Apron & Taxiways Management

Total Page:16

File Type:pdf, Size:1020Kb

Apron & Taxiways Management Episode 3 D2.2-045 - Detailed Operational Description - Version : 3.00 Apron & Taxiways Management - E2/3 Episode 3 Single European Sky Implementation support through Validation Document information Programme Sixth framework programme Priority 1.4 Aeronautics and Space Project title Episode 3 Project N° 037106 Project Coordinator EUROCONTROL Experimental Centre Deliverable Name Detailed Operational Description - Apron & Taxiways Management - E2/3 Deliverable ID D2.2-045 Version 3.00 Owner Rosalind Eveleigh EUROCONTROL Contributing partners Page 1 of 72 Issued by the Episode 3 consortium for the Episode 3 project co-funded by the European Commission and Episode 3 consortium. Episode 3 D2.2-045 - Detailed Operational Description - Version : 3.00 Apron & Taxiways Management - E2/3 - This page is intentionally blank - Page 2 of 72 Issued by the Episode 3 consortium for the Episode 3 project co-funded by the European Commission and Episode 3 consortium. Episode 3 D2.2-045 - Detailed Operational Description - Version : 3.00 Apron & Taxiways Management - E2/3 DOCUMENT CONTROL Approval Role Organisation Name Document owner EUROCONTROL Rosalind Eveleigh Technical approver EUROCONTROL Giuseppe Murgese Quality approver EUROCONTROL Frédérique Sénéchal Project coordinator EUROCONTROL Philippe Leplae Version history Justification - Could be a Version Date Status Author(s) reference to a review form or a comment sheet Anthony Inard Approval of the document by the 1.00 07/12/2009 Approved Ros Eveleigh Episode 3 Consortium. Eduardo Goni Final Alignment with ATM Process 2.00 01/02/2010 Approved Ros Eveleigh Model Cross DOD alignment. Approved by 3.00 15/04/2010 Approved Ros Eveleigh the Episode 3 Consortium Page 3 of 72 Issued by the Episode 3 consortium for the Episode 3 project co-funded by the European Commission and Episode 3 consortium. Episode 3 D2.2-045 - Detailed Operational Description - Version : 3.00 Apron & Taxiways Management - E2/3 TABLE OF CONTENTS EXECUTIVE SUMMARY........................................................................................................... 7 1 INTRODUCTION ............................................................................................................... 8 1.1 PURPOSE OF THE DOCUMENT.................................................................................... 8 1.2 INTENDED AUDIENCE ................................................................................................ 9 1.3 DOCUMENT STRUCTURE ........................................................................................... 9 1.4 BACKGROUND ........................................................................................................ 10 1.5 GLOSSARY OF TERMS............................................................................................. 11 2 OPERATING CONCEPT-CONTEXT AND SCOPE........................................................ 12 2.1 SESAR CONCEPT FOR AIRPORT APRON & TAXIWAYS MANAGEMENT ....................... 12 2.1.1 General introduction ......................................................................................... 12 2.1.2 Safety on the airport surface ............................................................................ 13 2.1.3 Arrival flight operations..................................................................................... 13 2.1.4 Turn-round operations...................................................................................... 14 2.1.5 Departing flight operations................................................................................ 15 2.2 ATM PROCESSES DESCRIBED IN THE DOCUMENT ..................................................... 16 2.3 RELATED SESAR OPERATIONAL IMPROVEMENTS (OIS) ........................................... 20 2.4 RELATED SESAR PERFORMANCE REQUIREMENTS .................................................. 20 3 CURRENT OPERATING METHOD AND MAIN CHANGES.......................................... 25 3.1 ASPECTS OF TODAY'S OPERATIONS THAT WILL REMAIN ............................................. 25 3.2 ASPECTS OF TODAY'S OPERATIONS THAT WILL CHANGE ............................................ 25 3.3 ASPECTS OF TODAY'S OPERATIONS THAT WILL DISAPPEAR ........................................ 25 4 PROPOSED OPERATING PRINCIPLES ....................................................................... 26 4.1 APRON & TAXIWAYS MANAGEMENT SUPPORT TO BALANCE ACTUAL DEMAND AND CAPACITY (A3.1).................................................................................................... 26 4.1.1 Scope and Objectives....................................................................................... 26 4.1.2 Assumptions ..................................................................................................... 26 4.1.3 Expected Benefits, Issues and Constraints...................................................... 27 4.1.4 Overview of Operating Method......................................................................... 27 4.1.4.1 Assess Surface Capacity Load (A3.1.1.1.1.2) ............................................. 28 4.1.4.2 Switch Surface Operational Rules (A3.1.2.1.2) .......................................... 29 4.1.4.3 Coordinate Temporary Airport Surface Resource Closure (A3.1.2.2.2) ..... 30 4.1.5 Enablers............................................................................................................ 32 4.1.6 Transition issues............................................................................................... 32 4.2 APRON & TAXIWAYS MANAGEMENT SUPPORT TO MANAGE TRAFFIC QUEUES (A3.2) .33 4.2.1 Scope and Objectives....................................................................................... 33 4.2.2 Assumptions ..................................................................................................... 33 4.2.3 Expected Benefits, Issues and Constraints...................................................... 33 4.2.4 Overview of Operating Method......................................................................... 34 4.2.4.1 Optimise Departure Sequence (A3.2.1.1.2)................................................. 34 4.2.5 Enablers............................................................................................................ 37 4.2.6 Transition issues............................................................................................... 37 4.3 APRON & TAXIWAYS MANAGEMENT SUPPORT TO DE-CONFLICT AND SEPARATE TRAFFIC (A3.3).................................................................................................................... 38 4.3.1 Scope and Objectives....................................................................................... 38 4.3.2 Assumptions ..................................................................................................... 38 4.3.3 Expected Benefits, Issues and Constraints...................................................... 38 4.3.4 Overview of Operating Method......................................................................... 40 4.3.4.1 Detect & Solve Hazardous Situations Outside the Runway Protected Area (A3.3.1.2.2) ................................................................................................. 41 4.3.4.2 Manage Traffic Movement Outside the Runway Protected Area (A3.3.1.3.2) ..................................................................................................................... 44 Page 4 of 72 Issued by the Episode 3 consortium for the Episode 3 project co-funded by the European Commission and Episode 3 consortium. Episode 3 D2.2-045 - Detailed Operational Description - Version : 3.00 Apron & Taxiways Management - E2/3 4.3.5 Enablers............................................................................................................ 47 4.3.6 Transition issues............................................................................................... 48 5 ENVIRONMENT DEFINITION......................................................................................... 49 5.1 AIRSPACE CHARACTERISTICS.................................................................................. 49 5.2 TRAFFIC CHARACTERISTICS .................................................................................... 49 6 ROLES AND RESPONSIBILITIES ................................................................................. 50 6.1 MAIN ROLES AND RESPONSIBILITIES........................................................................ 50 6.2 ACTORS RESPONSIBILITIES IN THE ATM PROCESS MODEL ....................................... 52 7 REFERENCES AND APPLICABLE DOCUMENTS....................................................... 54 7.1 REFERENCES ......................................................................................................... 54 7.2 APPLICABLE DOCUMENTS........................................................................................ 55 8 ANNEX A: OPERATIONAL SCENARIOS...................................................................... 56 9 ANNEX B: DETAILED USE CASE................................................................................. 61 10 ANNEX C: OI STEPS TRACEABILITY TABLE ............................................................. 62 11 ANNEX D: HOT TOPICS ................................................................................................ 71 Page 5 of 72 Issued by the Episode 3 consortium for the Episode 3 project co-funded by the European Commission and Episode 3 consortium. Episode 3 D2.2-045 - Detailed
Recommended publications
  • Injuries and Fatalities of Workers Struck by Vehicles on Airport Aprons
    REPORT TO CONGRESS Injuries and Fatalities of Workers Struck by Vehicles on Airport Aprons Prepared by U.S. Department of Transportation Federal Aviation Administration Office of the Associate Administrator for Airports July 2002 I. Executive Summary Section 520 of the Wendell H. Ford Aviation Investment and Reform Act for the 21st Century (AIR-21) required the Federal Aviation Administration (FAA) to conduct the study described below and report the results to Congress by April 5, 2001: The Administrator shall conduct a study to determine the number of persons working at airports who are injured or killed as a result of being struck by a moving vehicle while on an airport tarmac, the seriousness of the injuries to such persons, and whether or not reflective safety vests or other actions should be required to enhance the safety of such workers. A review of the FAA, Occupational Safety and Health Administration (OSHA), and Bureau of Labor Statistics (BLS) of the U.S. Department of Labor (DOL) databases found that between 1985 and August 2000, 11 workers were fatally injured when struck by vehicles on airport aprons. Of the 11 fatalities, only two occurred between 1995 and 2000. Increased emphasis on ramp safety by the airline industry and airports could be a contributing factor to the decline in “struck by” injuries. The lack of comprehensive nonfatal injury data makes it impossible to determine accurately the number and severity of nonfatal struck by injuries. The data suggest that airline industry workers actually sustain significantly fewer struck by injuries than workers in most other industries.
    [Show full text]
  • Aircraft Push-Back Prediction and Turnaround Monitoring by Vision-Based Object Detection and Activity Identification
    Aircraft Push-back Prediction and Turnaround Monitoring by Vision-based Object Detection and Activity Identification Thai Van Phat∗, Sameer Alam∗, Nimrod Lilith∗, Phu N. Tran† and Binh T. Nguyen‡ ∗Saab-NTU Joint Lab, Nanyang Technological University, Singapore †Air Traffic Management Research Institute, Nanyang Technological University, Singapore ‡AISIA Research Lab, University of Science, Vietnam National University, Ho Chi Minh City, Vietnam Abstract—An accurate prediction of aircraft readiness for departure can help Air Traffic Control (ATC) plan an optimal pre-departure sequence at which aircraft are dispatched from the parking stands. This dynamic mechanism between predicting when all ground handling activities end (Target Off Block Time) and the pre-departure sequencing (Target Start-up Approval time) is the core of Airport Collaborative Decision Making. This turnaround process consists of several activities (fueling, board- ing/deboarding, loading/unloading, etc.) and involves several ground support types of equipment and vehicles. In this research, we propose a visual-analytic approach for detection, tracking such activities to predict the Target Off Block Time (push-back time). This research introduces a Convolutional Neural Networks based video-analytic framework that can monitor the aircraft turnaround processes, including object detection, object tracking, activity detection, and push-back prediction. It recognizes an aircraft type and retrieves turnaround process/activities from its Aircraft Performance Manual and then detects and tracks various activities to estimate their completion time with high accuracy. Live Gate Cam video data was collected from the Gate 3 at Tokachi-Obihiro airport, in Hokkaido, Japan. We used 16 videos with the corresponding lengths varying from 40 to 60 minutes for training and five videos for testing.
    [Show full text]
  • Airport Apron Lighting Musco’S Industry-Leading Total Light Control — TLC for LED® Technology Leading the Way in Apron Lighting
    Airport Apron Lighting Musco’s Industry-Leading Total Light Control — TLC for LED® Technology Leading the Way in Apron Lighting There’s a lot to consider with airport apron lighting. Will glare affect pilots or air traffic controllers? What about maintenance? Will it improve operations? Is it energy efficient? As the use of LED continues to emerge, it’s important to understand that different LED lighting produces vastly different results. Musco has applied its more than 40 years of research and experience to take advantage of the LED light source in ways no other manufacturer can. The result is an LED system that’s created new possibilities for airport lighting. Improved Visibility TOTAL LIGHT CONTROL — PRIOR HPS LIGHT SOURCE Custom optics provide greater light uniformity, TLC FOR LED® improving visibility and efficiency of ground crews. Reduced Glare Patented glare reduction technology eliminates glare from impacting pilots and air traffic controllers. Total Light Control Superior light control preserves darkness in areas where light isn’t intended. Camera settings for both photos 1s at f/4, ISO 100, WB 4300 Streamlined Maintenance Remote electrical enclosures eliminate the need for lifts to service and removes weight from the poletop. Longer Reliability System solution with lighting, electrical, and structural components designed to work together for long-term reliability. System Adaptability Interfaces with new or existing facility management systems, along with adaptive controls based on gate usage. No Maintenance Costs A comprehensive 10-year parts and labor warranty eliminates maintenance costs and headaches for the next decade. An Ideal New or Retrofit Foundation to Poletop Solution Retrofit Solution Light-Structure System™ System Solution Whether installed as a retrofit or foundation to poletop solution, Musco’s LED apron system is factory aimed, wired, and tested for easy installation and trouble-free operation.
    [Show full text]
  • Ground Operations Occurrences at Australian Airports 1998 to 2008
    Publication Date: June 2010 ISBN 978-1-74251-061-3 The Australian Transport Safety ATSB TRANSPORT SAFETY REPORT Bureau (ATSB) is an independent Aviation Research & Analysis AR-2009-042 Commonwealth Government statutory Agency. The Bureau is governed by a Final Commission and is entirely separate from transport regulators, policy makers and service providers. The ATSB's function is to improve safety Ground operations occurrences at and public confidence in the aviation, marine and rail modes of transport through excellence in: Australian airports independent investigation of transport accidents and other safety occurrences; 1998 to 2008 safety data recording, analysis and research; and fostering safety awareness, knowledge and action. The ATSB does not investigate for the purpose of apportioning blame or to Abstract provide a means for determining liability. The aviation industry has been slow to acknowledge the risks associated with ground operations. The ATSB performs its functions in accordance with the provisions of the While most occurrences on airport aprons and taxiways do not have consequences in terms of loss of Transport Safety Investigation Act 2003 and, where applicable, relevant life, they are often associated with aircraft damage, delays to passengers and avoidable financial costs international agreements. to industry. The focus of this report is to examine ground occurrences involving high capacity aircraft When the ATSB issues a safety operations. recommendation, the person, organisation or agency must provide a written response within 90 days. That This report examines occurrences involving ground operations and foreign object debris that occur at response must indicate whether the Australian airports which receive high capacity aircraft.
    [Show full text]
  • Analysis of Apron Pavement Thickness in Central Airport Based on the Amount and Type of Aircraft
    International Journal of Innovative Technology and Exploring Engineering (IJITEE) ISSN: 2278-3075, Volume-8, Issue-4S February, 2019 Analysis of Apron Pavement Thickness in Central Airport Based On the Amount and Type of Aircraft Ika Putri Hendriyani, Sakti Adji Adjisasmita, Achmad Faisal Aboe Abstract: Sentani Airport is one of the airports that became a Bethary, Pradana and Basidik (2015) did a study on liaison between districts in Papua. Growth that occurs annually Soekarno-Hatta airport pavement strength using makes Sentani airport gets busier. Analysis of the rigid pavement International Civil Aviation Organization (ICAO) method apron of Sentani airport was done with the aim to determine the and found that the pavement was able to withstand loads of thickness of pavement layers at airports. The method used is a up to 80,000 lbs [3]. This value is far greater than the weight method of planning the FAA (Federal Aviation Administration). The first step to consider is the value of CBR of the Airbus A-380 aircraft which is 57,000 lbs. Then this (California Bearing Ratio) subgrade, the determination of the is strengthened by the Pavement Classification Number value of the modulus of subgrade, selecting the best plan, (PCN) value at Soekarno airport Hatta is 120 R / D / W / T maximum take-off weight (MTOW) of the aircraft, the load of the and 96 R / D / W / T (in terminal 3 Apron) greater than the aircraft wheels (w2), departure corrected (R2), the load of the value of Aircraft Classification Number of Airbus A-380 aircraft wheels plans (w1) and annual equivalent flight type is 94 R / D / W /T.
    [Show full text]
  • Ramboll References Aviation
    RAMBOLL REFERENCES AVIATION ABU DHABI INTERNATIONAL AIRPORT, UNITED ARAB EMIRATES Design & Build contract for 9 hardstands The Abu Dhabi International marking and signage. There will CUSTOMER Airport (ADIA) is undergoing a be staging areas for Ground Al Naboodah National Contracting major programme of expansion Support Equipment (GSE) and LOCATION under the management of Abu airside service roads connected Abu Dhabi Dhabi Airports Company (ADAC). to the main airside service road PERIOD As part of this expansion ADAC network.The stands are being 2013-2014 requires 9 Code E Hardstands to executed through a Design and SERVICES PROVIDED be constructed to provide relief Build procurement route and Pavement Design aircraft parking until opening of Ramboll has been appointed as AGL the new Midfield Terminal the Designer of Record by the Geotech Engineering Building in 2017. D&B contractor - Al Naboodah Structural Engineering National Contracting. Electrical, Drainage During peak periods, demand for Highway and Road Design aircraft parking stands is Besides providing the core Design Co-ordination frequently greater than the services of aviation layout, PROJECT BUDGET available number of stands, pavement design and 50.000.000 EUR leading to operational delays. infrastructural services, Ramboll will also adopt the Jet Fuel The 9 Code E Hardstands will be Hydrant and electrcal & telecom fitted with a storm water designs prepared by others., drainage system, apron flood lighting, AGL, VDGS, a fuel hydrant system, CCTV, Wi-Fi, IMAGE Abu Dhabi International Airport 38 AVIATION PROJECTS ABU DHABI AIRPORT EXPANSION Part of a $6.8bn expansion programme to increase capacity from 3.5 to 20 million passengers by 2011.
    [Show full text]
  • Airport Apron Roundabout Intersection
    Airport Apron Roundabout – Operational Concept and Capacity Evaluation Bojana Mirkovic, Vojin Tošić Peter Kanzler, Michael Hoehenberger Division of Airports and Air Traffic Safety Apron Control; Operations Planning University of Belgrade – Faculty of Transport and Traffic Munich Airport International Engineering, Belgrade, Serbia Munich, Germany [email protected] Abstract - The paper presents one of the initial steps in the Munich Airport (MUC) is a rare case, in terms of apron evaluation process towards possible implementation of an taxiway system configuration. It operates with three parallel innovative taxiway design at Munich Airport apron. A taxiways across all three aprons, see Fig. 1. At Apron 2 roundabout is proposed as a potential solution for the 12-line standard yellow marking is used for all three taxiways. They intersection area expected at redesigned Apron 3. The paper are designed to allow simultaneous taxiing of the two largest presents preliminary design and operations concepts of the aircraft (ICAO code letter F), or three smaller aircraft (up to C). roundabout, followed by its capacity evaluation. The aim was to In other apron areas, side taxiways, orange and blue, may be analyze whether a roundabout is suitable, in terms of capacity, to used simultaneously only by smaller aircraft (A, B and C). The replace a conventional intersection under Munich Airport yellow central taxiway is used by larger aircraft (D, E or F). It operating conditions. cannot be used simultaneously with the blue and orange side Key words - airport apron; taxiway intersection; capacity lines. evaluation; simulation; analytical modelling In the current state, the most complex intersection is located on the southern side of Apron 2 (red rectangle in Fig.
    [Show full text]
  • AC 150/5220-21C, Aircraft Boarding Equipment, 29 June 2012
    Advisory U.S. Department of Transportation Federal Aviation Circular Administration Subject: Aircraft Boarding Equipment Date: 6/29/2012 AC No: 150/5220-21C Initiated by: AAS-100 Change: 1. PURPOSE. This advisory circular (AC) contains the Federal Aviation Administration’s (FAA’s) performance standards, specifications, and recommendations for the design, manufacture, testing and maintenance of equipment used in the boarding of airline passengers. 2. CANCELLATION. This AC cancels AC 150/5220-21B, Guide Specification for Devices Used to Board Airline Passengers with Mobility Impairments, dated March 17, 2000. 3. SCOPE. This AC covers the four most common pieces of equipment used to board aircraft: a. Passenger boarding bridges (PBBs) that are entered from the passenger terminal boarding area, b. Ramps that are moved into place to allow boarding from the airport apron, c. Lifts to vertically transport passengers from the airport apron to the door of the aircraft, and d. Aircraft boarding chairs used to transfer passengers from their wheelchair or other apparatus to their seat in the aircraft cabin. The physical area covered in this AC is that which is bounded by the door of the passenger terminal area, on one end, to the door of the aircraft, on the other end. Although this AC refers only to aircraft boarding (enplaning), all references apply equally to disembarking (deplaning) with the described procedures occurring in reverse order. Chapters 3-5 for this AC are primarily based on the performance standards, specifications, and recommendations contained in the Society of Automotive Engineers (SAE) Aerospace Recommended Practice (ARP) 1247, General Requirements for Aerospace Ground Support Equipment (Motorized and Non-motorized), U.S.
    [Show full text]
  • Apron Layout Design and Flight-To-Gate Assignment at Lanseria International Airport
    APRON LAYOUT DESIGN AND FLIGHT-TO-GATE ASSIGNMENT AT LANSERIA INTERNATIONAL AIRPORT T. Leonard1 & J. Bekker2* Department of Industrial Engineering Stellenbosch University, South Africa 1 [email protected], 2 [email protected] ABSTRACT Air traffic is continuously increasing and more efficient air transport systems are required to handle the air travel demand. The study investigates the expansion of Lanseria International Airport in Gauteng, South Africa. Expansion of Lanseria requires a study of the airport apron layout to ensure efficient passenger-aircraft flow as well as the efficient flow of aircraft to and from the airport. The candidate layout designs are based on the layout concept of the Hartsfield-Jackson Atlanta International Airport in Atlanta, USA. In the study, different airport apron layouts were compared, including the existing layout of Atlanta Airport, via a simulation model of each. Designs based mainly on passenger transfer distance between the terminal building and aircraft were evaluated. The cross-entropy method was used to develop a generic flight-to-gate assignment program that minimises passenger transfer distances. OPSOMMING Lugverkeer groei toenemend en meer doeltreffende lugvervoerstelsels word benodig om in die lugvervoerbehoefte te voorsien. In hierdie studie word die uitbreiding van die Lanseria Internasionale Lughawe in Gauteng, Suid-Afrika ondersoek. Die uitbreiding van Lanseria vereis ’n studie van die lughawe se laaibladuitleg om doeltreffende vloei van passassiers na en van vliegtuie te verseker, asook die vloei van vliegtuie na en van die lughawe. Die moontlike uitleg-ontwerpe is gebaseer op die uitlegkonsep van die Hartsfield-Jackson Atlanta Internasionale Lughawe in Atlanta, VSA. Verskillende uitleg-ontwerpe, insluitend die bestaande uitleg van Atlanta, is in die studie met simulasie vergelyk.
    [Show full text]
  • Airport Capacity US Department Ot Transportation Enhancement Plan Federal Aviation Administration DOT/FAA/CP-86/1 DOT-TSC-FAA-86-2
    e Airport Capacity US Department ot Transportation Enhancement Plan Federal Aviation Administration DOT/FAA/CP-86/1 DOT-TSC-FAA-86-2 1986 Prepared for Prepared by Airport Capacity Program Office Transportation Systems Center Washington DC 20591 Cambridge MA 02142 -• NOTICE This document is disseminated under the sponsorship of the Department of Transportation in the interest of information exchange. The United States Government assumes no liability for its contents or use thereof. NOTICE The United States Government does not endorse products or manufacturers. Trade or manufacturers' names appear herein solely because they are considered essential to the object of this report. Technical Report Documentation Page 1. Report No. 2 GoveTnmentAccession No. 3. Recipient's Catalog No. DOT/FAA/CP-86/1 4. Title and Subtitle Report Date AIRPORT CAPACITY ENHANCEMENT PLAN 1986 Performing Organization Code 7. Authors) DTS-45 Performing Organization Report No. D0T-TSC-FAA-86-2 9. PerformingOrganization Name and Address 10. Work Unit No. (TRAIS) U.S. Department of Transportation FA614/A6223 Research and Special Programs Administration Transportation Systems Center 11. Contract orGrant No. Cambridge, MA 02142 12. Sponsoring Agency Name and Address 13. Type of Report and PeriodCovered U.S. Department of Transportation Final Report Federal Aviation Administration November 1984 - January 1986 Airport Capacity Program Office Washington» DC 20591 14. Sponsoring AgencyCode 15. Supplementary Notes 16. Abstract The first edition of the Airport Capacity Enhancement Plan has been developed by the Federal Aviation Administration's newly established Airport Capacity Program Office (ACPO). The plan is intended to increase the capacity and efficient utiliza tion of airports, and to alleviate current and projected aircraft operating delays in the nation's airport system without compromises to safety or to the environment.
    [Show full text]
  • Airfield Pavement Management PROGRAM
    FLORIDA DEPARTMENT OF TRANSPORTATION AVIATION AND SPACEPORT OFFICE DISTRICT 1 REPORT JUNE 2015 STATEWIDEATEWIDE Airfield Pavement Management PROGRAM Pavement Evaluation Report –District 1 Statewide Airfield Pavement Management Program TABLE OF CONTENTS Executive Summary .............................................................................................................. 1 1. Introduction ................................................................................................................... 19 2. Airfield Pavement System Inventory and Network Update ................................ 31 3. Airfield Pavement Condition Analysis and Evaluation ........................................ 37 4. Pavement Performance Modeling .......................................................................... 47 5. Maintenance Level Activities .................................................................................... 55 6. Major Rehabilitation Needs ....................................................................................... 65 7. Conclusion ..................................................................................................................... 69 LIST OF TABLES Table I: Condition Summary by Airport ............................................................................ 3 Table II: Runway Condition Summary by Airport............................................................ 4 Table III: District Summary of Area by Use by Airport..................................................... 7 Table IV: Summary
    [Show full text]
  • To Study and Design of Airport Runway Pavement
    id4972531 pdfMachine by Broadgun Software - a great PDF writer! - a great PDF creator! - http://www.pdfmachine.com http://www.broadgun.com ISSN: 2347-6540 International Journal of Latest Research In Engineering and Computing (IJLREC) Volume 3, Issue 5 , Page No. 7-10 September-October 2015 www.ijlrec.com To Study and Design of Airport Runway Pavement 1Sanjeev Gill ,2Dr.Rajiv Kumar ,3Shivam Singhal, Rahul kumar, Rishi Raj Mani, Subham Srivastav, Purushottam 1HOD Department of Civil Engineering, JBIT, Dehradun 3JBIT B-TECH Final year Students ABSTRACT The structural design of airport runway pavements are material design and thickness design. Material design deals with the selection of suitable materials for various pavement layers and mix design of bituminous materials Pavements are designed and constructed to provide durable all-weather travelling surfaces for safe and speedy movement of people and goods with an acceptable level of comfort to users. These functional requirements of pavements are achieved through careful considerations in the following aspects during the design and construction phases: (a) types of pavement (b) grading of material (c) design of pavement thickness. Airport facility requirements include runways, taxiways, pavement condition, navigational aids, lighting systems, and aircraft parking apron, hangars, fixed base operator (FBO) facilities, aircraft fuelling, automobile parking, utilities and surface access. Keys: flexible pavement, rigid pavement, run way, pavement surface, parking, apron area INTRODUCTION An airport runway is defined as a rectangular area on a land prepared for the landing and takeoff of aircraft. Runways may be a man-made surface (often asphalt, concrete, or a mixture of both) or a natural surface (grass, dirt, gravel, ice, or salt).Runways are named by a number between 01 and 36, which is generally the magnetic azimuth of the °), runway 18 is south (180°), runway 27 runway's heading in deca degrees : a runway numbered 09 points east (90 °) and runway 36 points to the north (360° rather than 0°).
    [Show full text]