thursday, 7/1/21 at 6:30p.m., Richard Jung Fire Station 7. Administrator’s Report. 8.
    [Show full text]
  • Beaver Dam Management
    BMP Factsheet #8 BEAVER DAM MANAGEMENT Introduction corn, other herbaceous plants, and a variety of woody Beavers are North America’s largest rodent and perhaps plants. Beaver dams create habitat for many animals and are second only to humans in their ability to alter the plants and provide essential habitat for juvenile salmon, environment. Beaver dams can cause drainage problems particulary Coho. In winter, deer and elk frequent beaver on managed watercourses and impounded water can ponds to forage on shrubby plants that grow where cause property damage. beavers cut down trees for food or to use in making their dams and lodges. Weasels, raccoons, and herons Pursuant to RCW 77.55 a permit must be issued for hunt frogs and other prey along the marshy edges of work that will use, obstruct, change, or divert the bed beaver ponds. Migratory waterbirds use beaver ponds as or flow of state waters. To remove or modify a beaver nesting areas and resting stops during migration. Ducks dam on a natural or modified watercourse, you must and geese often nest on top of beaver lodges, since they have a Hydraulic Project Approval (HPA) issued by the offer warmth and protection, especially when lodges are Washington Department of Fish & Wildlife (WDFW). formed in the middle of a pond. The trees that die as a In emergency situations (when an immediate threat to result of rising water levels attract insects, which in turn property or life exists), verbal approval from WDFW may feed woodpeckers, whose holes later provide homes for be obtained for work necessary to solve the problem.
    [Show full text]
  • Effects of Beaver Dams on Subarctic Wetland Runoff
    EFFECTS OF BEAVER DAMS ON SUBARCTIC WETLAND RUNOFF BY JAMES MICHAEL WADDINGTON A Research Paper Submi tted to the Department of Geography i n Fulfilment of the Requirements of Geography 4C6 McMaster University March 1989 URBAN DOCUMENT CENTRE RESEARCH UNir " URBAN STUDIES M STER UNiVERSill HAI~ILTON, ONTARIO ABSTRACT Beaver ams located on streams of a western James Bay marsh were stu ied to determine their effects on the runoff from subarctic wetlands. A survey of the location, type, class, and geometry of 50 dams on five different creeks were related to streamflow hydrographs from the 1987 field season. The hydrographs showed that although gapflow and overflow type dams stored more water upstream during low flow, little alteration to s tormflow occurred except for the shedding of water to the s rrounding wetland. Throughflow type dams altered streamfl ow only at the local scale, while underflow type beaver dams, despite having little affect at low flow, created a 12 hour time lag and a long hydrograph recession during high flows. A water balance comparison was performed for the period June 18th to July 28th, 1988 between a basin without a beaver dam and one dammed by the beaver to determine the effects of the beaver dams at the basin scale. The amount of water stored in the beaver dam basin (18mm) was 53mm greater than that stored in the basin without a dam (-35mm) indicating (ii) a distinct diffe rence in the basins' abilities to store water. In both basi ns, net subsurface flow was negligible. Precipitation wa s similar in magnitude between the two basins.
    [Show full text]
  • Beaver Conflicts in Vermont
    Best Management Practices for Resolving Human-Beaver Conflicts in Vermont Vermont Fish & Wildlife Department Vemont Department of Environmental Conservation August 2002 Revised 2004 TABLE OF CONTENTS Purpose ....................................................................................................................................... 1 Beaver Management in Vermont .............................................................................................. 1 Biology and Behavior of Beavers ............................................................................................... 2 Definition of the Problem ........................................................................................................... 4 Best Management Practices for Handling Human-Beaver Conflicts ..................................... 4 Damage Prevention Techniques...............................................................................................................................5 Obstructed Culverts and Dams Less Than Two Years Old.................................................................................... 6 Conflicts with an Established Beaver Dam or Dam Complex ...............................................................................7 Appendices ................................................................................................................................. 8 Appendix 1 – List of Regional Offices, Wardens and Other Contacts ............................................................... 9 Appendix 2 –
    [Show full text]
  • Montana Department of Natural Resources and Conservation
    Montana Department of Natural Resources and Conservation ∼ Guidance for Landowners and Practitioners Engaged in Stream and Wetland Restoration Activities ∼ This document offers guidance for the development and implementation of wetland and stream restoration projects as they pertain to Montana water rights. These guidelines are not intended to offer official departmental policy nor do they serve as a substitute for administrative rules established through the rulemaking process. DNRC’s intention in the development of these guidelines is to provide an educational resource to the public and restoration practitioners involved in the work of stream and wetland restoration efforts. This document discusses restoration techniques in terms of whether or not they constitute a diversion, impoundment or withdrawal of a quantity of water for beneficial use, which is how the Montana Water Use Act defines an appropriation of water that requires a water right. This document only pertains to State of Montana water right issues and does not contemplate other aspects of private property rights or civil law. This document also does not contemplate permitting requirements in addition to those directly relating to Montana water rights, but other permitting information can be found here: http://dnrc.mt.gov/licenses-and-permits/stream-permitting DNRC strongly encourages individuals engaged in restoration work to contact their local DNRC Regional Office staff to obtain assistance regarding water rights questions for specific restoration projects: Billings: (406) 247-4415 Bozeman: (406) 586-3136 Glasgow: (406) 228-2561 Havre: (406) 265-5516 Helena: (406) 444-6999 Kalispell: (406) 752-2288 Lewistown: (406) 538-7459 Missoula: (406) 721-4284 Background: There is concern that inappropriately assuming a water right is required for wetland and stream restoration projects, including beavery mimicry, might limit ongoing ecological restoration efforts.
    [Show full text]