Invitation to Bid

Total Page:16

File Type:pdf, Size:1020Kb

Invitation to Bid Republic of the Philippines DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS OFFICE OF THE DISTRICT ENGINEER Cavite 1st District Engineering Office Brgy. De Ocampo, Trece Martires City INVITATION TO BID 1. The Department of Public Works and Highways (DPWH), Cavite 1st District Engineering Office, through its Bids and Awards Committee now invites bids for the hereunder Works: 1. Name of Contract : FY 2021 DPWH INFRASTRUCTURE PROGRAM Local Program Local Infrastructure Program Buildings and Other Structures Multipurpose/Facilities Construction of Multi-Purpose Building, Brgy. Anabu, Imus City, Cavite Contract ID No. : 21DF0073 (Re-advertised) Contract Location : Imus City, Cavite Scope of Works : Construction of Multi-Purpose Building Net Length : Approved Budget for the : ₱ 7,920,000.00 Contract Source of Funds : FY 2021 NEP for DPWH INFRA PROGRAM Contract Duration : 150 c.d. Size Range : Small B License Category : C & D Cost of Bidding Documents : ₱ 10,000.00 2. Name of Contract : FY 2021 DPWH INFRASTRUCTURE PROGRAM Local Program Const. / Repair / Rehab. / Improvement of Various Infrastructure including Local Projects Local Roads and Bridges Local Roads Road Widening along Rosario Drive with Drainage System including Access Road to Cavite Export Processing Zone (PEZA Main), Rosario, Cavite Contract ID No. : 21DF0074 Contract Location : Rosario, Cavite Scope of Works : Widening of Road with Drainage (42” dia RCPC) Net Length : 846.50 LM road (w = 3.50m) with 504.70 LM drainage (42” dia RCPC) Approved Budget for the : ₱ 19,600,000.00 Contract Source of Funds : FY 2021 NEP for DPWH INFRA PROGRAM Contract Duration : 121 c.d. Size Range : Medium A License Category : B Cost of Bidding Documents : ₱ 25,000.00 IB: 21DF0073-21DF008521D00010, 21D00035, 21D00042, 21Page 1 of 7 3. Name of Contract : FY 2021 DPWH INFRASTRUCTURE PROGRAM Organizational Outcome 1 : Ensure Safe and Reliable National Road System Construction of By-Pass and Diversion Roads Cabuco - Indang - Naic - Maragondon Diversion Road, Cavite Contract ID No. : 21DF0075 Contract Location : Trece Martires City, Cavite Scope of Works : Concreting of road with drainage Net Length : 342.40 LM road (4 lanes) with drainage Approved Budget for the : ₱ 24,500,000.00 Contract Source of Funds : FY 2021 NEP for DPWH INFRA PROGRAM Contract Duration : 126 c.d. Size Range : Medium A License Category : B Cost of Bidding Documents : ₱ 25,000.00 4. Name of Contract : FY 2021 DPWH INFRASTRUCTURE PROGRAM Convergence and Special Support Program Special Road Fund - Motor Vehicle User's Charge (MVUC) as per R.A. 11239 Repair/Rehabilitation along Juanito R. Remulla Sr Road (S06090LZ) K0045+061-K0045+647, K0045+669-K0046+047, Trece Martires City Contract ID No. : 21DF0076 Contract Location : Trece Martires City, Cavite Scope of Works : Asphalt Overlay of road with RTPM and Internally Illuminated (Solar) Studs Net Length : 0.959 Lane Km road (width variable) Approved Budget for the : ₱ 27,634,705.00 Contract Source of Funds : FY 2021 NEP for DPWH INFRA PROGRAM Contract Duration : 63 c.d. Size Range : Medium A License Category : B Cost of Bidding Documents : ₱ 25,000.00 5. Name of Contract : FY 2021 DPWH INFRASTRUCTURE PROGRAM Organizational Outcome 2 : Protect Lives and Properties Against Major Floods Flood Management Program Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers Construction of Revetment along San Juan River, Brgy. San Juan Section West Side, Phase 4, Noveleta, Cavite Contract ID No. : 21DF0077 Contract Location : Noveleta, Cavite Scope of Works : Construction of revetment Net Length : 193.60 LM revetment Approved Budget for the : ₱ 29,400,000.00 Contract Source of Funds : FY 2021 NEP for DPWH INFRA PROGRAM Contract Duration : 150 c.d. Size Range : Medium A License Category : B Cost of Bidding Documents : ₱ 25,000.00 IB: 21DF0073-21DF008521D00010, 21D00035, 21D00042, 21Page 2 of 7 6. Name of Contract : FY 2021 DPWH INFRASTRUCTURE PROGRAM Convergence and Special Support Program Special Road Fund - Motor Vehicle User's Charge (MVUC) as per R.A. 11239 Installation of Road Lights along Noveleta-Rosario Diversion Road, K0026+(-575) to K0027+000 Contract ID No. : 21DF0078 Contract Location : Noveleta, Cavite Scope of Works : Installation of 160 sets single arm posts with streetlights and internally illuminated (solar) studs Net Length : 3.20 Km road Approved Budget for the : ₱ 30,687,000.00 Contract Source of Funds : FY 2021 NEP for DPWH INFRA PROGRAM Contract Duration : 150 c.d. Size Range : Medium A License Category : B Cost of Bidding Documents : ₱ 25,000.00 7. Name of Contract : FY 2021 DPWH INFRASTRUCTURE PROGRAM Convergence and Special Support Program Special Road Fund - Motor Vehicle User's Charge (MVUC) as per R.A. 11239 Repair/Rehabilitation along Tanza - Trece Martires City - Indang Road (S06096LZ) K0036+683- K0037+883, Tanza, Cavite Contract ID No. : 21DF0079 Contract Location : Tanza, Cavite Scope of Works : Asphalt Overlay of road with RTPM and Internally Illuminated (Solar) Studs Net Length : 1.20 Km road (width variable) Approved Budget for the : ₱ 34,259,430.00 Contract Source of Funds : FY 2021 NEP for DPWH INFRA PROGRAM Contract Duration : 68 c.d. Size Range : Medium A License Category : B Cost of Bidding Documents : ₱ 25,000.00 8. Name of Contract : FY 2021 DPWH INFRASTRUCTURE PROGRAM Convergence and Special Support Program Special Road Fund - Motor Vehicle User's Charge (MVUC) as per R.A. 11239 Repair/ Rehabilitation Improvement along Crisanto delos Reyes Avenue (S02006LZ) K0054+267- K0055+000, K0055+592-K0056+056, K0059+000- K0059+138 Contract ID No. : 21DF0080 Contract Location : Amadeo, Cavite Scope of Works : Asphalt Overlay of road with RTPM and Internally Illuminated (Solar) Studs Net Length : 5.424 Lane Km road (width variable) Approved Budget for the : ₱ 48,250,000.00 Contract Source of Funds : FY 2021 NEP for DPWH INFRA PROGRAM Contract Duration : 81 c.d. Size Range : Medium A License Category : B Cost of Bidding Documents : ₱ 25,000.00 IB: 21DF0073-21DF008521D00010, 21D00035, 21D00042, 21Page 3 of 7 9. Name of Contract : FY 2021 DPWH INFRASTRUCTURE PROGRAM Organizational Outcome 2 : Protect Lives and Properties Against Major Floods Flood Management Program Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers Construction of Revetment along Imus River, Brgy Tanzang Luma VI, East Side Section Imus, Cavite Contract ID No. : 21DF0081 Contract Location : Imus City, Cavite Scope of Works : Construction of revetment Net Length : 312.40 LM revetment Approved Budget for the : ₱ 49,000,000.00 Contract Source of Funds : FY 2021 NEP for DPWH INFRA PROGRAM Contract Duration : 171 c.d. Size Range : Medium A License Category : B Cost of Bidding Documents : ₱ 25,000.00 10. Name of Contract : FY 2021 DPWH INFRASTRUCTURE PROGRAM Convergence and Special Support Program Special Road Fund - Motor Vehicle User's Charge (MVUC) as per R.A. 11239 Repair/Rehabilitation along Crisanto - Delos Reyes Ave (S02006LZ) K0063+621-K0065+491, Amadeo, Cavite Contract ID No. : 21DF0082 Contract Location : Amadeo, Cavite Scope of Works : Asphalt Overlay of road with RTPM and Internally Illuminated (Solar) Studs Net Length : 7.484 Lane Km road (width variable) Approved Budget for the : ₱ 53,640,490.00 Contract Source of Funds : FY 2021 NEP for DPWH INFRA PROGRAM Contract Duration : 84 c.d. Size Range : Medium A License Category : B Cost of Bidding Documents : ₱ 50,000.00 11. Name of Contract : FY 2021 DPWH INFRASTRUCTURE PROGRAM Convergence and Special Support Program Special Road Fund - Motor Vehicle User's Charge (MVUC) as per R.A. 11239 Repair/Rehabilitation along Tanza - Trece Martires City- Indang Road (S06097LZ) K0048+ (-641) - K0049+472, Trece Martires City Contract ID No. : 21DF0083 Contract Location : Trece Martires City, Cavite Scope of Works : Asphalt Overlay of road with RTPM and Internally Illuminated (Solar) Studs Net Length : 2.12 Lane Km road (width variable) Approved Budget for the : ₱ 60,462,075.00 Contract Source of Funds : FY 2021 NEP for DPWH INFRA PROGRAM Contract Duration : 87 c.d. Size Range : Medium A License Category : B Cost of Bidding Documents : ₱ 50,000.00 IB: 21DF0073-21DF008521D00010, 21D00035, 21D00042, 21Page 4 of 7 12. Name of Contract : FY 2021 DPWH INFRASTRUCTURE PROGRAM Convergence and Special Support Program Special Road Fund - Motor Vehicle User's Charge (MVUC) as per R.A. 11239 Repair/Rehabilitation along Noveleta -Naic - Tagaytay Road (S06093LZ) K0039+215-K0042+415, Tanza, Cavite Contract ID No. : 21DF0084 Contract Location : Tanza, Cavite Scope of Works : Asphalt Overlay of road with RTPM and Internally Illuminated (Solar) Studs Net Length : 12.776 Lane Km road (width variable) Approved Budget for the : ₱ 90,973,445.00 Contract Source of Funds : FY 2021 NEP for DPWH INFRA PROGRAM Contract Duration : 105 c.d. Size Range : Medium B License Category : A Cost of Bidding Documents : ₱ 50,000.00 13. Name of Contract : FY 2021 DPWH INFRASTRUCTURE PROGRAM Local Program Const. / Repair / Rehab. / Improvement of Various Infrastructure including Local Projects Local Roads and Bridges Local Bridge Construction of Sahud Ulan Bridge along Sahud Ulan-Tres Cruses-TMC Road, Barangay Tres Cruses Section, Tanza, Cavite Contract ID No. : 21DF0085 Contract Location : Tanza, Cavite Scope of Works : Construction of bridge, road and drainage Net Length : 40.00 LM bridge, 580.00 LM road (w = 13.1m, 4 lanes) and 580.00 LM drainage (910mm RCPC) Approved Budget for the : ₱ 93,605,000.00 Contract Source of Funds : FY 2021 NEP for DPWH INFRA PROGRAM Contract Duration : 211 c.d. Size Range : Medium B License Category : A Cost of Bidding Documents : ₱ 50,000.00 Bids received in excess of the ABC shall be automatically rejected at bid opening. 2. Prospective Bidders should be (1) registered with and classified by the Philippine Contractors Accreditation Board (PCAB) with PCAB LICENSE Category and Classification as indicated on the above table. The description of an eligible Bidder is contained in the Bidding Documents, particularly, in Section II of Bidding Documents.
Recommended publications
  • 2.2 Natural Condition 2.2.1 Meteorology the Philippine
    The Feasibility Study and Implementation Support on the CALA East-West National Road Project Final Report Chapter 2 2.2 Natural Condition 2.2.1 Meteorology The Philippine Atmospheric Geophysical and Astronomical Services Administration (PAGASA) classifies climate based on the rainfall distribution in a given area. According to the Coronas Scheme, the study area is classified into Type I, Two pronounced seasons: dry season from November to April, wet season during the rest of the year. Figure 2.2.1 shows the monthly rainfall and mean temperature at Sangley Point in Cavite while Figure 2.2.2 shows the wind condition in the same area for a ten year period from 1994 to 2003. The wet season yields 88% of the annual rainfall and the dry season yields the remaining 12%. The mean annual temperature is 28.6oC. The coolest month is January with a mean temperature of 27.1o C while the warmest month is April with a mean temperature of 30.3oC. The average monthly relative humidity varies between 78% in April and 86% in December. Figure 2.2.1 Monthly Rainfall at Sangley Point in Cavite 600 35.0 30.0 500 25.0 400 Monthly rainfall 20.0 300 M ean temperature 15.0 Temperature(oC) Rainfall(mm) 200 10.0 100 5.0 0 0.0 JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC Month Source: PAGASA, 2004 Figure 2.2.2 shows the annual wind rose diagram prepared based on a 10-year average data from 1994 to 2003 at Sangley Point in Cavite.
    [Show full text]
  • Region IV CALABARZON
    Aurora Primary Dr. Norma Palmero Aurora Memorial Hospital Baler Medical Director Dr. Arceli Bayubay Casiguran District Hospital Bgy. Marikit, Casiguran Medical Director 25 beds Ma. Aurora Community Dr. Luisito Te Hospital Bgy. Ma. Aurora Medical Director 15 beds Batangas Primary Dr. Rosalinda S. Manalo Assumpta Medical Hospital A. Bonifacio St., Taal, Batangas Medical Director 12 beds Apacible St., Brgy. II, Calatagan, Batangas Dr. Merle Alonzo Calatagan Medicare Hospital (043) 411-1331 Medical Director 15 beds Dr. Cecilia L.Cayetano Cayetano Medical Clinic Ibaan, 4230 Batangas Medical Director 16 beds Brgy 10, Apacible St., Diane's Maternity And Lying-In Batangas City Ms. Yolanda G. Quiratman Hospital (043) 723-1785 Medical Director 3 beds 7 Galo Reyes St., Lipa City, Mr. Felizardo M. Kison Jr. Dr. Kison's Clinic Batangas Medical Director 10 beds 24 Int. C.M. Recto Avenue, Lipa City, Batangas Mr. Edgardo P. Mendoza Holy Family Medical Clinic (043) 756-2416 Medical Director 15 beds Dr. Venus P. de Grano Laurel Municipal Hospital Brgy. Ticub, Laurel, Batangas Medical Director 10 beds Ilustre Ave., Lemery, Batangas Dr. Evelita M. Macababad Little Angels Medical Hospital (043) 411-1282 Medical Director 20 beds Dr. Dennis J. Buenafe Lobo Municipal Hospital Fabrica, Lobo, Batangas Medical Director 10 beds P. Rinoza St., Nasugbu Doctors General Nasugbu, Batangas Ms. Marilous Sara Ilagan Hospital, Inc. (043) 931-1035 Medical Director 15 beds J. Pastor St., Ibaan, Batangas Dr. Ma. Cecille C. Angelia Queen Mary Hospital (043) 311-2082 Medical Director 10 beds Saint Nicholas Doctors Ms. Rosemarie Marcos Hospital Abelo, San Nicholas, Batangas Medical Director 15 beds Dr.
    [Show full text]
  • 200211 Taal Volcano Eruption Opertional Presence 3W
    PHILIPPINES Taal Volcano Eruption Operational Presence (3W) As of 10 Feb 2020 The Philippine Institute of Volcanology and Seismology (PHIVOLCS) raised the alert 726 status of Taal Volcano to level-4 on 12 January when it begun with a phreatic or steam-driven activity that progressed into magmatic eruption on 13 January. On 26 January, PHIVOLCS lowered the alert status of Taal Volcano to level-3 to reflect the 76 18 overall decrease in volcanic activity. Access to municipalities within the 7-km danger 66 820 zone – parts of Agoncillo and Laurel, Batangas – is still restricted. Taal Volcano Island ACTIVITIES Completed On-going Planned is identified as a permanent danger zone. ORGS 1 BATANGAS CITY (CAPITAL) SECTOR/CLUSTER CITY OF CAVITE FAO BATANGAS - PHO PRC CCCM NON-FOOD ITEMS UNFPA PRC PDRF/JOLLIBEE CFBCMM EARLY RECOVERY NUTRITION PDRF/MALAMPAYA DSWD PDRF/COCA-COLA PRC Manila PDRF/MERALCO KALABSAW PDRF/JOLLIBEE EDUCATION PROTECTION/CP/GBV PRC KGWD. E.P. PDRF/MAYNILAD FOOD SECURITY & AGRICULTURE SHELTER PRC KGWD. OLOCOLOC PDRF/MPIF UNFPA LGU - CONCEPCION SK PRC HEALTH/MHPSS/RH TELECOM PDRF/AC MOTORS/AYALA LGU - VALENZUELA CITY RI LOGISTICS WFP NCCP SISTERS COMPANY UNDP WASH PDRF/GLOBE PRIVATE INDIVIDUALS TANZA MULTI-CLUSTER GOV. OFFICIAL ADRA PRC THE UNITED METHODIST PDRF/CL CITY OF GENERAL TRIAS IOM PRC PDRF/MPIF PRC PRC; IFRC PRC CITY OF DASMARIÑAS PRC PRC GEN. MARIANO ALVAREZ NAIC PRC CITY OF CABUYAO WVI PRC IOM PRC TRECE MARTIRES CITY TERNATE PRC PRC WVI MARAGONDON PRC PRC RI WVI CAVITE SILANG IOM IOM HI/ADTF PRC RI GENERAL INDANG ADRA CITY OF CALAMBA PRC EMILIO AMADEO PRC ADRA PRC PRC AGUINALDO ADRA BSP ADRA PRC LAGUNA PRC NASUGBU IOM WVI UNFPA PRC ALFONSO MENDEZ CITY OF TAGAYTAY CITY OF TANAUAN CITY OF STO.
    [Show full text]
  • Accredited Hospitals
    ACCREDITED HOSPITALS BEATO CAUILAN HOSPITAL NATIONAL CAPITAL REGION Villa Carolina National Hi-way, Muntinlupa City (NCR-SOUTH ) Tel # 861-7741 to 45 / 861-5284 to 85 Fax # 861-5289 LAS PIÑAS MEDICAL CENTER MUNTINLUPA ALABANG MEDICAL CLINIC ( Almanza ) 38 National Road, Putatan, Muntinlupa City 2/F Susana Arcade 476 Real St., Almanza, Tel. # 862-0162 to 63 loc 122/ 861-9424 Las Piñas City Tel # 800-3840 / 801-4535/ 800-3831 OSPITAL NG MUNTINLUPA Civic Drive Filinvest Corporate City, Alabang, Muntinlupa ALABANG MEDICAL CLINIC ( Talon ) Tel # 771-0457 Alabang Zapote Road corner Mendoza St., Talon, Las Piñas PARAÑAQUE Tel # 874-2506 / 874-0164 / 873-6464 MEDICAL CENTER PARAÑAQUE LAS PIÑAS CITY MEDICAL CENTER A.Santos Ave.,Sucat Road, Paranaque City 1314 Marcos Alvarez Ave., Talon V., Las Piñas City Tel # 825-6911 to 15 / 820-0290 to 91/826-2121 Tel # 800-5654 / 800-5695 / 800-5613/ 800-5678 OLIVAREZ GENERAL HOSPITAL LAS PIÑAS DOCTOR ’ S HOSPITAL Dr. A. Santos Ave., Sucat, Paranaque City 8009 J.I. Aguilar Ave., Pulang Lupa II, Las Piñas City Tel # 825-8747 / 826-7966 Tel # 825-5236/ 829-5036 Fax # 825-5236 loc.123 SOUTH SUPERHIGHWAY MEDICAL CENTER ( Km. 17 ) Km.17 West Service Road, South Superhighway, UNIVERSITY OF PERPETUAL HELP RIZAL Parañaque MEDICAL CENTER Tel # 821-8452 to 53 / 823-2357 Alabang Zapote Road, Pamplona, Las Piñas City Tel # 874-8515/ 874-3329 UHBI-PARAÑAQUE DOCTORS HOSPITAL Fax 873-7210 175 Doña Soledad Avenue, Better Living, Parañaque City Tel # 776-0644 to 46 / 520-8421 Fax # 823-1340 MAKATI MAKATI MEDICAL CENTER PASAY 2 Amorsolo Street, Legaspi Village, Makati City Tel # 888-8999 / 815-9911 / 892-5544 MANILA ADVENTIST MEDICAL CENTER 1975 Donada St., Pasay City ST.
    [Show full text]
  • Lions Clubs International Club Membership Register the Clubs and Membership Figures Reflect Changes As of February 2006
    LIONS CLUBS INTERNATIONAL CLUB MEMBERSHIP REGISTER THE CLUBS AND MEMBERSHIP FIGURES REFLECT CHANGES AS OF FEBRUARY 2006 CLUB MMR MMR FCL YR MEMBERSHI P CHANGES TOTAL TYPE IDENT NBR CLUB NAME DIST RPT DATE RCV DATE OB NEW RENST TRANS DROPS NETCG MEMBERS 4605 023471 ALBAY L C 301A2 1 11-2005 11-14-2005 -20 -20 20 0 0 0 -20 -20 0 4605 023474 BATANGAS 301A2 1 07-2005 08-02-2005 6 -3 3 4605 023474 BATANGAS 301A2 1 08-2005 08-30-2005 4605 023474 BATANGAS 301A2 1 09-2005 10-01-2005 8 -6 2 4605 023474 BATANGAS 301A2 3 09-2005 10-06-2005 6 6 4605 023474 BATANGAS 301A2 1 10-2005 10-29-2005 -2 -2 4605 023474 BATANGAS 301A2 1 11-2005 11-30-2005 10 -1 9 4605 023474 BATANGAS 301A2 1 12-2005 01-02-2006 4605 023474 BATANGAS 301A2 1 01-2006 01-31-2006 4 4 4605 023474 BATANGAS 301A2 9 01-2006 02-27-2006 -1 -1 4605 023474 BATANGAS 301A2 1 02-2006 02-27-2006 93 28 0 0 -7 21 114 4605 023475 BINAN 301A2 1 07-2005 08-08-2005 5 -7 -2 4605 023475 BINAN 301A2 1 09-2005 10-04-2005 -1 -1 4605 023475 BINAN 301A2 1 08-2005 10-05-2005 1 1 4605 023475 BINAN 301A2 1 10-2005 11-17-2005 1 1 4605 023475 BINAN 301A2 1 11-2005 01-16-2006 4605 023475 BINAN 301A2 1 12-2005 01-16-2006 4605 023475 BINAN 301A2 9 12-2005 01-17-2006 4 4 4605 023475 BINAN 301A2 9 11-2005 01-20-2006 -1 -1 4605 023475 BINAN 301A2 9 12-2005 01-20-2006 73 11 0 0 -9 2 75 4605 023477 BULAN 301A2 1 07-2005 08-18-2005 4605 023477 BULAN 301A2 1 08-2005 09-22-2005 4605 023477 BULAN 301A2 1 09-2005 10-24-2005 4605 023477 BULAN 301A2 1 10-2005 11-28-2005 4605 023477 BULAN 301A2 1 11-2005 01-04-2006 4605 023477
    [Show full text]
  • Lions Clubs International
    GN1067D Lions Clubs International Clubs Missing a Current Year Club Officer (Only President, Secretary or Treasurer) as of June 30, 2009 District 301A2 District Club Club Name Title (Missing) District 301A2 23474 BATANGAS President District 301A2 23474 BATANGAS Secretary District 301A2 23474 BATANGAS Treasurer District 301A2 23475 BINAN President District 301A2 23475 BINAN Secretary District 301A2 23475 BINAN Treasurer District 301A2 23477 BULAN President District 301A2 23477 BULAN Secretary District 301A2 23477 BULAN Treasurer District 301A2 23478 CABUYAO President District 301A2 23478 CABUYAO Secretary District 301A2 23478 CABUYAO Treasurer District 301A2 23479 CALAMBA HOST President District 301A2 23479 CALAMBA HOST Secretary District 301A2 23479 CALAMBA HOST Treasurer District 301A2 23480 CAMARINES SUR President District 301A2 23480 CAMARINES SUR Secretary District 301A2 23480 CAMARINES SUR Treasurer District 301A2 23481 CAVITE CITY President District 301A2 23481 CAVITE CITY Secretary District 301A2 23481 CAVITE CITY Treasurer District 301A2 23482 DAET President District 301A2 23482 DAET Secretary District 301A2 23482 DAET Treasurer District 301A2 23484 IMUS President District 301A2 23484 IMUS Secretary District 301A2 23484 IMUS Treasurer District 301A2 23485 LAS PINAS HOST President District 301A2 23485 LAS PINAS HOST Secretary District 301A2 23485 LAS PINAS HOST Treasurer District 301A2 23488 LEGASPI CITY President District 301A2 23488 LEGASPI CITY Secretary District 301A2 23488 LEGASPI CITY Treasurer District 301A2 23492 MAKATI
    [Show full text]
  • DSWD DROMIC Report #22 on the Taal Volcano Eruption As of 24 January 2020, 6AM
    DSWD DROMIC Report #22 on the Taal Volcano Eruption as of 24 January 2020, 6AM Situation Overview At 5:30 PM on 12 January 2020, the Philippine Institute of Volcanology and Seismology (PHIVOLCS) has raised Alert Level 4 over Taal Volcano indicating that hazardous eruption is possible within hours to days. In its 7:30 PM advisory on the same day, the agency reiterated total evacuation of Taal Volcano Island and additional evacuation of areas at high- risk to pyroclastic density currents and volcanic tsunami within a 14-kilometer radius from the main crater. PHIVOLCS warned that areas in the general north of Taal Volcano to stay alert against effects of heavy and prolonged ash fall. Source: Philippine Institute of Volcanology and Seismology (PHIVOLCS) I. Status of Affected Families / Persons A total of 88,842 families or 346,244 persons were affected by the Taal Volcano phreatic eruption in Region CALABARZON (see Table 1). Table 1. Number of Affected Families / Persons NUMBER OF AFFECTED REGION / PROVINCE / MUNICIPALITY Barangays Families Persons GRAND TOTAL - 88,842 346,244 NCR - 663 2,459 Caloocan City** - 3 16 Malabon City** - 32 141 Manila City** - 44 166 Muntinlupa City** - 1 5 Paranaque City** - 123 446 Taguig City** - 433 1578 Quezon City** - 22 88 San Juan City** - 5 19 CALABARZON - 88,179 343,785 Batangas - 68,587 264,105 Agoncillo* - 73 387 Alitagtag** - 1,721 5,834 Balayan** - 4,147 14,969 Balete* - 64 263 Batangas City (capital)** - 7,704 29,635 Bauan** - 7,858 30,544 Calaca* - 2,100 7,896 Calatagan** - 1,149 4,194 Cuenca* -
    [Show full text]
  • March 2021 Alogis E-Newsletter
    R E A D Y - B U I L T F A C I L I T I E S B A R A N G A Y S A B A N G , N A I C , C A V I T E March 2021 A L O G I S - N A I C 1 A V A I L A B L E Unit 3: 1,210 sqm Unit 4: 1,210 sqm Unit 8: 1,078 sqm Unit 9: 1,078 sqm Unit 10: 1,078 sqm Unit 11: 1,078 sqm Availability is subject to change without prior notice. S P E C I F I C A T I O N S Units ranging from 800 - 1,100 sqm 6.4-meter height clearance Floor load - 1 ton / sqm Dedicated loading bay that can accommodate up to 40ft trucks PEZA-registered facilities S T R A T E G I C A L L Y L O C A T E D CAVITE GATEWAY TERMINAL The new RORO barge terminal is only 14 minutes away via Antero- Soriano Highway SANGLEY POINT INTERNATIONAL AIRPORT 55 minutes away from the Sangley Airport Development that is accessible via Antero-Soriano Highway MULTIPLE ACCESS: via Governor's Drive; via Antero-Soriano Highway PROXIMITY TO NEARBY CITIES/MUNICIPALITIES: 30 minutes away from General Trias and Dasmariñas Cavite via Governor's Drive; 40 minutes away from Kawit and Rosario, Cavite via Antero-Soriano Highway [email protected] +63917 847 9475 R E A D Y - B U I L T F A C I L I T I E S B A R A N G A Y S A B A N G , N A I C , C A V I T E March 2021 A L O G I S - N A I C 2 (On-going construction) R F O O N Q 2 2 0 2 1 Units 10-13: 4,415 sqm R F O O N Q 3 2 0 2 1 Units 1-3 and 9: 4,875 sqm R F O O N Q 4 2 0 2 1 Units 4-8: 6,286 sqm S P E C I F I C A T I O N S Units ranging from 800 - 1,400 sqm 9-meter height clearance Floor load - 5 ton / sqm Dedicated loading bay that can accommodate up to 40ft
    [Show full text]
  • Chapter 8. Environment Sector
    A testament of good governance. Table 8A Volume of Residential Wastes and Market Wastes Generated, Province of Cavite: as of Chapter 8. Environment Sector December 2015 Residential Market Total City/Municipality Wastes Wastes (tons/day) Waste Generation (tons/day) (tons/day) The management of waste is one of the most challenging problems that any developing nation 1st District faces. Waste management can either make or break a nation, as for Cavite, a province. It is Cavite City 15.0000 25.0000 40.0000 stipulated in the Local Government Code that it is the responsibility of the Chief Local Executive Kawit 30.0000 3.9600 33.9600 to ensure that the waste generated in the area of his/her governance is taken-cared of and Noveleta 7.0000 1.0000 8.0000 complies with the provisions of the Solid Waste Management Act or RA 9003. Rosario 128.0000 1.0000 129.0000 2nd District By definition, solid wastes are Solid or semisolid, non-soluble material (including gases and liquids Bacoor 260.0000 23.7600 283.7600 in containers) such as agricultural refuse, demolition waste, industrial waste, mining residues, 3rd District municipal garbage, and sewage sludge. City of Imus 130.0000 3.0000 133.0000 th Proper management of waste is an attribute of maintaining the well-being of people. As of 4 District December 2015, the highest volume of residential wastes was observed in the City of Bacoor City of Dasmariñas 250.0000 2.0000 252.0000 with 260 tons of wastes daily. It is followed by the City of Dasmariñas which is producing 5th District residential wastes of 250 tons per day.
    [Show full text]
  • Capturing Warehousing Boom
    COLLIERS RADAR INDUSTRIAL | RESEARCH | MANILA | 10 DECEMBER 2020 Joey Roi Bondoc Manager | Research | Philippines +63 2 8858 9057 [email protected] Calvin Javiniar Senior Director | Capital Markets and Investment Services | Philippines +63 2 8863 4167 [email protected] CAPTURING WAREHOUSING BOOM Developers pivot to seize lockdown economy and household spending- driven opportunities in logistics and warehousing COLLIERS RADAR LOGISTICSINDUSTRIAL | |RESEARCH RESEARCH | |MANILA MANILA | |15 10 DECEMBER DECEMBER 2019 2020 Summary & Recommendations PHP 141.2 billion* 38% Colliers Philippines believes that the Total value of InstaPay transactions from Share of food and non-alcoholic beverages pandemic has caused a significant January to August 2020. The emergence of a in the household final consumption interruption to the long run growth of the lockdown economy has resulted in an aggressive expenditure in 9M 2020, up from 34% in use of online payment channels. 2019. Demand for warehouses and logistics Philippines’ consumer-driven economy. services will likely be driven by a personal Note: USD2.9 billion. InstaPay is an electronic fund transfer In our view, the COVID-19-induced service governed by Philippine Payment Management Inc. consumption-driven Philippine economy. interruptions have altered the immediacy in under the oversight of the Bangko Sentral ng Pilipinas. which retailers must innovate to remain relevant. The continued growth of the e- PHP118.4 billion* PHP220-PHP570* commerce sector and emergence of a Range of average monthly rental rates of traditional lockdown economy have only compelled Gross value added in the warehousing warehouses in Metro Manila (per sq metre). This is mall operators and retailers to aggressively sector in 9M 2020.
    [Show full text]
  • Massacre in the Philippines INTERNATIONAL SOLIDARITY MISSION RAPID ASSESSMENT DECEMBER 2009
    Massacre in the Philippines INTERNATIONAL SOLIDARITY MISSION RAPID ASSESSMENT DECEMBER 2009 International Federation of Journalists and National Union of Journalists of the Philippines with Alliance of Independent Journalists; Committee to Protect Journalists; International Media Support; International News Safety Institute; Institute for the Study of the Free Flow of Information; Media, Entertainment & Arts Alliance; Southeast Asia Press Alliance;Thai Journalists’ Association; and Union Network International Massacre in the Philippines: International Solidarity Mission Rapid Assessment STOP PRESS As this report was going to press, it was learned that Jepon Cadagdagon, 28, a photographer with local newspaper Saksi News, was confirmed to be among the 57 victims of the November 23 massacre. The confirmation of his death brings the toll of media personnel killed to 32, including 31 bodies recovered and one body not recovered. Therefore since 1986, 137 media personnel have met violent deaths in the Philippines. Massacre in the Philippines: International Solidarity Mission Rapid Assessment December 2009 Report of the International Federation of Journalists-led Mission to the Philippines, December 5-11 2009, to investigate the November 23 2009 Ampatuan Town Massacre, Maguindanao, Mindanao, Philippines Editors: Mike Dobbie and Ruth Pollard with Ranga Kalansooriya.The editors thank the mission delegates, the National Union of Journalists of the Philippines (NUJP) and all other contributors for their assistance in providing content for this report.
    [Show full text]
  • 11844016 03.Pdf
    Appendix 7.1 Hydrology A.1 Objectives and Work Flow Taking account of the goals of the recommended project, the objectives of the hydrological and hydraulic studies are set as follows: (i) To clarify the current conditions of river channel and riparian areas, where are subject to proposed road network (ii) To estimate the flood discharges of the rivers in various return periods through statistical approach at crossings along proposed road alignment (iii) To recommend betterment of drainage system along the proposed alignment, where deterioration of present drainage conditions due to implementation of the project is predicted, if any In order to accomplish the objectives above mentioned, the work flow of sectoral studies has been set up as follows: Collection of Data/ Information Hydrological and Setting of design parameters Verification of River Survey Hydraulic Analyses at crossing structures current river ・ Rainfall Analysis ・ Design High Water Level conditions Questionnaire Survey ・ Runoff Analysis ・ Design Flow Velocity, etc. Field Reconnaissance Figure A.1.1 General Work Flow of Hydrological Analysis A.2 Available Data, Maps and Documents (1) Topographic Maps Topographic maps of the Study Area were obtained from NAMRIA Map Sales Office in Fort Bonifacio, Manila. These maps of scale 1:50,000 and 1:10,000 were utilized to confirm the watershed boundaries of river basins and road crossings, which are concerned to the road/bridge design of three routes, i.e. CALA Expressway, North-South Road and Daang Hari Extension. The maps collected for the Study is schematically shown with index numbers in Figure A.2.1. On the other hand, the cross sections with 50 m intervals and plan along the proposed road alignment with 100 m wide became available exclusively for the present study together with the aerial photographs.
    [Show full text]