Sheriff.Street.Upper-Lane.Closure.Pdf

Total Page:16

File Type:pdf, Size:1020Kb

Sheriff.Street.Upper-Lane.Closure.Pdf SHERIFF STREET UPPER - ONE WAY SYSTEM TM PLAN DIVERSION WORKS AREA ROUTE TO BE PLACED Deireadh SOMEWHERE 7UiFKWDU VMS 2 an Timpill 0KDODLUW6Ot SUITABLE ENDDETOUR DIVERTED TRAFFIC WK 042 WK 001 7UiFKWDU 0KDODLUW6Ot DIVERTED 25m TRAFFIC 7UiFKWDU 0KDODLUW6Ot DIVERTED TRAFFIC SIGNS TO BE PLACED 25m APART ON ALEXANDRA RD WK 042 WK 042 WK 001 Trácht ar 7UiFKWDU Trácht ar TAPER 1 IN 20 Mhalairt Slí 0KDODLUW6Ot Mhalairt Slí DIVERTED DIVERTED TRAFFIC DIVERTED TRAFFIC TRAFFIC WK 001 WK 033 IARNROD SIGNS TO BE PLACED 25m APART & WK 033 DOUBLE BANKED EIREANN ENTRANCE TO BE Crioch EAST WALL ROAD MAINTAINED END DIVERSION 25m ROUTE 25m SHERIFF STREET UPPER 25m 7UiFKWDU 0KDODLUW6Ot 7UiFKWDU 0KDODLUW6Ot DIVERTED TRAFFIC DIVERTED A TRAFFIC 7UiFKWDU A 0KDODLUW6Ot PEDESTRIAN BARRIER DIVERTED TRAFFIC Trácht ar Mhalairt Slí DIVERTED TRAFFIC PEDESTRIAN 25m ROUTE WK 081 WK 080 7UiFKWDU 0KDODLUW6Ot 7UiFKWDU DIVERTED 0KDODLUW6Ot 25m TRAFFIC DIVERTED Crioch TRAFFIC 7UiFKWDU 25m END 0KDODLUW6Ot WK 001 DIVERTED P 010 TRAFFIC 25m 7UiFKWDU 0KDODLUW6Ot DIVERTED TRAFFIC WK 032 Deireadh 25m an Timpill ENDDETOUR EAST WALL ROAD WORKS AREA WK 001 SECTION A-A Traffic Pedestrian Cone Barrier WORKS AREA VMS 1 0.5 m Footpath 3.30m Min. Lane Width Works Width Varies Footpath Safety Zone MESSAGE TO 11.3m Carriageway Width BE DESIGN PARAMETERS SAFETY ZONE TEMPORARY SIGNS CONE SPACING AND SIZE RATE OF TAPER LAMP SPACING TRAFFIC MANAGEMENT SYSTEM GARY KEVILLE TRAFFIC MANAGEMENT LTD. CLIENT: Road Roadworks Speed Limit Min. Lane Longitudinal Lateral Set Back Distance Min. Size Sign Longitudinal At Tapers Min. Height Taper at Taper at At Tapers Longitudinal Coned Area Max. Traffic Number Method South Bank Road,Ringsend,Dublin 4, Co. Dublin,Ireland Level Type (km/h) Width (m) (m) (m) (m) (m) (mm) Visibility (m) (m) (m) (mm) H/ S (m) Lane (m) (m) (m) Length (m) Flow (veh/h) Tel: (+3531) 668 8838 Email: [email protected] 2 B 50 3.00 25 0.5 - 25 3 600 50 6 3 750 1 in 10 1 in 15 6 12 One Way 500 800 Fax: (+3531) 667 4339; Visit us at: www.gktm.ie CONSTRUCTION LIMITED GENERAL NOTES: SITE SPECIFIC NOTES: LEGEND 1) ALL INFORMATION CONTAINED IN THIS DRAWING (INCLUDING DRAWING THIS IN CONTAINED INFORMATION ALL 1) FOR RESPONSIBLE BE SHALL CONTRACTOR 5) CONTRACTOR OF SYSTEM AGREE TO AT MAINTAINED BE TO ACCESS PRIVATE DESIGNED: CMQ SCALE: PROJECT TITLE: NORTH DOCKLANDS SEWERAGE SCHEME, CONTRACT 4B, DUBLIN CITY DIGITAL DATA) SHOULD BE CHECKED AND VERIFIED BY VERIFIED AND CHECKED BE SHOULD DATA) DIGITAL ANY AT ACCESS RAMP OF PROVISION THE AND ZONES SAFETY THAT SO WORKS TIMES. ALL - TRAFFIC CONES CONTRACTOR PRIOR TO ANY STAGE OF CONSTRUCTION. OF STAGE ANY TO PRIOR CONTRACTOR WHERE LEVEL SURFACE ROAD IN CHANGE PROVIDED BE MAY WIDTH LANE MINIMUM DRAWN: CMQ NTS 2) ALL WORKS ARE TO BE CARRIED OUT IN ACCORDANCE WITH ACCORDANCE IN OUT CARRIED BE TO ARE WORKS ALL 2) SURFACE, TEMPORARY A ON RUNS TRAFFIC TIMES. ALL AT MAINTAINED AND PROVIDE TO TTOS ACCESS WORKS AND - SIGN LOCATION & ORIENTATION DRAWING NAME: SHERIFF STREET UPPER - LANE CLOSURE - ONE WAY SYSTEM LOCAL AUTHORITY REQUIREMENTS AND ARE TO BE INCLUDED BE TO ARE AND REQUIREMENTS AUTHORITY LOCAL WHERE RAMPS PEDESTRIAN/CYCLE FOR AND ZONE SAFETY LATERAL SUPERVISION. VERIFIED: BB DATE: IN THE SITE-SPECIFIC SAFETY & HEALTH PLAN. HEALTH & SAFETY SITE-SPECIFIC THE IN LEVEL A HAVE FOOTPATH/CYCLE-WAYS WORKS ALL IN OUT CARRIED BE TO - WORKS AREA DISCONTINUITY AS PER RESULT OF THE WORKS. THE OF RESULT PER AS DISCONTINUITY AUTHORITY. LOCAL WITH ACCORDANCE 02-09-15 STAGE: CONSTRUCTION DWG. NO.: 2240 - 00 - 02 REV: 11 3) SITE INSPECTIONS AND MAINTENANCE OF THE TRAFFIC THE OF MAINTENANCE AND INSPECTIONS SITE 3) CABLES" "OVERHEAD BE TO 082 WK SIGN APPROVED: BB USED IF OVERHEAD CABLES BECOME A BECOME CABLES OVERHEAD IF USED MANAGEMENT LAYOUT IS TO BE AGREED WITH LOCAL WITH AGREED BE TO IS LAYOUT MANAGEMENT ONLY MAY PLAN MANAGEMENT TRAFFIC THIS 6) - LONGITUDINAL SAFETY ZONE AUTHORITY TO ENSURE THE SAFETY AND INTEGRITY OF THE OF INTEGRITY AND SAFETY THE ENSURE TO AUTHORITY AGREED BE EXACT TO POSITIONS SIGNS LOCATION. WORK TO DUE HAZARD Rev. No. Revision Details Rev. Date: Designed: Drawn: Verified: Approved:Copyright Notes: BE IMPLEMENTED BY A TTOS WHO MUST CARRY MUST WHO TTOS A BY IMPLEMENTED BE SITE. ON THIS DRAWING IS THE PROPERTY OF GARY KEVILLE TRAFFIC MANAGEMENT. DESIGN. SITE INSPECTIONS AND MAINTENANCE OF - LATERAL SAFETY ZONE 9 Switch Lanes for works OUT A RISK ASSESSMENT BEFORE ASSESSMENT RISK A OUT 20-01-17 DL DL CMQ CMQ THE DESIGN INFORMATION CONTAINED HEREIN IS STRICTLY CONFIDENTIAL. 4) CONTRACTOR TO CARRY OUT A SITE RISK ASSESSMENT RISK SITE A OUT CARRY TO CONTRACTOR 4) IMPLEMENTATION. WIDTH LANE RUNNING MINIMUM. m 3.0 : THE TRAFFIC MANAGEMENT LAYOUT IS TO 10 Amend pedestrian route 14-07-17 DL BJ CMQ CMQ BE CONDUCTED ON A DAILY BASIS TO - PEDESTRIAN ROUTE THIS DOCUMENT IS NOT TO BE USED, REPRODUCED, DISCLOSED OR PRIOR TO THE INSTALLATION OF ANY TRAFFIC MANAGEMENT TRAFFIC ANY OF INSTALLATION THE TO PRIOR CARD CSCS OF POSSESSION IN BE MUST TTOS Amend pedestrian route CMQ CIRCULATED IN WHOLE OR IN PART WITHOUT THE PRIOR WRITTEN PLAN TO ENSURE THAT CONDITIONS REFLECT THOSE REFLECT CONDITIONS THAT ENSURE TO PLAN ROAD AT GUARDING AND LIGHTNING "SIGNING, ENSURE THE SAFETY AND INTEGRITY OF 11 07-09-17 DL BJ CMQ CONSENT IN EACH INSTANCE OF GARY KEVILLE TRAFFIC MANAGEMENT. - PEDESTRIAN BARRIERS CONSIDERED FOR DESIGN POST SUBMISSION. POST DESIGN FOR CONSIDERED 2006. REGULATIONS CONSTRUCTION WORKS" THE DESIGN. c GKTM 2017.
Recommended publications
  • Castleforbes Strategic Housing Development (SHD), Sheriff Street Upper, Dublin 1 Environmental Impact Assessment Report (EIAR) - Volume 2 Main Report
    Castleforbes Strategic Housing Development (SHD), Sheriff Street Upper, Dublin 1 Environmental Impact Assessment Report (EIAR) - Volume 2 Main Report Client: Glenveagh Living Ltd. Date: 01 December 2020 DOCUMENT CONTROL SHEET 6608_RP01_Environmental Impact Assessment Report (EIAR) - Volume 2 Main Report Project No. 6608 Client: Glenveagh Living Ltd. Project Name: Castleforbes Strategic Housing Development (SHD) Report Name: Environmental Impact Assessment Report (EIAR) - Volume 2 Main Report Document No. RP01 Issue No. 02 Date: 01/12/2020 This document has been issued and amended as follows: Issue Status Date Prepared Checked 00 Draft EIAR 12 Aug 2020 Rebecca Dunlea Thomas Burns 01 Draft EIAR (updated) 11 Nov 2020 Rebecca Dunlea / Various Thomas Burns 02 FINAL 01 Dec 2020 Rebecca Dunlea / Various Thomas Burns Contents Contents .................................................................................................................................................. 3 1 Introduction ................................................................................................................................... 1 1.1 Introduction..................................................................................................................................................... 1 1.2 The Applicant .................................................................................................................................................. 1 1.3 The Proposed Project .....................................................................................................................................
    [Show full text]
  • Download Date 26/09/2021 08:24:43
    Eastern Regional Health Authority annual report 2003 Item Type Report Authors Eastern Regional Health Authority (ERHA) Rights ERHA Download date 26/09/2021 08:24:43 Link to Item http://hdl.handle.net/10147/44836 Find this and similar works at - http://www.lenus.ie/hse Area Health Boards Acute Hospitals Ambulance Services Physical and Sensory Disability Services Services for the Elderly Rehabilitation Services Orthopaedic Services Mental Health Services 2003 ERHA Annual Report Maternity Hospitals Children's Hospitals Public Health Intellectual Disabilities Services Children's Services Cancer Treatments Drug Treatments Primary Care Buying and assuring best health for you Do chúram ár gcúram 01 Regional Maps p2 02 Chairman’s Report p4 03 Authority Board Members p8 04 Board Meetings p12 05 Board Committees p13 06 Area health Boards p15 07 Voluntary Service Providers p16 08 Management Team p22 09 Regional Chief Executives Report p24 10 Health Status/Socia-Demographic trends p28 11 Customer Services p40 12 Cardiovascular Strategy p42 13 Children/Families p48 14 Physical & Sensory Disabilities p59 15 Intellectual Disabilities p67 16 Older Persons p72 17 Adult Homelessness p80 18 Youth Homelessness p83 2003 19 Social Inclusion p86 20 Addiction p91 21 Mental Health p100 22 Primary Care p106 23 EHSS p117 24 Acute Hospitals p119 25 National Supra/Regional Specialities p135 26 Ambulance and Emergency Planning p142 27 Capital Development p144 28 Public Health p147 29 NMPDU p156 30 Corporate Services p162 31 M&E p171 32 Finance Directorate p173 33
    [Show full text]
  • 1 Boolavogue Road, East Wall, Dublin 3
    1 Boolavogue Road, East Wall, Dublin 3 c. 75 SqM DNG Fairview Negotiator: 2 Malahide Road, Fairview, Dublin 3 Rachel Cunningham T: 01 8331802 | E: [email protected] PSL 002049 For independent mortgage advice contact GMC Mortgages. Call 1890 462 462 or email [email protected]. Messrs. Douglas Newman Good for themselves and for the vendors or lessors of the property whose Agents they are, give notice that: (i) The particulars are set out as a general outline for the guidance of intending purchasers or lessees, and do not constitute part of, an offer or contract. (ii) All descriptions, dimensions, references to condition and necessary permissions for use and occupation, and other details are given in good faith and are believed to be correct, but any intending purchasers or tenants should not rely on them as statements or represen tations of fact but must satisfy themselves by inspection or otherwise as to the correctness of each of them. (iii) No person in the employment of Messrs. Douglas Newman Good has any authority to make or give representation or warranty whatever in relation to this development. 1 Boolavogue Road, East Wall, Dublin 3 Features DNG are delighted to present to the market this fine two bedroom semi detached property situated on a large corner site on • LARGE CORNER SITE PROPERTY a mature and residential road in the heart of East Wall. With a total site area of c. 170 SqM, there is excellent scope for a side and rear extension subject to planning permission and guidelines. Having been lovingly maintained throughout the years and • DOUBLE GLAZED WINDOWS with well laid out accommodation, the property enters the market in excellent condition affording a new owner the perfect • INTRUDER ALARM opportunity to effortlessly create a substantial family home just a short 1KM from Dublin City Centre.
    [Show full text]
  • Weekly Planning List 50/20
    Dublin City Council Weekly Planning List 50/20 (07/12/2020-11/12/2020) All applications received will be considered by the Planning Authority to determine their validity in accordance with Planning and Development Regulations 2001. Any application pending validation listed hereunder, and subsequently declared to be invalid, will be detailed in the DECISIONS SECTION of the Weekly List in a subsequent publication. 1 | P a g e Area 3 COMMERCIAL Area Area 3 - Central Application Number 2395/20 Application Type Permission Applicant Concept Fusion Ltd Location Swimming Pool lands, part of St. Vincent's CBS, Finglas Road, Glasnevin, Dublin 11, D11PD28 Registration Date 10/12/2020 Additional Information Clarification of Add. Information Recd. Proposal: The development will consist of the demolition of existing St. Vincent’s Swimming Pool (derelict single storey detached building c.757m sq.) and the construction of 5 no. dwellings, comprising 1 no. 2 storey 5 bedroom dwelling, 2 no. 2 storey 4 bedroom dwellings and 1 no. 2.5 storey 5 bedroom dwelling in a single terraced block and 1 no. 1.5 storey 4 bedroom detached dwelling, including all associated on and off-site development works, car parking, boundary treatment works, soft and hard landscaping on the site of c. 0.24ha. and removal of existing c.2m high boundary wall to create direct vehicular and pedestrian access by the extension of the existing Towerview Cottages cul de sac. The development will also include the provision of a temporary construction access road (c.90m long) through the adjoining St. Vincent’s School lands with vehicular access onto the Finglas Road and the temporary removal (and future reinstatement) of existing single storey building c.57m sq.
    [Show full text]
  • Bank of Ireland Branch 25 & 26 Marino Mart, Fairview Dublin 3
    High Profile Landmark Investment Opportunity (Bank Not Affected) BankBank OfOf IrelandIreland BranchBranch 2525 && 2626 MarinoMarino Mart,Mart, FairviewFairview DublinDublin 33 (OnFor the instructionSale of Receiver David Carson of Deloitte) Bank Of Ireland Branch High Profile Landmark Investment Opportunity 25 & 26 Marino Mart Fairview, Dublin 3 INVESTMENT SUMMARY • Landmark end of terrace high profile retail and office building. • Excellently located in a strategic and busy commercial location. • Fully let to unquestionably secure Bank of Ireland covenant. • Passing Rent of €195,648 per annum. • The property would suit a variety of commercial uses (SPP). • Leased on an Upward Only Rent Review and FRI terms. • Superbly appointed building with passenger lift and rear yard. • The opportunity presents a strong investment return in the context of a prevailing low interest rate environment. Cabra West Drumcondra Cabra Marino Phibsborough Cabra East Fairview East Wall Stoneybatter C H E S T E R F E I L D A V E B Islandbridge L A M C I K L Docklands H I T O A R R S Y E R D A L I V F E F ODD LAMP RD N E Y U E NEW RD S J T A S M J A E M S R T I E N O S W G T O N S W T A N NA V A E S R RO High Profile Landmark Investment Opportunity AD D C O N O R C R L A U T R L N A O E WALKINSTOWN ROAD R R N D D G M I L E R C D M O O BA LOCATION U N GGO R The property is locatedT R Don the busy N C commuter thoroughfare of Marino Mart E O in Fairview, directly opposite Fairview Park R L D and approx.
    [Show full text]
  • Sheriff St 20Jan Final
    MONDAYS WEDNESDAYS SATURDAYS AQUAFIT DANCE FITNESS PARKRUN (€3 Supplement) 6.15pm to 7pm 9.20am 12pm to 1pm and 7pm to 8pm Contact Point: Contact Point: Participants must register at www.parkrun.com Contact: Alysia Arkins (Fitness Instructor) Fairview Park Mary Bolger Hinds (Swim Ireland) 085 826 4065 St. Laurence O’ Toole Recreation Centre 086 775 9954 BOXFIT Sean Mc Dermott St Swimming Pool STRENGTH AND CONDITIONING 11am to 12pm Participants must register for this activity on the morning Evening Contact Point: of the activity through the contact above Contact: Elaine O Neill WALKING GROUP Adam Maguire (Duty Supervisor) 085 130 7765 1pm to 2pm 01 547 2257 Ballybough Boxing Club Contact: St. Laurence O’ Toole Recreation Centre Michael Darragh Macauley SATURDAYS / SUNDAYS 087 182 2010 THURSDAYS St. Laurence O’ Toole Recreation Centre ADVENTURE PROJECT GAA FOR MA’S 10am Additional registration with project Contact Point: YOGA 6pm to 7pm Contact: Willie Whelan (Adventure Project) 6.30pm to 7.30pm 087 294 3970 Contact: Thomas Gleeson 085 113 7728 Meet at Adventure Project every week David Mc Guinness (HSCL) St. Laurence O’ Toole Recreation Centre 085 844 8342 Participants must register for activity early in week through Willie Whelan. St. Laurence O’ Toole Recreation Centre FRIDAYS TUESDAYS YOGA 1pm to 2pm COUCH TO 5KM Contact: 1pm to 2pm Michael Darragh Macauley Contact: 087 182 2010 Colette Quinn (Athletics Officer) St. Laurence O’ Toole Recreation Centre 085 871 2817 Mountjoy Square COUCH TO 5 TAGS 5.45pm to 6.45pm Contact: Stephen Maher (Rugby Officer) 086 199 4569 St. Laurence O’ Toole Recreation Centre * Please note some classes may be limited by capacity ** that charge a supplementary 10am 11am 6pm 7pm 9am 1pm Get you moving through physical activity classes.
    [Show full text]
  • Travelling to the O2 Couldn't Be Easier
    Colour palette Primary colour Pantone CMYK RGB Websafe Gardiner St Upper Port land Five Clontarf Road ll Row hi Lamps Ea r Dart Station s Pedestrian Entry Points t W ROY 1km / 14min walk all Rd l Summe A L unne CANAL T rt Please take B t o S P per 20 27 116 145 note of the Up Parnel B A B A PMS 2747 C100 M094 Y000 K029 R000 G000 B102 Hex 000066 27C 29 31 31 32B Seville Plac B Gardiner St 40 40 120 123 A A Amiens East Rd LEGEND entrance l Sq East 42 42B 43 51 53 St Connolly A points. These Secondary colours 53 53 142 ll Rd Dorset St 90 127 129 130 142 e Rail / Dart Line A Station t Wall Rd 11 11 B s Parnell Docklands correlate to Lower Wa A Ea LUAS Red Line PMS 2768 C095 M081 Y000 K059 R025 G034 B079 Hex 000033 13 13 14 Station the designated A 93 151 O’Connell St 16 16 19 LUAS Sheriff St Upper LUAS Green Line Sheriff St Lwr East A A entry point 40C 48 123 PMS 2945 C100 M038 Y000 K015 R000 G088 B150 Hex 003399 Mayor Pedestrian Route Taxi Rank printed on 747748 Square Commons St The Guild St Bus Route Stop Busáras your event PMS 2925 C087 M023 Y000 K000 R000 G144 B208 Hex 3399CC 2 3 4 5 Spire Mayor St Lower 4 5 Car Park Parnell St A A chq Convention ticket. B A 7 7 8 10 10 A Castleforbes Rd D 7 B 7 8 53 PMS 2915 C060 M011 Y000 K000 R101 G180 B228 Hex 66CCFF D New Wapping St A Centre 14A 16 16 19 38 151 A A D A C North Wall Quay 38C 46B 46E 48 58 Quay 93 90 North Wall Quay North Wall Quay C Abbey St Lower House A Custom PMS 290 C016 M000 Y000 K000 R190 G217 B237 Hex * C Capel St 63 121 122 145 746 38 38 Sean O’Casey Samuel Beckett 151 Foot-Bridge
    [Show full text]
  • 47178-Owen Reilly-52 West Road.Indd
    52 West Road, East Wall, Dublin 3. For Sale By Private Treaty 52 West Road, East Wall, Dublin 3 DESCRIPTION and Aldi supermarkets on East Wall Road, the house would also be a most convenient Owen Reilly presents this extremely charming base for commuters who use the Port Tunnel large two-bedroom red brick mid-terrace or East Link Bridge – each a five-minute drive house located in a mature neighbourhood in from the house. Facebook have just moved heart of East Wall adjacent to the IFSC and just into their new offices in East Wall which five minutes from Facebook’s new office. This reflects that this is an area on the up! is a perfect starter home or investment given the value and convenience of the location FEATURES with a host of amenities on the doorstep. Recently redecorated, the accommodation • Charming two bedroom townhouse briefly comprises on the ground floor of a • Superb location adjacent to a host of hall, a living room with original feature brick amenities fireplace, a sitting room which leads to a • Close to East point Business Park galley style kitchen with French door access to an east facing rear garden. On the first • Bright interior floor there are two generous bedrooms with • Ample on street parking original feature fireplaces. Ample on street • Gas fired central heating parking to front. This delightful property must be viewed to be appreciated. • Generous east facing rear garden • High ceilings LOCATION • Convenient to the city centre and IFSC • Easy access to the M1 via the Port Tunnel At the north-eastern corner of Dublin’s North Docklands is East Wall, an established residential community with great personality.
    [Show full text]
  • New Build Gentrificaton in the Dublin Docklands and Its Effects on the Absolute and Percieved Employment Opportunities of the Neighbouring Deprived Communities
    New Build Gentrificaton in the Dublin Docklands and its effects on the Absolute and Percieved Employment Opportunities of the Neighbouring Deprived Communities. Utrecht University Faculty of Geosciences Research Master in Human Geography and Planning By Enda Duignan Supervisor: Brian Doucet 2011 Abstract Gentrification is a process which has undergone large scale changes since its inception in the mid 1960s. The term was initially used to describe the middle class invasion of London’s working class quarters but has now evolved to encompass a wider variety of actors, characteristics and even locations. Although gentrification has gained popularity over the last decade or so, an alternate viewpoint holds that the often celebratory tone surrounding the concept is unjustified, with the process overall being harmful for a neighbourhood. The process has gone through three separate waves or periods of development since its emergence and debate still exists today over how and why the phenomenon is actually caused, with authors such as Neil Smith and David Ley contesting its foundations. This thesis looks at the relatively recent phenomenon of new-build gentrification, a process which describes the conversion of ex-industrial structures or previously under developed land to create newly gentrified landscapes which show all the hall marks and characteristics of gentrification proper. It is often the case that new-build developments are constructed on Brownfield sites where there are no indigenous population, however a dearth in research exists over how the process of new-build gentrification impacts on neighbouring communities. This research examines the impact of such developments on both the absolute and perceived employment opportunities of surrounding deprived communities.
    [Show full text]
  • Chief Executive and Departmental Reports
    APPEN DIX {A} Chief Executive and Departmental Reports SHD0024/19 ABP - 305676 - 19 Lands to the Rear of Connolly Station, Connolly Station car park, Sheriff Street Lower, Dublin 1. Report on Planning Application Plan No: SHD0024/19 Location: Lands to the rear of Connolly Station, Sheriff Street Lower, Oriel Street and Seville Place, Dublin 1 Applicant: Oxley Holdings Limited. Proposal: Demolition of 4 no. existing structures on site and provision of 741 no. Build to Rent Apartments with 1444sq.m. of residential amenities and 10 no. commercial/retail units. Application Type: Strategic Housing Development Site Location and Description The site is a 2.88 hectare site situated to the east of Connolly Station, south of Seville Place and southwest of existing two-storey houses at Oriel Hall off Oriel Street Upper. The site is bounded to the east by Oriel Street Upper, which has a mix of two and three-storey houses and apartment buildings on the opposite side, and by Sheriff Street Lower to the south. The site extends to a point at the junction of Oriel Street Upper and Sheriff Street Lower, with an existing single storey redbrick building in this area. The site then extends north and west along Sheriff Street Lower facing existing mixed use blocks dating from the 1990s on the south side of the street. The site includes an existing luggage store and workshop building which are set within the boundary wall, a protected structure, along the southern boundary of the site on the northern side of Sheriff Street Lower. The bulk of the site is occupied by the car park of Connolly Station, which is accessed from Sheriff Street Lower.
    [Show full text]
  • East Wall Road, Dublin 3 HEADQUARTER OFFICES 1 the North Docklands DUBLIN's PRIMARY CORPORATE QUARTER
    AT GATEWAY BE IN PRIME POSITION East Wall Road, Dublin 3 HEADQUARTER OFFICES 1 The North Docklands DUBLIN'S PRIMARY CORPORATE QUARTER HIGH PROFILE DEVELOPMENT EXCELLENT AMENITIES Leading business environment • The Gateway development, located in the North Docklands, comprises three seperate blocks of high specification, third generation, office space extending to almost 16,000 sq.m. • The new docklands masterplan provides for the expenditure of €1.24 billion in a public private partnership to improve infrastructure and provide for major commercial and residential developments between now and 2020. • Gateway is located in one of Dublin's best served public transport areas with Dart, Mainline Rail, Dublin Bus and Luas connections all in the vicinity. There are a host of shops, restaurants, bars and hotels within walking distance in the neighbouring IFSC / Spencer Dock area not to mention the convenience store on your doorstep at Gateway. 2 Prime CORPORATE EFFICIENCY SPECTACULAR VIEWS STRATEGIC POSITION Centrepiece of the Gateway Development • PRIME, the centrepiece of the hugely successful Gateway Development in the North City Docklands, has been designed to meet the most demanding requirements expected of a corporate headquarter. • This 3rd generation office space meets the highest specification, in both presentation and technology. The presentation is impressive and authoritative and includes solid wood panelling in the reception areas. Internal structures and external amenities combine to provide the levels of corporate efficiency which are essential in today’s business world. The building also offers spectacular views across the city. • Strategically positioned on East Wall Road, between the dynamic Dublin Docklands and the East Wall Business Campus, PRIME is highly accessible, being served by all primary transport modes including Dublin Port Tunnel.
    [Show full text]
  • Inspectors Report (307/R307987.Pdf, .PDF Format 303KB)
    Inspector’s Report ABP-307987-20. Development Demolition of premises and construction of a 2-4 storey apartment block with 13 no. apartments. Location Church Road, East Wall, Dublin. Planning Authority Dublin City Council. Planning Authority Reg. Ref. 2773/20. Applicant MKN Property Group. Type of Application Permission. Planning Authority Decision Refuse. Type of Appeal First Party Appellant MKN Property Group. Observer Steve O’Connor. Date of Site Inspection 14th January 2021. Inspector Philip Davis. ABP-307987-20 Inspector’s Report Page 1 of 20 Contents 1.0 Introduction .......................................................................................................... 3 2.0 Site Location and Description .............................................................................. 3 3.0 Proposed Development ....................................................................................... 4 4.0 Planning Authority Decision ................................................................................. 4 Decision ........................................................................................................ 4 Planning Authority Reports............................................................................ 5 Prescribed Bodies ......................................................................................... 6 Third Party Observations .............................................................................. 7 5.0 Planning History ..................................................................................................
    [Show full text]