03.03.2009 ´s tunnel tube disaster

Annual IMIA Conference - , 14.09.2010

Jens Manderfeld E-TVS Cologne´s tunnel tube disaster

¾ Jens Manderfeld

¾ Degree in Civil Engineering and Business Administration and Engineering

¾ 1993 - 2001 Structural Engineer / Site Manager

¾ 2002 - 2003 Gerling Risk Management Department

¾ 2003 - today HDI-Gerling Claims Management Engineering (CAR / EAR)

¾ Responsible claims manager for the project “Nord-Süd- Köln”

HDI-Gerling Industrie Versicherung AG Jens Manderfeld, E-TVS Essen -2- Berlin, 14.09.2010 Cologne´s tunnel tube disaster

International Engineering market German speaking Eng. market

Co-Insurer Lead Insurer Co-Insurer Lead Insurer Claims-dep.

Lawyer Loss Adjuster Broker Broker Experts, Experts Lawyer

Insured Insured

HDI-Gerling Industrie Versicherung AG Jens Manderfeld, E-TVS Essen -3- Berlin, 14.09.2010 Cologne´s tunnel tube disaster

¾ General information about the project

¾ Track crossover structure (Gleiswechselbauwerk)

¾ Collapse of the archive on March 3rd 2009

¾ Possible cause of loss

¾ Further site activities

¾ Characteristic of the German CAR Wordings

HDI-Gerling Industrie Versicherung AG Jens Manderfeld, E-TVS Essen -4- Berlin, 14.09.2010 General information about the project Location of the project

HDI-Gerling Industrie Versicherung AG Jens Manderfeld, E-TVS Essen -5- Berlin, 14.09.2010 General information about the project

¾ Length ca. 4 km

¾ 8 underground stations

¾ Max depth: 30 meter

¾ period (scheduled) 2004 – 2010

¾ Completion expected 2016

¾ Estimated constr. value / insured sum 630 Mio €

¾ Final constr. costs ? Mio €

HDI-Gerling Industrie Versicherung AG Jens Manderfeld, E-TVS Essen -6- Berlin, 14.09.2010 Track crossover structure (Gleiswechselbauwerk) Topview

HDI-Gerling Industrie Versicherung AG Jens Manderfeld, E-TVS Essen -7- Berlin, 14.09.2010 Track crossover structure Construction sequence 1

+47,80m

Water table

1.) Diaphragm walls down to –45m 1 1

+12,80m Water resistant layer (tertiary)

HDI-Gerling Industrie Versicherung AG Jens Manderfeld, E-TVS Essen +2,80m -8- Berlin, 14.09.2010 Track crossover structure Construction sequence 2

+47,80m

Water table

2.) Tunnelling works diameter 7.30m

2

+12,80m

HDI-Gerling Industrie Versicherung AG Jens Manderfeld, E-TVS Essen +2,80m -9- Berlin, 14.09.2010 Track crossover structure Construction sequence 3 3 +47,80m

3.) Dewatering system

3 +12,80m

HDI-Gerling Industrie Versicherung AG Jens Manderfeld, E-TVS Essen +2,80m -10- Berlin, 14.09.2010 Track crossover structure Construction sequences 4 - 7

6 +47,80m

5 5 4

+36,00m

4.) Excavation of 12 m 7 5.) Grouted anchor 6.) Temporary steel ceiling 7.) Concrete slab I as final concr. ceiling I +12,80m

HDI-Gerling Industrie Versicherung AG Jens Manderfeld, E-TVS Essen +2,80m -11- Berlin, 14.09.2010 Track crossover structure Construction sequences 8 - 9

+47,80m

+36,00m 8.) Excavation of next 8 6 m +29,95m

9.) Concrete slab II as 9 final concrete ceiling II

+12,80m

HDI-Gerling Industrie Versicherung AG Jens Manderfeld, E-TVS Essen +2,80m -12- Berlin, 14.09.2010 Track crossover structure Construction sequences 10 - 12

+47,80m

+36,00m 10.) Excavation of next 8 m +29,95m 11.) Dismantling of 11 tunnel tube in the crossover structure 10 12.) Bottom slab +21,80m 12 +12,80m

HDI-Gerling Industrie Versicherung AG Jens Manderfeld, E-TVS Essen +2,80m -13- Berlin, 14.09.2010 Track crossover structure Construction sequences 13 - 14

+47,80m

13

+36,00m

13.) Backfilling and 14 asphalt works +29,95m 14.) Final works

14 +21,80m

+12,80m Water resistant layer (tertiary)

HDI-Gerling Industrie Versicherung AG Jens Manderfeld, E-TVS Essen +2,80m -14- Berlin, 14.09.2010 Collapse of the archive on March 3rd 2010 Historical town archive Cologne

¾ Built in 1971

¾ Largest town archive north of the alps

¾ 30 km storage space

¾ Oldest document dates back to the year 922

¾ Contents sum insured 60 Mio. €

HDI-Gerling Industrie Versicherung AG Jens Manderfeld, E-TVS Essen -15- Berlin, 14.09.2010 Collapse of the town archive on March 3rd 2009 Location of archive and track crossover structure

HDI-Gerling Industrie Versicherung AG Jens Manderfeld, E-TVS Essen -16- Berlin, 14.09.2010 Collapse of the town archive on March 3rd 2009

HDI-Gerling Industrie Versicherung AG Jens Manderfeld, E-TVS Essen -17- Berlin, 14.09.2010 Collapse of the town archive on March 3rd 2009 3.000m³ of soil (gravel)

HDI-Gerling Industrie Versicherung AG Jens Manderfeld, E-TVS Essen -18- Berlin, 14.09.2010 Collapse of the town archive on March 3rd 2009 3.000m³ of soil (gravel)

HDI-Gerling Industrie Versicherung AG Jens Manderfeld, E-TVS Essen -19- Berlin, 14.09.2010 Collapse of the town archive on March 3rd 2009 3.000m³ of soil (gravel)

HDI-Gerling Industrie Versicherung AG Jens Manderfeld, E-TVS Essen -20- Berlin, 14.09.2010 Collapse of the town archive on March 3rd 2009 Demolition rubble in the structure

HDI-Gerling Industrie Versicherung AG Jens Manderfeld, E-TVS Essen -21- Berlin, 14.09.2010 Collapse of the town archive on March 3rd 2009 Protection measures for the archive contents

HDI-Gerling Industrie Versicherung AG Jens Manderfeld, E-TVS Essen -22- Berlin, 14.09.2010 Collapse of the town archive on March 3rd 2009 Damaged property

+47,80m

+36,00m

- Temporary steel ceiling - Debris and soil in the structure +29,95m - Cracks in concrete construction - Movement of the structure 3.000m³ - Loosening and loss of the +21,80m surrounding soil - Dewatering system +12,80m Water resistant layer (tertiary) +2,80m HDI-Gerling Industrie Versicherung AG Jens Manderfeld, E-TVS Essen -23- Berlin, 14.09.2010 Cologne´s tunnel tube disaster Possible cause of loss

Cause is still under investigation by

¾ The public attorney's office

¾ The independent experts nominated by the court

HDI-Gerling Industrie Versicherung AG Jens Manderfeld, E-TVS Essen -24- Berlin, 14.09.2010 Cologne´s tunnel tube disaster Possible cause of loss - Scenario I

Scenario I Removal of soil by the dewatering system has caused a local separation

HDI-Gerling Industrie Versicherung AG Jens Manderfeld, E-TVS Essen -25- Berlin, 14.09.2010 Cologne´s tunnel tube disaster Possible cause of loss - Scenario II

Scenario II Imperfection in the diaphragm wall

HDI-Gerling Industrie Versicherung AG Jens Manderfeld, E-TVS Essen -26- Berlin, 14.09.2010 Cologne´s tunnel tube disaster Possible cause of loss

Soil investigation 18.11.2009

HDI-Gerling Industrie Versicherung AG Jens Manderfeld, E-TVS Essen -27- Berlin, 14.09.2010 Cologne´s tunnel tube disaster Further site activities

Next steps:

1.) Temporary structure for the recovery of remaining archives contents

2.) Temporary structure for the inspection of the diaphragm wall

3.) Reinstatement works

HDI-Gerling Industrie Versicherung AG Jens Manderfeld, E-TVS Essen -28- Berlin, 14.09.2010 Cologne´s tunnel tube disaster Characteristic of the German CAR Wordings

Insured property in standard German wordings

¾ Construction work

¾ Building materials, prefabricated parts

¾ Temporary structures

HDI-Gerling Industrie Versicherung AG Jens Manderfeld, E-TVS Essen -29- Berlin, 14.09.2010 Cologne´s tunnel tube disaster Characteristic of the German CAR Wordings

On application: the surrounding building ground / subsoil up to a first risk sum.

Examples for clauses:

¾ Surrounding Building ground / subsoil is insured against all kind of perils

¾ Surrounding Building ground / subsoil is insured only as a result of covered loss

¾ Surrounding Building ground / subsoil is insured only as a result of a loss

HDI-Gerling Industrie Versicherung AG Jens Manderfeld, E-TVS Essen -30- Berlin, 14.09.2010 Cologne´s tunnel tube disaster

¾ The collapse of the archive is not the result of a typical tunnel risk

¾ The collapse of the archive is the result of an excavation pit risk

HDI-Gerling Industrie Versicherung AG Jens Manderfeld, E-TVS Essen -31- Berlin, 14.09.2010