B Y T H E N U M B E R S . . .

FOX SPORTS SET S Nearly one month of construction time T N

50+ square meters of LED walls E

25 cameras, including: M

A moveable two-point Flycam, bringing the viewing audience from the ocean to the set E Multiple robotics and cranes L E

Wireless cameras N

GAMEDAY FAN PLAZA & FIELD SET O I

Full set with large LED screens and FOX Sports demo field in the middle of the action outside T

Hard Rock Stadium C 10 additional cameras U D 1,200-foot, two-point Flycam camera system with ability to fly over the plaza and into the O

stadium R

Collapsing modular stage at the southeast side of the stadium P

SUPER BOWL LIV 70 manned or robotic cameras; 30+ lock-off and POV cameras 20+ end zone and end line pylon cameras Wireless “Line-to-Gain” camera, following every first down from ground level 24+ Super Motion cameras (high speed), ranging from 180-1,800 frames per second Three (3) 8K cameras Two (2) focused on team benches and sidelines, with ability to be magnified up to 12x and replayed One (1) which will, for the first time, shoot the entire in 8K Eight (8) high-speed 4K cameras at the end zone, down the line and high end zone positions which can be magnified up to 6x in any area of interest in the frame Two (2) SkyCams High and low – the high SkyCam is capable of elevating above the stadium roof Seven (7) wireless cameras, including: Multiple Steadicams Movi Gimbal Stadicam Multiple Digital Cinema Cameras

FOX SPORTS’ EMMY AWARD-WINNING AUDIO TEAM: 72 field mics Two (2) full submix boards 5.1 Surround Sound Wireless player mics

FUN FACTS 13 mobile units in the FOX Sports broadcast compound, totaling nearly 10,000 square feet of office space 15 temporary structures, providing an additional 19,000 square feet 180,000 feet of cable – more than 34 miles 3 megawatts of power generators