ODCP Enviro Sus Study Final.Indd

Total Page:16

File Type:pdf, Size:1020Kb

ODCP Enviro Sus Study Final.Indd OPDC Environmental Standards Study April 2017 DRAFT © OPDC except where stated otherwise. This report takes into account the particular instructions and requirements of our client and its contents have been prepared and are intended solely for their information and use. Atkins Ltd assumes no responsibility to any other party in respect of or arising outDRAFT of or in connection with this document and/or its contents. OPDC Environmental Standards Study Contents Contents Executive 1. 2. 3. 4. Summary Introduction Vision and Issues and Environmental Objectives Opportunities Performance Pages 3-16 Pages 17-23 Pages 25-29 Pages 31-51 Pages 53-112 5. 6. 7. 8. Appendices Environmental Application of Case Study Conclusions and Quality and Guidance Analysis Recommend- Resilience ations Pages 113-170 Pages 171-187 Pages 189-200 Pages 201-205 Pages 207- Green Energy Waste Materials Carbon Water Air Infrastructure & Resilience Biodiversity DRAFT 1 DRAFT OPDC Environmental Standards Study Executive Summary Executive Summary DRAFT 3 OPDC Environmental Standards Study Executive Summary 4 DRAFT OPDC Environmental Standards Study Executive Summary Executive Summary Environmental Vision Introduction It is the aspiration of the Old Oak and Park Substantial reductions in transport construction and operation. There is already a To be a flagship low carbon, Royal Development Corporation (OPDC) related emissions are achievable with a tradition of waste recycling in the OPDC site. resource efficient development to deliver a new part of London that is an fully integrated approach to urban form, A number of waste recycling facilities exist in which is resilient to climate change exemplar in environmental sustainability, movement, open space, green infrastructure Old Oak and Park Royal. and promotes smart and healthy and realise the wider investment potential and microclimate across the site, rooted behaviours, environmental health and from the HS2 and Crossrail transport in Transit Oriented Development (TOD) There is a huge opportunity at Old Oak and mental and physical wellbeing. infrastructure projects. Atkins was tasked principles, with the aim of maximising non Park Royal to promote a local economy based with the development of a set of aspirational freight movement by public transport, non- on ‘Circular Economy’ principles, which is and deliverable environmental sustainability motorised modes and zero/low emission waste free and which through recycling and Old Oak targets that will enable all future development vehicles. re-processing resources ensures that products across the Old Oak Common and Park Royal and materials are kept at their highest • Exemplar model of high density, sites to be exemplar in construction and Reducing emissions from waste disposal will utility for as long as possible with minimal compact, mixed use operation. centre on minimising waste sent to landfill associated carbon emissions. To achieve • Climate responsive design and maximising recycling and composting, this zero waste ambition, the focus will be The OPDC area has been identified to have with low carbon energy generation from on maximising recycling and composting • Fossil fuelled car free the capacity to deliver a minimum additional incineration of the remainder. of recyclable/compostable waste, and neighbourhood 26,000 homes and indicative 59,000 jobs, maximising carbon efficient generation of • Multi-function, multi-benefit green representing London and the UK’s largest To achieve an ambition of operational zero energy from the residual waste. infrastructure regeneration project. At over 120ha of carbon for Old Oak, in the short-medium developable land, Old Oak provides particular term there is likely to be a need to offset The Challenge of Super Density • Carbon positive, zero waste, and significant net carbon emissions, either biodiversity positive opportunities for a range of supporting uses. Providing high quality and sustainable through onsite or offsite sequestration, other housing at the very high residential densities Our approach has been to provide strategic, designated offsite carbon reduction initiatives proposed at Old Oak presents a number of smart and conceptual thinking that defines or carbon pricing. In the longer term, as the interrelated challenges. Serious consideration Park Royal what OPDC is trying to achieve and provides carbon intensity of grid electricity is expected needs to be given to housing families the rationale and high level evidence to to fall and energy efficiencies increase, it may with children above ground level. To work • Low carbon high performance support the adoption of environmental goals be possible for the new development to be business park effectively in the long term, family dwellings and objectives in the emerging Local Plan. carbon positive. above ground need to offer levels of amenity • Rapidly adaptable Achieving Carbon Positive Achieving Zero Waste approaching those provided by single family • Promote walking and cycling houses at ground level. This requires private Old Oak presents an unmatched opportunity The scale of new development and • Zero/low emission freight vehicles open space of sufficient size, with adequate for creating a new model of low/zero carbon regeneration at Old Oak and Park Royal outlook, privacy and shelter. • Extensive greening development, with the potential to be a will result in very substantial amounts of • Low carbon, low waste and ground-breaking exemplar for London and municipal waste being generated and biodiversity positive the UK. of materials and resources being used in DRAFT 5 OPDC Environmental Standards Study Executive Summary Design of the public realm at the base of tall implications for ground level delivery, storage Accessible Open Space Deficiency Serious consideration should be given to buildings requires an analysis of their servicing and servicing arrangements. At basement providing a second access for pedestrians and The majority of the Old Oak site and all of needs. The success of the public realm can and podium level there is a need to balance cyclists. This could take the form of a green Wormwood Scrubs falls within the London be undermined by failing to accommodate the demands for car parking, secure cycle bridge. Borough of Hammersmith and Fulham. access for parking, refuse requirements or parking, private storage, delivery vehicles, Wormwood Scrubs is the largest publicly the need for adequate cycle storage. Where refuse collection vehicles, waste storage and Wormwood Scrubs: Biodiversity accessible space in the borough and acts as a the ground space is in intense demand, recycling, district energy facilities and plant and Greenspace Metropolitan Park. The Borough’s Parks and for example around transport hubs, it is rooms. Open Spaces Strategy 2008 – 2018 predicts Wormwood Scrubs covers almost 70 important to provide comfortable, sheltered that the demand for open space will rise as hectares and acts as an important green space, safe from traffic and removed from Roof Spaces the borough’s population increase. This will lung that provides people and wildlife with noise and fumes. At rooftop level there are competing reduce the ratio of public open space from the opportunity to enjoy green open space. demands, particularly if rooftops experience Portions of Wormwood Scrubs are designated As density increases and becomes multi- an already low 1.35ha per 1000 people to high levels of daylight. There is a need to as Local Nature Reserves and Sites of Borough tenure, there is a need to ensure there is 1.22ha per 1000. With the exception of a balance the demands for: Importance. The mosaic of habitats support more focus on the long term management few small pockets most areas of the borough a diverse range of native plants, breeding and maintenance costs at the design stage of • Private and semi-private open space in the have access to less than 1ha per 1000 people. birds and insects, including species not usually a development. Cost effective and efficient form of terraces and roof gardens with Our initial analysis demonstrates that the found in more formal parks and open spaces. management arrangements in superdense ‘intensive’ planting. draft masterplan allocates 9% of the Old Oak area to public open space (including development are essential to minimise • Rooftop mini-allotments and local food Issues civic spaces). We compared this to other services charges and aid affordability. Very production. • How to accommodate the significant similar high density, mixed use schemes dense developments, with tall towers, create number of residents and workers in • ‘Green’ roofs with restricted access and which allocate around 24% to 35% of their more intense pressure on shared space and Old Oak wanting to access the natural ‘extensive’ planting of low maintenance site area to open space. 9% is considered infrastructure and have higher management greenspace in Wormwood Scrubs without vegetation. to be insufficient to meet the recreational and maintenance costs than other typologies. any net loss in biodiversity? Service charges need to be projected in order • ‘Brown’ roofs, with low maintenance needs of the future population of Old Oak to ensure that dense developments do not gravels and aggregates used to recreate and Park Royal (including both workers and • How to balance the competing demands become unaffordable for future occupiers. brownfield habitats. residents). The lack of publicly accessible for active recreation and sport from open space within Old Oak is a key issue not
Recommended publications
  • Bradfield College Campus Development Framework Transport Appraisal
    BRADFIELD COLLEGE CAMPUS DEVELOPMENT FRAMEWORK TRANSPORT APPRAISAL 13 February 2019 Our Ref: DA/AW/JG/lh/adf/JNY9598-01i RPS 20 Western Avenue Milton Park Abingdon Oxon OX14 4SH Tel: 01235 432190 Fax: 01235 834698 Email: [email protected] rpsgroup.com/uk QUALITY MANAGEMENT Prepared by: Amy Waites / Joanna Gunn Authorised by: David Archibald Date: 13 February 2019 Project Number/Document JNY9598-01i Reference: COPYRIGHT © RPS The material presented in this report is confidential. This report has been prepared for the exclusive use of Bradfield College and shall not be distributed or made available to any other company or person without the knowledge and written consent of RPS. rpsgroup.com/uk CONTENTS 1 INTRODUCTION ..................................................................................................................................... 1 2 CAMPUS LAYOUT AND PUPIL DESIRE LINES .................................................................................. 2 3 SUSTAINABLE TRANSPORT BASELINE AND SURVEYS ................................................................. 6 4 TRANSPORT RELATED POLICIES .................................................................................................... 17 5 KEY PRINCIPLES OF DEVELOPMENT .............................................................................................. 21 6 SUMMARY AND CONCLUSIONS ....................................................................................................... 27 FIGURES FIGURE 1 – SITE LOCATION FIGURE 2 – CAMPUS LAYOUT APPENDICES
    [Show full text]
  • Volume 7.0 M4 Junctions 3 to 12 Smart Motorway TR010019
    Safe roads, reliable journeys, informed travellers M4 junctions 3 to 12 smart motorway TR010019 7.3 Engineering and design report 5(2) (q) Revision 0 March 2015 Planning Act 2008 Infrastructure Planning (Applications: Prescribed Forms and Procedure) Regulations 2009 Volume 7.0 Volume An executive agency of the Department for Transport HIGHWAYS AGENCY – M4 JUNCTIONS 3 TO 12 SMART MOTORWAY EXECUTIVE SUMMARY The Highways Agency (the "Agency") is making an application (the "Application") for development consent to improve the M4 motorway ("M4") to a smart motorway between junction 3 (Hayes) in west London and junction 12 (Theale), which is near Reading, (the "Scheme"). This Engineering and Design Report ("EDR") accompanies the Application and its purpose is to explain the design principles and design rationale for the Scheme. It describes how the design has been influenced by the technical and operational requirements of creating all-lane running and smart motorway infrastructure. It is similar to a Design and Access Statement ("DAS"), but provides additional Scheme-specific information beyond that usually provided for within a DAS. It also supports the environmental impact assessment of the Scheme. The Strategic Road Network ("SRN") in England comprises motorways and all-purpose trunk roads. The SRN is operated, maintained and improved in England by the Agency on behalf of the Secretary of State. The Agency is an executive agency of the Department for Transport (“DfT”). The M4 is the main strategic route between London and the west of England, and on to South Wales. The M4 currently suffers from heavy congestion between junctions 3 (Hayes) and 12 (Theale), which leads to unpredictable journey times.
    [Show full text]
  • Prominent New Retail and Leisure Units to Let in the Filaments, Salford Available October 2020
    PROMINENT NEW RETAIL AND LEISURE UNITS TO LET IN THE FILAMENTS, SALFORD AVAILABLE OCTOBER 2020 START > A newHistory of the site neighbourhood The Filaments is a brand new mixed-use development ideally situated next to Salford Central station. This well-connected scheme will comprise of 376 apartments with a mixture of one, two and three bedroom apartments as well as six townhouses to rent. The development comprising of two buildings with six retail and leisure units at ground floor creates an internal pedestrian piazza perfect for outdoor seating. HOME HOME A NEW A NEW SITE PLAN SITE PLAN SEE THE LIGHTSEE THE LIGHT OPPORTUNITY OPPORTUNITY KEY FACTS KEY FACTS CONNECTIVITY CONNECTIVITY DESTINATIONS DESTINATIONS LOCATION LOCATION UNITSCOMMERCIAL AVAILABLE DETAILSPLANS DETAILS NEIGHBOURHOODNEIGHBOURHOOD OVERVIEW < 2 > BLOOM STREET Site plan TRINITY WAY CHAPEL STREET CHAPEL STREET SALFORD CENTRAL STATION GORE STREET Future pedestrian walk way connecting The Filaments to New Bailey NEW BAILEY STR IRWELL STREET EE T HOME A NEW SITE PLAN SEE THE LIGHT OPPORTUNITY KEY FACTS CONNECTIVITY DESTINATIONS LOCATION UNITS AVAILABLE DETAILS NEIGHBOURHOOD < 3 > See the light The Filaments fall within the Salford Central Masterplan, one of the UK’s largest development projects and which has already delivered substantial Grade A office space, hotels and new homes. HOME A NEW SITE PLAN SEE THE LIGHT OPPORTUNITY KEY FACTS CONNECTIVITY DESTINATIONS LOCATION UNITS AVAILABLE DETAILS NEIGHBOURHOOD < 4 > Opportunity The ground floor units benefit from flexible planning use classes (A1-A5, B1 and D2) and are suited to a range of different uses. Commercial occupiers will benefit from the proximity to onsite residents as well as a large daytime office population.
    [Show full text]
  • Transport Statement Next Generation Data (NGD)
    Data Centre 3 Transport Statement Next Generation Data (NGD) October 2020 Notice This document and its contents have been prepared and are intended solely as information for Next Generation Data (NGD) and use in relation to Proposed Data Centre at Plot 4, Imperial Park, Marshfield, Newport, NP10 8BE Atkins Limited assumes no responsibility to any other party in respect of or arising out of or in connection with this document and/or its contents. This document has 41 pages including the cover. Document history Revision Purpose description Originated Checked Reviewed Authorised Date Rev 1.0 Draft to Client RM SL SF JP October 2020 Client signoff Client Next Generation Data (NGD) Project Data Centre 3 Job number 5197938 5197949-TS | 1.0 | October 2020 Atkins | NGD DC3 TS v1.0 Page 2 of 41 Contents Section Page Introduction 5 1. Introduction 6 1.1. Overview 6 1.2. Existing Site 6 1.3. Description of Development Proposals 6 1.4. Scoping Background 7 1.5. Report Structure 7 Transport Planning Policy and Review 8 2. Transport Planning Policy and Review 9 2.1. Introduction 9 2.2. National Policy 9 2.3. Regional Policy 11 2.4. Local Policy 12 Baseline Conditions 14 3. Baseline Conditions 15 3.1. Introduction 15 3.2. Existing Site and Location 15 3.3. Surrounding Road Network 16 3.4. Site Accessibility by Active Travel and Public Transport 17 3.5. Accident History 18 Development Proposals 20 4. Development Proposals 21 4.1. Introduction 21 4.2. Development Description 21 4.3. Access 22 4.4.
    [Show full text]
  • Investoren Vermarktung Immobilie
    ERNEUERUNG WIEDERAUFBAU MASTERPLAN RAHMENPLAN TOU- RISMUS LEERSTAND INVESTOREN VERMARKTUNG IMMOBILIE- NENTWICKLUNG STADTMARKETING BINNENHAFEN ENTWICKLUNG ZERTIFIZIERTES ERHALTUNGSGEBIET ERNEUERUNG DES EIN- ZELHANDELS IRA BOMBING IMMOBILIENENTWICKLUNG STADT- MARKETING BUSINESS IMPROVEMENT DISTRICT ÖFFENTLICHER RAUM ARCHITEKTUR POLITISCHES ZENTRUM SPINNEREIEN STAD- TENTWICKLUNG IMMOBILIENENTWICKLUNG GENTRIFIZIERUNG KREATIVSZ ENE ARCHITEKTUR MARKTHALLEN NEUBAU 24 HOUR CITY WIRTSCHAFTLICHE EINNAHMEQUELLE SANIERUNG VON WOHNSIEDLUNGEN LEERSTAND DENKMALSCHUTZ SPINNEREIEN GRÜNFLÄCH­eNENTWICKLUNG VORZEIGEPROJEKT STADTMAR- KETING IMMOBILIENENTWICKLUNG ARCHITEKTUR LAGERRÄUME ALTBAU NEUBAU STADTMARKETING AUSWIRKUNGEN DER GroS- SPORTVERANSTALTUNGEN ANZIEHUNG VON INVESTOREN WIRT- SCHAFTLICHE EINNAHMEQUELLE GESCHÄFTS straSE WEGBEZIE- HUNGEN INVESTOREN IMMOBILIENENTWICKLUNG MANCHESTER KULTURZENTRUM HAFENENTWICKLUNG AR- CHITEKTUR NEUBAU MEDIA CITY STADTERNEU- ÖKONOMIE ERUNG ARCHITEKTUR BRÜCKENGESTALTUNG DER STADT- GRÜN FREIRAUMENTWICKLUNG UNIVERSITÄT ERNEUERUNG ENTWICKLUNG EINES STUDENTENDORFES NACHTÖKONOMIE Diese Broschüre ist ein Ergebnis des Seminars "Ökonomie der Stadterneuerung" im Rahmen der Master-Studiengänge Stadt- und Regionalplanung und Urban Design an der TU Berlin. Das Seminar wurde im Sommersemester 2015 als Exkursionsseminar nach Manchester, England, angelegt. Technische Universität Berlin Fakultät VI - Planen Bauen Umwelt Intstitut für Stadt- und Regionalplanung Fachgebiet Stadt- und Regionalökonomie Prof. Dr. Dietrich Henckel Veranstaltungsleitung:
    [Show full text]
  • Bath Avon River Economy
    BATH AVON River Corridor Group BATH AVON RIVER ECONOMY FIRST REPORT OF BATH & NORTH EAST SOMERSET COUNCIL ADVISORY GROUP SUMMER 2011 Group Members The Bath Avon River Corridor Economy Advisory Group held its Inaugural Meeting in the Guildhall in Bath on 29th October 2010. Group members were nominated by Councillor Terry Gazzard or John Betty, Director of Development and Major Projects and North East Somerset Council, for their particular skills and relevant experience. Those present were: Michael Davis For experience in restoring the Kennet and Avon Canal Edward Nash For experience in urban regeneration and design management Jeremy Douch For experience in transport planning David Laming For experience in using the river for boating James Hurley Representing Low Carbon South West and for experience in resource efficiency Steve Tomlin For experience in reclamation of materials John Webb Representing Inland Waterways Association and the Kennet and Avon Canal Trust and experienced in Waterways management Nikki Wood For experience in water ecology Councillor Bryan Chalker For experience in Bath’s heritage and representing the Conservative Political Group Councillor Ian Gilchrist For experience in sustainability issues and representing the Liberal Democrats Political Group Melanie Birwe/ Tom Blackman For Bath and North East Somerset Council – liaison with Major Projects Office Steve Tomlin stood down in early 2011. CONTENTS 1. Introduction 9. The Role of the River in Flood Resilience 2. Executive Summary 10. Renewable Energy and Spatial Sustainability 3. The Problem and Its History 11. Creating Growth Points for Change a) The Geographic History b) The Challenges and Opportunities Now 12. Drivers of Economic Development c) The Regeneration Model • The Visitor Offer • University Sector 4.
    [Show full text]
  • Pibwrlwyd Guidance
    Carmarthenshire County Council Supplementary Planning Pibwrlwyd Guidance Adopted December 2014 Produced by the Forward Planning Section Planning and Development Brief: Pibwrlwyd Contents Page 1. Introduction 2 Status of the Brief 2 2. The Site 2 3. Planning Context 2 Development Plan: The Carmarthenshire LDP 2 Planning History 3 4. Proposed Uses 4 5. Site Considerations 4 Design 4 Linkages and Access 4 Landscape and Biodiversity 5 Drainage 5 Phasing 6 Planning Requirements 6 Section 106 Requirements 6 Ground Conditions 6 6. Contacts 7 7. Disclaimer 7 Appendix 1: Planning History Figure 1: Location Plan Figure 2: Site Plan 1. Introduction 1.1 This Planning and Development Brief has been prepared as Supplementary Planning Guidance (SPG) to inform development proposals at Pibwrlwyd, Carmarthen. The Brief provides guidance by elaborating on the policies and proposals of the adopted Carmarthenshire Local Development Plan (LDP), and seeks to achieve a deliverable, high quality development that is sympathetic to the character of the surrounding area. 1.2 Production of this Brief has taken place as part of the preparation of the LDP and pays due regard to National Planning Policy. 1.3 Developers are encouraged to work closely with the Council to incorporate and reflect the content of this Brief into their proposals. Pre-application discussions with the Council are strongly encouraged. Proposals that do not accord with the development principles set out in the Brief will not be supported. Status of the Brief 1.4 This Brief was formally adopted by County Council on the 10th December 2014 as Supplementary Planning Guidance. The draft Brief was published in July 2013 and was subject to public consultation between the 31st July 2013 and the 11th October 2013.
    [Show full text]
  • Swansea Bay Beach ST THOMAS SA1 ARIN MARINA MARITIMEE
    High Street Railway Station H PLEA Underpass The NCN Route 43 to liberty Stadium and Clydach E T City Temple Underpass A D HILL STREET S N G Ebenezer L A R E A N Baptist A N P T I G W Church G D O R V WORDSWORTH S P T A WINSTON ST RY STREET P N R R I L EBENEZER STREET B V E POTTE I A E L O T O E E L W C E I A E A R A N O E H A T U R D D R A WINDMILL TERRACE T E T M WATKIN STREET Y E R C T N R O B D E R R S C B S O N R E R A H N U AY VIEW R T Y A C A T G H N C E A R C 1 E T U R MARINER STRE G S R ET I S E I Y N ET S F D H C I SHORT STREET E E T A N JONES TERRACE T E S STRE Rail R N R G MILTON TE T R Station E IN O A R W R C A D E E Footbridge C D K I C U L E Y PLA D IVE E R V ROA D T - EY RA AN T D A R EW STREET R AN T R T i 4 R N X S E A E Grand O L v 2 R University of Wales C A E Hotel A 1 RA Trinity St David D 7 Swansea e CE - Fire Station r A 4 PIC TO QU 8 T GRENFE M N ARRY 3 S L O T a L PARK ROAD ER T U R A N C W w T E O R B STANLEY PLACE S P R Oldway E E STANLEY TERRACE E N L e N L UL Centre T A E F W T Parc Tawe L D H VICARAGE TERRACE A E A S 2 A I S L R Glynn Vivian O E D L A R R Llys R N P N Art Gallery L O A T M PEN ISA COED T R Glas A A S C D R N E RO T A H P X S G C E E L L I ST THOMAS ON IF A N T T H O T N IF H R IL L L C University of Wales E University of Wales G MACKWORTH TERRAC T Trinity St David E U E Trinity St David BBC A I E South West N S E Wales PL EASANT STREET E KINGS S Urban T A R R T Village B Ragged E RE E O T T C A A Swansea School A N L S KING D Amateurs S P LA K NE Centre S OMWELL STREET M Orchard ’ D CR W
    [Show full text]
  • One Angel Square, ‘The Co-Operative Group’S Driver Was O EN G T
    RY GOOD VE EX CE OD LL Case study: One angel square, E ‘The Co-operative Group’s driver was GO N T O U T to showcase their leadership on S T S A the co-operative group headquarters S N A D P I N G environmental issues by creating This iconic building is a leading example of our ability to integrate sustainable features from inception to delivery of the project, and beyond. one of the most sustainable Scored 95.53% at BREEAM Post-construction Stage commercial buildings in Europe.’ Sustainable design Tackling climate change Nitesh Magdani, This 16-storey building contains 325,000 sq ft of The double skinned façade and soaring open Director of Sustainability open plan office space and a large central atrium. atrium are key to creating natural heating, cooling Two basement floors include underground car and lighting. The atrium, for example, floods the parking, auditorium and fitness facilities. building’s interior with light which is reflected by the exposed white painted concrete coffered 300 The Co-operative Group’s vision was to floors, reducing the amount of artificial lighting lux create an iconic headquarters that would be required to light the building from 550 to 300 lux. a sustainable workplace. From the outset, the challenge was to deliver a carbon neutral building The on-site Combined Heat and Power (CHP) Reduced the amount of artificial providing a display energy certificate (DEC) A+ plant, fuelled by pure plant-oil grown by The lighting from 550 to 300 lux grade performance coupled with the BREEAM Co-operative farms, provides the majority of the Outstanding status.
    [Show full text]
  • Potato Wharf, Castlefield
    Research Report Jones Lang LaSalle Incorporated Manchester Residential Market August 2017 Manchester Potato Wharf, Castlefield Supporting Copy Contents Why Manchester? ............................................................................................................................................................. 3 Why Castlefield? ............................................................................................................................................................... 5 Urbanisation & Growth ...................................................................................................................................................... 7 Employment ...................................................................................................................................................................... 9 Demographic Overview ................................................................................................................................................... 11 Universities ...................................................................................................................................................................... 12 Transport Connectivity .................................................................................................................................................... 13 Retail Provision ..............................................................................................................................................................
    [Show full text]
  • Avison Young Commercial Real Estate Investment Review
    Fall 2018 Avison Young Commercial Real Estate Investment Review North America and Europe Partnership. Performance. Contents Overview 05 Canada Investment Market Overview 43 Memphis 71 London 11 U.S. Investment Market Overview 44 Miami 72 Manchester 45 Minneapolis Canada 46 Nashville Germany 17 Calgary 47 New Jersey 74 Berlin 18 Edmonton 48 New York 75 Duesseldorf Montreal 19 49 Oakland 76 Frankfurt 20 Ottawa 50 Orange County 77 Hamburg 21 Toronto Orlando 51 78 Munich Vancouver 22 52 Philadelphia Phoenix Romania United States 53 Pittsburgh 54 80 Bucharest 24 Atlanta 55 Raleigh-Durham 25 Austin 56 Sacramento More from Avison Young 26 Boston San Antonio 57 Company Overview 27 Charlotte 84 58 San Diego County 28 Chicago 86 Publications and Social Media 59 San Francisco 29 Cleveland 87 Contact Us 60 San Jose/Silicon Valley 30 Columbus, OH 61 San Mateo 31 Dallas 62 St. Louis 32 Denver 63 Tampa 33 Detroit Washington, DC 34 Fairfield County 64 West Palm Beach 35 Fort Lauderdale 65 Westchester County 36 Hartford 66 37 Houston Mexico 38 Indianapolis 39 Jacksonville 68 Mexico City Disclaimer 40 Las Vegas United Kingdom The statistics contained in this report were obtained from sources deemed reliable, including Altus InSite, Avison Young, Collette, Plante & Associés, Commercial Edge, CoStar Group 41 Long Island Inc., Desjarlais Prévost Inc., Gettel Network, Property Data Ltd., Real Capital Analytics, Inc., RealNet Canada, RealTrack, Reis Services, LLC, and Thomas Daily GmbH. However, Avison Young (Canada) Inc. does not guarantee the accuracy or completeness of the information presented, nor does it assume any responsibility or liability for any errors or omissions.
    [Show full text]
  • Proposed Change of Use (Retail to Gym) Castle View Shopping Centre, Caerphilly
    PROPOSED CHANGE OF USE (RETAIL TO GYM) CASTLE VIEW SHOPPING CENTRE, CAERPHILLY Transport Statement March 2021 Proposed Change of Use (Retail to Gym) Castle View Shopping Centre, Caerphilly Connect Consultants, 78 Broad Street, Chipping Sodbury, Bristol BS37 6AG t:01454 320 220 f:01454 320 099 e:[email protected] Contents 1.0 INTRODUCTION ........................................................................ 1 1.1 Appointment of Connect Consultants ..................................................................... 1 1.2 Site Location ........................................................................................................ 1 1.3 Development Proposals ........................................................................................ 2 1.4 Planning Background ............................................................................................ 2 1.5 Planning Policy Wales ........................................................................................... 3 1.6 Local Planning Policy ............................................................................................ 4 1.7 Report Overview .................................................................................................. 5 2.0 SITE TRANSPORT CONTEXT ..................................................... 6 2.1 Introduction ........................................................................................................ 6 2.2 Pedestrian Access ...............................................................................................
    [Show full text]