Government of Arunachal Pradesh G Office of the Chief Engineer (EZ

Government of Arunachal Pradesh G Office of the Chief Engineer (EZ

Government of Arunachal Pradesh Office of the Chief Engineer (EZ), PWD Itanagar – 791 111 (Arunachal Pradesh) Ph: 0360-2212427 (Off), 2212428 (Fax) No. CEAP(EZ)/BTA-1/NLCPR/2008-09 25th September/2008 To The Superintending Engineer, Aalo/Boleng/Tezu/Basar PWD Circle. Sub: Submission of Utilization Certificate in respect of projects under NLCPR (Eastern Zone only). A statement showing project-wise amount released by Ministry of DoNER, Expenditure incurred upto 31.08.2008 and pending Utilization Certificates is enclosed herewith. Under the column 10, the difference between ‘expenditure incurred upto 31.8.2008’ and ‘UCs submitted till last’ has been shown. As per guideline of NLCPR, if the expenditure incurred is more than 75% of the amount released, the full Utilization Certificates can be submitted. Superintending Engineers are requested to submit the Utilization Certificates along with inspection report, photographs so as to take up the Ministry for release of next installment. Encl: As stated above. (Bora Ete), Chief Engineer, (EZ) PWD, Itanagar. No. CEAP(EZ)/BTA-1/NLCPR/2008-09 25th September/2008 Copy to: The Executive Engineer, Aalo / Rumgong / Yingkiong / Boleng / Pasighat / Anini / Hayuliang / Daporijo for needful action. (Bora Ete), Chief Engineer (EZ) PENDING Ucs UNDER NLCPR AS ON 25/09/2008 Rs. in Lakhs Name of the Amt. for which UC Year of Approved Amount Released under Expenditure incurred Pending Ucs in Sl.No. Name of project Execution Status of Work submitted alongwith Approval Cost NLCPR upto 31/08/08 Lakhs Agency/ District date of submission Central State Central State 12 34 5 6 78 9 10 1 Impvt. Of upgradation of 2005- 06 356.67 112.35 30.67 76.77 Executive 49.46 (18/ 6/ 2007) 27.31 Menga- Giba Rooad Engineer, upto March/ 2007 (8Km) in Upper Subansiri Daporijo, Upper Dist. Of A.P Subansiri 2 C/o Road from Jengging 2006- 07 536.62 169.04 53.66 283.57 Executive 133.25 (15/ 01/ 2008) 150.32 to Ramsing in Upper 2007- 08 200.00 Engineer, upto Sep/ 2007 Siang Dist. 35.00 Km Yingkiong,Upper Si 3 C/o Steel Suspension 2005- 06 861.61 271.40 79.06 309.71 Executive 252.54 (18/ 06/ 2007) 57.17 bridge over river Subansiri Engineer, Upto March/ 2007 near Siyum (Span 174 Daporijo, Upper Mtr.) Subansiri 4 C/o Steel Suspension 2005- 06 1396.00 439.74 71.60 439.74 25.39 Executive 299.36 (18/ 06/ 2007) 165.77 bridge (210 Mtr. Span) Engineer, Upto March/ 2007 over Siang river & Yingkiong, Upper approach road at Kodak Siang near Tuting 5 C/o Mororable 2005- 06 2521.77 377.71 180.30 371.83 60.42 Executive 103.66 (18/ 06/ 2007) 328.59 Suspension bridge over Engineer, Upto March/ 2007 river Siang at site of Yingkiong, Upper Gandhi Bridge in Upper Siang Siang District 6 C/o 200 seated girls 2005- 06 515.11 175.84 312.67 Executive 175.84 (18/ 06/ 2008) 136.83 hostel in J.N College at 2007- 08 144.00 Engineer, Upto March/ 2007 Pasighat Pasighat, East Siang Expdr. incurred under NLCPRPf- I Name of the Amt. for which UC Year of Approved Amount Released under Expenditure incurred Pending Ucs in Sl.No. Name of project Execution Status of Work submitted alongwith Approval Cost NLCPR upto 31/08/08 Lakhs Agency/ District date of submission Central State Central State 12 34 5 6 78 9 10 7 Re- Construction of 2005- 06 302.29 95.22 195.22 Executive 95.22 (18/ 07/ 2007) 100.00 Higher Secondary School 2007- 08 100.00 Engineer, Anini, Upto March/ 2007 at Anini Dibang Valley 8 C/o Motorable suspension 2005- 06 1309.79 412.59 72.68 327.34 Executive 90.33 (18/ 07/ 2007) 237.01 bridge over Lohit to Engineer, Upto March/ 2007 connect Manchal Hayuliang, Anjaw Administrative Centre (Span 156.55 Mtr.) 9 C/o PMT Suspension 2006- 07 763.82 240.60 76.38 384.23 30.07 Executive 134.28 (15/ 02/ 2008) 249.95 bridge over river Siyom at 300.00 Engineer, Upto Dec/ 2007 Paksing (Span 122.00 Rumgong, West Mtr.) in Arunachal Siang 10 C/o Motorable 2007- 08 1834.41 577.84 158.09 Executive 158.09 Suspension bridge over Engineer, Boleng, river Siang between East Siang BRTF Road & Komsing (Span 225 Mtr.) at Sangam in East Siang District 11 C/o Road from Nyorak to 2007- 08 989.75 284.49 98.97 189.49 Executive 189.49 Rime- Moku Village in Engineer, Along, West Siang Dist. (Ph- I) West Siang 12 C/O Road from Satnaguri 2008-09 565.75 174.71 12.04 Executive 12.04 to Longding via Kanubari, Engineer, Banfera, Wanu and Longding Zedua (Ph-I) - 15.50 Km. Division. Tirap District A P 3060.70 115.88 1812.57 Total 3176.58 Expdr. incurred under NLCPRPf- I.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    3 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us