Pending Air Freight Bills

Total Page:16

File Type:pdf, Size:1020Kb

Pending Air Freight Bills GOVERNMENT OF ARUNACHAL PRADESH DIRECTORATE OF SUPPLY & TRANSPORT : NAHARLAGUN ******* th NO. DST/III/44/180 Dated Naharlagun, the 14 May/2007 To 1. The Executive Engineer (PWD), Pasighat/ Ziro/ Mechuka/ Anini / Jairampur / Changlang 2. The Executive Engineer (Power), Miao/ Roing / Along/ Yingkiong 3. The Executive Engineer (RWD), Along/ Yingkiong/Roing/Ziro/Pasighat 4. The Executive Engineer (IFCD), Ziro 5. The DDSE, Changlang 6. The ADC, Changlang 7. The PD DRDA, Ziro Sub: PAYMENT OF OUTSTANDING AIR FREIGHT BILLS Sri, In continuation to our last reminder vide No. DST/III/44, dated 29th November/2000 regarding payment of long pending outstanding Air Freight charges and directed to state that inspite of our several correspondence from time to time we are unable to realise long pending outstanding Air Freight charge from your Department side for that a huge amount of Air Freight charges bulls are still lying pending with you and A.G. Audit has raised serous objection for non realization of outstanding amount from your department. Further, I am to state that further lifting of departmental stores by Ration Sorties will not be entertained till clearance of following outstanding dues by the defaulting Department. Sl Amount as on Name of Defaulting Office No May/2007 1. Executive Engineer (PWD), Pasighat 45,58,933.00 2. Executive Engineer (PWD), Ziro 11,20,922.00 3. Executive Engineer (PWD), Mechuka 1,78,33,129.00 4. Executive Engineer (PWD), Anini 67,07,759.00 5. Executive Engineer (PWD), Jairampur 43,46,005.00 6. Executive Engineer (PWD), Changlang 7,840.00 7. Executive Engineer (Power), Miao 53,04,373.00 8. Executive Engineer (Power), Roing 67,27,993.00 9. Executive Engineer (Power), Along 12,02,736.00 10. Executive Engineer (Power), Yingkiong 63,89,526.00 11. Executive Engineer (RWD), Along 41,18,814.00 12. Executive Engineer (RWD), Yingkiong 48,47,483.00 13. Executive Engineer (RWD), Roing 1,19,654.00 14. Executive Engineer (RWD), Pasighat 11,76,727.00 15. PD DRDA, Ziro 16,00,711.00 16. ADC, Changlang 8,165.00 17. DDSE, Changlang 11,648.00 Therefore, all defaulting Departments are requested to arrange for immediate payment of the outstanding bills by Bank Draft in favor of the Director of Supply & Transport, Naharlagun to avoid further complicacy in near future. Yours faithfully, (J.T. Toko), SF & AO for Director of Supply & Transport, Arunachal Pradesh :: Naharlagun th NO. DST/III/44/180 Dated Naharlagun, the 14 May/2007 Copy to: 1. The Secretary (Supply & Transport), Govt. of Arunachal Pradesh, Itanagar for information. 2. The Chief Engineer (PWD), Eastern Zone, Government of Arunachal Pradesh, Itanagar. 3. The Chief Engineer (PWD), Western Zone, Government of Arunachal Pradesh, Itanagar. For information and 4. The Chief Engineer (Power), necessary action. Government of Arunachal Pradesh, Itanagar. 5. The Chief Engineer (RWD), Government of Arunachal Pradesh, Itanagar. 6. The Chief Engineer (IFCD), Government of Arunachal Pradesh, Itanagar. 7. The Director of Rural Work Department, Government of Arunachal Pradesh, Itanagar. 8. The DDST, Mohanbari. He is requested not to Air-lift any Departmental Stores still clearance of Pending bills. 9. The ADST, Lilabari/ Ziro/ Pasighat / Along for information and necessary action. (J.T. Toko), SF & AO for Director of Supply & Transport, Arunachal Pradesh :: Naharlagun Note: Re-composed version of the letter for uploading in http://arunachalpwd.org .
Recommended publications
  • The Adi House: Manifestation of Traditional Wisdom ~~R.N
    ARUNACHAL A monthly english journal DECEMBER 2018 1 REVIEW The Adi House: Manifestation of Traditional Wisdom ~~R.N. Koley he Adis, the blanket name fulfillment of the basic needs away from it. Even, every Adi Tof some sub-groups are in- and the requirements of com- village depicts a definite pat- habited in Siang Valley the cen- munity members. Traditions tern in housing. Prospect of tral part of Arunachal Pradesh. and socio-cultural heritage are water, sunlight and drainage They are comprising around uniformly inherited by individu- facility of domestic waste to- one fourth of the tribal popula- als and society. wards lower slope at a village tion of this state. They are hav- The traditional house site are always wisely taken ing unique tradition and rich of the Adis are constructed in consideration with utmost cultural heritage of their own. with bamboos, woods, canes, importance. All these tradi- In Arunachal Pradesh every leaves etc. which are found tional mechanism reveal a ethnic community has own ar- abundant in their surround- foresight and scientific think- chitectural design of house as ings. Till today the construction ing as outcome of deep expe- part of their traditional wisdom is made always on community rience based on century old to cope with their ecology. Like- or collective basis to which all behavioral science. Security of wise the Adis have own tradi- the abled body villagers con- the houses is also major con- tional architect in constructing tribute their labour spontane- cern in early days. In a village their houses which are tested ously as part of century old tra- houses are camouflaged with over the time.
    [Show full text]
  • Elliot's Laughingthrush Trochalopteron Elliotii and Black
    130 Indian BirDS VOL. 8 NO. 5 (PUBL. 5 SEPTEMBER 2013) sored by Bombay Natural History Society.) Oxford University Press [Oxford India L’Oiseau et la Revue Francaise d’Ornithologie 40 (1): 48–68. Paperbacks.]. Vol. 1 of 10 vols. Pp. 2 ll., pp. i–lxiii, 1–384, 2 ll. Rasmussen, P. C., & Anderton, J. C., 2012. Birds of South Asia: the Ripley guide. 2nd Attié, C., Stahl, J. C., Bretagnolle, V., 1997. New data on the endangered Mascarene ed. Washington, D.C. and Barcelona: Smithsonian Institution and Lynx Edicions. Petrel Pseudobulweria aterrima: a third twentieth century specimen and 2 vols. Pp. 1–378; 1–683. distribution. Colonial Waterbirds 20 (3): 406–412. Robertson, A. L. H., 1995. Occurrence of some pelagic seabirds (Procellariiformes) in Jouanin, C., 1970. Le Petrel noir de bourbon Pterodroma aterrima Bonaparte. waters off the Indian subcontinent. Forktail 10: 129–140 (1994). Elliot’s Laughingthrush Trochalopteron elliotii and Black-headed Greenfinch Chloris ambigua from Anini, Arunachal Pradesh, India Shashank Dalvi Dalvi, S., 2013. Elliot’s Laughingthrush Trochalopteron elliotii and Black-headed Greenfinch Chloris ambigua from Anini, Arunachal Pradesh, India. Indian BIRDS 8 (5): 130. Shashank Dalvi, Centre for Wildlife Studies, 224 Garden Apartments, Bangalore 560001, Karnataka, India. and Wildlife Conservation Society India Program, National Centre for Biological Sciences, GKVK, Bangalore – 560065, Karnataka. Email: [email protected] uring my recently concluded master’s study on the ‘Role 95°53’E; 1600 m asl). These birds were seen perched on of Brahmaputra River as a biogeographical barrier,’ I came overhead electric wires, and conifer trees, on multiple occasions.
    [Show full text]
  • History of Project Vartak
    Brig JS Ishar Chief Engineer HISTORY OF PROJECT VARTAK The Beginning 1. During the second meeting of BRDB on 13 May 1960, late Pandit Jawaharlal Nehru, the then Prime Minister directed that the work on the construction of Road Bhalukpong- Tenga should commence on 01 Jun 1960. Accordingly, Project Tusker was raised on 07 May 1960. Thus Project Tusker was the first in Border Roads Organisation to commence road construction activity. 2. Project Tusker was also made responsible for the maintenance of road Missamari- Foothills-Chaku-Tenga, which had been constructed by PWD. Elephant Gate: Entry To Bomdila-Tawang Road 3. Work on the improvement of the Road Bhalukpong-Tenga-Bomdila was continued by 14 BRTF, which was raised in early 1962. The most difficult stretch on this high priority road was between Sessa and Bomdila. The task was completed in 6 months and the road was made trafficable by Oct 1962. Further improvements continued. Shri YB Chavan, the then Defence Minister formally opened the road in Apr 1963. 4. In 1962, a jeepable track Bomdila-Dirang-Sela-Tawang was also attempted. A Signals Task Force was raised for laying of telephone lines for Bomdila-Tawang, North Lakhimpur-Lekhabali-Along, Kimin-Ziro and Along-Daporijo sector. Initial Problems 5. During the initial induction of the Project, there were many teething problems. Maj Gen OM Mani, the first Chief Engineer (then Brigadier) of the Project later recalled:- “The Administrative Offices functioned under the cover of tarpaulins spread over bamboos. The office furniture comprised of a few packing cases and even these were in short supply.
    [Show full text]
  • Working Paper-6 Final
    Working Paper No. CDS/06/2020 Challenges of Development in the Border Areas: An Empirical Study Amitava Mitra June 2020 Centre for Development Studies Department of Economics Rajiv Gandhi University Rono Hills, Arunachal Pradesh Working Paper No. CDS/06/2020 Challenges of Development in the Border Areas: An Empirical Study Amitava Mitra June 2020 Centre for Development Studies Department of Economics, Rajiv Gandhi University Rono Hills, Arunachal Pradesh PREFACE The Centre for Development Studies (CDS) was set up as a research adjunct at the Department of Economics, Rajiv Gandhi University (RGU), Itanagar, Arunachal Pradesh, with a generous grant from the Ministry of Finance (Department of Economic Affairs), Government of India. The objectives of the Centre include the creation of high-quality research infrastructure for students, researchers and faculty members, in addition to sponsoring and coordinating research on various developmental issues having policy implications at the regional and national level. Publishing working/policy papers on the research outcome of the Centre, monographs and edited volumes are the key activities of the Centre. The present working paper by Prof. Amitava Mitra, titled, ‘Challenges of Development in the Border Areas of Arunachal Pradesh: An Empirical Study’, is an output of a research project. It is sixth in the series of working paper published by the Centre for Development Studies. The working paper has explored the wide ranging inter-district disparities in the state of Arunachal Pradesh, in terms of availability of infrastructural facilities that are crucial for improving the economic condition of people in the state. The districts of the northern and eastern international border areas, with high mountains are less well serviced than the districts in the foothills of Arunachal Pradesh.
    [Show full text]
  • District Census Handbook, Dibang Valley, Part XII a & B, Series-3
    CENSUS OF INDIA 1991 SERIES - 3 ARUNACHAL PRADESH PART XII - A & B VILLAGE & TOWN DIRECTORY VILLAGE & TOWN·WISE PRIMARY CENSUS ABSTRACT TAPAN SENAPATI Director of Census Operations, Arunachal Pradesh Jlrunaclia[ Pradesfi is a tfiin[y popu[ated fii[[y tract eying rougMy between tfie Latitudes 2~ 28'?(_ and 29° 31' fJ{_ and tfie Longitudes 91° 30' 'E and 9;0 30' 'E on tlie IJ{prtfi 'East e;r.tremity of India, comprising rougMy of 83,743 Xj[ometre squares of area. It is bounded on tlie IJ{prtfi, 'J{prtfi-'East ana IJ{prtfi-West 6y Cliina tIi6et), on tlie Soutli by Jlssam and fJ{_aga[an~ on tfie Sout!i.-'East 6y Myanmar ('13urma) and on t!i.e West 6y tB!i.utan. rrfie Pradesfi is k_nown to 6e ricfi in j(ora, fauna, power and minera{ potentia(. Wfien tfie 1971 Census was taK!.n in Jlrunacfia( Pradesfi, tfie area was I(p.own as tfie IJ{prt!i. 'East :frontier J1.gency (fJ{_'E:f5l in sliort) wliicfi 'loas constitutiona[[y a part of tlie state of 5lssa·m. J1. t tfiat time fJ{_'E:fJ1. was direct[y administered 6y tlie President of Inaia tlirougfi: tlie governor of J1.ssam as fiis agent, wlio was assisted 6y an J1.dviser. tJlie office of tlie J1.dviser to tlie governor of J1.ssam was situated at Slii[{ong, tlie former capita[ of tlie 5'Lssam State, now tfie Capita{ of Megfia{aya. On 21st January, 1972 tJ{E:f5l was given tfie status of a Vnion tJerritory unaer tlie provision of tfie IJ{prtfi-'Eastern J1.rea ('R.f.organisation) J1.ct, 1971 (8 of 1971) ana p{acea under tfie cfiarge of a Cfiief Commissioner witfi fiis lieadquarters at Slii{{ong.
    [Show full text]
  • Our Human Resources
    DEPARTMENT OF POWER COMMISSIONER (POWER) Chief Engineer Chief Engineer Chief Engineer Chief Engineer Chief Electrical Inspector (Transmn. P & M Zone) Eastern Electrical Zone (19/03/2005) Central Electrical Zone (19/04/2012) Western Electrical Zone (13/09/2005) (20/03/12) SF & AO SE (PLG).-I SE (PLG)-II SE (PLG.) SE (PLG.) SE (PLG.) EE(PLG.) -I EE(PLG.) -II EE(PLG.)-III EE-I EE-II EE-III EE(PLG.)-I EE(PLG.)-II EE(PLG.)-III EE(PLG.)-IV EE(PLG.)-I EE(PLG.)-II EE(PLG.)-III Administrative Officer AE (PLG.) - I AE (PLG.) - II AE (PLG.) - I AE (PLG.) - II AE (PLG.) - I AE (PLG.) - II AE (PLG.) - I AE (PLG.) - I APEC-VII, Tezu APEC - III, Miao APEC-VI, Aalo APEC - II, Pasighat APEC - V, Ziro APEC - I, Nlgn APEC - IV, Dirang APEC-VIII, SUBU Transmission Circle, Itanagar EE (PLG.) EE (PLG.) EE (PLG.) EE (PLG.)-IEE (PLG.)-II EE (PLG.) EE(PLG.)-I EE(PLG.)-II EE (PLG.) EE (PLG.) SEI, SEI, WEST EAST Itanagar Pasighat AE (PLG.) AE (PLG.) AE (PLG.) AE (PLG.) AE (PLG.) AE (PLG.) AE (PLG.) AE (PLG.) Anini Roing Namsai Miao Yatdam Deomali Longding Aalo Basar Pasighat Ziro Daporijo Itanagar Sagalee Naharlagun Tawang Bomdila Rupa Seppa Transmn. & Hayuliang Rumgong Yingkiong Transmn. Transmn. Elect. Elect. Elect. Elect. Elect. Elect. Elect. Elect. Elect. Elect. Elect. Elect. Elect. Elect. Elect. Sangram Elect. Division Elect. Elect. Elect. Elect. Elect. Elect. Elect. SLDC Division - I Division - III Division Division Division Division Division Division Division Division Division Division Division Division Division Division Division Division Division Division Division Division Division Division Division - II HQ Bomdila HQ, Tezu EE EE EE EE EE EE EE EE EE EE EE EE EE EE EE EE EE EE EE EE EE EE EE EE EE Tawang, West Kameng, Lohit, Namsai, East Kameng Anjaw HQ, Roing HQ, Itanagar AE(PLG.) AE(PLG.) AE(PLG.) AE(PLG.) AE(PLG.) AE(PLG.) AE(PLG.) AE(PLG.) AE(PLG.) AE(PLG.) Dibang Valley, Papum Pare Lower Dibang Valley HQ, Ziro Ind.
    [Show full text]
  • OF Publicinstructton DIBANG Mauey DISTRICT ANINI
    . c F tK L r C t v J i ^ L Y lG>i HCff'SU} " *"■'* ' ^0 imi,n-*--r.u-^ ^ .*- I OFFICE OF WE VEPUTY DIRECTOJ? OF PUBLICINSTRUCTtON DIBANG MAUEy DISTRICT ANINI INTRRODUCTION The basic objective of the All India JEk3ucetional Survey w?s to conduct a d e ta ile d ah aly tical study regerding the overall position of all e<^r:ational Institutions in each district of the country as w^l^ ar to <?ollect so e v it a l s t a t is t ic s sa & data to pronnote ifnplementation of the new educ-tion policy in its proper perspective. The 5th All India Educational survp'y w-s taken up in Dihang Valiev District vrith effect from July'1987 in which all the existfihg Higher Secondary r i{0idle pnd Pri ary Schools were cevcred. / - V Tt is believed that the detailed ar-esnnent- survey will have significant contributir-n in shaping up the future plan persectice inthe field of educational progr emme. The District Survey report, is in fact/ a consolidated rnd corrprrhensive endepvour of the ouf- cane the 5th All India Educational Survey in resp-^jct of Dibaaa V alle y Dis-f-rict. m ( P.J.D'ey) Dy .Director of Public Ins+-fuction; Dibano Valley District? ANINI» NIEPA DC D07563 g ,5.' ?»■. :■ i'C "*”■^'<^.4--' ”V' 1 F ».,i;'ArY !^i DOs.irmTATiOK 'praa- «iti ,.;.' ) e L.f Educacioadf >; ‘■' .v;i .;s|liQd dnuuistrarion. J '' iT‘B* jfj Aurobiiido Matg. ■'■ t. vV.' vv I vIhi‘ili.0J6 ^ ni\r~^ '2 DOC.
    [Show full text]
  • Government of Arunachal Pradesh G Office of the Chief Engineer (EZ
    Government of Arunachal Pradesh Office of the Chief Engineer (EZ), PWD Itanagar – 791 111 (Arunachal Pradesh) Ph: 0360-2212427 (Off), 2212428 (Fax) No. CEAP(EZ)/BTA-1/NLCPR/2008-09 25th September/2008 To The Superintending Engineer, Aalo/Boleng/Tezu/Basar PWD Circle. Sub: Submission of Utilization Certificate in respect of projects under NLCPR (Eastern Zone only). A statement showing project-wise amount released by Ministry of DoNER, Expenditure incurred upto 31.08.2008 and pending Utilization Certificates is enclosed herewith. Under the column 10, the difference between ‘expenditure incurred upto 31.8.2008’ and ‘UCs submitted till last’ has been shown. As per guideline of NLCPR, if the expenditure incurred is more than 75% of the amount released, the full Utilization Certificates can be submitted. Superintending Engineers are requested to submit the Utilization Certificates along with inspection report, photographs so as to take up the Ministry for release of next installment. Encl: As stated above. (Bora Ete), Chief Engineer, (EZ) PWD, Itanagar. No. CEAP(EZ)/BTA-1/NLCPR/2008-09 25th September/2008 Copy to: The Executive Engineer, Aalo / Rumgong / Yingkiong / Boleng / Pasighat / Anini / Hayuliang / Daporijo for needful action. (Bora Ete), Chief Engineer (EZ) PENDING Ucs UNDER NLCPR AS ON 25/09/2008 Rs. in Lakhs Name of the Amt. for which UC Year of Approved Amount Released under Expenditure incurred Pending Ucs in Sl.No. Name of project Execution Status of Work submitted alongwith Approval Cost NLCPR upto 31/08/08 Lakhs Agency/ District date of submission Central State Central State 12 34 5 6 78 9 10 1 Impvt.
    [Show full text]
  • SP's Aviation
    SPECIAL ISSUE 85TH ANNIVERSARY OF INDIAN AIR FORCE SP’s AN SP GUIDE PUBLICATION Aviation 100.00 (INDIA-BASED BUYER ONLY) BUYER 100.00 (INDIA-BASED Sharp Content for Sharp Audience ` www.sps-aviation.com vol 20 ISSUE 9 • SEptEmbEr • 2017 MILITARY: INDIA's NEw DEFENCE mINIStER P11 / INDIA & Us: NEw phASE IN DEFENCE pARTNERSHIP P14 / TRIBUTE tO AN ICON P16 CHALLENGES BEFORE THE INDIAN AIR FORCE TÊTE-À-TÊTE wIth ChIEF OF thE AIR sTAFF AIR ChIEF mARSHAl b.S. DhANOA P21 / CHALLENGEs bEFORE thE IAF P25 / CHALLENGEs IN thE NORth EASt P27 / FORMAtION OF spACE COmmAND P29 / WOmEN IN INDIAN AIR FORCE P32 / LASt wORD: SELECt thE RIGHT COMBAt PLATFORm P40 CIVIL AIRPORTs: OVER-lOADED hUBs P4; REGIONAl AVIAtION: { bIg OR smALL, sAFETY Is UTMOSt P6 & LEt's gO DUTCH! P9 { RNI NUMBER: DELENG/2008/24199 SeaGuardian MULTI-ROLE SINGLE SOLUTION • 40 hour endurance provides superior mission area coverage • Powerful 360° maritime search radar with Inverse Synthetic Aperture Radar (ISAR) • All weather, day/night, high definition full motion video and imagery • Enhanced situational awareness via teaming with manned air/surface needs • Tailored to fulfill the maritime security needs of India’s Navy www.ga-asi.com ©2017 General Atomics Aeronautical Systems, Inc. Leading the Situational Awareness Revolution table of contents vol 20 ISSUE 9 • SEptEmbEr • 2017 SPECIAL ISSUE 85TH ANNIVERSARY OF INDIAN AIR FORCE SP’s AN SP GUIDE PUBLICATION Aviation 100.00 (INDIA-BASED BUYER ONLY) BUYER 100.00 (INDIA-BASED Sharp Content for Sharp Audience ` www.sps-aviation.com vol 20 ISSUE 9 • SEptEmbEr • 2017 MILITARY: INDIA's NEw DEFENCE mINIstER P11 / INDIA & Us: NEw phAsE IN DEFENCE pARTNERSHIP P14 / TRIBUtE tO AN ICON P16 CHALLENGES BEFORE THE INDIAN AIR FORCE têtE-À-TÊTE wIth ChIEF OF thE AIR sTAFF AIR ChIEF mARshAl b.S.
    [Show full text]
  • Rainfall Distribution and Weather Activity: 26.08.2021 to 01.09.2021
    Govt. of India / भारत सरकार Ministry of Earth Sciences / पृ镍वी ववज्ञान मंत्रालय India Meteorological Department / भारत मौसम ववज्ञान ववभाग Regional Meteorological Centre /क्षेत्रीय मौसम कᴂद्र Guwahati – 781 015/ गुवाहाटी - ७८१०१५ Weekly Weather Report for Arunachal Pradesh, Assam& Meghalaya, Nagaland- Manipur-Mizoram & Tripura for week ending on 29.09.2021 Synoptic Feature: “Monsoon Trough” persisted and passed through Jaisalmer, Chittorgarh,Tikamgarh, Sidhi, Ambikapur, Jharsuguda,Puri and thence SE-wards to EC-Bay of Bengal on 23rd.It persisted and passed through Jaisalmer,Ajmer,Nowgong,Daltonganj,Jamshedpur,Digha and thence SE-wards to EC-Bay of Bengal on 24th.It persisted and passed through Jaisalmer, Kota, Mandla, Sambhalpur, Paradeep and thence ESE –wards to the centre of Deep Depression over NW & adjoining WC-Bay of Bengal on 25th.It persisted and passed through Bikaner,Kota,Sagar,Pendra Road,Jharsuguda and thence ESE-wards to the centre of Cyclonic Storm “Gulab” over Northwest & adjoining WC-Bay of Bengal on 26th.It persisted and passed through Jaisalmer,Udaipur,Akola,Chandrapur,centre of Deep depression over south Odisha & adjoining south Chattisgarh,Vishakapatnam and thence ESE- wards to EC-Bay of Bengal on 27th.The monsoon Trough at mean sea level has become disorganized on 28th. The Deep Depression over north and adjoining central Bay of Bengal moved westwards with a speed of 14 kmph in last 6 hours and lay centred at 0830 hrs IST of 25th September,over northwest and adjoining WC_Bay of Bengal near Lat.18.4°N and Long 89.3°E, about 470 km ESE of Gopalpur(Odisha) & 540 km ENE of Kalingapatnam(Andhra Pradesh).It is likely to intensify in to a Cyclonic Storm during next 06 hours.
    [Show full text]
  • Arunachal Pradesh Information Commission, Itanagar
    ARUNACHAL PRADESH INFORMATION COMMISSION, ITANAGAR ANNUAL REPORT 2016 - 2017 1 The real Swaraj will come not by the acquisition of authority by a few, but by the acquisition of capacity by all to resist authority when abused. - MAHATMA GANDHI “Laws are not masters but servants, and he rules them who obey them”. -HENRY WARD BEECHER “Democracy requires an informed citizenry and transparency of information which are vital to its functioning and also to contain corruption and to hold Government and their instrumentalities accountable to the governed” ( Preamble, RTI Act 2005 ) 2 ACKNOWLEDGMENT This 11th & 12th Annual Reports of Arunachal Pradesh Information Commission 2016 - 2017 has been prepared in one volume. The data for preparation of this report are collected from Government Departments of the State. According to Information provided by the departments, the total number of Public Authorities in the State is 30 and the number of Public Information Officers is more than 310. The Right to Information Act, 2005 is a landmark legislation that has transformed the relationship between the citizen and the State. This legislation has been created for every citizen, to hold the instrumentalities of Governance accountable on a day to day basis. The legislation perceives the common man as an active participant in the process of nation building by conferring on him a right to participate in the process through the implementation of the Right to Information Act. It is more than a decade Since the RTI Act has been in operation in the State. The State Information Officers and Appellate Authorities are quasi judicial functionaries under the RTI Act with distinctive powers and duties and they constitute the cutting edge of this “Practical regime of information”, as envisaged in the preamble of the Right to Information Act.
    [Show full text]
  • The Strategic Postures of China and India: a Visual Guide
    MARCH 2020 The Strategic Postures of China and India: A Visual Guide Frank O’Donnell Alex Bollfrass Force Tables Reference Sheet This document contains the accompanying tables for “The Strategic Postures of China and India: A Visual Guide.” See the full report and the accompanying interactive maps at belfercenter.org/StrategicPostures The Strategic Postures of China and India: A Visual Guide | Belfer Center for Science and International Affairs | March 2020 1 Ground Forces: China Icon Name Parent Force Type Force Numbers Location Command Tibet Military 52nd Mountain Infantry Brigade HQ Infantry Brigade ~ 4,600 (total) Link District (MD) Unit 77675, 52nd Mountain Infantry Tibet MD Infantry Battalion ~ 700 Link Brigade Unit 77678, Artillery Regiment, 52nd Tibet MD Artillery Regiment ~ 1,100 Link Mountain Infantry Brigade 1st Battalion, 52nd Mountain Infantry Tibet MD Infantry Battalion ~ 700 Link Brigade 2nd Battalion, 52nd Mountain Infantry Tibet MD Infantry Battalion ~ 700 Link Brigade 3rd Battalion, 52nd Mountain Infantry Tibet MD Infantry Battalion ~ 700 Link Brigade 4th Battalion, 52nd Mountain Infantry Tibet MD Infantry Battalion ~ 700 Link Brigade 53rd Mountain Infantry Brigade HQ Tibet MD Infantry Brigade ~ 4,600 (total) Link Unit 77680, 53rd Mountain Infantry Tibet MD Infantry Battalion ~ 700 Link Brigade Artillery Regiment, Unit 77683, 53rd Tibet MD Artillery Regiment ~ 1,100 Link Mountain Infantry Brigade 1st Battalion, 53rd Mountain Infantry Tibet MD Infantry Battalion ~ 700 Link Brigade 2nd Battalion, 53rd Mountain Infantry
    [Show full text]