Proposed New Passenger Station at Glyne Gap Bexhill – Final Report Proposed New Passenger Station at Glyne Gap, Bexhill Final Report August 2013 Rother District Council Proposed New Passenger Station at Glyne Gap, Bexhill 311776 ITD ITN 4 B P:\Manchester\Northwest\Projects (Even)\311776 - Glyne Gap\9.0 Reports\4 Final report\RevB for issue\Glyne Gap Stage 4 Final Report 1 Augustrev B.1.docx 2013 Final Report Proposed New Passenger Station at Glyne Gap, Bexhill Final Report August 2013 Rother District CouncilCouncil, Town Hall, Bexhill-on-Sea, TN39 3JX Town Hall, Bexhill-on-Sea, TN39 3JX Mott MacDonald, 111 Piccadilly, Manchester M1 2HY, United Kingdom T +44 (0)161 638 0885 W www.mottmac.com Proposed New Passenger Station at Glyne Gap, Bexhill Final Report Issue and revision record Revision Date Originator Checker Approver Description Standard A 31 May 2013 Laura Magson John Taylor, Robert Fickling Initial Draft Tony Millward B 1 August 2013 John Taylor Robert Fickling Frank Shorter Final Report C 19 August 2013 John Taylor Robert Fickling Frank Shorter Final Report (with minor revisions) This document is issued for the party which commissioned it and We accept no responsibility for the consequences of this for specific purposes connected with the above-captioned project document being relied upon by any other party, or being used only. It should not be relied upon by any other party or used for for any other purpose, or containing any error or omission any other purpose. which is due to an error or omission in data supplied to us by other parties. This document contains confidential information and proprietary intellectual property. It should not be shown to other parties without consent from us and from the party which commissioned it.. 311776 /ITD/ITN/4/B 1 August 2013 P:\Manchester\Northwest\Projects (Even)\311776 - Glyne Gap\9.0 Reports\4 Final report\RevB for issue\Glyne Gap Stage 4 Final Report rev B.1.docx Proposed New Passenger Station at Glyne Gap, Bexhill Final Report Contents Chapter Title Page Executive Summary i 1 Introduction 1 1.1 Introduction ________________________________________________________________________ 1 1.2 The GRIP process __________________________________________________________________ 2 1.3 Previous studies into Glyne Gap station __________________________________________________ 3 2. Infrastructure Assessment 6 3. Demand Forecasts 10 4. Operational Assessment 12 5. Business Case 13 5.1 Appraisal Methodology ______________________________________________________________ 13 5.2 Scheme Benefits __________________________________________________________________ 15 5.2.1 User benefits _____________________________________________________________________ 15 5.2.2 Non-user benefits __________________________________________________________________ 16 5.2.3 Demand from Ravenside Retail Park ___________________________________________________ 16 5.2.4 Demand from Bexhill College _________________________________________________________ 17 5.2.5 Abstracted Trips from Bexhill _________________________________________________________ 18 5.2.6 New-to-rail trips at Glyne Gap ________________________________________________________ 19 5.2.7 Through-traveller Impacts ____________________________________________________________ 20 5.3 Scheme costs _____________________________________________________________________ 21 5.3.1 Capital costs ______________________________________________________________________ 21 5.3.2 Operating costs ___________________________________________________________________ 21 5.4 Benefit to Cost Ratio (BCR) __________________________________________________________ 21 5.5 Appraisal results ___________________________________________________________________ 22 5.6 Sensitivity test – impacts of high growth _________________________________________________ 23 5.7 Summary and Recommendations _____________________________________________________ 24 6. Funding Sources 26 7. Conclusions and Next Steps 28 Appendices 30 Appendix A. Location Map _____________________________________________________________________ 31 Appendix B. Photographs ______________________________________________________________________ 34 Appendix C. Capital Cost Breakdown _____________________________________________________________ 40 Appendix D. Operating Cost Breakdown __________________________________________________________ 48 Appendix E. Land Ownership ___________________________________________________________________ 51 Appendix F. Details of Timetabling Assessment ____________________________________________________ 56 311776 /ITD/ITN/4/B 1 August 2013 P:\Manchester\Northwest\Projects (Even)\311776 - Glyne Gap\9.0 Reports\4 Final report\RevB for issue\Glyne Gap Stage 4 Final Report rev B.1.docx Proposed New Passenger Station at Glyne Gap, Bexhill Final Report Appendix G. Economic Assessment, assuming central growth _________________________________________ 62 Appendix H. Economic Assessment, assuming high growth ___________________________________________ 67 Tables Table 1.1: Summary of previous studies into Glyne Gap station ________________________________________ 4 Table 2.1: Cost estimates _____________________________________________________________________ 8 Table 3.1: Demand at Glyne Gap, excluding abstraction assessment __________________________________ 10 Table 3.2: Demand at Glyne Gap, including abstraction assessment ___________________________________ 11 Table 5.1: Sources of benefit for demand from Ravenside Retail Park __________________________________ 17 Table 5.2: Sources of benefit for demand from Bexhill College ________________________________________ 18 Table 5.3: Sources of benefit for demand abstracted from Bexhill _____________________________________ 19 Table 5.4: Sources of benefit for new-to-rail demand _______________________________________________ 20 Table 5.5: Source of benefits for through travellers _________________________________________________ 20 Table 5.6: Analysis of Monetised Costs and Benefits for Glyne Gap, Central Growth Scenario _______________ 22 Table 5.7: Analysis of Monetised Costs and Benefits for Glyne Gap, High Growth Scenario _________________ 23 Table F.1: Glossary of station codes and other abbreviations _________________________________________ 58 Figures Figure 1.1: East Coastway route between Brighton and Ashford ________________________________________ 1 Figure 1.2: The GRIP Process __________________________________________________________________ 2 Figure 2.1: Site Location Map ___________________________________________________________________ 7 Figure 2.2: Platform Arrangement – Option 2 _______________________________________________________ 9 Figure 6.1: South East of England ERDF area _____________________________________________________ 27 Figure A.1: Location of proposed station at Glyne Gap ______________________________________________ 32 Figure B.1: Existing cycle storage facilities, looking south ____________________________________________ 34 Figure B.2: Existing under-bridge no.214 south elevation (beach side) __________________________________ 34 Figure B.3: Existing under-bridge no.214 north elevation (retail park side) ________________________________ 35 Figure B.4: Existing retail access road looking towards A259, showing area grass adjacent to the leisure centre __ 35 Figure B.5: Grassed area adjacent to existing leisure centre looking towards under-bridge no. 214 ____________ 36 Figure B.6: Existing car park showing end of existing building and bus stop for Bexhill on A259 _______________ 36 Figure B.7: Existing car park looking west toward Ravenside Retail Park ________________________________ 37 Figure B.8: Existing bus stop for Hastings on A259 north of the site ____________________________________ 37 Figure B.9: Existing car park for Ravenside Retail Park _____________________________________________ 38 Figure E.1: Land owned by Rother District Council in the Glyne Gap area ________________________________ 52 Figure E.2: Land owned by East Sussex County Council in the Glyne Gap area ___________________________ 53 Figure E.3: Land owned by Land Securities in the Glyne Gap area _____________________________________ 54 311776 /ITD/ITN/4/B 1 August 2013 P:\Manchester\Northwest\Projects (Even)\311776 - Glyne Gap\9.0 Reports\4 Final report\RevB for issue\Glyne Gap Stage 4 Final Report rev B.1.docx Proposed New Passenger Station at Glyne Gap, Bexhill Final Report Executive Summary This report provides an overall summary of the ongoing study into a proposed new railway station at Glyne Gap, as well as reporting the business case for the station. The study has been commissioned by Rother District Council (RDC), East Sussex County Council (ESCC) and Land Securities Group PLC (Land Securities) in order to build on earlier studies which suggested, at an outline level, that there might be a case for the provision of a station at this site. This report brings together the results of a number of reports produced for the new station at Glyne Gap, as follows: Stage 1 – Review of Existing Studies; Stage 2 – Infrastructure Assessment Report; Stage 3a – Demand Forecasting Report; and Stage 3b – Operational Assessment Report. Following on from Stage 3, this Final Report also outlines the results of the business case of the scheme. The results of the business case for the central case are summarised below: Analysis of Monetised Costs and Benefits £’000, discounted to 2010 prices, in 2010 market prices PRESENT VALUE OF BENEFITS (PVB) £1,539 PRESENT VALUE OF COSTS (PVC) £5,430 OVERALL IMPACTS NET PRESENT
Recommended publications
  • Bexhill Creative Workspace Economic Impact Study Contents
    Bexhill Creative Workspace Economic Impact Study Contents 1 Executive Summary, Recommendations & Considerations 3 2 Introduction 12 3 Context 15 3.1 Why Bexhill 3.2 Why Creative Industries 4 Methodology 22 4.1 RDC Brief 4.2 IPPR matrix 4.3 Characteristics for Success 4.4 Other Factors 5 Applying the Methodology to the sites 30 5.1 Hastings and Rother Furniture Service 5.2 De La Warr Heights 5.3 The Bexhill Hive 6. Case Studies 43 6.1 Local Bexhill Contemporary Art Studio 18 Talkative Online 18 Hours @ Rock House Starlings + Murmurations always possible 7 Appendices 55 powering brilliant decisions 3 Executive Summary, 1 Recommendations and Considerations 4 Executive summary Bexhill has an international reputation in high quality visual arts practice and appreciation - and it is the drive behind this community that may provide the most obvious draw for creative people in this town. Bexhill needs to be distinctive from neighbouring Hastings and Eastbourne – both investing heavily in tech, music and events-led creative industries growth. With a clear offer for visual artists, both traditional and cutting-edge, a new narrative can be written about Bexhill as a place to work, play and visit. Investing in work space is itself more of an art than a science, and there are a number of ingredients that need to be in place in order to maximise both economic and cultural return. We will demonstrate, through case studies from the local area and further afield, that, the right kind of creative work space can attract and sustain the mix of talents that can enable a range of creative individuals and organisations to flourish and form identifiable clusters.
    [Show full text]
  • Submissions to the Call for Evidence from Organisations
    Submissions to the call for evidence from organisations Ref Organisation RD - 1 Abbey Flyer Users Group (ABFLY) RD - 2 ASLEF RD - 3 C2c RD - 4 Chiltern Railways RD - 5 Clapham Transport Users Group RD - 6 London Borough of Ealing RD - 7 East Surrey Transport Committee RD – 8a East Sussex RD – 8b East Sussex Appendix RD - 9 London Borough of Enfield RD - 10 England’s Economic Heartland RD – 11a Enterprise M3 LEP RD – 11b Enterprise M3 LEP RD - 12 First Great Western RD – 13a Govia Thameslink Railway RD – 13b Govia Thameslink Railway (second submission) RD - 14 Hertfordshire County Council RD - 15 Institute for Public Policy Research RD - 16 Kent County Council RD - 17 London Councils RD - 18 London Travelwatch RD – 19a Mayor and TfL RD – 19b Mayor and TfL RD - 20 Mill Hill Neighbourhood Forum RD - 21 Network Rail RD – 22a Passenger Transport Executive Group (PTEG) RD – 22b Passenger Transport Executive Group (PTEG) – Annex RD - 23 London Borough of Redbridge RD - 24 Reigate, Redhill and District Rail Users Association RD - 25 RMT RD - 26 Sevenoaks Rail Travellers Association RD - 27 South London Partnership RD - 28 Southeastern RD - 29 Surrey County Council RD - 30 The Railway Consultancy RD - 31 Tonbridge Line Commuters RD - 32 Transport Focus RD - 33 West Midlands ITA RD – 34a West Sussex County Council RD – 34b West Sussex County Council Appendix RD - 1 Dear Mr Berry In responding to your consultation exercise at https://www.london.gov.uk/mayor-assembly/london- assembly/investigations/how-would-you-run-your-own-railway, I must firstly apologise for slightly missing the 1st July deadline, but nonetheless I hope that these views can still be taken into consideration by the Transport Committee.
    [Show full text]
  • RR/2019/2289/P Rother District Council
    pl200813 – RR/2019/2289/P Rother District Council Report to - Planning Committee Date - 13 August 2020 Report of the - Executive Director Subject - Application RR/2019/2289P Address - 92 London Road The Sussex Hotel London Road BEXHILL Proposal Proposed Extension & Change of Use of Hotel/Public House to form Offices at Ground Floor and 10 No. Self- Contained Flats at First and Second Floor View application/correspondence RECOMMENDATION: It be RESOLVED to REFUSE (FULL PLANNING) Head of Service: Tim Hickling Applicant: Mr M. Lear Fondare Developments Agent: Mr Andrew Gerken Pump House Designs Case Officer: Mr T. Hardwick (Email: [email protected]) Parish: BEXHILL Ward Member(s): Councillors C.A. Bayliss and P.C. Courtel Reason for Committee consideration: Member referral: Councillor C.A. Bayliss requests that the Committee consider the benefits of bringing the property into beneficial use at the earliest opportunity Statutory 8 week date: 28 February 2020 Extension of time agreed to: 16 August 2020 This application is included in the Committee site inspection list. 1.0 SUMMARY 1.1 This is the site of the Sussex Hotel in London Road, Bexhill. The property was trading as a public house, with hotel rooms until June 2019. It is currently vacant. 1.2 The application seeks change of use of the ground-floor of the building to Class A2 Financial and Professional Services and of the second and third pl200813 – RR/2019/2289/P floors to 10 self-contained flats. A substantial three storey extension would be added at the rear, which would extend all three floors of the building and would extend across a large part of the yard at the back of the property.
    [Show full text]
  • 98 Bus Time Schedule & Line Route
    98 bus time schedule & line map 98 Bexhill View In Website Mode The 98 bus line (Bexhill) has 7 routes. For regular weekdays, their operation hours are: (1) Bexhill: 5:50 PM - 6:50 PM (2) Eastbourne Town Centre: 6:28 AM - 3:39 PM (3) Hailsham: 4:45 PM (4) Hastings Town Centre: 6:35 AM - 6:13 PM (5) Hollington: 5:49 PM - 7:42 PM (6) Sidley: 10:49 AM - 4:49 PM (7) St Helens: 7:05 AM - 5:19 PM Use the Moovit App to ƒnd the closest 98 bus station near you and ƒnd out when is the next 98 bus arriving. Direction: Bexhill 98 bus Time Schedule 39 stops Bexhill Route Timetable: VIEW LINE SCHEDULE Sunday Not Operational Monday 5:50 PM - 6:50 PM Conquest Hospital, St Helens Tuesday 5:50 PM - 6:50 PM St Anne's House, Baldslow Wednesday 5:50 PM - 6:50 PM Baldslow Post O∆ce, Baldslow Thursday 5:50 PM - 6:50 PM Recreation Ground, Baldslow Friday 5:50 PM - 6:50 PM Ashdown House, Baldslow Saturday 5:50 PM - 6:50 PM Little Ridge Avenue West, Silverhill Park Towerscroft Avenue, Silverhill Park 98 bus Info Direction: Bexhill Hollinghurst Road, Silverhill Park Stops: 39 Trip Duration: 49 min Clarendon Close, Silverhill Park Line Summary: Conquest Hospital, St Helens, St Anne's House, Baldslow, Baldslow Post O∆ce, Mildenhall Drive, Silverhill Baldslow, Recreation Ground, Baldslow, Ashdown House, Baldslow, Little Ridge Avenue West, Silverhill Beauchamp Road, Hollington Park, Towerscroft Avenue, Silverhill Park, Beauchamp Road, Hastings Hollinghurst Road, Silverhill Park, Clarendon Close, Silverhill Park, Mildenhall Drive, Silverhill, Beauchamp Marline Avenue,
    [Show full text]
  • Govia Thameslink Railway Penalty Fares Scheme
    GOVIA THAMESLINK RAILWAY PENALTY FARES SCHEME CONTENTS 1 INTRODUCTION 2 PENALTY FARES TRAINS 3 PENALTY FARES STATIONS 4 COMPULSORY TICKETS AREAS 5 TICKET FACILITIES 6 PUBLICITY AND WARNING NOTICES 7 SELECTION AND TRAINING OF AUTHORISED COLLECTORS 8 WRITTEN INSTRUCTIONS TO AUTHORISED COLLECTORS 9 TICKET FACILITIES AND DISPLAY OF WARNING NOTICES 10 SELLING TICKETS ON BOARD TRAINS 11 ARRANGEMENTS WITH OTHER OPERATORS 12 APPEALS Govia Thameslink Railway 2 1 July 2015 Penalty Fares Scheme 1 Introduction 1.1 We, Govia Thameslink Railway (GTR) Ltd, give notice, under rule 3.2 of the Penalty Fares Rules 2002 that we wish to continue to operate a Penalty Fares Scheme across the Thameslink, Southern and Great Northern (TSGN) franchise, with effect from 26th July 2015. This document describes our Penalty Fares Scheme for the purposes of rule 3.2 b. 1.2 We have decided to introduce a Penalty Fares Scheme because the previous operator of the railway passenger services comprised of the Thameslink Great Northern franchise, First Capital Connect and Southern Railways, operated a Penalty Fares Scheme in such franchise area and the experience has proved that it is an efficient means to deter ticketless travel. In addition, once some Southeastern routes and stations are integrated into the TSGN franchise from 14 December 2014 and once the entire current Southern franchise is integrated into the TSGN franchise on 26th July 2015, it is important that there is consistency across all franchise areas (as Southeastern and Southern both also operate a Penalty Fares Scheme); so as to avoid causing confusion for our passengers. This scheme will now include all stations under schemes previously operated by Govia Thameslink Railway Limited and Southern Railway Limited.
    [Show full text]
  • Glyne Gap – Demand Forecasting
    Proposed New Passenger Station at Glyne Gap, Bexhill Demand Forecasting Report March 2013 Rother District Council Proposed New Passenger Station 311766 01 a at Glyne Gap, Bexhill 311766 28 March 2013 Demand Forecasting Report March 2013 Rother District Council Town Hall, Bexhill-on-Sea, TN39 3JX Mott MacDonald, Spring Bank House, 33 Stamford Street, Altrincham, WA14 1ES United Kingdom t +44 (0)161 926 4000 f +44 (0)161 926 4100, W www.mottmac.com Proposed New Passenger Station at Glyne Gap, Bexhill Issue and revision record Revision Date Originator Checker Approver Description A January 2013 JPT RJF FS Draft technical note summarising demand forecasting calculations B March 2013 JPT RJF FS Final report, incorporating client comments This document is issued for the party which commissioned it We accept no responsibility for the consequences of this and for specific purposes connected with the above-captioned document being relied upon by any other party, or being used project only. It should not be relied upon by any other party or for any other purpose, or containing any error or omission which used for any other purpose. is due to an error or omission in data supplied to us by other parties. This document contains confidential information and proprietary intellectual property. It should not be shown to other parties without consent from us and from the party which commissioned it. Mott MacDonald, Spring Bank House, 33 Stamford Street, Altrincham, WA14 1ES United Kingdom t +44 (0)161 926 4000 f +44 (0)161 926 4100, W www.mottmac.com Proposed New Passenger Station at Glyne Gap, Bexhill Content Chapter Title Page Executive Summary i 1.
    [Show full text]
  • South East Route: Sussex Area Route Study September 2015 Contents September 2015 South East Route: Sussex Area Route Study 02
    Long Term Planning Process South East Route: Sussex Area Route Study September 2015 Contents September 2015 South East Route: Sussex Area Route Study 02 Foreword 03 Executive Summary 04 Chapter 1 – Background 16 Chapter 2 – Baseline 21 Chapter 3 – Future demand & resulting conditional outputs 34 Chapter 4 – Consultation responses 55 Chapter 5 – Control Period 6 priorities 63 Chapter 6 – Accommodating conditional outputs in 2043 101 Appendices 114 Glossary 182 Foreword September 2015 South East Route: Sussex Area Route Study 03 I am delighted to present the Sussex Route Study, which sets out the horizon to 2043, allowing sets of long term interventions to be strategic vision for the future of this vital part of the rail network presented alongside and consistent with a prioritised set of options over the next 30 years. for Control Period 6 (2019 – 2024). Each day this railway carries more than 60,000 people in the high On this route, developing options that can make a particular peak hour alone into Central London, with many thousands more contribution long term to improving performance as well as accessing key interchange points at East Croydon and Clapham meeting the capacity challenge is particularly important. Alongside Junction and travelling between regional centres on the route. this, the study has also considered the growing challenges of peak passenger volumes at stations, with a view to setting priorities and Working closely with industry stakeholders, Network Rail and train options for investment in CP6. operators have delivered significantly expanded capacity for passengers in recent years on the route, with Control Period 4 (2009 This study was published for Consultation in October 2014.
    [Show full text]
  • Route Specifications 2016 South East South East Route March 2016 Network Rail –Route Specifications: South East 02
    Delivering a better railway for a better Britain Route Specifications 2016 South East South East Route March 2016 Network Rail –Route Specifications: South East 02 Route A: Kent and High Speed One (HS1) Route B: Sussex In 2014, Network Rail merged the Kent and Sussex SRS A.01 Victoria Lines 4 SRS B.01 London Victoria - Windmill Bridge Junction 65 Route into South East Route. Kent and Sussex becoming Areas within the Route. SRS A.02 Otford - Sevenoaks 8 SRS B.02 Windmill Bridge Junction - Brighton 69 SRS A.03 London - Chislehurst 12 SRS B.03 London Bridge - Windmill Bridge Junction 73 To reflect this change, this document consists of Kent SRS A.04 Chislehurst - Tonbridge 16 SRS B.04 Three Bridges - Arundel Junction 77 and Sussex Areas in separate sections. SRS A.05 Chislehurst - Ashford 20 SRS B.05 Brighton - Havant 81 SRS A.06 Tonbridge - Hastings 24 SRS B.06 Brighton/Wivelsfield - Seaford/Hastings 85 The South East Route: Sussex Area Route Study Draft SRS A.07 Dartford lines to Gravesend & Hayes Branch 28 SRS B.07 South Central Inner Suburban 89 for Consultation was published in 2014 so this document will be updated in Summer 2015 when the SRS A.08 Bromley North Branch 32 SRS B.08 South Central Sutton Lines 93 Final document has been published. SRS A.09 Gravesend/Swanley - Margate 36 SRS B.09 Dorking - Horsham 97 SRS A.10 Sheerness Branch 40 SRS B.10 Hurst Green - Uckfield 101 SRS A.11 Strood - Paddock Wood 44 SRS B.11 Tattenham Corner and Caterham Lines 105 SRS A.12 East Kent Routes 48 SRS B.12 East Grinstead Line 109 SRS A.13 Hastings
    [Show full text]
  • Brighton Main Line and Coastways
    Factsheet 5 Brighton Main Line and Coastways Towards London Blackfriars St. Pancras & beyond (closed between Dec 2014 & Jan 2018) London Victoria London Bridge Clapham Junction Towards London Blackfriars via Elephant & Castle Norwood Junction East Croydon Purley Coulsdon South Merstham Redhill Earlswood Salfords Horley Ashford Gatwick Airport International Three Bridges Ham Street Balcombe Appledore Haywards Heath Rye Wivelseld Plumpton Winchelsea Burgess Hill Cooksbridge St. Leonards Doleham Hassocks Pevensey Normans Warrior Falmer Lewes Glynde Berwick Polegate & Westham Bay Collington Square Ore Three Oaks Durrington Preston Park Angmering -on-Sea Worthing Lancing Southwick Portslade Hove Pevensey Cooden Bexhill Hastings Moulsecoomb Hampden Southease Park Bay Beach Goring West East Shoreham Fishersgate Aldrington London Road -by-Sea Worthing Worthing -by-Sea (Brighton) Newhaven Town Eastbourne Newhaven Harbour Bishopstone Littlehampton Brighton Seaford New rolling stock • 108 new state-of-the-art trains designed for needs of airport passengers to replace the current Gatwick Express trains in early 2016, providing easier boarding and access, and cleaner and more reliable journeys • New-build class 700 Siemens trains will start to replace the existing Thameslink fleets from 2016 • 1,000 extra standard-class seats from Brighton to central London in the morning peak from May 2018, and more 12 Class 700 carriage trains – boosting carrying capacity by 75% Timetable improvements December 2015 May 2018 A major recast of the Brighton Main Line is planned. • Four Thameslink trains per hour will operate from Customers will benefit from more even service intervals Brighton – all calling at London Bridge and Thameslink and the reduced ‘bunching’ of services is expected to help central London stations – with 2tph to Bedford and 2tph to performance improve.
    [Show full text]
  • The Combined Thameslink, Southern and Great Northern Franchise
    Do not remove this if sending to Page Title The Combined Thameslink, Southern and Great Northern Franchise Stakeholder Briefing Document and Consultation Response September 2013 The Department for Transport has actively considered the needs of blind and partially sighted people in accessing this document. The text will be made available in full on the Department’s website. The text may be freely downloaded and translated by individuals or organisations for conversion into other accessible formats. If you have other needs in this regard please contact the Department. Department for Transport Great Minster House 33 Horseferry Road London SW1P 4DR Telephone 0300 330 3000 Website www.gov.uk/dft General email enquiries [email protected] © Crown copyright 2013 Copyright in the typographical arrangement rests with the Crown. You may re-use this information (not including logos or third-party material) free of charge in any format or medium, under the terms of the Open Government Licence. To view this licence, visit www.nationalarchives.gov.uk/doc/open- government-licence/ or write to the Information Policy Team, The National Archives, Kew, London TW9 4DU, or e-mail: [email protected]. Where we have identified any third-party copyright information you will need to obtain permission from the copyright holders concerned. Contents Foreword ............................................................................................................ 4 Introduction........................................................................................................
    [Show full text]
  • Speed Awareness Course
    National Driver Offender Retraining Scheme Manor Barn, 4 De La Warr Road, Old Town, Bexhill-on-Sea TN40 2JA (best for GPS navigation) Please bring your Photocard Driving Licence as you will be unable to register and attend the course without it. Please allow plenty of time for your journey as roads can get congested at peak times. Courses start promptly at published times and late arrivals will not be admitted. Manor Barn is a Grade II listed building on the northern outskirts of Bexhill. The entrance to Manor Barn & Manor Gardens is on the Old Town section of De La Warr Road, close to Church Street. Please note that there is another section of De La Warr Road which joins King Offa Way and the Bexhill Road at Glyne Gap (the Ravenside Shopping Centre). Drivers with Sat Nav are advised to use the postcode, TN40 2JA. Car Parking: There is free parking close by, however this cannot be guaranteed (please see photographs overleaf). Once parked walk towards the public conveniences, take the path in the southwest corner (to the right of the public conveniences and this will take you to Manor Barn. The brick path is wheelchair accessible. Upon arrival: Once you have arrived, please wait in the foyer and the presenters will direct you into the training room when they are ready to begin registration. Registration: It is important that you arrive in time for registration; late arrivals will be refused admittance onto the course. The course fee will not be reimbursed and you will be deemed not to have completed the course.
    [Show full text]
  • Govia Thameslink Railway Penalty Fares Scheme
    GOVIA THAMESLINK RAILWAY PENALTY FARES SCHEME Issue 2 30th September 2016 CONTENTS 1 INTRODUCTION 2 PENALTY FARES TRAINS 3 PENALTY FARES STATIONS 4 COMPULSORY TICKETS AREAS 5 TICKET FACILITIES 6 PUBLICITY AND WARNING NOTICES 7 SELECTION AND TRAINING OF AUTHORISED COLLECTORS 8 WRITTEN INSTRUCTIONS TO AUTHORISED COLLECTORS 9 TICKET FACILITIES AND DISPLAY OF WARNING NOTICES 10 SELLING TICKETS ON BOARD TRAINS 11 ARRANGEMENTS WITH OTHER OPERATORS 12 APPEALS Govia Thameslink Railway 2 30 September 2016 Penalty Fares Scheme 1 Introduction 1.1 We, Govia Thameslink Railway (GTR) Ltd, give notice, under rule 3.2 of the Penalty Fares Rules 2002 that we wish to operate a Penalty Fares Scheme across the Thameslink, Southern and Great Northern (TSGN) franchise, with effect from 26th July 2015, the document approved in July 2015 has now been amended to reflect the additional TVM’s that have been installed making all GTR stations penalty fare stations. This document describes our Penalty Fares Scheme for the purposes of rule 3.2 b. 1.2 We have decided to introduce a Penalty Fares Scheme because the previous operator of the railway passenger services comprised of the Thameslink Great Northern franchise, First Capital Connect and Southern Railways, operated a Penalty Fares Scheme in such franchise area and the experience has proved that it is an efficient means to deter ticketless travel. It is important that there is consistency across all franchise areas so as to avoid causing confusion for our passengers. This scheme will now include all stations operated by Govia Thameslink Railway Limited. The scheme will also take into account the provision of penalty fare notices issued electronically which were implemented from September 2015.