Quick viewing(Text Mode)

Acorn-Events-Brochure-2018.Pdf

Acorn-Events-Brochure-2018.Pdf

Credit Anthony Mooney, presents Steel Yard Acorn Event Structures is one of the UK’s largest providers of indoor and outdoor scaffold-based event structures.

Credit:aLIVEcoverage, Creamfields UK Harnessing almost 20 years’ experience with Europe’s largest stock of Layher Outdoor stage roofs for live Temporary scaffold Combining stock components Event System and Prolyte Staging music events plus ancillary infrastructure and overlay with custom elements to create Products, we consistently deliver structures. solutions. unique. installations. premium and innovative solutions to world-class events. 6 50m Super Structure 28 Ground Levelling Platforms 40 Pavilions, Expo & Exhibition 8 33m to 16m Space Roof 29 Staircases & Towers 41 Theatre, Media, TV & Film With strategically placed operational bases 10 30m Dome Roof 30 Access Ramps 42 Truss Structures throughout the UK and in-house design, 11 26m or 19m Arc Roof 31 Handrails & Balustrade 43 Experiential Projects engineering and logistical departments we 12 Custom Stages 32 Service & Signage Gantries 44 Art Installations deliver the complete package, from brief to 13 22m Dome Roof 33 Pedestrian Walkways &Bridges 45 Extreme Sports activation. 14 18m Dome Roof 34 Grandstands 46 Mass Participation Events 15 18m Midi Roof 35 Media, Film & TV Platforms 47 Brand Walls & Towers Get in touch to see how we can assist in 16 16m Dome Roof 36 Facades & Hoarding the activation of your event or bring your 17 14m Midi Roof 37 Hoists & Lifts concept to life. 18 12m Dome Roof 19 Unique Stock Stages www.acorn-events.com 20 Front of House & Projector Towers 21 Rigging Towers 22 Screen Supports 23 Ground Support 24 Steel Truss 25 Stairs, Platforms & Infrastructure 6 50m Super Structure 8 33m to 16m SpaceRoof 10 30m Dome Roof 11 26m or 19m Arc Roof 12 Custom Stages 13 22m Dome Roof 14 18m Dome Roof 15 18m Midi Roof 16 16m Dome Roof 17 14m Midi Roof 18 12m Dome Roof 19 Unique Stock Stages 20 Front of House & Projector Towers 21 Rigging Towers 22 Screen Supports 23 Ground Support 24 Steel Truss 25 Stairs, Platforms & Infrastructure

“Acorn has been supplying Boomtown Festival with structures for over 4 years and we have always found them to be supremely efficient and skilled. Having proved a reliable contractor, we have increased Acorn’s spec over this period with confidence that they could deliver the project.

We have an ongoing, professional working relationship with them – in planning they are thorough and proactive with advice, helping us to design large structures for unique set builds and stages. Whilst on site they are flexible and willing to problem solve new requirements that our challenging design concepts pose.”

Credit: LorenzoTnc, Creamfields UK Lak Mitchell, Founder, Boomtown Fair Credit : Wembley Stadium Credit : Charlie Raven, Steel Yard @ Creamfields UK 2016

Credit: Anthony Mooney, Creamfields presents Steel Yard, London

50m Super Structure 50m Super Structure

Key Features Plant Requirements Applications

• Modular construction, variable sizes • Award-winning Dome Structure Credit: Mike Davies, Creamfields presents Steel Yard Credit : Anthony Mooney, Steel Yard @ Creamfields UK 2016 • Crane • Temporary venue • Widths up to 50m • Integral Layher stage platforms/ • Cherry picker • Aircraft hanger • Length in 6m increments up to 120m VIP gantries /set support structures • Scissor lift • Warehouse storage facility • Trim height of 20m • Flat-packed minimises transportation • Roto telehandler • TV & Film Studio • Standard packages: • Fully weatherproof with PVC roof 2,000m2/ 4,000m2 / 6,000m2 and gable end sheets Site Requirements • Build time – 3 to 7 days • High pressure water supply • Load capacity 4000kg per beam line • Remote weather monitoring • Trackway Floor area Load capacity 2,000m2 50,000kg 4,000m2 85,000kg 6,000m2 120,000kg

Steel Yard Super Structure Build

6 The Steel Yard concept was created by and designed by Acorn for Creamfields UK. Credit: Charlie Raven, Steel Yard @ Creamfields UK 2017 7 Justin Bieber Lytham Festival Dublin Cuffe & Taylor Aiken Promotions

Credit : Wembley Stadium

Phil Collins Gorillaz Dublin Dreamland LarMac LIVE MCD Productions Credit:Credit : AnthonyaLIVE Coverarge, Mooney, Creamfields Creamfields 2015, UK LarMac LIVE

MTV Crashes, Coventry, Clockwork Productions Creamfields UK, , LarMac LIVE Space Roof – Stadium Space Roof – Festival

Key Features Plant Requirements Key Features Plant Requirements • Stage widths from 16m to 33m • Cherry picker • Stage widths from 16m to 33m • Cherry picker • Stage depths from 12m to 21m • Scissor lift • Stage depths from 12m to 21m • Scissor lift • Trim heights from 8m to 16m • Roto telehandler Bruce Springsteen Forbidden Fruit • Trim heights from 8m to 16m • Roto telehandler • Layher stage platform incorporating Wembley Dublin • Layher stage platform incorporating ballast and roof towers Site Requirements Live Nation Pod.ie ballast and roof towers Site Requirements • Integral PA hangs up to 4,000kg per side • High pressure water supply • Integral PA hangs up to 4,000kg per side • High pressure water supply • Space Roof or Steel Truss video wings • Trackway to four sides of stage • Space Roof or Steel Truss video wings • Trackway to four sides of stage • Integral Layher load-in ramp • Three phase power supply • Integral Layher load-in ramp • Three phase power supply and access stairs and access stairs • Cowsheds to side and rear up • Cowsheds to side and rear up to 6m deep to 6m deep • Load capacity – up to 60,000kg • Load capacity – up to 60,000kg • Build time – 2 to 4 days • Build time – 2 to 4 days 8 • Remote weather monitoring station Credit: Wembley Stadium • Remote weather monitoring station 9 Victorious Southsea

Kew the Music London Larmac Live Credit : Anthony Mooney, Creamfields 2015, LarMac LIVE

Victorious Festival, Southsea, Victorious Festival 30m Dome Roof Arc Roof

Key Features Plant Requirements Key Features Plant Requirements • 22m Stage performance width • 2 x Cherry Pickers • 26m or 19m Stage performance width • 2x cherry pickers • Depth of stage modular in 2m • 50 Tonne Crane • Depth of stage modular in 4m • 50 tonne crane increments Victorious increments • Layher stage platform incorporating Site Requirements Southsea • Layher stage platform incorporating Site Requirements balast and roof towers • High pressure water supply Victorious Festival ballast and roof arches • High pressure water supply • Intergral Layher load-in ramp and • Trackway to four sides of stage • Integral Layher load-in ramp • Trackway access stairs and access stairs • Cowsheds • Intergal cowsheds • 4m eyebrow for weather protection • Load capacity – 40,000kg UDL • Load capacity - 12,000kg UDL per arch • Build time – 3 to 4 days • Build time - 2 days • Remote weather monitoring station • Remote weather monitoring station

10 11 Lions Den Proms in the Park Winchester Swansea Boom Town Fair Swansea City Council

Town Centre Y-Not Festival Winchester Derbyshire Boom Town Fair Broadwick Live Credit : Boomtown Fair

Sector 6, Winchester, Boom Town Fair , Belfast, MCD Production Custom Stages 22m Dome Roof

Key Features Plant Requirements Due to an increase in demand of We have the resource to take your • 21m Stage performance width • 2x Cherry pickers customers requiring unique solutions conceptual designs from paper to reality, • Depth of stage modular in 2.0 / 2.5m • 50 tonne crane for their event presence, we established managing all aspects of the process Green Man OnRoundhay increments a dedicated division to handle these in-house from design and engineering Brecon Beacons Leeds • Layher stage platform incorporating Site Requirements enquiries. through to fabrication and installation. Plantpot Productions Harvey Goldsmith ballast and roof arches • High pressure water supply • Integral Layher load-in ramp • Trackway Combining components of the scaffold and access stairs and staging divisions with custom • Cowsheds elements and extensive knowledge • Load capacity – 12,000kg per arch base, we can create unique solutions for • Build time – 2 days clients looking for something different • Remote weather monitoring station for their event. 12 13 Common People Oxford Clockwork Productions

Carnival 56 Dundee LarMac LIVE

Concert by the Lake, Tatton, Cuffe & Taylor 18m Dome Roof 18m Midi Roof Key Features Plant Requirements Key Features Plant Requirements • 16.5m Stage performance width • Cherry picker • 16m Stage performance width • Cherry picker • 10m stage depth • Depth of stage modular in 2.0 / 2.5m • Layher stage platform incorporating Site Requirements increments Concert by the Lake ballast and roof towers • High pressure water supply • Layher stage platform incorporating Site Requirements Tatton • Integral Layher load-in ramp • Three phase power ballast and roof arches • High pressure water supply Cuffe & Taylor and access stairs • Trackway • Integral Layher load-in ramp • Trackway • Integral PA points and access stairs • Cowsheds • Cowsheds • Load capacity – 12,000kg UDL • Load capacity – 8,000kg per arch • Build time – 1 day • Build time – 2 days • Remote weather monitoring station • Remote weather monitoring station 15 14 15 Greenwich Music Madness Grandslam Greenwich Music Time Time UK Tour London London Liz Hobbs Group Cuffe & Taylor Cuffe & Taylor

Love Supreme Walthomstow Love Supreme East Sussex Garden Party East Sussex LarMac LIVE London LarMac LIVE Barbican Centre Carfest, Hamphire, SWG Events Wireless Fest, , Live Nation 16m Dome Roof 14m Midi Roof Key Features Plant Requirements Key Features Plant Requirements • 13m Stage performance width • Cherry picker • 14m Stage performance width • Cherry picker • 8m stage depth • Depth of stage modular in 2.5m • Layher stage platform incorporating Site Requirements increments Site Requirements Liverpool Sound Sleep in the Park ballast and roof towers • High pressure water supply • Layher stage platform incorporating • High pressure water supply City Edinburgh • Integral Layher load-in ramp • Three phase power ballast and roof towers • Three phase power Liverpool Unique Events and access stairs • Trackway Ground Control • Integral Layher load-in ramp • Trackway • Integral PA points and access stairs • Cowsheds • Cowsheds • Load capacity – 8,000kg UDL • Load capacity – 14,000kg UDL • Build time – 1 day • Build time – 1 to 2 days • Remote weather monitoring station • Remote weather monitoring station 17 16 17 Container Warehouse

Hemisphere Stage 60m Mega Arch

12m Dome Roof Unique Stock Stages Hemisphere Stage Warehouse Stage Mega Arch Key Features Plant Requirements • 20 to 50m structure width • Modular construction • Modular construction • 9m Stage performance width • Forklift • 2,000m 2 floor area • Widths up to 33m • Widths up to 80m • 8m stage depth • Load capacity • Lengths in 2.572m • Lengths in 6m increments • Layher stage platform incorporating Site Requirements Warehouse Stage – 15,000kg UDL increments up to 102m • Variable trim heights ballast and roof towers • High pressure water supply We Are FSTVL • Layher stage platform • Trim height of 13m • Load capacity - 14,000kg • Integral Layher load-in ramp • Trackway Lime Green Events • Build time – 3 to 5 days • Layher stage platform per beam line and access stairs • Load capacity – up to • Build time – 3 to 5 days • Intergral PA points 1,500kg per beam line • Load capacity – 8,000kg UDL • Build time – 3 to 5 days • Build time – 1 day • Remote weather monitoring station

19 18 Credit: Andrew Whitton, We are FSTVL 2017, Fanatic LIVE 19 4 Storey Two Thousand Trees Front of House Gloucestershire Two Thousand Trees

Glass Fronted Projector Tower

Single Storey Front of House Phil Collins, Dublin. Aiken Promotions Front of House & Rigging Towers Projector Towers

Key Features Key Features • Modular width in 2.5m increments • Vertical or cantilevered truss • Modular depth in 2.0m increments 2 Storey • Numerous Layher tower configurations • Any number of decked levels at Front of House • Range of heights up to 18m any height • Load bearing capacity up to 3,000kg • Layher stage platform • Integral ballast • Shallow arch roof for improved • Customisation and branding sightlines options available • Eyebrow for weather protection • Fully engineered solutions supplied • Glass fronted with engineering drawings and • Build time – 1/2 day structural calculations • Customisation options available

20 Justin Bieber Bruce Springsteen 21 Dublin, Aiken Promotions Wembley, Live Nation Advent Calendar Courteeners Marble Arch Blackpool Wildstone Group SJM

MCFC Cityzen The Killers Launch Paris Manchester Anagram Beyond 90 Glasgow 2014 Opening Ceremony, Celtic Park, Jack Morton Blackpool Rocks, Blackpool, Cuffe & Taylor Screen Supports Ground Support Key Features • Numerous stage widths, trim heights Key Features and load bearing capacities • Truss goalpost or Layher options Wimbledon 2017 Campbell vs Harris • Integral PA wings • Configurable to suit any screen size London Craven Park, Hull • Layher stage platform incorporating and weight, vertical or horizontal Electric Fly Matchroom for ballast and roof towers • Integral ballast Sky Sport • Integral Layher load-in ramp • Customisation and branding and access stairs options available • Fully engineered solutions supplied • Fully engineered solutions supplied with engineering drawings and with engineering drawings and structural calculations structural calculations Credit : Wembley Stadium

22 23 Creamfields VIP Platform Warrington EDC LarMac LIVE Live Nation

Disabled Viewing Platform Goodwood FOS Goodwood Road Racing

Very Fashion Show, Liverpool, Liverpool Council Venue Access & Egress, Odsal Stadium, Cuffe & Taylor Steel Truss Stairs, Platforms & Infrastructure Key Features • Two sizes available to suit a wider range Key Features Typical Applications of applications • Range of accessories including cubes Load-in Ramp • Modular scaffold system to create a wide • Internal stage platforms and headstocks Sunderland range of temporary infrastructure for live • Followspot & camera platforms • Full integration with Layher system AEG Live music events • Commentary positions scaffold including heavy duty tower • Integral ballast • Accessible viewing platforms bases • Choice of cladding & branding options • Entrance & wayfinding gantries • Arches of up to 50m span • Fully compliant with all relevant public • Freestanding hoardings • Single horizontal spans of up to 40m access regulations • Tent facades • UDL up to 7,000kg/m • Security towers • CPL up to 14,000kg • Access stairs and ramps

24 25 25 28 Ground Levelling Platforms 29 Staircases & Towers 30 Access Ramps 31 Handrails & Balustrade 32 Service & Signage Gantries 33 Pedestrian Walkways & Bridges 34 Grandstands 35 Media, Film & TV Platforms 36 Facades & Hoarding 37 Hoists & Lifts

‘From conception to delivery, we have always found the Acorn team to be safety aware and technically excellent . What’s more, the delivery team on site always go over and above to fulfil our client expectations.

Here at De Boer, we recently reviewed our sub contractors and , without exception, all our foreman enjoy working with the Acorn product and team on site.’

David Tunnicliffe Special Projects Manager De Boer Heavy Duty Platform Venue Entrance Goodwood FOS Goodwood FOS Bentley Motors Porsche

Multi-Level Platform VIP Entrance Kent Yorkshire Private Party Massive

Frieze London, Regents Park, 35,000m2 Tent Support Platforms London 2012, Greenwich Park, Venue Entrance Ground Levelling Staircases & Towers

Platforms Key Features • Range of sizes and configurations Key Features Applications to suit any height, shape or space • Range of grid sizes and configurable • Tent and cabin substructures Ice Rink Platform Feature Entrance limitations to suit any height discrepancy, ground • Ice rink bases London Eye Athletes Village • Can be specified independently or type and load bearing capacity • Viewing and wheelchair platforms Icescape LOCOG compatible with our range of platforms, • Range of platform coverings to suit • Raised walkways and terraces stages and grandstands application • Outdoor exhibition stands • Choice of floor coverings and • Choice of handrails to suit all • Experiential projects cladding materials applications from basic back of house • Handrails to suit all applications edge protection to premium glass from basic back of house to premium balustrade VIP environments • Fully compliant with all relevant public • Fully compliant with all relevant access regulations public access regulations 28 • Choice of cladding and branding options 29 Venue Entrance Childproof Guardrails Athletes Village Venue Entrance LOCOG Greenwich Park

VIP Entrance Glass Balustrade Goodwood FOS Exhibition Stand Bentley Motors Goodwood

VIP Entrance, Goodwood Festival of Speed Glasgow 2014 Opening Ceremony, Celtic Park, Jack Morton Access Ramps Handrails & Balustrade

Key Features Key Features • Range of sizes and configurations • Range of products to suit all to suit any height, shape or space applications from basic back of house limitations Load-in Ramp Wire Balustrade to premium VIP environments • Can be specified independently Goodwood FOS • Fully compatible with our range of or compatible with our range of AEG Live platforms, stages and grandstands platforms, stages and grandstands • Fully compliant with all relevant public • Choice of floor coverings and access regulations cladding materials • Handrails to suit all applications from basic back of house to premium VIP environments • Fully compliant with all relevant public access regulations 30 31 Service Gantry Pedestrian Bridge O2 Arena Battersea Park LOCOG Formula E

FOS Air Pedestrian Bridge Goodwood FOS Battersea Park Formula E Pedestrian Bridge, Make the Future Live, Imagination Start Gantry, Brighton Marathon, InEvent Branding Service & Signage Gantries Pedestrian Walkways

Key Features & Bridges • Clear spans from 6 to 30m and configurable to virtually any height Key Features and width Service Gantry Venue Entrance • Clear spans from 6 to 30m and • Integral ballast • Choice of cladding and branding Hadleigh Farm Greenwich Park configurable to virtually any height • Fast installation minimises site materials LOCOG LOCOG and width disruption and road closures • Minimal site preparation required • Modular stair and hoist access • Fully engineered solutions supplied • Integral ballast configurable to suit site conditions with engineering drawings and • Fast installation minimises site • Minimal site preparation required structural calculations disruption • Choice of cladding, decking and • Fully compliant with all relevant • Fully engineered solutions supplied roof canopy options public access regulations with engineering drawings and • Integral and isolated cable runs structural calculations 32 33 Tiered Platform Mixed Zone Platform West Green House Eton Dorney De Boer LOCOG

Grandstand Judging & Kings Cross Broadcast Platforms De Boer O2 Arena LOCOG Game of Thrones, Tower of London, De Boer Grandstand Access, Eton Dorney, LOCOG Grandstands Media, Film & TV Platforms

Key Features Key Features Applications • Range of sizes and configurations • Suitable for internal or external • Range of grid sizes and configurable • Camera platforms, tracks and towers to suit any height, shape or space applications to suit any height discrepancy, ground • Mixed zone platforms limitations • Fully engineered solutions supplied Grandstand Camera Platform type and load bearing capacity • Sporting event scoreboards • Integral access stairs/ramps with engineering drawings and Hadleigh Farm Wembley Stadium • Range of platform coverings to suit • Screen supports • Internal barriers and gangways structural calculations LOCOG Production North application • Film and TV set construction • Choice of branding and cladding • Fully compliant with all relevant • Optional handrails, ladders/stair access • Broadcast studios materials public access regulations and winch/pulleys • Commentary, judging and • Childproof handrails • Internal and external solutions media tribunes • Choice of cladding and branding options • Fully engineered solutions supplied with engineering drawings and structural calculations 34 35 Art 13 Grandstand Access London Eton Dorney Art Fairs London LOCOG

Hoarding Grandstand Access Olympia Lea Valley Centre Art 13 LOCOG

Facade Structure, Porsche Stand, Godowood Festival of Speed Grandstand Access, Eton Dorney, LOCOG Facades & Hoarding Hoists & Lifts

Key Features Key Features • Range of sizes and configurations • Range of hoists and lifts to suit to suit any height, shape or space any application limitations Hoarding Facade Venue Access • Integral support scaffold • Choice of branding and cladding Farnborough Air Show Greenwich Park • Range of options for upper and lower materials Embreaer LOCOG level access and egress • Integral ballast • Fully engineered solutions supplied • Suitable for internal or external with engineering drawings and applications structural calculations • Fully engineered solutions supplied with engineering drawings and structural calculations

36 37 40 Pavilions, Expo & Exhibition 41 Theatre, Media, TV & Film 42 Truss Structures 43 Experiential Projects 44 Art Installations 45 Extreme Sports 46 Mass Participation Events 47 Brand Walls & Towers

“Acorn’s innovative, flexible and adaptable approach has enabled Tough Mudder to create the biggest, most challenging obstacles to date.

The Acorn design team has worked with us during the season to continually develop and improve our obstacles, frequently under pressing timescales.”

David Solan, Construction Manager, Tough Mudder General Notes Basis of Design This has been prepared from information supplied to us by, or on behalf of the the contractor, who should check that his requirements have been correctly interpreted and that all loadings, dimensions, lift heights, bay sizes, erection / striking sequences Lexus Pavilion Goose Nest Cladding etc. are as required and practicable. Imposed Loads The contractor is to ensure that the existing structure, it's fabric and / or the ground will safely support the extra imposed loads; or supply new. Maximum calculated tie load: See notes Goodwood FOS Warwick Maximum calculated leg load: See notes Loadings Allowed The contractor must ensure that all loading(s) allowed for is sufficient. Live loads: See notes MSL Global University of Warwick Wind loading: As BSEN1991-1-4 Maximum number of boarded levels:

Shoring Work We can not and will not pass comment on the structure being shored, as this involves matters beyond our control and knowledge. It is the contractors responsibility to ensure that the existing structure will safely span between our supports, and can be safely shored in the way indicated.

Foundations The contractor must prepare all foundations prior to erection.

Temporary Roofs No temporary roof can be made watertight. Loadings: Snow loading assessed using BS6399 Part 3, unless the contractor adopts a snow management system.

Materials All scaffolding materials forming this structure are to comply, and be constructed in accordance with BS1139 and TG20:13 (current editions).

Modification No alteration is to be made to the structure detailed on this drawing without prior written permission from Acorn Events Structures Ltd.

Property This drawing is confidential and the exclusive property of THE SCAFFOLD CONTRACTOR. No unauthorized use, copy or disclosure is to be made, and is to be returned on request.

Dimensions Written dimensions shall take precedence over scaled dimensions. The contractor must verify all site dimensions and notify of any discrepancies prior to erection.

Permits The contractor must obtain all permits and permissions prior to erection.

Construction Notes 1) All ladder beams and/or unit beams are to be tied together at 1200 centres on top cord and 2400 centres on bottom chord, with the top chord plan braced, unless stated otherwise. 2) Unless otherwise noted all lifts other than boarded platform levels are to be constructed using load bearing couplers. 3) All general construction is to be in accordance with TG20:13 unless noted otherwise. 4) Main contractor to undertake all making good where necessary. 5) Main contractor to provide and maintain adequate tie positions. 6) No sheering, wind protection of fans to be added to this structure without prior written permission from Acorn Events Structures Ltd.

! DESIGN BASED RESIDUAL HAZARD !

Design based hazards actively eliminated where possible in the design process. Where hazards cannot be eliminated, this symbol on the drawing with an attached note means. 1: Design based hazards exist within this proposal. 2: Action is required by the person supervising the work to manage the design hazards during construction. In accordance with THE SCAFFOLD CONTRACTORS Procedures. The PERSON SUPERVISING the construction MUST CONTACT the design office BEFORE WORK COMMENCES for CLARIFICATION of the identified hazards.

! PROPOSAL APPROVAL ! CUSTOMER TO: A- Approve layout prior to any erection. B- Ensure structure is capable of withstanding all loads imposed from scaffold.

BMW Pavillion Warner Structure Client: Lunchbox Productions PGA Championship Edinburgh Festival Title: The Rose Theatre Wentworth DF Concerts York 2018 TRO Model Sheet: ISO - 2 Rev Date Details Paper Size: Drawn By: Filename: Nissan Experience, Goodwood Festival of Speed, TRO Rose Theatre, York, Lunchbox Productions A3 RR THE-ROSE-THEATRE-V2.4N-MODEL Issued for Approval Moxon Way, Moor Lane Trading Estate Scale: Sheet Number: Version: Ver Date: Sherburn-in-Elmet, Leeds, LS25 6ES Tel: +44 (0)800 078 7916 - - V2.4N 05-02-18 Email: [email protected] Pavilions, Expo & Exhibition Theatre, Media, TV & Film Key Features Key Features • Range of sizes and configurations • Range of sizes and configurations to suit to suit any height, shape or space any height, shape or space limitations limitations Volvo Stand Goose Nest Theatre • Suitable for internal or external • Suitable for internal or external Goodwood FOS Warwick applications applications TRO University of Warwick • Choice of branding & cladding materials • Choice of branding and cladding Fully engineering solutions supplied materials with engineering drawings & structural • Fully engineered solutions supplied calculations with engineering drawings and structural calculations

40 41 GP CLUB Stage Set Goodwood FOS Busted Tour MSL Global Production North

GP CLUB Xbox Launch Goodwood FOS Leicester Square MSL Global London LS Live GP CLUB, Goodwood Festival of Speed, MSL Global Treehouse for Virgin Holidays, London, Presentation Design Services Truss Structures Experiential Projects

Key Features Key Features • Range of sizes and configurations • Range of sizes and configurations to suit any height, shape or space to suit any height, shape or space limitations GP CLUB Viewing Tower limitations • Suitable for internal or external Goodwood FOS Goodwood FOS • Suitable for internal or external applications MSL Global RPM applications • Choice of branding and cladding • Choice of branding and cladding materials materials • Fully engineered solutions supplied • Fully engineered solutions supplied with engineering drawings and with engineering drawings and structural calculations structural calculations

42 43 Feature Structure Slopestyle Course Paris Clapham Common Incredible Mgt Vision Nine

Portal Structure Abseil Platform Olympia London Art 13 Threshold Sports

Feature Structure, Paris, Incredible Mgt Funky Monkey Obstacle, Henley, Tough Mudder Art Installations Extreme Sports

Key Features Key Features • Range of sizes and configurations • Range of sizes and configurations to suit any height, shape or space to suit any height, shape or space limitations Truss Facade Gas Ramp limitations • Suitable for internal or external Royal Academy Goodwood FOS • Suitable for internal or external applications MDM Events 22 applications • Choice of branding and cladding • Choice of branding and cladding materials materials • Fully engineered solutions supplied • Fully engineered solutions supplied with engineering drawings and with engineering drawings and structural calculations structural calculations

44 45 Art 13 Start Gantry London Silverstone Art Fairs London InEvent Branding

King of the Swingers Leeds International Broughton Hall Film Festival Tough Mudder Leeds Leeds City Council Augustus Gloop & Snot Rocket, Broughton Hall, Tough Mudder Olympic Homecoming, Manchester City Centre, Beyond 90 Mass Participation Events Brand Walls & Towers

Key Features Key Features • Range of sizes and configurations • Range of sizes and configurations to suit any height, shape or space to suit any height, shape or space limitations Ice Rink Base Goodwood FOS limitations • Suitable for internal or external Southampton TRO • Suitable for internal or external applications, either freestanding Icescape applications, either freestanding or tied into existing surface or tied into existing surface • Choice of branding and cladding • Choice of branding and cladding materials materials • Fully engineered solutions supplied • Fully engineered solutions supplied with engineering drawings and with engineering drawings and structural calculations structural calculations

46 47 Credit : LorenzoTnc, Creamfields 2016, LarMac LIVE www.acorn-events.com t: +44 (0)800 078 7916 e: [email protected] Moxon Way, Moor Lane Trading Estate, Sherburn-in-Elmet, Leeds LS25 6ES