Old Town Edinburgh
Total Page:16
File Type:pdf, Size:1020Kb
Investing in your gas supply Old Town Edinburgh We will soon be starting work in Edinburgh’s Old Town to upgrade our gas network in the High Street, Blackfriars Street, Cowgate, Holyrood Road and St John Street. Our essential work involves replacing old All businesses in the local area will remain metal pipework, which is around 120 years old, open as usual. We do have a compensation with modern plastic pipe. This will ensure a scheme in place for small businesses which continued safe and reliable gas supply for the suffer a genuine loss of trade because of our local community for many years to come. The work. Packs are available from our website, modern plastic pipe has a minimum lifespan of sgn.co.uk, via the Publications section. around 80 years. All being well, our work should be Following consultation with the local completed in October. authority, Police Scotland, Scottish Fire and Rescue Service and local bus companies, If you have any enquiries about this project, our work will start on Monday 20 March please call us on 0131 469 1728 during office and take approximately 28 weeks. hours (9am to 5pm) or on 0800 912 1700 outwith these times. We’ll do everything we can to minimise disruption. At times during our work there will You’ll find further details, such as where be some diversions and road closures in place, we’ll be working, overleaf. however, our work has been planned to be carried out in phases, and around high profile To explain more about our work we are events which take place in the area, to minimise holding a drop-in session at the Radisson inconvenience and keep traffic flowing. Blu Hotel, 80 High Street, The Royal Mile, Edinburgh, EH1 1TH, on Wednesday 15 Our work will continue during the Edinburgh March between 4pm and 7.30pm. Please Festival and Fringe. We will be working away feel welcome to drop in to speak to us if from the main festival area during this time. you have any questions about this project. Pedestrian access will be maintained at all times. Where is the work taking We are place? sorry about any inconvenience our work causes and would like to thank road users and residents for their patience. This is a complex engineering project, however we always aim to minimise disruption whenever possible. Key Phase 1: Phase 2: Phase 3: Phase 4: Phase 5: Phase 6: Phase 7: Phase 8: Our work is planned to take place in phases to ensure traffic can flow around our work area, with the minimum disruption possible. Each phase will usually start as the previous phase finishes, however, there will be certain points during the project where we will be working in two locations at the same time. Advance notice signage will be put in place before our work starts in each location. During the phases of our work, the diversions shown on the following pages will be in place. To access this leaflet in an alternative format please call 0800 912 1700 ATE COWG C T A REE N ST DL RS EM MBE A A K CH ER R O W P L E A S A N C E F B O R I R S S T O R O U E L P S T L H T A C R E B REET Key R T O D S I N A D O D G M Work area: E H IC R T Diversion: S E W Phase 1 Road closure in High Street Bus routes and Blackfriars Street During the High Street road closure Diversion Lothian bus service 35 will be diverted • St Mary’s Street/Pleasance/ via Regent Road and North Bridge — West Richmond Street/ stops in Abbeymount, Canongate and 1 South Bridge, and reverse High Street will be missed out. • Blackfriars Street Traffic will enter and exit Blackfriars Street from Cowgate S T L E O N A Smell gas? R D 0800 912 1700 ’S S T R E E S T O U TH C L E R K S TR T E REE E ST T ON ST D RE A ST P L EA K E IT H R O A D CO WGATE C A N D L E M A K E R R O Phase 2 W CHAMBERS STREET Key No diversion Work area: F O B R R 2 R Temporary traffic lights in place when required IS E T S O T L R P O L A A D C E P L E S A O S U A T N H C E B R I D G E ND STREE MO T CH RI ST WE H O COWGA R TE S C E A W N D Y L N E M D A K E R R O W CHAMBERS STREET Phase 3 Closure of Holyrood Road F between Pleasance O B R R R IS and Viewcraig Gardens E T S O T L R P O L A 3 A Diversion D C E • St Mary’s Street/TheP Royal L QUEEN’S DRIVE E S Mile/Canongate/HorseA O S S U A T N T Wynd/Queen’s Drive/ L H C E E O B N S R Holyrood Gait, and reverse O A I K D R U e G D TH y ’ E S S Work area: STR C ND EE T O T L M R H E IC E R R Diversion: T E S K E Bus routes T W S TR E During the Holyrood Road closure E T To access this leaflet in an alternative Lothian bus service 6 will be diverted format please call via Canongate — stops in St Mary’s Street EAST PRESTON STREET and Holyrood Road will be missed out. 0800 912 1700 D A L K E I T H R O A D S T L E O N S O A R U D TH ’S S C T L R E E R E K T S TR E E T EAST PRESTON STREET D A L K E I T H R O A D H O R S E W Y N D ATE COWG C ET AN TRE D S S L ER EM MB A A K CH ER R O W P L E A S A N C E F B O R I R S T S R O O E L P U S L T T A H C R E B TREET O R S ND A I D O D G M E H IC R T S E W Key Work area: S T L E O N A R Diversion 1: D’ S S T Diversion 2: R E E T S O Diversion 3: U T H C L Diversion 4: E R K S T Diversion 5: R E E T T REE ST Diversion 6: TON RES ST P EA D A L K E I T H R O A D Phase 4 Diversions • Cowgate will be a one-way system — westbound side of road closed • St Mary’s Street — Canongate/Horse Wynd/Queen’s Drive/Holyrood Gait/ Holyrood Road • St Mary’s Street for Cowgate — High Street/South Bridge/Chambers Street/ 4 Bristol Place/Forrest Road/Candlemaker Row • St Mary’s Street for Holyrood Road and Pleasance — The Royal Mile/ Canongate/Horse Wynd/Queen’s Drive/Holyrood Gait/Holyrood Road • Dalkeith Road (city bound) — Dalkeith Road/East Preston Street/South Clerk Street (A7)/Nicolson Street/South Bridge/Blair Street • Pleasance — Cowgate/West Richmond Street/Nicolson Street/ South Bridge/Blair Street Smell gas? 0800 912 1700 CO WGATE C A N D L E M A K E R R O W CHAMBERS STREET F O B R R R IS E T S O T L R P O L A A D C E P L Phase 5 E K A e S y O WorkS area: U A Diversion N T Diversion: H C • E High Street/St Mary’s Street/Cowgate,B and reverse • R Westbound — Pleasance/West RichmondI Street/Richmond Place/ 5 D West Adam Street/East Adam Street/Pleasance/StG Mary’s Street/ E High Street (only when the Cowgate is closed westboundND STREE from MO T CH Holyrood Road) RI ST WE To access this leaflet in an alternative format please call 0800 912 1700 S T L E O N S O A R U D TH ’S S C T L R E E R E K T S TR E E T EAST PRESTON STREET D A L K E I T H R O A D H O COWGA R TE S C E A W N D Y L N E M D A K E R R O W CHAMBERS STREET F O B R R R IS E T S O T L R P O L A A D C E P L S E O A U S T A H K N e B y C R Work area: E I D Diversion: G E ND STREE MO T CH Phase 6 RI ST Westbound road closure WE Diversion 6 • Northbound — St Mary’s Street/High Street/South Bridge/ Chambers Street/Bristol Place/Forrest Road/Candlemaker Row • Southbound — Pleasance/West Richmond Street/South Bridge/ Chambers Street/Bristol Place/Forrest Road/Candlemaker Row Smell gas? 0800 912 1700 S T L E O N S O A R U D TH ’S S C T L R E E R E K T S TR E E T EAST PRESTON STREET D A L K E I T H R O A D H O R S E W Y N D ATE COWG C T A REE N ST DL RS EM MBE A A K CH ER R O W P L E A S A Key N C E Work area: F B O R I R S S Diversion: T O R O U E L P S T L H T A C R E B REET R T O D S I N A D O D G M E H IC R T S E W Phase 7 Closure of Holyrood Road Bus routes between St John Street During the Holyrood Road closure and Viewcraig Gardens Lothian bus service 6 will be diverted Diversion via Canongate — stops in St Mary’s Street • St Mary’s Street/The Royal and Holyrood Road will be missed out.