Government of Office of the Chief Engineer (EZ), PWD – 791 111 (Arunachal Pradesh) Ph: 0360-2212427 (Off), 2212428 (Fax) No. CEAP(EZ)/BTA-1/NLCPR/2008-09 25th September/2008

To To

The Superintending Engineer, ///Basar PWD Circle.

Sub: Submission of Utilization Certificate in respect of projects under NLCPR (Eastern Zone only).

A statement showing project-wise amount released by Ministry of DoNER, Expenditure incurred upto 31.08.2008 and pending Utilization Certificates is enclosed herewith. Under the column 10, the difference between ‘expenditure incurred upto 31.8.2008’ and ‘UCs submitted till last’ has been shown. As per guideline of NLCPR, if the expenditure incurred is more than 75% of the amount released, the full Utilization Certificates can be submitted. Superintending Engineers are requested to submit the Utilization Certificates along with inspection report, photographs so as to take up the Ministry for release of next installment. Encl: As stated above.

(Bora Ete), Chief Engineer, (EZ) PWD, Itanagar.

No. CEAP(EZ)/BTA-1/NLCPR/2008-09 25th September/2008

Copy to:

The Executive Engineer, Aalo / Rumgong / / Boleng / / / / for needful action.

(Bora Ete), Chief Engineer (EZ) PENDING Ucs UNDER NLCPR AS ON 25/09/2008 Rs. in Lakhs

Name of the Amt. for which UC Year of Approved Amount Released under Expenditure incurred Pending Ucs in Sl.No. Name of project Execution Status of Work submitted alongwith Approval Cost NLCPR upto 31/08/08 Lakhs Agency/ District date of submission

Central State Central State 12 34 5 6 78 9 10 1 Impvt. Of upgradation of 2005- 06 356.67 112.35 30.67 76.77 Executive 49.46 (18/ 6/ 2007) 27.31 Menga- Giba Rooad Engineer, upto March/ 2007 (8Km) in Upper Subansiri Daporijo, Upper Dist. Of A.P Subansiri

2 C/o Road from Jengging 2006- 07 536.62 169.04 53.66 283.57 Executive 133.25 (15/ 01/ 2008) 150.32 to Ramsing in Upper 2007- 08 200.00 Engineer, upto Sep/ 2007 Siang Dist. 35.00 Km Yingkiong,Upper Si 3 C/o Steel Suspension 2005- 06 861.61 271.40 79.06 309.71 Executive 252.54 (18/ 06/ 2007) 57.17 bridge over river Subansiri Engineer, Upto March/ 2007 near Siyum (Span 174 Daporijo, Upper Mtr.) Subansiri

4 C/o Steel Suspension 2005- 06 1396.00 439.74 71.60 439.74 25.39 Executive 299.36 (18/ 06/ 2007) 165.77 bridge (210 Mtr. Span) Engineer, Upto March/ 2007 over Siang river & Yingkiong, Upper approach road at Kodak Siang near

5 C/o Mororable 2005- 06 2521.77 377.71 180.30 371.83 60.42 Executive 103.66 (18/ 06/ 2007) 328.59 Suspension bridge over Engineer, Upto March/ 2007 river Siang at site of Yingkiong, Upper Gandhi Bridge in Upper Siang

6 C/o 200 seated girls 2005- 06 515.11 175.84 312.67 Executive 175.84 (18/ 06/ 2008) 136.83 hostel in J.N College at 2007- 08 144.00 Engineer, Upto March/ 2007 Pasighat Pasighat, East Siang

Expdr. incurred under NLCPRPf- I Name of the Amt. for which UC Year of Approved Amount Released under Expenditure incurred Pending Ucs in Sl.No. Name of project Execution Status of Work submitted alongwith Approval Cost NLCPR upto 31/08/08 Lakhs Agency/ District date of submission

Central State Central State 12 34 5 6 78 9 10 7 Re- Construction of 2005- 06 302.29 95.22 195.22 Executive 95.22 (18/ 07/ 2007) 100.00 Higher Secondary School 2007- 08 100.00 Engineer, Anini, Upto March/ 2007 at Anini Dibang Valley

8 C/o Motorable suspension 2005- 06 1309.79 412.59 72.68 327.34 Executive 90.33 (18/ 07/ 2007) 237.01 bridge over Lohit to Engineer, Upto March/ 2007 connect Manchal Hayuliang, Anjaw Administrative Centre (Span 156.55 Mtr.)

9 C/o PMT Suspension 2006- 07 763.82 240.60 76.38 384.23 30.07 Executive 134.28 (15/ 02/ 2008) 249.95 bridge over river Siyom at 300.00 Engineer, Upto Dec/ 2007 Paksing (Span 122.00 Rumgong, West Mtr.) in Arunachal Siang

10 C/o Motorable 2007- 08 1834.41 577.84 158.09 Executive 158.09 Suspension bridge over Engineer, Boleng, river Siang between East Siang BRTF Road & Komsing (Span 225 Mtr.) at Sangam in

11 C/o Road from Nyorak to 2007- 08 989.75 284.49 98.97 189.49 Executive 189.49 Rime- Moku Village in Engineer, Along, West Siang Dist. (Ph- I) West Siang

12 C/O Road from Satnaguri 2008-09 565.75 174.71 12.04 Executive 12.04 to Longding via Kanubari, Engineer, Banfera, Wanu and Longding Zedua (Ph-I) - 15.50 Km. Division. A P 3060.70 115.88 1812.57

Total 3176.58

Expdr. incurred under NLCPRPf- I