Environmental Management Plan

Total Page:16

File Type:pdf, Size:1020Kb

Environmental Management Plan ROAD DEPARTMENT OF GEORGIAN MINISTRY OF REGIONAL DEVELOPMENT AND INFRASTRUCTURE CONTRACT: #SLRP III/CS/QCBS-01 PREPARATION OF DETAILED DESIGN AND BIDDING DOCUMENTS FOR REHABILITATION OF 10 ROAD (Approx. 100 km) SECTIONS UNDER THE THIRD SECONDARY AND LOCAL ROADS PROJECT (SLRPIII) Road Name: Local Access Road to Village Didvela Section Km 4.5 ~ Km 9.0 Road No.8, Stage II, Under the Terms of Reference Environmental Management Plan VOLUME VI CONSULTANT: SUB-CONSULTANT: TBILISI 2015 PART 1: GENERAL PROJECT AND SITE INFORMATION INSTITUTIONAL &ADMINISTRATIVE Country Georgia Project title Rehabilitation of Local Access Road to Village Didvela, Section of Km 4.5 ~ Km 9.0 Scope of project and Many parts of exposed gravel surface and asphalt pavement surface are damaged i.e., plastic deformation, pot activity holes due to the traffic / environmental condition, and stagnant water at surface layer. Providing of asphalt surface layer is essential to recover road function in terms of driving convenience and driving safety. Existing pipes are consisted of reinforced concrete. Most of the existing pipes will be repalced with new pipes due to the insufficient capacity and dysfunctionality. The traffic facilities such as road signs, pencing, bus staion, and etc. will be provieded and replaced since there are not appropriate traffic safety facilities to minimize traffic accidents. General information of detailed design for rehabilitation work is as follows: - Design speed: 50 km/h - Width of carriageway: 5.0 ~ 5.5 m - Width of Shoulder: 0.5 ~ 1.0 m - Number of carriageway: 2 lanes / 2 directions - Pavement thickness: Asphalt layer (5cm), Stabilization layer (16cm) Institutional WB Project Management Local Counterpart and/or Recipient arrangements (Name (Project Team Leader) and contacts) Natalya Stankevich Giorgi Tsereteli (Baghdati municipality) Implementation WB Local Counterpart Local Inspectorate Contractor arrangements (Name Safeguard Supervision Supervision Supervision and contacts) Technical Supervisor JV LtD Orientiri” Darejan Kapanadze LtD “Roads Rehabilitation and Besarion Modernization Supervision Bochorishvili and LtD Direction” “Arnabi 21” Davit Merab Jishiashvili Jgenti SITE DESCRIPTION Local Access Road to Village Didvela, Section of Km 4.5 ~ Km 9.0 Name of site It is located in Imereti region and crosses the territory of Baghdati municipality. The road starts at 17 km of Kutaisi ~ Bagdati ~ Abastumani Benara road, and it passes Rokiti, Didvela villages. Describe site The ending section of this road is connected to Vartsikhe ~ Rokhi road at 2 km near Vartsikhe village. The total location length of this road section is 4.7 km. Who owns the land? Baghdati Municipality Description of Location: The project road is located in Imereti region and passes through the territory of Baghdati municipality. geographic, Absolute level of road varies between 98.5m ~ 127.7 m. From geological point of view, project area belongs to physical, biological, Chakvi-Sairme sub-zone of northern Ajara-Trialeti folding zone. There are no geotechnical instabilitits observed geological, on the project road. According to the seismic zoning the study area belongs to the 8 point earthquake zone. hydrographic and Climate of project area is identified as a hot weather in summer season and short, mild weather in winter period. socio-economic The main income of the local people is agriculture (wine-making). context Air: Due to the low intensity of traffic and absent of industrial facilities the air quality parameters are high. According to the nearest meteorological station, the background radiation is under the permissible point. Appropriately the risk of high radiation in the region is not recorded. Water and Soil: No pollution is reported. Flora: Vegetation within the area is not thick and no rare/protected species are registered in it. Minor quality of shrubs and small trees are located within the project’s direct impact are. Fauna: The project road pass through the degraded territory and accordingly the fauna is not reach. Mostly fauna is presented by the species which does not need any special protecting measures. Due to the small area of the project the impact on the fauna will be minimal. Noise: The current noise level is low due to low traffic levels and a lack of industrial facilities. The project activities will have modest impact on those people who reside in existing villages (Immediately along the road) and this impact will be limited to the rehabilitation phase. Social: The road passes through 2 villages where 320 families in total are settled.. Information for material resources nearest from the project area Locations and distance for material Description Location Hauling distance, Note sourcing, especially 1 Quarry Bagdati municipality, Vartsikhe village 10km inert aggregates, 2 Borrow pit Bagdati municipality area 9 km water, stones 3 Disposal area Bagdati municipality area 4 km 2 4 Concrete plant Bagdati municipality, Vartsikhe village 7 km 5 A/C plant Bagdati municipality, Vartsikhe village 7 km 6 Landfill Kutaisi municipality area 35 km LEGISLATION Identify national & The project triggers World Bank OP/BP 4.01 - Environmental Assessment and, according to its principles, has local legislation been classified as environmental Category B. The present EMP has been prepared to meet requirements of &permits that apply OP/BP 4.01. to project activity Georgian legislation does not require any type of environmental review, approval, or permitting for the project. Though according to the national regulatory system, (i) Contractor company must be licensed, (ii) Construction materials must be obtained from licensed providers, (iii) Once contractor wishes to open quarries, then the contractor must obtain respective license. (iv) If, in time of rehabilitation, contractor wishes to operate own asphalt or concrete (Or both) plants, he should have permission regarding specified limited level of pollutant substances in exhaust. (v) Disposal of the construction waste and excess ground generated in the course of earth works shall be placed in a selected locations agreed and approved by local governing bodies in written. PUBLIC CONSULTATION Identify when / Environmental Management Framework for the Secondary and Local Roads Project III was disclosed through where the public the RDMRDI web page and a stakeholder consultation meeting was held on 11/04/2014. The present site- consultation process specific EMP was disclosed through the same media and also delivered in hard copies to the Baghdati shall take place municipality. Consultation meeting with local communities was held and the minutes of this meeting were attached to this EMP. ATTACHMENTS Attachment 1: Project Location Map Attachment 2: Minutes of public consultation; Attachment 3: Waste disposal agreement (to be provided by contractor); Attachment 4: Borrowing license (as applicable by contractor); Attachment 5: Asphalt plant operation agreement (as applicable); Attachment 6: Other (as applicable) 3 PART 2: SAFEGUARDS SCREENING AND TRIGGERS ENVIRONMENTAL /SOCIAL SCREENING FOR SAFEGUARDS TRIGGERS Activity/Issue Status Triggered Actions A. Roads rehabilitation [x] Yes [ ] No If “Yes”, see Section 3 - A B. New construction of small traffic infrastructure [ ] Yes [x] No If “Yes”, see Section 3 - A C. Impacts on surface drainage system [x] Yes [ ] No If “Yes”, see Section 3 - B Will the site activity D. Historic building(s) and districts [ ] Yes [x] No If “Yes”, see Section 3 - C include/involve any of the E. Acquisition of land1 [ ] Yes [x] No If “Yes”, see Section 3 - D following? F. Hazardous or toxic materials2 [] Yes [x] No If “Yes”, see Section 3 - E G. Impacts on forests and/or protected areas [] Yes [x]No If “Yes”, see Section 3 - F H. Risk of unexploded ordinance (UXO) [ ] Yes [x] No If “Yes”, see Section 3 - G I. Traffic and Pedestrian Safety [x] Yes [ ] No ‘Yes”, see Section 3 - H ------------------------------------------------ 1 Land acquisition includes displacement of residents, change the way of life, this is concerning with land which was purchased/handed over and impact on persons living and/or unlawfully exist and or/performing business activities (Booths) on the land already purchased. 2Hazardous or toxic materials contain, but is not limited to: asbestos, toxic paints, hazardous dissolvent materials, removal of lead containing materials and etc. 4 PART 3: MITIGATION MEASURES ACTIVITY PARAMETER MITIGATION MEASURES CHECKLIST 0. General Conditions Notification and a) The local construction and environment inspectorates and communities have been notified of upcoming activities Worker Safety b) The public has been notified of the works through appropriate notification in the media and/or at publicly accessible sites (including the site of the works) c) All legally required permits have been acquired for construction and/or rehabilitation d) The Contractor formally agrees that all work will be carried out in a safe and disciplined manner designed to minimize impacts on neighboring residents and environment. e) Workers’ PPE will comply with international good practice (always hardhats, as needed masks and safety glasses, harnesses and safety boots) f) Appropriate signposting of the sites will inform workers of key rules and regulations to follow. A. General Rehabilitation Air Quality a) During excavation works dust control measures shall be employed, e.g. by spraying and moistening the ground and /or Construction b) Demolition debris, excavated soil and aggregates shall be kept in controlled area
Recommended publications
  • YOUTH POLICY IMPLEMENTATION at the LOCAL LEVEL: IMERETI and TBILISI © Friedrich-Ebert-Stiftung
    YOUTH POLICY IMPLEMENTATION AT THE LOCAL LEVEL: IMERETI AND TBILISI © Friedrich-Ebert-Stiftung This Publication is funded by Friedrich-Ebert-Stiftung. The views expressed in this publication are not necessarily those of the Friedrich-Ebert Stiftung. Commercial use of all media published by the Friedrich-Ebert-Stiftung (FES) is not permitted without the written consent of the FES. YOUTH POLICY IMPLEMENTATION AT THE LOCAL LEVEL: IMERETI AND TBILISI Tbilisi 2020 Youth Policy Implementation at the Local Level: Imereti and Tbilisi Tbilisi 2020 PUBLISHERS Friedrich-Ebert-Stiftung, South Caucasus South Caucasus Regional Offi ce Ramishvili Str. Blind Alley 1, #1, 0179 http://www.fes-caucasus.org Tbilisi, Georgia Analysis and Consulting Team (ACT) 8, John (Malkhaz) Shalikashvili st. Tbilisi, 0131, Georgia Parliament of Georgia, Sports and Youth Issues Committee Shota Rustaveli Avenue #8 Tbilisi, Georgia, 0118 FOR PUBLISHER Felix Hett, FES, Salome Alania, FES AUTHORS Plora (Keso) Esebua (ACT) Sopho Chachanidze (ACT) Giorgi Rukhadze (ACT) Sophio Potskhverashvili (ACT) DESIGN LTD PolyGraph, www.poly .ge TYPESETTING Gela Babakishvili TRANSLATION & PROOFREADING Lika Lomidze Eter Maghradze Suzanne Graham COVER PICTURE https://www.freepik.com/ PRINT LTD PolyGraph PRINT RUN 150 pcs ISBN 978-9941-8-2018-2 Attitudes, opinions and conclusions expressed in this publication- not necessarily express attitudes of the Friedrich-Ebert-Stiftung. Friedrich-Ebert-Stiftung does not vouch for the accuracy of the data stated in this publication. © Friedrich-Ebert-Stiftung 2020 FOREWORD Youth is important. Many hopes are attached to the “next generation” – societies tend to look towards the young to bring about a value change, to get rid of old habits, and to lead any country into a better future.
    [Show full text]
  • Status and Protection of Globally Threatened Species in the Caucasus
    STATUS AND PROTECTION OF GLOBALLY THREATENED SPECIES IN THE CAUCASUS CEPF Biodiversity Investments in the Caucasus Hotspot 2004-2009 Edited by Nugzar Zazanashvili and David Mallon Tbilisi 2009 The contents of this book do not necessarily reflect the views or policies of CEPF, WWF, or their sponsoring organizations. Neither the CEPF, WWF nor any other entities thereof, assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, product or process disclosed in this book. Citation: Zazanashvili, N. and Mallon, D. (Editors) 2009. Status and Protection of Globally Threatened Species in the Caucasus. Tbilisi: CEPF, WWF. Contour Ltd., 232 pp. ISBN 978-9941-0-2203-6 Design and printing Contour Ltd. 8, Kargareteli st., 0164 Tbilisi, Georgia December 2009 The Critical Ecosystem Partnership Fund (CEPF) is a joint initiative of l’Agence Française de Développement, Conservation International, the Global Environment Facility, the Government of Japan, the MacArthur Foundation and the World Bank. This book shows the effort of the Caucasus NGOs, experts, scientific institutions and governmental agencies for conserving globally threatened species in the Caucasus: CEPF investments in the region made it possible for the first time to carry out simultaneous assessments of species’ populations at national and regional scales, setting up strategies and developing action plans for their survival, as well as implementation of some urgent conservation measures. Contents Foreword 7 Acknowledgments 8 Introduction CEPF Investment in the Caucasus Hotspot A. W. Tordoff, N. Zazanashvili, M. Bitsadze, K. Manvelyan, E. Askerov, V. Krever, S. Kalem, B. Avcioglu, S. Galstyan and R. Mnatsekanov 9 The Caucasus Hotspot N.
    [Show full text]
  • Doing Business in Georgia: 2015 Country Commercial Guide for U.S
    Doing Business in Georgia: 2015 Country Commercial Guide for U.S. Companies INTERNATIONAL COPYRIGHT, U.S. & FOREIGN COMMERCIAL SERVICE AND U.S. DEPARTMENT OF STATE, 2010. ALL RIGHTS RESERVED OUTSIDE OF THE UNITED STATES. • Chapter 1: Doing Business In Georgia • Chapter 2: Political and Economic Environment • Chapter 3: Selling U.S. Products and Services • Chapter 4: Leading Sectors for U.S. Export and Investment • Chapter 5: Trade Regulations, Customs and Standards • Chapter 6: Investment Climate • Chapter 7: Trade and Project Financing • Chapter 8: Business Travel • Chapter 9: Contacts, Market Research and Trade Events • Chapter 10: Guide to Our Services Chapter 1: Doing Business in Georgia • Market Overview • Market Challenges • Market Opportunities • Market Entry Strategy Market Overview Return to top Market Overview Georgia is a small transitional market economy of 3.7 million people with a per capita GDP of $3,681 (2014). Georgia is located at the crossroads between Europe and Central Asia and has experienced economic growth over the past twelve years. In June 2014, Georgia signed an Association Agreement (AA) and Deep and Comprehensive Free Trade Area (DCFTA) with the European Union. Through reduced tariffs and the removal of technical barriers to entry, the DCFTA gives Georgian products access to over 500 million people in the EU. Reciprocally, products from the EU now enjoy easier access to the Georgian market. Following the launch of the U.S.-Georgia Strategic Partnership Commission (SPC) in 2009, the U.S. Department of State holds regular meetings with its Georgian counterparts across various working groups. One of these dialogues is the Economic, Energy, and Trade Working Group which aims to coordinate Georgia’s strategy for development in these areas and to explore ways to expand bilateral economic cooperation.
    [Show full text]
  • Pre-Election Monitoring of October 8, 2016 Parliamentary Elections Second Interim Report July 17 - August 8
    International Society for Fair Elections and Democracy Pre-Election Monitoring of October 8, 2016 Parliamentary Elections Second Interim Report July 17 - August 8 Publishing this report is made possible by the generous support of the American people, through the United States Agency for International Development (USAID) and the National Endowment for Democracy (NED). The views expressed in this report belong solely to ISFED and may not necessarily reflect the views of the USAID, the United States Government and the NED. 1. Introduction The International Society for Fair Elections and Democracy (ISFED) has been monitoring October 8, 2016 elections of the Parliament of Georgia and Ajara Supreme Council since July 1, with support from the United States Agency for International Development (USAID) and the National Endowment for Democracy (NED). The present report covers the period from July 18 to August 8, 2016. 2. Key Findings Compared to the previous reporting period, campaigning by political parties and candidates has become more intense. ISFED long-term observers (LTOs) monitored a total of 114 meetings of electoral subjects with voters throughout Georgia, from July 18 through August 7. As the election campaigning moved into a more active phase, the number of election violations grew considerably. Failure of relevant authorities to take adequate actions in response to these violations may pose a threat to free and fair electoral environment. During the reporting period ISFED found 4 instances of intimidation/harassment based on political affiliation, 2 cases of physical violence, 3 cases of possible vote buying, 4 cases of campaigning by unauthorized persons, 8 cases of misuse of administrative resources, 4 cases of interference with pre- election campaigning, 4 cases of use of hate speech, 7 cases of local self-governments making changes in budgets for social and infrastructure projects; 3 cases of misconduct by election commission members.
    [Show full text]
  • Social Screening of Subprojects
    Public Disclosure Authorized Gas Supply and Access Road Rehabilitation for Vartsikhe Cellar LTD in Village Vartsikhe, Baghdati Municipality Public Disclosure Authorized Sub-Project Environmental and Social Screening and Environmental Management Plan Public Disclosure Authorized WORLD BANK FINANCED SECOND REGIONAL AND MUNICIPAL INFRASTRUCTURE DEVELOPMENT PROJECT (SRMIDP) Public-Private Investment (PPI) Public Disclosure Authorized November 2018 The Sub-Project Description The Subproject (SP) site is located in village Vartsikhe, Baghdati municipality, Imereti region, Western Georgia. The SP includes rehabilitation of a 775-meter-long road from Vartsikhe-Didveli motorway main road to the Vartsikhe Cellar. The road is registered as a municipal property (with the cadastral code: 30.06.33.008) and the road bed does not overlap with the privately-owned agricultural land plots under vineyards and other crops located on the sides of the road, so works will be completed within the ROW. Furthermore, contractor does not need any access to the adjacent lands to complete the civil works. No residential houses are located at the road sides. The road to be rehabilitated is in a very poor condition. The first half section is covered with ground and gravel surface, while another half has no cover and only traces of car tires are visible marks of the road bed. According to the SP design, the road will be covered by asphalt and road signs will be arranged. Along the road, there are two culverts, one of them is in a satisfactory condition and one pipe needs to be repaired. The road will be rehabilitated within the following parameters: the width of the carriageway - 6.0m; the width of the shoulders - 0.5m.
    [Show full text]
  • 6. Imereti – Historical-Cultural Overview
    SFG2110 SECOND REGIONAL DEVELOPMETN PROJECT IMERETI REGIONAL DEVELOPMENT PROGRAM IMERETI TOURISM DEVELOPMENT STRATEGY Public Disclosure Authorized STRATEGIC ENVIRONMENTAL, CULTURAL HERITAGE AND SOCIAL ASSESSMENT Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Tbilisi, December, 2014 ABBREVIATIONS GNTA Georgia National Tourism Administration EIA Environnemental Impact Assessment EMP Environmental Management Plan EMS Environmental Management System IFI International Financial Institution IRDS Imereti Regional Development Strategy ITDS Imereti Tourism Development Strategy MDF Municipal Development Fund of Georgia MoA Ministry of Agriculture MoENRP Ministry of Environment and Natural Resources Protection of Georgia MoIA Ministry of Internal Affairs MoCMP Ministry of Culture and Monument Protection MoJ Ministry of Justice MoESD Ministry of Economic and Sustaineble Developmnet NACHP National Agency for Cultural Heritage Protection PIU Project Implementation Unit PPE Personal protective equipment RDP Regional Development Project SECHSA Strategic Environmental, Cultural Heritage and Social Assessment WB World Bank Contents EXECUTIVE SUMMARY ........................................................................................................................................... 0 1. INTRODUCTION ........................................................................................................................................... 14 1.1 PROJECT CONTEXT ...............................................................................................................................
    [Show full text]
  • Energy Policy Review: Georgia 2020
    Georgia 2020 Energy Policy Review Georgia 2020 Energy Policy Review INTERNATIONAL ENERGY AGENCY The IEA examines IEA member IEA association the full spectrum countries: countries: of energy issues including oil, gas Australia Brazil and coal supply and Austria China demand, renewable Belgium India energy technologies, Canada Indonesia electricity markets, Czech Republic Morocco energy efficiency, Denmark Singapore access to energy, Estonia South Africa demand side Finland Thailand management and France much more. Through Germany its work, the IEA Greece advocates policies Hungary that will enhance Ireland the reliability, Italy affordability and Japan sustainability of Korea energy in its 30 Luxembourg member countries, Mexico 8 association Netherlands countries and New Zealand beyond. Norway Poland Portugal Slovak Republic Spain Sweden Switzerland Turkey United Kingdom United States The European Commission also participates in the work of the IEA Please note that this publication is subject to specific restrictions that limit its use and distribution. The terms and conditions are available online at www.iea.org/t&c/ Source: IEA. All rights reserved. International Energy Agency Website: www.iea.org Foreword The International Energy Agency (IEA) has been conducting in-depth peer reviews of energy policies of its member countries – and of other countries – since 1976, and it recently modernised these reviews to focus on some of the countries’ key energy transition and security challenges. As the IEA has opened its doors to emerging economies, in-depth reviews have come to play an increasingly prominent role in bilateral collaborations. Georgia is one of the focus countries of the EU4Energy programme, which is implemented FOREWORD by the IEA and the European Union, along with the Energy Community and the Energy Charter, and which includes Armenia, Azerbaijan, Belarus, Georgia, Kazakhstan, Kyrgyzstan, Moldova, Tajikistan, Turkmenistan, Ukraine and Uzbekistan.
    [Show full text]
  • Some Notes on the Topography of Eastern Pontos Euxeinos in Late Antiquity and Early
    Andrei Vinogradov SOME NOTES ON THE TOPOGRAPHY OF EASTERN PONTOS EUXEINOS IN LATE ANTIQUITY AND EARLY BYZANTIUM BASIC RESEARCH PROGRAM WORKING PAPERS SERIES: HUMANITIES WP BRP 82/HUM/2014 This Working Paper is an output of a research project implemented within NRU HSE’s Annual Thematic Plan for Basic and Applied Research. Any opinions or claims contained in this Working Paper do not necessarily reflect the views of HSE. Andrei Vinogradov1 SOME NOTES ON THE TOPOGRAPHY OF EASTERN PONTOS EUXEINOS IN LATE ANTIQUITY AND EARLY BYZANTIUM2 This paper clarifies some issues of late antique and early Byzantine topography of Eastern Pontos Euxeinos. These questions can be divided into two large groups: the ecclesiastical topography and the locations of Byzantine fortresses. The earliest testimony of Apostolic preaching on the Eastern black sea coast—the list of the apostles by Pseudo- Epiphanius—following the ‘Chronicon’ of Hyppolitus of Rome, unsuccessfully connects South- Eastern Pontos Euxeinos to Sebastopolis the Great (modern Sukhumi), which subsequently gives rise to an itinerary of the apostle Andrew. The Early Byzantine Church in the region had a complicated arrangement: the Zekchians, Abasgians and possibly Apsilians had their own bishoprics (later archbishoprics); the Lazicans had a metropolitan in Phasis (and not in their capital Archaeopolis) with five bishop-suffragans. Byzantine fortresses, mentioned in 7th c sources, are located mostly in Apsilia and Missimiania, in the Kodori valley, which had strategic importance as a route from
    [Show full text]
  • Chiatura Reference Plan, 2016
    Community managed urban strategies in historical cities Chiatura reference plan, 2016 CHIATURA REFERENCE PLAN COMMUNITY LED URBAN STRATEGIES IN HISTORIC TOWNS (COMUS) Chiatura, 2016 0 Community managed urban strategies in historical cities Chiatura reference plan, 2016 1 Community managed urban strategies in historical cities Chiatura reference plan, 2016 Abstract For the purposes of social and economic development of Chiatura Municipality, in terms of limited resources, it is the most important to identify priorities correctly and ensure efficient use of funds. The reference plan aims to support the Administration of Chiatura Municipality to identify strategic goals, tasks and actions for medium and long-term development on the basis of local engagement, which will be the basis of the further levels for monitoring their implementation and performance. According to the guidelines developed by the Council of Europe, the reference plan reflects the objective possibilities for Chiatura development, identified through participation of the stakeholders and serves to improvement of the living environment and social and economic conditions for local residents through rehabilitation of cultural heritage. 2 Community managed urban strategies in historical cities Chiatura reference plan, 2016 Analysis 3 Community managed urban strategies in historical cities Chiatura reference plan, 2016 1. Basic information Administrative Centre of Chiatura Municipality, - the city of Chiatura, - is situated in the west Georgia, in the narrow valley of the Qvirila River and Chiatura plateau at 350-500 metres above the sea level. Chiatura has been mentioned in historical sources since 1879, andacquired the status of a town in 1917. As of the year of 2016, population of the town equals to 12 800 persons.
    [Show full text]
  • Realizing the Urban Potential in Georgia: National Urban Assessment
    REALIZING THE URBAN POTENTIAL IN GEORGIA National Urban Assessment ASIAN DEVELOPMENT BANK REALIZING THE URBAN POTENTIAL IN GEORGIA NATIONAL URBAN ASSESSMENT ASIAN DEVELOPMENT BANK Creative Commons Attribution 3.0 IGO license (CC BY 3.0 IGO) © 2016 Asian Development Bank 6 ADB Avenue, Mandaluyong City, 1550 Metro Manila, Philippines Tel +63 2 632 4444; Fax +63 2 636 2444 www.adb.org Some rights reserved. Published in 2016. Printed in the Philippines. ISBN 978-92-9257-352-2 (Print), 978-92-9257-353-9 (e-ISBN) Publication Stock No. RPT168254 Cataloging-In-Publication Data Asian Development Bank. Realizing the urban potential in Georgia—National urban assessment. Mandaluyong City, Philippines: Asian Development Bank, 2016. 1. Urban development.2. Georgia.3. National urban assessment, strategy, and road maps. I. Asian Development Bank. The views expressed in this publication are those of the authors and do not necessarily reflect the views and policies of the Asian Development Bank (ADB) or its Board of Governors or the governments they represent. ADB does not guarantee the accuracy of the data included in this publication and accepts no responsibility for any consequence of their use. This publication was finalized in November 2015 and statistical data used was from the National Statistics Office of Georgia as available at the time on http://www.geostat.ge The mention of specific companies or products of manufacturers does not imply that they are endorsed or recommended by ADB in preference to others of a similar nature that are not mentioned. By making any designation of or reference to a particular territory or geographic area, or by using the term “country” in this document, ADB does not intend to make any judgments as to the legal or other status of any territory or area.
    [Show full text]
  • Separation of Powers Program
    PROMOTING RULE OF LAW IN GEORGIA (PROLoG) CA # AID-114-A-15-00004 QUARTERLY REPORT YEAR FOUR APRIL 1, 2018 – JUNE 30, 2018 1 PROMOTING RULE OF LAW IN GEORGIA ACTIVITY (PROLoG) QUARTERLY REPORT YEAR FOUR APRIL 1, 2018 – JUNE 30, 2018 Prepared under the USAID’s Promoting Rule of Law in Georgia (PROLoG) Activity, Cooperative Agreement Number AID-114-A-15-00004 Submitted to: USAID/Georgia as of July 23, 2018 Implementer East-West Management Institute, Inc. Responsible Parties: Giorgi Chkheidze, Chief of Party, Tbilisi, [email protected] Mark Dietrich, Project Director, Washington, D.C. [email protected] Disclaimer This report is made possible by the support of the American People through the United States Agency for International Development (USAID). The contents of this report are the sole responsibility of East-West Management Institute, Inc. and do not necessarily reflect the views of USAID or the United States Government 2 TABLE OF ACRONYMS ACCESS Advancing CSO Capacities and Engaging Society for Sustainability ADR Alternative Dispute Resolution CA Cooperative Agreement CEPEJ European Community for the Efficiency of Justice CIDA Civil Development Agency CRRC Caucasus Resource Research Center CLE Continuing Legal Education COE Council of Europe COP Chief of Party DCOP Deputy Chief of Party ECtHR European Court of Human Rights EHRAC European Human Rights Advocacy Centre EMC Human Rights Education and Monitoring Center EWMI East-West Management Institute Free-Uni Free University of Tbilisi GDI Georgian Democracy Imitative GBA Georgian
    [Show full text]
  • VET Reform in Georgia
    Brief Summary of the Progress Achieved under the Vocational Education Reform in Georgia 2014-2016 years Background Information: Since 2013 Georgia started VET sector reform. Poor image of vocational education from soviet time, abolished system, required fundamental intervention for achieving the goals on the way to approximation to EU education system. The volume of transformation set ambitious agenda for the government and generated the need of well-structured strategy for guiding the reform. On December 26, 2013 GoG adopted the strategy of VET sector reform (2013-2020) together with its action plan and initiated the development of the VET field facilitated by the Ministry of Education and Science of Georgia and supported by EU representation to Georgia. Main Goals of the Reform: Increasing relevance of vocational education system to social-economic challenges of the country; fulfilling the current and future requirements of the labor market; Enhancing life-long learning opportunities, social inclusion, and personal and professional development of individuals; Approximation of Georgian VET system to European education system; Reform Objectives: Creating legislation base for the reform; Enhancement of quality and accessibility; Improving infrastructure; Developing inclusive vocational education and training; Developing of human resources; Institutional strengthening and Private Sector involvement; Popularization of Vocational Education and Training; Financial support; Monitoring and evaluation. Main Achievements 2014-2016: Legislation: In 2016, Ministry of Education and Science completed the work on development of new Law on Vocational Education. New draft framework law ensures the development of the sector in line with the strategy goals, eradicates the dead ends existing in the system, ensures life-long learning principle, increases the access to VET for all groups of population etc.
    [Show full text]