Sarah Liljefelt Accepts Position As OCA's Water Resources

Total Page:16

File Type:pdf, Size:1020Kb

Sarah Liljefelt Accepts Position As OCA's Water Resources Sarah Liljefelt Accepts Position as OCA’s Water Resources Committee Chair Schroeder Law Offices is pleased to announce that Attorney/Partner Sarah Liljefelt accepted the position of Water Resources Committee Chair for the Oregon Cattlemen’s Association, beginning in the coming year. Sarah has been a member of the Oregon Cattlemen’s Association for many years, and has been very active with the Oregon CattleWomen as Vice President and Legislative Committee Chair. She is excited to use her Oregon water resources knowledge to support and defend the Oregon Cattlemen’s Association’s water interests in the years to come. Sarah’s new position was announced earlier this week when she presented at the Oregon Cattlemen’s Association’s Mid-Year Conference in Canyonville, Oregon. Sarah provided an update on the Klamath River Basin Adjudication and conjunctive surface water/groundwater management in the Klamath Basin. Some of the other highlights from the conference included an update of Western Resources Legal Center’s recent victories by Executive Director Caroline Lobdell (Sarah is a former WRLC law clerk), and a trip to Melrose Vineyards (https://www.melrosevineyards.com/) with the Oregon Cattlewomen – beautiful location, friendly staff, and great food and wine! Willamette Project’s 50 Year Anniversary: Flooding and Reallocation The year 2019 marks the 50th anniversary of the Willamette Valley Project, a tumultuous time in the history of the project. These dams are operated by the United States Army Corp of Engineers’ (“Corp”) Portland District, which utilizes 13 dams to prevent flooding and provide water storage for various water users and aquatic species in Western Oregon. (https://www.nwp.usace.army.mil/Locations/Willamette-Valley/) Since their construction, flooding like that seen in the Christmas Flood of 1964 has been rare. This April, the Willamette Valley saw substantial flooding as an “atmospheric river” overwhelmed the capacity of the dams, forcing the Corp release water at historic rates to prevent overtopping of the dams. (https://www.statesmanjournal.com/story/news/2019/04/07/oregon-flooding-willamette-river-santiam -river-eugene-salem/3393877002/). As these dams were created specifically to prevent flooding, what went wrong? The various interests in water stored in these dams leads to considerable controversy over how to operate the Willamette Valley Project dams. Combined, these dams hold 1.6 million acre-feet in the summer months for various uses including municipal, irrigation, and hydropower. The controversy in operations relates to these uses. For example, storing additional water in the dams benefits electricity production and recreational boating uses (requiring high lake levels), but harms aquatic species and irrigators. Releasing the stored water during the summer reduces electricity production and leaves little for migrating salmon in the fall, but provides irrigation for many Willamette Valley farms. The Corp is left to balance these competing interests for the use of “conservation storage” (the water stored for use in the summer months). Recently, the Corp considered reallocating water between theses interests, which focuses primarily on how to use the water stored in the summer months. We have discussed this potential reallocation here: https://www.water-law.com/study-willamette-valley-project-reallocation/. The allocations of uses between these interests has not been reconsidered since the original construction of the dams. (The Capital Press recently covered the discussion here: https://bit.ly/2IyzCfr). While the reallocation will determine how stored water is used, the dam regulation curves determine when the dams are emptied and space is made for flood mitigation. Flood control is another “interest” competing for the Corp’s attention and a reservior’s capacity. In the winter, these dams are emptied to allow the space to be used to absorb the brunt of storms. In the spring, the dams are gradually refilled up to their maximum operating capacity during the summer, for use for power and water storage. The image to the right depicts the regulation curve for the Cougar Reservoir, which stores water from the South Fork of the McKenzie River. The Corp developed the operating curve for the Cougar Reservoir in 1964, located in the Cougar Reservoir Regulation Manual. (https://bit.ly/2PtpANm). Each dam has its own manual, determining how and when water is released from the reservoir. While the allocation determines how stored water is used, the “conservation storage” hump determines when, how much, and for how long the dams are filled. This year’s atmospheric river struck on April 7-8, 2019, just as these dams were being filled for use as summer storage. While not at “max conservation pool” level (occurring around May 1), the dams were approaching their upper limits. Cougar Reservoir, for example, was at around 494 meters (1620 feet) before the storm and according to its operating curve, the reservoir should have been around 500 meters (1640 feet) (seen in the graph to the right, reservoir levels are measured by elevation to sea level, not depth). After April 12, 2019, the South Fork of the Willamette River discharged between 3,000 and 5,000 cubic feet per second (“cfs”) compared to its typical average of about 400-800 cfs at this time. (https://on.doi.gov/2Izcf5n). By April 13, 2019, Cougar Reservoir levels had shot up to nearly 515 meters (1690 feet), the maximum summer flood control level shown in the regulation curve above, several weeks early. By releasing record volumes of water from these dams, and using up any remaining storage capacity still available, the Corp prevented overtopping of the dams at the cost of downstream riparian landowners. Water releases over this period prevented an overflow, but opens the question of whether more flood control space may be required for spring storms in the future. When the reservoirs are full late in the season, the Corp has little choice but to open the gates, flooding downstream homes, farms, and cities. Calls for changing the Corp’s dam regulation curves may also come alongside the calls to reallocate stored water, adding even more controversy for the Willamette Valley Project near its 50th birthday. Make sure to stay tuned to Schroeder Law Offices’ Water Blog for more news that may affect you!.
Recommended publications
  • Implementation of the California Water Plan
    NOTICE CONCERNING COPYRIGHT RESTRICTIONS This document may contain copyrighted materials. These materials have been made available for use in research, teaching, and private study, but may not be used for any commercial purpose. Users may not otherwise copy, reproduce, retransmit, distribute, publish, commercially exploit or otherwise transfer any material. The copyright law of the United States (Title 17, United States Code) governs the making of photocopies or other reproductions of copyrighted material. Under certain conditions specified in the law, libraries and archives are authorized to furnish a photocopy or other reproduction. One of these specific conditions is that the photocopy or reproduction is not to be "used for any purpose other than private study, scholarship, or research." If a user makes a request for, or later uses, a photocopy or reproduction for purposes in excess of "fair use," that user may be liable for copyright infringement. This institution reserves the right to refuse to accept a copying order if, in its judgment, fulfillment of the order would involve violation of copyright law. TC 824 C2 A2 no. 160: 66 C.2 1 LIBRARY UNIVERSITY OF CALIFORNIA PAVIS state of California THE RESOURCES AGENCY Apartment of Wa ter Resources BULLETIN No. 160-66 IMPLEMENTATION OF THE CALIFORNIA WATER PLAN DAVIS APR 2 ^ iS66 LIBRARY. MARCH 1966 HUGO FISHER EDMUND G. BROWN WILLIAM E. WARNE Adminisirator Governor Director The Resources Agency State of California Department of Water Resources state of California THE RESOURCES AGENCY Department of Wa ter Resources BULLETIN No. 160-66 IMPLEMENTATION OF THE CALIFORNIA WATER PLAN MARCH 1966 HUGO FISHER EDMUND G.
    [Show full text]
  • Shipping in Pacific Northwest Halted Due to Cracked Barge Lock at Bonneville Dam
    Shipping in Pacific Northwest Halted Due to Cracked Barge Lock at Bonneville Dam Reports of a broken barge lock at the Bonneville Dam on the Columbia River surfaced on September 9th. The crack was discovered last week and crews began working Monday morning on repairs. The cause of the damage is unknown. To begin the repairs, the crews must first demolish the cracked concrete section. It remains unclear, however, when the repairs will be complete. Navigation locks allow barges to pass through the concrete dams that were built across the Columbia and Snake Rivers to generate hydroelectricity for the West. A boat will enter the lock which is then sealed. The water is then lowered or raised inside the lock to match the level of the river on the other side of the dam. When the levels match, the lock is then opened and the boat exits. The concrete that needs to be repaired acts as the seal for the lock. The damage to the concrete at the Bonneville Dam resulted in significant leaking—enough that water levels were falling when the lock was in operation. Thus, immediate repair was necessary. The Columbia River is a major shipping highway and the shutdown means barges cannot transport millions of tons of wheat, wood, and other goods from the inland Pacific Northwest to other markets. Eight million tons of cargo travel inland on the Columbia and Snake rivers each year. Kristin Meira, the executive director of the Pacific Northwest Waterways Association said that 53% of U.S. wheat exports were transported on the Columbia River in 2017.
    [Show full text]
  • Corps'pondent
    ORPS’PONDENT C Vol. 38, No. 6 November - December 2014 Christmas 1964: Remembering and learning from Oregon’s historic flood. R CONTENTS November - December 2014 1.75” x 1.25” pg.5 INSIDE THIS ISSUE: Pantone 032 = Red CMYK = C0, M100, Y80, K0 3 Commander’s Column: Portland District Teammates 4 Portland District People: Julie Ammann 5 Facing yesterday’s storm today 8 How it all came down: pg.8 Extreme weather conditions deliver the Christmas Flood 10 It came and it conquered 12 New technology means better water management when flood season arrives 14 Regulators behind the scenes keep reservoirs, rivers on target pg.10 16 Volunteers: vital to community preparedness Errata In the September/ October Corps’pondent Nick Cooper was pg.12 incorrectly identified. This is Mr. Cooper. We regret the error. Cover photo: The 1964 Christmas Flood brought immeasurable loses. Corps of Engineers Archives. Corps’pondent is an authorized unofficial newsletter for Department of Defense employees and retirees. Editorial content is the responsibility of the Public Affairs Office, Portland District, U.S. Army Corps of Engineers, P.O. Box 2946, Portland, OR 97208. Contents herein are not necessarily the official views of, Commander: Col. Jose L. Aguilar or endorsed by, the U.S. Government or the Department of the Army. Layout and printing by USACE Enterprise Chief, Public Affairs: Matt Rabe Information Products Services. Circulation 750. Contributions and suggestions are welcome by mail, phone at (503) 808-4510 or email to [email protected] Check out Corps’pondent Editor: Erica Jensen online at www.nwp.usace.army.mil/library/districtpublications.aspx ® 2 November - December 2014 Corps’pondent ® R Commander’s Column Portland District Teammates, Thank you for your tremendous contribution to the success of the District’s 1.75” x 1.25” mission this past year.
    [Show full text]
  • Natural Hazard Mitigation Plan in an Effort to Reduce Future Loss of Life and Property Resulting from Natural Disasters
    Natural Hazard Mitigation Plan CITY OF PORTLAND Office of Emergency Management 1st Edition • August 2005 Portland Office of Emergency Management Mitigation & Planning Patty Rueter, Coordinator 823-3809 ● [email protected] City of Portland Natural Hazards Mitigation Plan Report for: City of Portland, Office of Emergency Management 1001 SW 5th Avenue, Suite 650 Portland, OR 97204 Prepared by: ECONorthwest 99 West 10th Avenue, Suite 400 Eugene, OR 97401 Phone: (541) 687-9951 Fax: (541) 344-0562 1st Edition August 2005 Special Thanks & Acknowledgements Project Steering Committee: City of Portland Commissioner Dan Saltzman Dr. Ron Tammen, Steering Committee Chair, Portland State University, Hatfield School of Government Dr. Vicki McConnell, State Geologist, Department of Geology and Mineral Industries Bonny McKnight, Citywide Landuse Group and Neighborhood Coalitions Meryl Redisch, Executive Director, Audubon Society of Portland Don Eggleston, Principal, SERA Architects Myron Burr, Environmental Manager, Siltronic Corporation Dan Caufield, Planning and Operations Manager, Tri-Met Wade Lange, Sr. Property Manager, Ashforth Pacific Inc. Gil Kelley, Director, Bureau of Planning Ray Kerridge, Director, Bureau of Development Services Dean Marriott, Director, Bureau of Environmental Services Ed Wilson, Chief, Bureau of Fire and Rescue Jeanne Nyquist, Director, Bureau of Maintenance Mort Anoushirivani, Director, Bureau of Water Works Brant Williams, Director, Portland Office of Transportation Miguel Ascarrunz, Director and Elise Marshall, Assistant Director, City of Portland Office of Emergency Management Subcommittee members: Severe Weather Subcommittee Dave Harrington, Chair, Portland Office of Transportation and Maintenance Ken Carlson, Eric Thomas, and Phil Burkart, Bureau of Development Services Bryan McNerney, City Forester, Parks and Urban Forestry John McGregor, Bureau of Environmental Services Lt.
    [Show full text]
  • Readers Share Pulled from Chaos
    THEFLOOD OF DECEMBER 2014 50YEARS 19 6 4$1.00 LATER Readers share their memories of the fl ood Pulled from chaos: Rescue missions in river valleys Lives lost: Remembering the 29 who died Humboldt 2 Times-Standard The Flood of 1964 remembers The ‘Thousand Year Flood’ 50 years later: Commemorating the Christmas flood of 1964 BY CLAY MCGLAUGHLIN by warm rains that melt- cessively lower latitudes ranges oriented at nearly [email protected] @CMcGlaughlinTS on Twitter ed the snow and inundat- before turning to the right angles to the flow ed local watersheds in a northeast and moving of the air resulted in This December marks matter of hours. towards the west coast. heavy rain from Dec. 21 the 50th anniversary “Prior to the main A storm track 500 miles to 23. Today we use the of the “Thousand Year storm period, Dec. 19 wide extending from term ‘Atmospheric River’ Flood” in Northern Cali- through 25, minor rain near Hawaii to Oregon to describe this type of fornia, which officially events of November into and northern California weather phenomenon. … began on Dec. 21, 1964 — early December had sat- was established,” wrote A high pressure system reaching its peak on Dec. urated the ground and Reginald Kennedy, ser- built into the area north- 23 of that year and con- increased the flow in vice hydrologist at the east of Hawaii on Dec. tinued until early Janu- the local rivers. In mid- Eureka station of the 24 and cut off the flow ary 1965. Striking nine December, a strong high National Oceanic and At- of warm moist air to the years almost to the day pressure system was lo- mospheric Administra- west coast.
    [Show full text]
  • Natural Hazard Mitigation Plan 2018 Revision
    Nez Perce Tribe Natural Hazard Mitigation Plan 2018 Revision Nez Perce Tribe Emergency Management Box 365 – 109 Lolo St Lapwai ID 83540 (208) 621-3760 Prepared By Northwest Management, Inc. - THIS PAGE INTENTIONALLY LEFT BLANK - Forward Nez Perce Tribal Emergency Management is dedicated to the protection of life, property, economic and environmental resources throughout the Reservation. Seeking to inform and educate citizens, provide training and resource coordination and ultimately reduce the vulnerability of Tribal citizens through comprehensive disaster planning and mitigation. “Hazard mitigation is sustained action to reduce or eliminate the long‐term risk to human life and property from hazards. Natural hazard mitigation planning is a process used by state, tribal, and local governments to engage stakeholders, identify hazards and vulnerabilities, develop a long-term strategy to reduce risk and future losses, and implement the plan, taking advantage of a wide range of resources. A state mitigation plan demonstrates commitment to reduce risks from natural hazards and serves as a guide for decision makers for reducing the effects of natural hazards as resources are committed”1 The Nez Perce Tribe Natural Hazard Mitigation Plan was updated in 2017-18 by the Nez Perce Tribe Hazard Mitigation Planning Committee in cooperation with Northwest Management, Inc. of Moscow, Idaho. This Plan satisfies the requirements for a local natural hazard mitigation plan under 44 CFR Part 201.6, in addition this plan fully integrated the processes of FEMA’s Natural Hazard Mitigation Plan with the Community Wildfire Protection Plan as outlined in the Healthy Forest Restoration Act. 1 Federal Emergency Management Agency.
    [Show full text]
  • A Long-Term Comparison of High Rocky Intertidal Communities In
    A LONG TERM COMPARISON OF ROCKY INTERTIDAL COMMUNITIES IN REDWOOD NATIONAL AND STATE PARKS By Cara L. McGary A Thesis Presented to The Faculty of Humboldt State University In Partial Fulfillment of the Requirement for the Degree Master of Art Biological Sciences December, 2005 i A LONG TERM COMPARISON OF ROCKY INTERTIDAL COMMUNITIES IN REDWOOD NATIONAL AND STATE PARKS HUMBOLDT STATE UNIVERSITY by Cara L. McGary We certify that we have read this study and that it conforms to acceptable standards of scholarly presentation and is fully acceptable, in scope and quality, as a thesis for the degree of Master of Arts. Dr. Sean Craig, Major Professor Date Dr. Milton Boyd, Committee Member Date Dr. Frank Shaughnessy, Committee Member Date Dr. Doug Eernisse, Committee Member Date Dr. Michael Mesler, Graduate Coordinator Date Donna E. Schafer, Dean for Research and Graduate Studies Date ii ABSTRACT Long term comparisons are important for understanding intertidal community dynamics and documenting response to environmental pressures. This study compares the historical abundance of high intertidal sessile organisms at two rocky intertidal sites within Redwood National and State Parks shortly after the park was established (“historical”:1974-1976) to the present community (2004-2005) at the same locations. Percent cover of ephemeral, early successional species was higher in historical assessments, whereas percent cover and magnitude of seasonal variation in perennial, late successional organisms increased in assessments of the present community. The long term successional shift is likely a result of decreased disturbance severity between the mid 1970’s to present. Severe historical disturbance is linked to increased sedimentation and frequent driftwood battering associated with logging.
    [Show full text]
  • A Study of Adolescents' Reactions to Temporary Absences from Home in a Crisis Situation
    Utah State University DigitalCommons@USU All Graduate Theses and Dissertations Graduate Studies 5-1966 A Study of Adolescents' Reactions to Temporary Absences From Home in a Crisis Situation Imogene Ward Christensen Utah State University Follow this and additional works at: https://digitalcommons.usu.edu/etd Part of the Social and Behavioral Sciences Commons Recommended Citation Christensen, Imogene Ward, "A Study of Adolescents' Reactions to Temporary Absences From Home in a Crisis Situation" (1966). All Graduate Theses and Dissertations. 2428. https://digitalcommons.usu.edu/etd/2428 This Thesis is brought to you for free and open access by the Graduate Studies at DigitalCommons@USU. It has been accepted for inclusion in All Graduate Theses and Dissertations by an authorized administrator of DigitalCommons@USU. For more information, please contact [email protected]. A STUDY OF ADOLESCENTS' REACTIONS TO TEMPORARY ABSENCES FROM HOME IN A CRISIS SITUATION by Imogene Ward Christensen A thesis submitted in partia l fulfillment of the requirements for the degree of MASTER OF SCIENCE in Family and Child Development . TABLE OF CONTENTS Chapter Page I. INTRODUCTION l Definition of the Problem 1 Purpose of the Study 1 Method of Procedure . 2 Discovering the problem 2 Form letter to students . 2 Questionna ire to students 2 The sample . 3 Structured questions for parent interviews 3 Foll ow-up 4 Other methods 4 De l i mitation of the Study 4 II . REVIEW OF LITERATURE 5 Independence and Maturity 5 Crisis and stress . 8 School and learning processes 9 III. BACKGROUN D CHARACTERISTICS 12 Characteristics and Traits of the District 12 Earl y settlement 14 La ter settlement 14 Drainage .
    [Show full text]
  • The Mitigation Plan
    Natural Hazard Mitigation Plan Multnomah County Office of Emergency Management April 2006 Executive Summary Multnomah County, Oregon developed this Natural Hazards Mitigation Plan in an effort to reduce future loss of life and property resulting from natural disasters. It is impossible to predict exactly when these disasters will occur, or the extent to which they will affect the County. However, with careful planning and collaboration among public agencies, private sector organizations, and citizens within the County, it is possible to minimize the losses that can result from natural disasters. The plan should be viewed as a living document that provides the County a system for long-term risk reduction from natural hazards. The plan’s architecture allows the County to review and update sections based on new data. The new data can be incorporated into the plan through a simple process that does not require a full plan update, resulting in a plan that remains relevant and current. Additionally, the plan has been developed in a way that will allow and encourage the County’s local jurisdictions, special districts, and other partners can build upon the plan to develop their own locally-specific addendum to the County plan. The plan is non-regulatory in nature, meaning that it does not set forth any new County policies. It does, however, (1) provide a starting point or foundation for coordination and collaboration among agencies and the public in the County, (2) identify and prioritize future mitigation activities, (3) establish an official process for future development and implementation of mitigation activities, and (4) assist in meeting federal planning requirements and qualifying for assistance programs.
    [Show full text]
  • Flooding and Change on the Willamette River
    Flooding and Change on the Willamette River The Willamette River Like many rivers of the northwest the Willamette River once had a very different appearance. It was wild river and as it passed through Eugene took the form of braided channels and a wide floodplain. Further to the north through Portland it consolidated into a single meandering trench. Flooding was a regular occurrence and has been happening consistently for the last 150 years (Sinclair 2005) though today it not as severe due to the control by dams. During the winter and spring months the river surged over its banks and filled the floodplain, the low lying area around the river channel where the excess water flows during times of flood. Floods deposit soils and create habitat for riparian vegetation and other creatures that live in the riverside environment. Flooding also moves gravel around and can uproot trees, which create beneficial environments for aquatic life. The action of the river also created new channels and thousands of small islands around which it flowed (Sinclair 2005). Altering the River The rich and fertile land along the flood plain was also very attractive to Euro- American settlers arriving in Oregon. The plains adjacent to the river were quickly converted into agricultural and grazing lands. Before 1850 almost all (95%) of the population of Oregon was concentrated in the Willamette Valley (Sinclair, 2005). The river banks became more and more populated and soon human activities began to alter the landscape of the river. Farms thrived along the river because of the readily available soil and water resources.
    [Show full text]
  • Sediments Soil
    Sediments & Soil Objective: Grade: 2 Students will observe the nature of sorted sediments and will investigate Subject Areas: Earth Sciences the various parts of soil. Materials Skills: communicating, • 1/2 cup of dried • sieves (optional) exploring, modeling, beans, rice and coffee • small shovel or trowels (if observing, predicting, grounds collecting on campus) writing • a see-through • paper or science journals container of water • soil samples (from a • buckets of sediments garden) Duration: 1hour • jars with lids • magnifying glasses or • plastic funnels (large microscopes Connections: enough for sand to • tweezers history, physics, plant pass though) • plastic tubs or petri dishes science, soils • clear cups of silt, sand, • “non-living” and “living” and gravel labels (see attachment) • tall clear soda bottles • white paper Vocabulary (250+mL) coarse erosion Standards Strands: Excellence in Environmental Education Guidelines fine Strand 1 —Questioning and Analysis Skills: A) Learners are able to develop questions that help them learn about the environment and do simple investigations. B) Designing forces Investigations: Learners are able to design simple investigations. F) Working with models and simulations: Learners understand that relationships, patterns, and processes can be layers presented by models. Strand 2.1 —Knowledge of Environmental Processes and Systems A) Processes that sediments shape the Earth: Learners are able to identify changes and differences in the physical environment. B) Changes in matter: Learners are able to identify basic characteristics of and sieve changes in matter. Strand 2.2 — The Living Environment: C) Systems and connections: Learners understand soil basic ways in which organisms are related to their environment and to other organisms.
    [Show full text]
  • Covered Bridges Built in the Last Two Decades for Private Use
    Cedar Crossing Bridge - Photos by: Bill Cockrell Although not a true covered bridge as no truss is used for support, Cedar Crossing represents Oregon's commitment to a history rich in covered bridge lore. Don Clark, former Multnomah County Executive, lobbied for the county to build a covered span. He suggested that the bridge "be over a stream where the foliage is thick and turns to shades of yellow and orange in the autumn and children can peer out windows to see the waters below." One of Clark's ancestors, who had settled in Multnomah County, helped to promote a bridge across the Willamette. The location for the roofed bridge was found when engineers decided to replace the narrow, deteriorating wooden truss bridge crossing Johnson Creek in southeast Portland. Work to demolish the old bridge began in November 1981, and soon after, workers cut the stone abutments to accommodate the greater width of the new bridge. The installation of the decking, siding, and roofing was completed within two months. The span was dedicated in January 1982. After the ribbon cutting was completed and the commemorative plaque unveiled, a parade of vintage cars, horse-drawn buggies and wagons opened the span to public use. Although the day was cold and wet, the ceremony was far from dampened as Clark quipped, "If you ever wonder why they put covers on bridges, this weather will tell you." The interior of the bridge is finished with knotty pine, and a five-foot walkway separates the pedestrian and bicycle traffic from the 24-foot roadway.
    [Show full text]