Tagaytay Bulk Water Supply Project

2 PTK H2O Water Corporation

 Private entity incorporated in 2007  PTK’s primary objective is focused on water supply development and providing drinking water to the population  To engage in the water supply development initiatives under the Public- Private Partnership of the Philippine government

PTK Timelines The Project

 Objectives  Components  Water Source

Objectives

 To provide 10,ooo cu. m of potable water each day to the City Water District;

Components

 Intake Structure  Sedimentation Tank  Filtration Plant  Booster Pumping Stations  Transmission Pipelines Location Plan

Buna Lejos Kayquit 2

Project Component Location Intake Structure, Raw Mahabang Kahoy Cerca Barangay Kayquit 2 Water Pipeline Sedimentation, Filtration, Barangay Kayquit 2 Pumping Station No. 1 Transmission Pipeline to Barangay Kayquit 2, Pumping Station No. 2 Buna Lejos Pumping Station No.2 Buna Lejos Transmission Pipeline to Mahabang Kahoy Cerca Pumping Station No. 3 Balagbag Mahabang Pumping Station No. 3 Kahoy Lejos Transmission Pipeline to Balagbag Mahabang Pumping Station No. 4 Kahoy Lejos Balagbag Mahabang Kahoy Lejos Balagbag Mahabang Pumping Station No. 4 Kahoy Lejos Transmission Pipeline to Balagbag Mahabang Delivery Point Kahoy Lejos

Intake Building Process Flow Diagram Filtration Building Benefits of the Project

Impact on of the Project

 The entry of investor to Indang is a big boost in the local economy 2  PTK H2O to pay at least Php2 million taxes from the operation of the Project.  Providing Indang people jobs during construction and long-term work during operation  PTK to provide technical and financial assistance to Indang Water District.  Supply potable water to Indang Water District at minimal cost to prevent water rate increase  Payment of production assessment for Indang Water District Php0.5M  Watershed protection through planting of one million trees in Indang

People’s Apprehension on the Project

 PTK will take all the waters of Indang Rivers  farmers will be deprived of irrigation waters  Big pipes=big volume of water to be taken from Indang  PTK Project is harmful to the natural resources and beauty of Indang  Indang waters is for Indang use only PTK’s Assurance

 PTK assures the Provincial Government of that Indang’s water requirements will not be compromised by the Tagaytay Bulk Water Project.  PTK is pro-environment  PTK is pro-Indang  PTK is pro-people of Cavite  PTK is pro-God

Project Permits and Incentives

 Water Rights  Environmental Compliance Certificate (ECC)  Business Permit  Excavation Permit  BOI Incentives

River Systems in Indang and neighbouring towns

 Ikloy River (Indang) Pinagsanghan River ()  Indang River (Indang) Bukat Creek (Maragondon)  Lambak River (Indang) Magay River (Maragondon)  Saluysoy River (Indang) Balsahan River (Naic)  Salipit River (Maragondon) Balayugan River (Naic)  Lagundi River (Maragondon) Colongcolong River (Naic)  Kaybaclao Creek(Maragondon ) Sabing River (Naic)  Maragondon River (Maragondon) Lumipa River (GMA)  Pual Buan River (GMA) Water Users of the River System

 Indang Water District  National Irrigation Administration (NIA)  Mabuhay  F. Estua  A. De dios  C. Navasa  FSDC  M. Gimenez  Magondondon

The End

Maraming Salamat Po sa Inyong Lahat