planning workshop australia
APPENDIX 5
RECREATION AND TOURISM POTENTIALS REPORT
(Jenny Rand & Associates)
© Dungog Shire Situation Analysis 3-Sep-08
TILLEGRA DAM ASSESSMENT OF RECREATION & TOURISM POTENTIAL July 2008
TILLEGRA DAM 1 ASSESSMENT OF RECREATION AND TOURISM POTENTIAL
CONTENTS
1. INTRODUCTION 3
3. COMMUNITY ATTITUDES TO TILLEGRA DAM 11
4. ATTRACTION & RECREATION BASE OF THE SHIRE 14
5. THE COMPETITIVE ENVIRONMENT - WATERWAYS 20
6. ACCOMMODATION ASSESSMENT 32
7. POTENTIAL VISITATION - MARKET ASSESSMENT 41
8. KEY FINDINGS & RECOMMENDATIONS 61
for: PLANNING WORKSHOP AUSTRALIA by
JENNY RAND & ASSOCIATES 272 Prince Charles Pde Kurnell NSW Tel: (02) 9668 8474 Mobile: 0411 782 700 Fax: (02) 9668 8474 Email: [email protected]
TILLEGRA DAM 2 ASSESSMENT OF RECREATION AND TOURISM POTENTIAL
1. INTRODUCTION
1.1 Background
In 2006 the NSW State Government announced its strategy for securing the future water needs for the Lower Hunter and Central Coast Regions of NSW. The Strategy included a proposal to build Tillegra Dam. Tillegra Dam is to be located on the Williams River in the foothills of the Barrington Ranges in Dungog Shire. Tillegra Dam will create a large water body (2,000 ha) that has the potential to be used for a range of recreation and tourism activities. The Dam is to be operated by Hunter Water.
In 2007 Dungog Shire Council commissioned Planning Workshop Australia to prepare a Shire-wide land use strategy as a basis for a review of the existing Local Environmental Plan or the preparation of a new Plan, taking into consideration the potential impacts of Tillegra Dam.
The potential impacts of and opportunities for the Dam in terms of recreation and tourism in the Shire and surrounding region is being assessed as part of the Planning Brief.
1.2 Terms of Reference
Planning Workshop in conjunction with Dungog Shire Council has commissioned Jenny Rand and Associates to: