Commercial Lands

Total Page:16

File Type:pdf, Size:1020Kb

Commercial Lands 184 Street CommercialEdmonton, Alberta Lands ± 22.19 acres, surrounded by existing development in the Northwest Industrial District › Three individually titled parcels › Flexible parcel consolidation options › Portions of site graveled and compacted › Ideal for large scale distribution, multi-tenant, or manufacturing › (IM & AGI) Industrial zoning › Office building available for Lease or Sale › Access and exposure to 184th & 180th Street › Immediate possession ADAM BUTLER Associate Vice President +1 780 328 0065 [email protected] JLL Edmonton Industrial TD Tower, Suite 2101 10088 102 Avenue Edmonton AB T5J 2Z1 184 Street Commercial Lands Three, individually titled, parcels of land located in the Northwest Industrial District with YELLOWHEAD TRAIL various sale, leasing and build-to-suit configurations EASY ACCESS › Highway 16A (Westbound) / Stony Plain Road (Eastbound): 0.65 km Edmonton › Yellowhead Trail: 3.0 km › Anthony Henday Drive: 2.2 km SHERWOOD PARK FREEWAY WHITEMUD DRIVE DISTANCE TO › Mayfield Common: 2.6 km › West Edmonton Mall: 3.9 km › Whitemud Drive: 6.4 km › Downtown Edmonton: 12.4 km ANTHONY HENDAY DRIVE N 184 STREET COMMERCIAL LANDS JLL EDMONTONQUEEN INDSUTRIAL ELIZABETH HIGHWAY 2 105 AVENUE 180 STREET Site Overview 423’ 236’ PARCEL TWO 330’ 3.98 ACRES 184 STREET PARCEL ONE 6.4 ACRES 707’ 1054’ 423’ PARCEL THREE ± 11.81 ACRES N 514’ 104 AVENUE 184 STREET COMMERCIAL LANDS JLL EDMONTON INDUSTRIAL 3 › Legal Description: Plan 0723500 Block 1 Lot 10 › Legal Description: Plan 510RS, Lot 2 › Municipal Address: 10457 184 Street NW › Municipal Address: 10460 180 Street NW Parcel › Site Area: 6.4 acres Parcel › Site Area: ± 3.98 acres › Current Zoning: IM (Medium Industrial) › Current Zoning: AG (Industrial Reverse Zone) › Site Servicing: Fully serviced › Site Servicing: Not serviced. Servicing One Two available for tie in. › Industrial District: Northwest Industrial 6.4 ACRES › For Sale Price: $750,000 per acre* ± 3.98 ACRES › Industrial District: Northwest Industrial › For Sale Price: $700,000 per acre* *ask agent about as-is pricing program 105 AVENUE 105 AVENUE 180 STREET 184 STREET OFFICE BUILDING & SITE AREA Parcel One offers the flexibility to purchase/lease site with or This site is minimally improved but offers opportunity for storage without the office building. Existing structures can be left for use or yard, build-to-suit, multi or single tenant construction. Parcel Two demolished and cleared. can be combined with Parcel One to total 10.38 acres with 180th and 184th Street access and exposure. 184 STREET COMMERCIAL LANDS JLL EDMONTON INDUSTRIAL 4 › Legal Description: Plan 1918 MC, Lot A/R › Municipal Address: 10335 184 Street NW Servicing & Offsite Levy Summary Parcel › Site Area: ± 11.81 acres › Current Zoning: AGI (Industrial Reserve Zone) › Site Servicing: Fully serviced Three › Industrial District: Northwest Industrial Offsite Levies: ± 11.81 ACRES › For Sale Price: $750,000 per acre* *ask agent about as-is pricing program › N.W. Industrial Storm and Sanitary PAC: $40,971.65 /acre › Expansion Assessment (WESS): $11,772.73 /acre 105 AVENUE › Sanitary Sewer Trunk Charge (SSTC): $3,297.38 /acre *No reserves owing 180 STREET Servicing Upgrades / Tie-ins: (as per ISL Engineering Cost Summary (07-05-17)) 184 STREET Parcel 1: Storm Sewer Mains: $18,345.00 Water Mains: $44,350.00 Parcel 2: Sewer Mains: $17,353.00 Storm Sewer Mains: $117,861.39 Water Mains: $27,950.00 Parcel 3: Parcel Three offers tremendous exposure and frontage to 184 Street. Storm Sewer Mains: $15,876.00 An ideal site for multi-tenant or single tenant build-to-suit. 184 STREET COMMERCIAL LANDS JLL EDMONTON INDUSTRIAL 5 JLL is a Commercial Real Estate Brokerage 80,000 EMPLOYEES with Global Reach & Multiple Capabilities $6.8B REVENUE EMEA 88 offices PROPERTY & 30 countries 4.4B CORPORATE FACILITIES UNDER MANAGEMENT (s.f.) AGENCY LEASING 334M TRANSACTIONS (s.f.) (20,185 transactions) TENANT REPRESENTATION 494M TRANSACTIONS (s.f.) (18,591 transactions) INVESTMENT ASSETS $60.1B UNDER MANAGMENT Americas 59 offices 7 countries PROJECT & Asia Pacific $640M DEVELOPMENT 81 offices SERVICES (fee revenue) 16 countries ENERGY SAVINGS $4.5B FOR CLIENTS 1,600 LEED ACREDITED PROFESSIONALS 10 CONSECUTIVE YEARS Edmonton Industrial Team Jim Bijou, SIOR David Kraus Darryl McGavigan Adam Butler Angela Wu-Kemp Senior Vice President Vice President, Associate Broker Vice President Associate Vice President Associate Vice President +1 780 328 2551 +1 780 328 0068 +1 780 328 0064 +1 780 328 0065 +1 780 328 0067 [email protected] [email protected] [email protected] [email protected] [email protected] Andres Mateluna Jonathan Wang Wendy Phanthikane Ashley Hodgins JLL Edmonton Senior Associate Sales Associate Brokerage Coordinator Brokerage Coordinator 2101, 10088 102 Avenue NW +1 780 328 2557 +1 780 328 2569 +1 780 328 2555 +1 780 328 0069 Edmonton, Alberta T5J 2Z1 [email protected] [email protected] [email protected] [email protected] Tel: +1 780 328 2550 Fax: +1 780 328 5486 .
Recommended publications
  • Bus Network Route 008 Schedule
    SUNDAY schedule guide information 8 Reading the Schedule ETS Real-Time To find the estimated times that a bus stops Track your bus anywhere anytime from your UNIVERSITY TO UNIVERSITY TO at a particular location, read down the column phone or computer using these recommended SERVICE FREQUENT ABBOTTSFIELD ABBOTTSFIELD under that location. real-time tools: edmonton.ca/realtime, To find the estimated times that a particular Google Maps, Transit App University 104 St & 101 St & 106 St & Coliseum Abbottsfield University 104 St & 101 St & 106 St & Coliseum Abbottsfield bus will stop at other locations, read across the TC 82 Ave Jasper Ave 118 Ave TC TC TC 82 Ave Jasper Ave 118 Ave TC TC row (left to right). F E D C B A F E D C B A Reading across the row tells you the time ETS Text & Ride TIMING POINTS TIMING required for the bus to travel between Text the bus stop number to 31100 or 2021 14, May Revised: timing points. 5:33 5:40 5:49 6:08 6:17 6:28 5:06 5:15 5:25 5:44 5:55 6:08 bus stop # [space] bus route # to receive 8ABBOTTSFIELD DOWNTOWN 5:53 6:00 6:09 6:28 6:37 6:48 5:21 5:30 5:40 5:59 6:10 6:23 your bus schedule by text message. 6:13 6:20 6:29 6:48 6:57 7:08 5:36 5:45 5:55 6:14 6:25 6:38 Example COLISEUM WHYTE AVE 6:33 6:40 6:49 7:08 7:17 7:28 5:51 6:00 6:10 6:29 6:40 6:53 For the schedule below, to arrive at 102 St & ETS BusLink NAIT UNIVERSITY 6:53 7:00 7:09 7:28 7:37 7:48 6:06 6:15 6:25 6:44 6:55 7:08 MacDonald Drive for 7:56 a.m., you will need Call 780-496-1600 for information about MACEWAN 7:13 7:20 7:29 7:48 7:57 8:08 6:21 6:30 6:40 6:59 7:10 7:23 to board the bus at Capilano Transit Centre when the next bus orLRT is scheduled to arrive.
    [Show full text]
  • 2016 Alberta Highways Historical ESAL Report
    ALBERTA HIGHWAY HISTORICAL ESAL REPORT 2016 Alberta Transportation Strategy and Policy Branch Produced: 02-Mar-2017 By CornerStone Solutions Inc. Length ESAL / Day / Dir Hwy CS TCS Muni From To in Km WAADT 2016 2015 2014 2013 2012 2011 2010 2009 2008 2007 2006 2005 2004 2003 1 2 4 Bigh BANFF PARK GATE W OF 1A NW OF CANMORE WJ 3.777 23010 1710 1600 1470 1370 1610 1550 1550 1530 1370 1400 1370 1340 1340 1460 1 2 8 Bigh E OF 1A NW OF CANMORE WJ W OF 1A S OF CANMORE EJ 4.741 19610 1690 1590 1620 1530 1570 1500 1250 1230 1140 1160 1300 1250 1240 1260 1 2 12 KanC E OF 1A S OF CANMORE EJ W OF 1X S OF SEEBE 23.165 22530 1660 1570 1510 1420 1810 1730 1680 1660 1700 1710 1690 1630 1610 1670 1 2 16 KanC E OF 1X S OF SEEBE KANANASKIS RIVER 0.896 22900 2350 2240 2080 1970 2050 1960 1960 1920 2110 2110 2020 1950 1930 2410 1 2 BANFF PARK GATE KANANASKIS RIVER 32.579 22171 1690 1590 1530 1440 1750 1670 1600 1580 1590 1600 1610 1540 1520 1610 1 4 4 Bigh KANANASKIS RIVER W OF 40 AT SEEBE 3.228 22900 1810 1720 1600 1510 1630 1560 1560 1530 1520 1530 1460 1400 1390 1630 1 4 8 Bigh E OF 40 AT SEEBE E BDY STONY INDIAN RESERVE 22.296 23680 2310 2230 2070 1960 1980 1650 1650 1580 1270 1230 1170 1130 1130 1380 1 4 KANANASKIS RIVER E BDY STONY INDIAN RESERVE 25.524 23581 2240 2160 2010 1900 1940 1640 1630 1570 1300 1270 1210 1170 1160 1410 1 6 4 Rkyv E BDY STONY INDIAN RESERVE W OF JCT 68 3.166 23280 2040 1950 1810 1710 2140 2040 2030 1970 2250 2250 2150 2080 2080 2440 1 6 8 Rkyv E OF JCT 68 W OF 22 S OF COCHRANE 17.235 23480 2530 2640 2490 2360 2410 2010 2000 1960 1880 1800 1690 1640 1640 1500 1 6 E BDY STONY INDIAN RESERVE W OF 22 S OF COCHRANE 20.401 23449 2450 2540 2390 2260 2360 2010 2000 1950 1930 1880 1760 1710 1710 1640 1 8 4 Rkyv E OF 22 S OF COCHRANE W OF 563 W OF CALGARY 11.441 27200 1570 1550 1380 1300 1160 1110 1100 1060 1020 1010 940 910 890 910 1 8 8 Rkyv E OF 563 W OF CALGARY CALGARY W.C.L.
    [Show full text]
  • Better Yellowhead Access Coming to Sherwood Park
    Road construction report July 5, 2013 Better Yellowhead access coming to Sherwood Park Preparation for a new Yellowhead Highway overpass will detour access to Sherwood Drive for three months starting July 10 at 9 a.m. From July 10 to October 10, the entrance and exit ramps between eastbound Yellowhead Trail (Highway 16) and Sherwood Drive will be closed as crews relocate sanitary lines and conduct earthwork in preparation for a new interchange being built to increase access and safety for motorists around the community of Sherwood Park. Full closure of these ramps will allow quick, efficient and safe work to be completed. Sherwood Drive will be closed north of Emerald Drive. Two alternate Yellowhead exits are available for those entering or leaving Sherwood Park: Broadmoor Boulevard to the west and Clover Bar Road to the east. Commuters are encouraged to check Yellowhead traffic volume near Clover Bar Road using camera feeds provided by 511 Alberta. The speed limit on Yellowhead will be maintained at 110km/h where traffic will continue to flow freely. Drivers are reminded to obey all flag persons, signs and signals. Fines for speeding are doubled in construction zones when workers are present. When completed in late 2015, the new Sherwood Drive interchange will provide commuters with a new overpass over Yellowhead with four access ramps, an improvement from the one (southbound) exit and one (eastbound) entrance. This will enhance safety and capacity in preparation for increased traffic expected on Yellowhead Trail when the Edmonton Ring Road is completed in fall 2016. Using Alberta’s P3 model for highways allows Northeast Anthony Henday Drive to be finished in 2016, three years earlier than through conventional delivery and at a savings of $370 million for taxpayers.
    [Show full text]
  • City of Edmonton Speed Zones Bylaw Bylaw No. 6894
    CITY OF EDMONTON SPEED ZONES BYLAW BYLAW NO. 6894 (CONSOLIDATED NOVEMBER 26, 2019) OFFICE OF THE CITY CLERK CONSOLIDATION BYLAW NO. 6894 A Bylaw to Establish Certain Speed Zones in the City of Edmonton Whereas pursuant to: Section 14 of the Traffic Safety Act, RSA 2000, c T-6, Council may prescribe speed limits for lanes and other thoroughfares used by vehicles on privately owned property within the City to which vehicles driven by members of the public generally have access; Section 108 of the Traffic Safety Act, Council may prescribe a maximum speed limit for a highway or any portion of a highway under the direction, control, and management of the City that is greater or lower than 50km/h; Section 108 of the Traffic Safety Act, a road authority may prescribe a lower maximum speed limit by erecting signs along a highway; Section 108 of the Traffic Safety Act, a person authorized by a road authority may prescribe a maximum speed limit for highways under construction, repair, or in a state of disrepair by erecting signs along a highway; Sections 107 and 108 of the Traffic Safety Act, Council may prescribe maximum speed limits for school zones located on highways under the direction, control, and management of the City and may vary the prescribed periods of time during which the speed limit is in effect for school zones; Section 107 of the Traffic Safety Act, if Council varies the prescribed periods of time during which the speed limit is in effect for school zones, it must cause traffic control devices to be displayed identifying the hours
    [Show full text]
  • Canada Gouvernementaux Canada
    Public Works and Government Services Travaux publics et Services 1 1 Canada gouvernementaux Canada RETURN BIDS TO: Title - Sujet RETOURNER LES SOUMISSIONS À: Weather Radar Network Modernization Bid Receiving Solicitation No. - N° de l'invitation Amendment No. - N° modif. PWGSC K3D33-141144/A 005 33 City Centre Drive Client Reference No. - N° de référence du client Date Suite 480C Mississauga K3D33-141144 2014-12-19 Ontario GETS Reference No. - N° de référence de SEAG L5B 2N5 PW-$TOR-018-6639 Bid Fax: (905) 615-2095 File No. - N° de dossier CCC No./N° CCC - FMS No./N° VME TOR-4-37044 (018) Time Zone SOLICITATION AMENDMENT Solicitation Closes - L'invitation prend fin at - à 02:00 PM Fuseau horaire MODIFICATION DE L'INVITATION Eastern Daylight Saving on - le 2015-02-17 Time EDT F.O.B. - F.A.B. The referenced document is hereby revised; unless otherwise Plant-Usine: Destination: 9 Other-Autre: indicated, all other terms and conditions of the Solicitation remain the same. Address Enquiries to: - Adresser toutes questions à: Buyer Id - Id de l'acheteur Pan, Long tor018 Ce document est par la présente révisé; sauf indication contraire, Telephone No. - N° de téléphone FAX No. - N° de FAX les modalités de l'invitation demeurent les mêmes. (905) 615-2076 ( ) (905) 615-2060 Destination - of Goods, Services, and Construction: Destination - des biens, services et construction: Comments - Commentaires Instructions: See Herein Vendor/Firm Name and Address Raison sociale et adresse du Instructions: Voir aux présentes fournisseur/de l'entrepreneur Delivery Required - Livraison exigée Delivery Offered - Livraison proposée Vendor/Firm Name and Address Raison sociale et adresse du fournisseur/de l'entrepreneur Issuing Office - Bureau de distribution Telephone No.
    [Show full text]
  • 2021 Regional Transportation Priorities EMRB Integrated Regional Transportation Master Plan
    2021 Regional Transportation Priorities EMRB Integrated Regional Transportation Master Plan August 12, 2021 2021 Regional Transportation Priorities EMRB Integrated Regional Transportation Master Plan Contents 1 Introduction .......................................................................................................................................... 1 2 2021 Regional Transportation Priorities .............................................................................................. 1 2.1 Transit Projects ......................................................................................................................... 1 2.2 Roadway Projects ..................................................................................................................... 2 2.3 Active Transportation Projects .................................................................................................. 2 3 2021 Prioritization Results ................................................................................................................... 2 Appendix A - Project Grouping.................................................................................................................... 12 Appendix B - Project Maps......................................................................................................................... 15 Tables Table 1 - Advance to Planning Priorities ....................................................................................................... 4 Table 2 - Ready for Design Priorities
    [Show full text]
  • In Case of Emergency F I R E | P O L I C E | a M B U L a N C E 911 211 811 7804234567
    IN CASE OF EMERGENCY F I R E | P O L I C E | A M B U L A N C E 911 211 811 7804234567 HEALTH MENTAL HEALTH INFORMATION AND NON-EMERGENCY SOCIAL SUPPORTS ADVICE POLICE IF IT IS AN EMERGENCY ALWAYS CALL 911 IF YOU CALL 911 ON ACCIDENT, DO NOT HANG UP! STAY ON THE LINE AND INFORM THE OPERATOR 24-Hour Hotlines ADDICTION 1-866-332-2322 ADVOCACY COUNSELLOR 780-414-6317 BULLYING 1-888-456-2323 CHILD ABUSE 1-800-387-5437 CRISIS SUPPORT 1-800-232-7288 DISTRESS 780-482-HELP [4357] FAMILY VIOLENCE 780-310-1818 KIDS HELP 1-800-668-6868 MENTAL HEALTH 1-877-303-2642 SENIOR ABUSE 780-454-8888 SEXUAL ASSAULT 780-423-4121 SUICIDE 1-833-456-4566 visit www.yegthecomeup.com/lbb for more details and information do you need a place to stay? If you or someone you know is in need of a safe place to spend the night, please call 211 and children and family services for youth under 18 SHELTERS HOPE MISSION YOUTH SHELTER Free overnight emergency accommodation service for co-ed youth aged 16-24 yrs. Showers and basic hygiene products available for client use 9908 106 Ave NW | 780 422 2018 | [email protected] YOUTH EMPOWERMENT AND SUPPORT SERVICES [YESS] SHOWERS, FOOD AND BASIC HYGIENE PRODUCTS FOR CLIENT USE 9310 82 ave nw | 780 422 2018 | www.yess.org resource centres 10310 85 Avenue armoury resource 780.468.7070 Monday-Friday | 9AM-4PM centre [arc] -yess Sunday | 2PM-6PM 10325-83 Avenue 780 496 5947 old strathcona Tue-Thurs | 1:00pm-9:00pm youth society Fri-Sat | 2:00pm-6:00pm [co-op] Sun-Mon | closed visit www.yegthecomeup.com/lbb for more details and information for new residents The city of Edmonton has resources available to newcomers.
    [Show full text]
  • Prioritization of Arterial Roads and Primary Highways Projects
    6. 4 Prioritization of Arterial Roads and Primary . Highways Projects Level of Service and Capital Budget Information Recommendation That the April 3, 2018, Urban Form and Corporate Strategic Development report CR_4227, be received for information. Previous Council/Committee Action At the November 1, 2016, Executive Committee meeting, the following motion was passed: That Administration provide: a. a report outlining the breakdown by quadrant of infrastructure demand/capacity for arterial roads and primary highways in poor and very poor condition. b. a rating (A, B, C, D, F) for intersections on major arterials and primary highways categorized by quadrant c. some analysis on how this information would inform the prioritization of arterial road addition and widening projects for the next couple of budget cycles and return to Committee in the first quarter of 2018. Executive Summary This report outlines the status and performance of aspects of the road network and how improvements to the network are coordinated between the land development industry and the City. Monitoring indicates that the majority of Edmonton’s arterial road network and primary highways are operating within design capacity, and 94 percent of arterial road intersections in the city are rated A through E. This means they are operating within an acceptable level of service. Twenty intersections (six percent) are rated F. This means they are congested during peak hours. Some of the F rated intersections are in new growth areas where the road network is not fully developed. Other F rated ROUTING - Urban Planning Committee | DELEGATION - P. Ohm/D. Vriend April 3, 2018 – Urban Form and Corporate Strategic Development CR 4227 Page 1 of 8 Prioritization of Arterial Roads and Primary Highways Projects intersections in the city would require additional investigation to determine the cause of congestion and the benefits of additional investment in improvements.
    [Show full text]
  • December 7, 2005 Province Enjoys Successful Highway Construction
    December 7, 2005 Province enjoys successful highway construction season Edmonton... Despite relatively wet, cool weather in many parts of Alberta this spring and summer, the province's highway system continued to expand and improve. The major portion of a successful highway construction season wrapped up in November. "Investing $660 million in Alberta's highway network is critical to the province's economy and ongoing prosperity," said Dr. Lyle Oberg, Minister of Infrastructure and Transportation. "Infrastructure improvements also make highways safer, which is a priority for this government." Construction highlights for 2005 include: Paving 434 kilometres; Twinning 46 kilometres; Completing seven interchanges and starting eight others; Chip seal coating 425 kilometres; Grading 60 kilometres. Highlights of major projects include: Completed the Douglasdale interchange on Deerfoot Trail in Calgary, making Highway 2 completely free-flow from Claresholm to Edmonton. Completed the South Innisfail interchange on Highway 2, Cassils Road interchange on Highway 1 near Brooks, the Campsite Road interchange on Highway 16 near Spruce Grove, and two interchanges on Anthony Henday Drive at Whitemud Drive and 87th Avenue. Completed and opened Anthony Henday Drive in Edmonton between Lessard Road and Terwillegar Drive, including new twin bridges over the North Saskatchewan River. Started the southeast leg of Anthony Henday Drive, Alberta's first highway project using a public-private partnership. Completed 44 kilometres of twinning on Highway 43 between Edmonton and Grande Prairie. Completed 24 kilometres of new paving on Highway 881 between Lac La Biche and Ft. McMurray. - 30 - Media enquiries may be directed to: Bart Johnson Communications Director Alberta Infrastructure and Transportation (780) 415-1841 To call toll free within Alberta dial 310-0000.
    [Show full text]
  • 12220 Stony Plain Road Edmonton, Alberta Office Space Available for Immediate Occupancy Carolyn Bull 1,968 to 9,006 S.F
    McLennan Ross Building For Lease 12220 Stony Plain Road Edmonton, Alberta Office space available for immediate occupancy Carolyn Bull 1,968 to 9,006 s.f. available +1 780 328 2553 [email protected] – Various sized suites on the main and second floors available for immediate occupancy Dan Budman +1 780 328 2582 – Heated underground and surface parking for staff and guests [email protected] – Minutes away from the downtown core, newly developed Chad Brennand Brewery District, and various other amenities +1 780 328 2552 [email protected] – Convenient access to the West End via Stony Plain Road Chad Boddez – Great exposure with podium signage available +1 780 328 2567 [email protected] JLL 2101, 10088 102 Avenue NW Edmonton, Alberta T5J 2Z1 jll.ca 115 Avenue NW 142 Street NW Kingsway NW Groat Road NW 97 Street NW 124 Street NW Details 106 Street NW LEASABLE AREAS: Suite 100 6,152 s.f.* 95 Street NW 101 Street NW Suite 212 1,968 s.f. Suite 300 9,006 s.f.* (Available July 2019) *Demisable. 111 Avenue NW 111 Avenue NW Norwood Boulevard NW LEASE RATE: Negotiable OPERATING COSTS: $18.55 p.s.f. (2019) PARKING: 2 stalls per 1,000 s.f. 109 Street NW $150.00 / stall / month underground $75.00 / stall / month surface 107A Avenue NW 101 Street NW 107A Avenue NW 107 Avenue NW 107 Avenue NW 144 Street NW 117 Street NW 117 105 Street NW 124 Street NW McLennan Ross Building Stony Plain Road NW 103A Avenue NW Rogers Place 104 Avenue NW 100 Street NW 103 Street NW Stony Plain Road NW 102 Avenue NW 116 Street NW 116 Jasper Avenue NW Victoria Park Road NW Although information has been obtained from sources deemed reliable, Owner, Jones Lang LaSalle, and/or their representatives, brokers or agents make no guarantees as to the accuracy of the information contained herein, and offer the Property without express or implied warranties of any kind.
    [Show full text]
  • 2015-18 Tentative Major Construction Projects
    ALBERTA TRANSPORTATION 2015-18 Tentative Major Construction Projects Provincial Highway and Water Management Projects . Major Provincial Highway . Water Management The attached tentative three-year provincial construction and rehabilitation program lists the major projects where substantive work is anticipated to be complete or undertaken between 2015-16 and 2017-18, subject to provincial funding and priorities. Projects that are under contract or tendered are identified stating the year of construction. Other projects are being designed, right-of-way being negotiated and the acquisition of permits underway. These projects will commence as planned in the provincial program dependent upon the timely completion of the design and availability of funding. Minor changes to the program may be required as newer information becomes available. In particular, final paving, pavement overlays and bridge rehabilitation may be added and/or deleted from the program depending on how the roadway or bridge condition changes throughout the year. Not identified in the program are some of the bridge rehabilitation projects and local improvements, such as: minor slide repairs and intersection upgrades; small carry-over projects from 2014-15; and general expenditures such as chip seal coats, lighting, preliminary (consultant) engineering and future right-of-way. Additionally, minor safety-related improvements might be added as identified, generally in conjunction with larger projects. GLOSSARY This is a listing of abbreviations used in the following document
    [Show full text]
  • News Release
    News release July 16, 2012 Construction digs-in on final leg of Edmonton ring road Final leg of Anthony Henday Drive set to open to traffic in 2016 Edmonton ... The finish line on the Edmonton ring road is in sight with the final northeast leg of the Anthony Henday Drive scheduled to open in fall 2016. “It is very rewarding to turn sod on a project that is so far reaching. This new road improves our quality of life, supports a changing and expanding population and furthers Alberta’s economic growth,” said Minister of Transportation Ric McIver. “This is an exciting step in moving toward the long-range vision of the Edmonton Ring Road that began in the 1970s.” More than 50,000 Albertans use the Henday each day. The ring road, once completed, will change the way residents in the Capital Region connect with the people and services that matter to them – reducing commute times and traffic congestion. It will also dramatically benefit industry that uses the freeway as a vital route in all four directions, getting our products to market more quickly and efficiently. The Alberta government signed a 34-year contract with the Capital City Link General Partnership to design, build, operate, and partially finance Northeast Anthony Henday Drive. The public-private partnership (P3) contract is worth $1.81 billion in 2012 dollars, to be paid over the term of the contract, and follows a P3 selection process which began in March 2011. This is a savings of $370 million, compared to the estimated cost of $2.18 billion using traditional delivery.
    [Show full text]