Welsh Government Cathays Park Cardiff CF10 3NQ
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
74C Bus Time Schedule & Line Route
74C bus time schedule & line map 74C Newport - Underwood View In Website Mode The 74C bus line (Newport - Underwood) has 2 routes. For regular weekdays, their operation hours are: (1) Newport: 10:32 AM - 6:32 PM (2) Underwood: 9:55 AM - 5:55 PM Use the Moovit App to ƒnd the closest 74C bus station near you and ƒnd out when is the next 74C bus arriving. Direction: Newport 74C bus Time Schedule 23 stops Newport Route Timetable: VIEW LINE SCHEDULE Sunday Not Operational Monday 10:32 AM - 6:32 PM Shops, Underwood The Cedars, Bishton Community Tuesday 10:32 AM - 6:32 PM Birch Grove Exit, Underwood Wednesday 10:32 AM - 6:32 PM St Martin`S Church, Llanmartin Thursday 10:32 AM - 6:32 PM Friday 10:32 AM - 6:32 PM Greystones, Llanmartin Saturday 10:32 AM - 6:32 PM Pool Head, Llanmartin Tump Farm, Wilcrick Brewery, Magor 74C bus Info Direction: Newport Llanwern Clock, Llanwern Stops: 23 Trip Duration: 40 min Newport Retail Park, Liswerry Line Summary: Shops, Underwood, Birch Grove Exit, Underwood, St Martin`S Church, Llanmartin, Greystones, Llanmartin, Pool Head, Llanmartin, Tesco, Liswerry Tump Farm, Wilcrick, Brewery, Magor, Llanwern Clock, Llanwern, Newport Retail Park, Liswerry, Nash Drive, Liswerry Tesco, Liswerry, Nash Drive, Liswerry, Mulcaster Avenue, Liswerry, Nash Club, Liswerry, Post O∆ce, Mulcaster Avenue, Liswerry Liswerry, Black Horse Inn, Somerton, Somerton Nash Road, Newport Bridge, Somerton, Beechwood Park, Beechwood, Walmer Road, Maindee, Eveswell School, Maindee, Nash Club, Liswerry Maindee Square, Maindee, Library, Maindee, Clarence -
Advice to Inform Post-War Listing in Wales
ADVICE TO INFORM POST-WAR LISTING IN WALES Report for Cadw by Edward Holland and Julian Holder March 2019 CONTACT: Edward Holland Holland Heritage 12 Maes y Llarwydd Abergavenny NP7 5LQ 07786 954027 www.hollandheritage.co.uk front cover images: Cae Bricks (now known as Maes Hyfryd), Beaumaris Bangor University, Zoology Building 1 CONTENTS Section Page Part 1 3 Introduction 1.0 Background to the Study 2.0 Authorship 3.0 Research Methodology, Scope & Structure of the report 4.0 Statutory Listing Part 2 11 Background to Post-War Architecture in Wales 5.0 Economic, social and political context 6.0 Pre-war legacy and its influence on post-war architecture Part 3 16 Principal Building Types & architectural ideas 7.0 Public Housing 8.0 Private Housing 9.0 Schools 10.0 Colleges of Art, Technology and Further Education 11.0 Universities 12.0 Libraries 13.0 Major Public Buildings Part 4 61 Overview of Post-war Architects in Wales Part 5 69 Summary Appendices 82 Appendix A - Bibliography Appendix B - Compiled table of Post-war buildings in Wales sourced from the Buildings of Wales volumes – the ‘Pevsners’ Appendix C - National Eisteddfod Gold Medal for Architecture Appendix D - Civic Trust Awards in Wales post-war Appendix E - RIBA Architecture Awards in Wales 1945-85 2 PART 1 - Introduction 1.0 Background to the Study 1.1 Holland Heritage was commissioned by Cadw in December 2017 to carry out research on post-war buildings in Wales. 1.2 The aim is to provide a research base that deepens the understanding of the buildings of Wales across the whole post-war period 1945 to 1985. -
Coridor-Yr-M4-O-Amgylch-Casnewydd
PROSIECT CORIDOR YR M4 O AMGYLCH CASNEWYDD THE M4 CORRIDOR AROUND NEWPORT PROJECT Malpas Llandifog/ Twneli Caerllion/ Caerleon Llandevaud B Brynglas/ 4 A 2 3 NCN 4 4 Newidiadau Arfaethedig i 6 9 6 Brynglas 44 7 Drefniant Mynediad/ A N tunnels C Proposed Access Changes 48 N Pontymister A 4 (! M4 C25/ J25 6 0m M4 C24/ J24 M4 C26/ J26 2 p h 4 h (! (! p 0 Llanfarthin/ Sir Fynwy/ / 0m 4 u A th 6 70 M4 Llanmartin Monmouthshire ar m Pr sb d ph Ex ese Gorsaf y Ty-Du/ do ifie isti nn ild ss h ng ol i Rogerstone A la p M4 'w A i'w ec 0m to ild Station ol R 7 Sain Silian/ be do nn be Re sba Saint-y-brid/ e to St. Julians cla rth res 4 ss u/ St Brides P M 6 Underwood ifi 9 ed 4 ng 5 Ardal Gadwraeth B M ti 4 Netherwent 4 is 5 x B Llanfihangel Rogiet/ 9 E 7 Tanbont 1 23 Llanfihangel Rogiet B4 'St Brides Road' Tanbont Conservation Area t/ Underbridge en Gwasanaethau 'Rockfield Lane' w ow Gorsaf Casnewydd/ Trosbont -G st Underbridge as p Traffordd/ I G he Newport Station C 4 'Knollbury Lane' o N Motorway T Overbridge N C nol/ C N Services M4 C23/ sen N Cyngor Dinas Casnewydd M48 Pre 4 Llanwern J23/ M48 48 Wilcrick sting M 45 Exi B42 Newport City Council Darperir troedffordd/llwybr beiciau ar hyd Newport Road/ M4 C27/ J27 M4 C23A/ J23A Llanfihangel Casnewydd/ Footpath/ Cycleway Provided Along Newport Road (! Gorsaf Pheilffordd Cyffordd Twnnel Hafren/ A (! 468 Ty-Du/ Parcio a Theithio Arfaethedig Trosbont Rogiet/ Severn Tunnel Junction Railway Station Newport B4245 Grorsaf Llanwern/ Trefesgob/ 'Newport Road' Rogiet Rogerstone 4 Proposed Llanwern Overbridge -
Ecology and Nature Conservation
Welsh Government M4 Corridor around Newport Environmental Statement Volume 1 Chapter 10: Ecology and Nature Conservation M4CAN-DJV-EBD-ZG_GEN--REP-EN-0021.docx At Issue | March 2016 CVJV/AAR 3rd Floor Longross Court, 47 Newport Road, Cardiff CF24 0AD Welsh Government M4 Corridor around Newport Environmental Statement Volume 1 Contents Page 10 Ecology and Nature Conservation 10-1 10.1 Introduction 10-1 10.2 Legislation and Policy Context 10-2 10.3 Assessment Methodology 10-10 10.4 Baseline Environment 10-45 Statutory Designated Sites 10-45 Non-Statutory Designated Sites 10-49 Nature Reserves 10-52 Habitats 10-52 Species (Flora) 10-76 Species (Fauna) 10-80 Invasive Alien Species 10-128 Summary Evaluation of Ecological Baseline 10-132 Ecological Units 10-135 Future Baseline Conditions 10-136 10.5 Ecological Mitigation and Monitoring 10-140 10.6 Effects Resulting from Changes in Air Quality 10-159 10.7 Assessment of Land Take Effects 10-165 Designated Sites 10-166 Rivers (Usk and Ebbw) 10-171 Reens, Ditches, Reedbeds and Ponds 10-173 Grazing Marsh 10-182 Farmland 10-187 Industrial Land 10-196 Bats 10-200 Breeding Birds 10-203 Wintering Birds 10-204 Complementary Measures 10-206 10.8 Assessment of Construction Effects 10-206 Designated Sites 10-206 Rivers (Usk and Ebbw) 10-210 Reens, Ditches, Reedbeds and Ponds 10-226 Grazing Marsh 10-245 Farmland 10-249 Industrial Land 10-260 Bats 10-263 Breeding Birds 10-291 Wintering Birds 10-292 Welsh Government M4 Corridor around Newport Environmental Statement Volume 1 Complementary Measures 10-295 10.9 -
Governors' Annual Report to Parents
Governors’ Annual Report to Parents December 2019 Welsh language version available on request Governors’ Annual Report to Parents - 2019 On behalf of the Governing Body and Acting Headteacher, we would like to take this opportunity to thank you as parents, and the whole community for your support of St Julian’s School. Over this past academic year, the staff and governors have continued to work hard to develop the quality and provision of the education provided to all learners. The Governing Body has played a fundamental role in both supporting and challenging the school to ensure progress continues at St Julian’s at the appropriate pace. We hope that you have already had the opportunity to visit our evolving website and I would ask you to pay particular attention to the Governing Body web pages which can be found in ‘About Us.’ We continue to use these to ensure that the school community can access the work of the Governing Body, and the different roles we hold. We also ensure that we have parent governors available at all parents evenings so that parents can get in touch with their representatives more easily. As the report outlines we have paused to celebrate our success but also re-focused on the ongoing challenges ahead. Your role as parents / carers continues to be vital in not only supporting your children but communicating with us and providing helpful self-evaluation information on our work. The Governors, Acting Headteacher and staff are determined to ensure that the school continues to work tirelessly to develop our provision over the coming years and provide the quality of education that all our students deserve in meeting the national aspirations of becoming ambitious capable learners who are confident and able to make a successful contribution to society in Wales. -
Russell George AM Chair – Economy, Infrastructure & Skills Committee National Assembly for Wales 20 November 2019 Dear Ru
Russell George AM Chair – Economy, Infrastructure & Skills Committee National Assembly for Wales 20 November 2019 Dear Russell M4 Relief Road Costs As you aware, the Public Accounts Committee scrutinised the Welsh Government in July on the costs to date of the M4 Relief Road project. The Committee have concluded their work on this issue for now and I attach copies of detailed correspondence between myself and Andrew Slade, Director General, Economy, Skills and Natural Resources Group at the Welsh Government, which I hope will be helpful in your Committee’s future work on this issue following publication of the Lord Burns Review. Vikki Howells AM and Oscar Asghar AM are Members of both Committee and have agreed to update Public Accounts Committee on the work your Committee undertakes. Yours sincerely, Nick Ramsay AM Chair Grwp yr Economi, Sgiliau a Chyfoeth Naturiol Economy, Skills and Natural Resources Group Cyfarwyddwr Cyffredinol - Director General Nick Ramsay AM Chair Public Accounts Committee 8 October 2019 Dear Chair M4 PROJECT COSTS I am responding to your email of 22 July and further letter of 25 July, in which you requested additional information following the Committee session on 15 July. I am sorry for the delay in so doing, but it has taken a little time to pull all the relevant detail together in the form requested. Use of data and presentation Cost estimates were produced at each stage of the M4 Project development using the cost price base and VAT treatment that was appropriate to each development phase. The price base year was kept at 2015 throughout the Inquiry process to aid comparison and assessment of scope changes during the Inquiry, such as the additional off-slip proposed near Magor services and the accommodation works developed in Newport Docks during the course of the Inquiry. -
Newport Retail Park a New Retail Destination for Newport Location the Wider Context
Newport Retail Park A New Retail Destination for Newport Location The Wider Context Newport sits in south-east Wales, well situated on Abergavenny the M4 between Cardiff and the Severn Bridge. It Monmouth is a short drive from Cardiff, and is well connected by road to the nearby city of Bristol (40 minutes Raglan drive away), Chepstow, Monmouth, Abergavenny, Cwmbram and Pontypridd. Pontypool Cwmbran Chepstow Pontypridd Thornbury Newport Llantrisant Cardiff Portishead Bristol Clevedon Location Diagram Barry Distance Population Bath 10 minutes 65,000 20 minutes 230,000 30 minutes 900,000 N Newport Retail Park 2 Connectivity Access and Connections The M4 provides an arterial route running east west through south Wales towards England. The site is accessed from the M4 (junction 24) and driving along the Newport Southern Distributor Road, the To Cardiff To Severn Bridge A48. Newport Retail Park is accessed off it, after a 4 minute drive from the M4. The A48 runs around south Newport, connected at both ends with the M4 and providing further local connections by road. A4042 A48 M4 Newport Station Newport A4042 Southern Distributor Road A48 Usk Way Glan Llyn Housing Development Connectivity Diagram A48 A4810 Development Site Newport Retail Park A4810 M4 Main Roads Local Roads A48 Railway N Newport Retail Park 3 The Site To M4 The Surrounding Areas The site lies between the community of Liswerry to the west and the old Llanwern Steel Works site to the east. The Glan Llyn Masterplan delivers 4,000 A48 new houses in the Steel Works land, providing a significant boost to the local area. -
Welsh Government M4 Corridor Around Newport Proof of Evidence – Engineering Design
Welsh Government M4 Corridor around Newport Proof of Evidence – Engineering Design Adran yr Economi a’r Seilwaith Department for Economy and Infrastructure The M4 Motorway (Junction 23 (East of Magor) to West of Junction 29 (Castleton) and Connecting Roads) and The M48 Motorway (Junction 23 (East of Magor) Connecting Road) Scheme 201- The M4 Motorway (Junction 23 (East of Magor) to West of Junction 29 (Castleton) and Connecting Roads) and The M48 Motorway (Junction 23 (East of Magor) Connecting Road) (Amendment) Scheme 201- The London to Fishguard Trunk Road (East of Magor to Castleton) Order 201- The M4 Motorway (West of Magor to East of Castleton) and the A48(M) Motorway (West of Castleton to St Mellons)(Variation of Various Schemes) Scheme 201- The M4 Motorway (Junction 23 (East of Magor) to West of Junction 29 (Castleton) and Connecting Roads) and the M48 Motorway (Junction 23 (East of Magor) Connecting Road) and The London to Fishguard Trunk Road (east of Magor to Castleton) (Side Roads) Order 201- The Welsh Ministers (The M4 Motorway (Junction 23 (East of Magor) to West of Junction 29 (Castleton) and Connecting Roads) and the M48 Motorway (Junction 23 (East of Magor) Connecting Road) and the London to Fishguard Trunk Road (East of Magor to Castleton)) Compulsory Purchase Order 201- The M4 Motorway (Junction 23 (East Of Magor) to West of Junction 29 (Castleton) and Connecting Roads) and The M48 Motorway (Junction 23 (East Of Magor) Connecting Road) (Supplementary) Scheme 201- The Welsh Ministers (The M4 Motorway (Junction 23 (East Of Magor) to West of Junction 29 (Castleton) and Connecting Roads) and The M48 Motorway (Junction 23 (East Of Magor) Connecting Road) and The London to Fishguard Trunk Road (East of Magor to Castleton)) Supplementary Compulsory Purchase Order 201- Proof of Evidence Ben Sibert, BEng CEng FICE MIStructE MCIHT Welsh Government, Engineering Design Document Reference: WG 1.5.1 January 2017 Page 1 Welsh Government M4 Corridor around Newport Proof of Evidence – Engineering Design Contents 1. -
Visitor Experience Destination Management Plan
Living Levels Landscape Partnership Landscape Conservation Action Plan August 2017 APPENDIX 3 Living Levels Visitor Experience Destination Management Plan Living Levels Landscape Partnership Destination Management Plan Final Report May 2017 Prepared by: Cole & Shaw cyf with Letha Consultancy, Wye Knot Tourism, Gareth Kiddie Associates, Lucy von Weber Ltd, Can Do Team supported by Planning Solutions Consultancy Ltd Page | 3 CONTENTS PAGE Section 1 Project Introduction 3 What we were asked to do (and how we did it) 5 The Living Levels Story 13 Section 2 Interpretation Plan 15 Interpretation Action Plan 40 Section 3 Access and Signage Plan 62 Access Action Plan 83 Section 4 Marketing Plan 108 Marketing Action Plan 147 Section 5 Governance Monitoring and Evaluation 152 Section 6 Summary 3 year Project Plan 162 Appendices 1 Access and Signage: Joining up 164 2 Access and Signage: Draft Wales Coast Path Protocol 167 3 Case Study: Lighthouse Inn project details and costings 170 4 Tourism Assets on the Levels 174 5 Consultees 178 6 Baseline STEAM Data for the Levels 181 7 Travel Isochrones and Population Profiles 182 8 Sources and Resources 195 9 Background Information for Recommended Routes 196 Page | 4 SECTION 1 Introduction We are pleased to present the Visitor Experience Destination Management Project Plan for the Living Levels, a key output of the development phase of a successful major project supported by Heritage Lottery Fund under its Landscape Partnership Scheme for the area of the Severn Estuary coast of Wales known colloquially as the ‘Gwent Levels’, lying between Cardiff and Chepstow and either side of the River Usk. -
Michaelston-Y-Fedw Community Council Clerk Claire Dixon – 8, Druidstone House, Druidstone Road, Cardiff, CF3 6XF Phone: 01633 680506
Michaelston-Y-Fedw Community Council www.michaelston-y-fedw.com Clerk Claire Dixon – 8, Druidstone House, Druidstone Road, Cardiff, CF3 6XF Phone: 01633 680506 Minutes of the meeting held at Michaelston-Y-Fedw village hall on Wednesday 14th April, 2004. Members Present Councillor Dr C C Rowlands Councillor Mrs T Clifford Councillor Mr G Davies Councillor Mr C Walford Councillor Mr S Tyler Councillor Mr D Philips Councillor Mr R Evans Clerk Mrs C Dixon PC Jim Neesam Apologies for absence Councillor Mrs A Huckle Members of the Public Present Mr Alex Dunn Agenda Item and Comments 03/21/225 – Minutes of the Previous Meeting The minutes of the previous meeting held on Wednesday March 3rd were read and accepted as a true record. This was proposed by Cllr. Rowlands and seconded by Cllr. Evans. 03/21/226 – Matters Arising A summary of the March Action Plan was discussed. Litter Bin – No change. Still await one from Newport Council. Planning - All Councillors on-line have a link to the Newport Planning Site, as does the community web site. A hard copy will be brought to future meetings for those not on-line. Roads, Hedges & Verges – The Tirzah Baptist Graveyard – Despite the Community Council’s upkeep it was agreed that the Baptist Union should claim some responsibility for it. Cllr. Clifford and Cllr. Phillips will endeavour to find the appropriate contacts by the next meeting to enable the Clerk to write an appropriate letter. Michaelston Bridge – The Bridge Engineer, John Pritchard, responded to the Clerk’s correspondence indicating that he was happy to meet with representatives of the Community Council to discuss replacement bollards, and the safety of the bridge. -
Newport Bus Newport
Newport Bus Newport - Rogerstone 1B via Ridgeway & Cefn Wood Monday to Friday Ref.No.: N220 Commencing Date: 29/03/2020 Service No 1B 1B 1B 1B 1B 1B RuRuRuRuRuRu Newport Bus Station 0745 0945 1145 1345 1545 1745 Ridge Way Walk 0753 0953 1153 1353 1553 1753 High Cross, Post Office 0758 0958 1158 1358 1558 1758 Jubilee Park 0805 1005 1205 1405 1605 1805 St John's Crescent 0807 1007 1207 1407 1607 1807 St John's Crescent 0807 1007 1207 1407 1607 1807 Foxgloves (Morrisons) 0812 1012 1212 1412 1612 1812 Ru - Service operates to both Foxgloves and Ruskin Avenue Rogerstone - Newport 1B via Ruskin Avenue, Cefn Wood & Ridgeway Service No 1B 1B 1B 1B 1B 1B RuRuRuRuRuRu Foxgloves (Morrisons) 0813 1013 1213 1413 1613 1813 St John's Crescent 0817 1017 1217 1417 1617 1817 Ruskin Avenue 0821 1021 1221 1421 1621 1821 Cefn Wood (Thornbury Park Shops) 0829 1029 1229 1429 1629 1829 Ridge Way Hill 0837 1037 1237 1437 1637 1837 Newport Bus Station 0846 1046 1246 1446 1646 1846 Ru - Service operates to both Foxgloves and Ruskin Avenue Newport Bus Newport - Alway - Ringland 6E via Maindee Monday to Friday Ref.No.: N220 Commencing Date: 29/03/2020 Service No 6E 6E 6E 6E 6E 6E 6E 6E 6E 6E 6E 6E 6E Newport Bus Station 0700 0800 0900 1000 1100 1200 1300 1400 1500 1600 1700 1800 1900 Maindee Square 0706 0806 0906 1006 1106 1206 1306 1406 1506 1606 1706 1806 1906 Alway Shops 0718 0818 0918 1018 1118 1218 1318 1418 1518 1618 1718 1818 1918 Ringland Centre 0725 0825 0925 1025 1125 1225 1325 1425 1525 1625 1725 1825 1922 Ringland - Alway - Newport 6E via Maindee Service -
Welsh Government M4 Corridor Around Newport December 2016 Environmental Statement Supplement Appendix SS 2.2 Hazardous Installations Affected by the Scheme
Welsh Government M4 Corridor around Newport December 2016 Environmental Statement Supplement Appendix SS 2.2 Hazardous Installations Affected by the Scheme M4CaN-DJV-EGT-ZG_GEN-AX-EN-0004 At Issue | December 2016 . CVJV/AAR 3rd Floor Longross Court, 47 Newport Road, Cardiff CF24 0AD Welsh Government M4 Corridor around Newport December 2016 Environmental Statement Supplement Appendix SS 2.2 Hazardous Installations Affected by the Scheme Contents Page 1 Introduction 3 2 Legislation and Policy Context 4 3 Methodology 9 4 Baseline Environment 10 5 Installations Potentially Affected by the Scheme 12 6 Conclusions 18 Figures Figure 1 Health & Safety Executive Consultation Zones and Safety Distances Annexes Annex A Hazardous Substance Consents and Explosives Licence (1) Decision Notice for Solutia HSC (2) Decision Notice for HSC deemed consent ABP (3) Outline details of Corus Strip Products HSC (4) Decision Notice for Birdport HSC (5) ABP Explosives Licence Annex B Planning Permission 06/0471 with indicative master plan A011 for redevelopment of Llanwern Steelworks Annex C Consultation correspondence (1) Letter from WG to HSE dated 26 November 2015 (2) Letter from HSE to WG dated 9 May 2016 (3) Email from NCC to RPS dated 19 January 2016 (4) Email from NCC to RPS dated 14 March 2016 Annex D Hazardous Substance Consent Consultation Zones (1) H1416 (HSC1) (2) H3472 (HSC2) (3) H0109 (HSC3) (4) H3681 (HSC4) (5) H3715 (HSC5) (6) H0739 (HSC6) (7) H0739 (HSC7) M4CaN-DJV-EGT-ZG_GEN-AX-EN-0004 | At Issue | December 2016 Page 1 Welsh Government M4 Corridor around Newport December 2016 Environmental Statement Supplement Appendix SS 2.2 Hazardous Installations Affected by the Scheme (8) H1523 (HSC8) (9) H4322 (HSC9) (10) HSC 15/1109 (HSC10) M4CaN-DJV-EGT-ZG_GEN-AX-EN-0004 | At Issue | December 2016 Page 2 Welsh Government M4 Corridor around Newport December 2016 Environmental Statement Supplement Appendix SS 2.2 Hazardous Installations Affected by the Scheme 1 Introduction 1.1 Background 1.1.1 A new section of motorway is proposed by Welsh Government.